1 |
GGM/415/147/2020/31 DATED 09.10.2020 |
RERA-GRG-741-2020 |
102 EDEN ESTATE |
COUNTRYWIDE PROMOTERS PRIVATE LIMITED |
SECTOR 102 & 102 A GURUGRAM
|
GURUGRAM |
HRERA |
|
30/04/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
2 |
GGM/486/218/2021/54 DATED 21.09.2021 |
RERA-GRG-874-2021 |
102 EDEN ESTATE II |
COUNTRYWIDE PROMOTERS PRIVATE LIMITED |
SECTOR 102 & 102 A GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2025 |
|
View |
View Monitoring Cases |
|
3 |
15 OF 2018 DATED 19.01.2018 Lapsed Project |
RERA-GRG-494-2019 |
10.5437 ACRES GROUP HOUSING COLONY |
CHD DEVELOPERS LTD. |
SECTOR-71, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
28/07/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
4 |
GGM/314/46/2019/08 DATED 21.02.2019 Lapsed Project |
RERA-GRG-78-2018 |
106 GOLF AVENUE |
EMPIRE REALTECH PVT. LTD. |
SECTOR- 106, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/06/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
5 |
232 OF 2017 DATED 19.09.2017 |
RERA-GRG-406-2019 |
10 ACRES (AFFORDABLE GROUP HOUSING PROJECT) |
GLS INFRATECH PVT.LTD |
SECTOR-4, KHAIKA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
12/04/2020 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
6 |
GGM/359/91/2019/53 DATED-30.09.2019 |
RERA-GRG-231-2019 |
114 AVENUE |
VSR INFRATECH PRIVATE LIMITED |
SECTOR-114, GURGAON-BAJGHERA ROAD, TEHSIL- GURUGRAM, DISTRICT- GURUGRAM |
GURUGRAM |
HRERA |
|
31/12/2020 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
7 |
38 OF 2017 DATED 10.08.2017 |
RERA-GRG-375-2019 |
2.425 ACRES COMMERCIAL COLONY |
OJOS DEVELOPERS PVT. LTD. |
SECTOR 70, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
8 |
GGM/832/564/2024/59 DATED 03.06.2024 (SUPERSEDES GGM/661/393/2023/05 DATED 12.01.2023) |
RERA-GRG-1509-2023 |
24.74375 ACRES DDJAY RESIDENTIAL PLOTTED COLONY |
LOON LAND DEVELOPMENT LIMITED |
SECTOR-79, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
30/06/2026 |
|
View |
-- |
|
9 |
219 OF 2017 DATED 18.09.2017 Lapsed Project |
RERA-GRG-407-2019 |
2.9812 ACRES COMMERCIAL PROJECT |
PLUS PROJECTS PVT. LTD |
SECTOR-62, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
17/07/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
10 |
GGM/776/508/2024/03 DATED 08.01.2024 |
RERA-GRG-1235-2022 |
3B HOMES CORNER HUB |
SUNSAT EDUCATIONAL ACADEMY PVT. LTD. |
VILLAGE- JANAULA, SECTOR-1
|
GURUGRAM |
HRERA |
|
20/08/2026 |
|
View |
-- |
|
11 |
GGM/454/186/2021/22 DATED 15.06.2021 |
RERA-GRG-816-2021 |
3B HOMES PATAUDI ONE |
SUNSAT EDUCATIONAL ACADEMY PRIVATE LIMITED |
VILLAGE JANAULA, SECTOR-1
|
GURUGRAM |
HRERA |
|
14/07/2026 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
12 |
GGM/790/522/2024/17 DATED 01.03.2024 |
RERA-GRG-1529-2024 |
3XCROSSING |
ADDRESS INFRASTRUCTURES PRIVATE LIMITED |
SECTOR 109, VILLAGE - CHOUMA, GURUGRAM. HARYANA |
GURUGRAM |
HRERA |
|
11/11/2026 |
|
QPR not Uploaded |
-- |
|
13 |
GGM/602/334/2022/77 DATED 17.08.2022 (SUPERSEDED BY GGM/790/522/2024/17 DATED 01.03.2024) |
RERA-GRG-1090-2022 |
3XCROSSING |
BRISK INFRASTRUCTURES AND DEVELOPERS PVT LTD |
SECTOR 109, VILLAGE - CHOUMA, GURUGRAM. HARYANA |
GURUGRAM |
HRERA |
|
11/11/2026 |
|
View |
View Monitoring Cases |
|
14 |
GGM/661/393/2023/05 DATED 12.01.2023 (SUPERSEDED BY GGM/832/564/2024/59 DATED 03.06.2024) |
RERA-GRG-1245-2022 |
45.1625 ACRES DDJAY RESIDENTIAL PLOTTED COLONY |
LOON LAND DEVELOPMENT LIMITED |
SECTOR 79, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/06/2026 |
|
View |
View Monitoring Cases |
|
15 |
GGM/849/581/2024/76 DATED 15.07.2024 |
RERA-GRG-1572-2024 |
4S THE AURRUM |
4S DEVELOPERS PRIVATE LIMITED |
VILLAGE ULLAHWAS & BEHRAMPUR, SECTOR 59 & 63A GURUGRAM |
GURUGRAM |
HRERA |
|
31/10/2029 |
|
NA |
-- |
|
16 |
214 OF 2017 DATED 18.09.2017 Lapsed Project |
RERA-GRG-413-2019 |
5.09375 AFFORDABLE GROUP HOUSING COLONY |
LOTUS REALTECH PVT. LTD |
SECTOR-111, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/12/2021 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
|
17 |
249 OF 2017 DATED 26.09.2017 Lapsed Project |
RERA-GRG-404-2019 |
63 GOLF DRIVE |
SUNRAYS HEIGHTS PVT. LTD. |
SECTOR 63-A, VILLAGE ULLAHWAS , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
25/09/2022 |
|
View |
View Monitoring Cases |
|
18 |
119 OF 2017 DATED 28.08.2017 |
NA |
68 AVENUE |
VSR INFRATECH PVT.LTD. |
VILLAGE BADSHAHPUR, SECTOR 68 ,GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
30/06/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
19 |
28 OF 2017 DATED 28.07.2017 Lapsed Project |
RERA-GRG-286-2019 |
70 GRANDWALK |
SHINE BUILDCON PVT. LTD. |
SECTOR-70, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2022 |
|
View |
View Monitoring Cases |
|
20 |
GGM/310/42/2019/04 DATED 16.01.2019 |
RERA-GRG-125-2018 |
83 AVENUE |
REAL TOWN PROPERTIES PVT LTD |
SECTOR-83, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/09/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
21 |
337 OF 2017 DATED 27.10.2017 Lapsed Project |
RERA-GRG-341-2019 |
83 METRO STREET |
S.V HOUSING PVT. LTD. |
SETOR - 83, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/03/2021 |
|
View |
View Monitoring Cases |
|
22 |
GGM/649/381/2022/124 DATED 23.12.2022 |
RERA-GRG-1241-2022 |
8.7111 ACRES DDJAY RESIDENTIAL PLOTTED COLONY |
LOON LAND DEVELOPMENT LIMITED |
SECTOR 79, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2025 |
|
View |
-- |
|
23 |
GGM/711/443/2023/55 DATED 17.04.2023 |
RERA-GRG-1340-2023 |
AANANDAM ORA |
ORA LAND AND HOUSINGPRIVATE LIMITED |
SECTOR 93, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2027 |
|
View |
View Monitoring Cases |
|
24 |
260 OF 2017 DATED 03.10.2017 |
RERA-GRG-530-2019 |
AANGAN |
ALTON BUILDTECH INDIA PVT. LTD. |
SECTOR-88A & 89A, TEHSIL HARS ARU, DISTRICT GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
25 |
391 OF 2017 DATED 22.12.2017 Lapsed Project |
RERA-GRG-543-2019 |
AANGAN |
ALTON BUILDTECH INDIA PVT. LTD. |
SECTOR 88-A TO 89-A, SUB-TEHS IL HARSARU, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
15/12/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
|
26 |
GGM/875/607/2024/102 DATED 07.10.2024 |
RERA-GRG-1657-2024 |
AARIZE THE TESSORO |
AARIZE REALTECH LLP |
SECTOR 114, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
28/02/2029 |
|
NA |
-- |
|
27 |
GGM/269/2018/01 DATED 11.04.2018 (SUPERSEDED BY GGM/554/286/2022/29 DATED 25.04.2022) Lapsed Project |
NA |
AAROHAN COMMERCIAL TOWER |
VIPUL LIMITED |
SECTOR-53, GURUGRAM
|
GURUGRAM |
HRERA |
N/A |
30/06/2023 |
|
QPR not Uploaded |
View Monitoring Cases |
|
28 |
131 OF 2017 DATED 28.08.2017 (SUPERSEDED BY GGM/554/286/2022/29 DATED 25.04.2022) Lapsed Project |
RERA-GRG-452-2019 |
AAROHAN PHASE I |
VIPUL LTD. |
SECTOR -53, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
|
29 |
GGM/294/2018/26 DATED 28.11.2018 Lapsed Project |
RERA-GRG-89-2018 |
AASHIYARA |
RENUKA TRADERS PVT LTD |
SECTOR-37C, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/01/2023 |
|
View |
View Monitoring Cases |
|
30 |
GGM/485/217/2021/53 DATED 16.09.2021 |
RERA-GRG-872-2021 |
AASHIYARA-II |
RENUKA TRADERS PRIVATE LIMITED |
SECTOR-37C, VILLAGE-GHAROLI K HURD |
GURUGRAM |
HRERA |
|
08/12/2025 |
|
View |
View Monitoring Cases |
|
31 |
GGM/439/171/2021/07 DATED 22.02.2021 Lapsed Project |
RERA-GRG-388-2019 |
ACE PALM FLOORS |
BRIGHT BUILTECH PRIVATE LIMITED |
SECTOR 89-90, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2021 |
|
View |
View Monitoring Cases |
|
32 |
GGM/449/181/2021/17 DATED 12.04.2021 Lapsed Project |
RERA-GRG-832-2021 |
ACE PALM FLOORS |
BRIGHT BUILDTECH PVT. LTD. |
SECTOR 89-90,GURUGRAM
|
GURUGRAM |
HRERA |
|
29/06/2023 |
View Corrigendum |
View |
View Monitoring Cases |
|
33 |
GGM/769/501/2023/113 DATED 11.12.2023 |
RERA-GRG-1365-2023 |
ADVAIT |
PIONEER J. K. SENIOR LIVING LLP |
SECTOR-50, BADSHAPUR
|
GURUGRAM |
HRERA |
|
31/12/2028 |
|
View |
-- |
|
34 |
82 OF 2017 DATED 23.08.2017 |
RERA-GRG-1077-2022 |
AFFODABLE GROUP HOUSING COLONY-ZARA ROSSA |
DELURIS BUILDTECH INDIA PVT LTS |
SECTOR 112, BAJGHRA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
35 |
180 OF 2017 DATED 01.09.2017 |
RERA-GRG-425-2019 |
AFFORDABLE GROUP HOUSING COLONY |
ARETE INDIA PROJECTS PVT. LTD. |
VILLAGE SOHNA, SECTOR 6, TEHS IL SOHNA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
01/08/2019 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
36 |
178 OF 2017 DATED 01.09.2017 Lapsed Project |
RERA-GRG-420-2019 |
AFFORDABLE GROUP HOUSING COLONY |
PIVOTAL INFRASTRUCTURE PVT LTD |
SECTOR 62, ULLAHAWAS, GURUGRA M |
GURUGRAM |
INTERIM RERA |
|
29/05/2021 |
|
View |
View Monitoring Cases |
|
37 |
181 OF 2017 DATED 01.09.2017 Lapsed Project |
NA |
AFFORDABLE GROUP HOUSING COLONY |
AAR HOUSING PVT LTD |
SECTOR 31, VILLAGE ALIPUR, TE HSIL SOHNA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
16/07/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
38 |
152 OF 2017 DATED 28.08.2017 |
NA |
AFFORDABLE GROUP HOUSING COLONY |
PERFECT BUILDWELL PRIVATE LIMITED |
SECTOR 104
|
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
39 |
184 OF 2017 DATED 14.09.2017 |
RERA-GRG-588-2020 |
AFFORDABLE GROUP HOUSING COLONY |
CHIRAG BUILDTEC PRIVATE LIMITED |
SECTOR 95, VILLAGE DHORKA, GR UGRAM |
GURUGRAM |
INTERIM RERA |
|
13/09/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
40 |
91 OF 2017 DATED 24.08.2017 |
RERA-GRG-393-2019 |
AFFORDABLE GROUP HOUSING COLONY |
SUNCITY PROJECTS PVT LTD |
SECTOR 102, DHANKOT, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
18/06/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
41 |
108 OF 2017 DATED 24.08.2017 Lapsed Project |
RERA-GRG-462-2019 |
AFFORDABLE GROUP HOUSING OF 12.11 ACRES |
REVITAL REALITY PVT.LTD. |
SECTOR-79 &79;,-B
|
GURUGRAM |
INTERIM RERA |
|
31/01/2021 |
View Corrigendum |
View |
View Monitoring Cases |
|
42 |
105 OF 2017 DATED 24.08.2017 Lapsed Project |
RERA-GRG-586-2020 |
AFFORDABLE GROUP HOUSING OF 5 ACRES |
NANI RESORTS & FLORICULTURE PVT. LTD. |
SECTOR -102, VILLAGE-DHANKOT, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
01/01/1970 |
|
View |
View Monitoring Cases |
|
43 |
130 OF 2017 DATED 28.08.2017 |
RERA-GRG-370-2019 |
AFFORDABLE GROUP HOUSING OF 9.95475 ACRES |
BREEZ BUILDERS AND DEVELOPERS PVT.LTD. |
SECTOR-33,SOHNA GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
28/02/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
44 |
GGM/481/213/2021/49 DATED 10.09.2021 |
RERA-GRG-818-2021 |
AIPL AUTOGRAPH |
ADVANCE INDIA PROJECTS LIMITED |
SECTOR 66
|
GURUGRAM |
HRERA |
|
08/04/2026 |
|
View |
View Monitoring Cases |
|
45 |
224 OF 2017 DATED 18.09.2017 |
NA |
AIPL BOULEVARD ( GROUP HOUSING PROJECT) |
HAAMID REAL ESTATE PVT. LTD |
SECTOR-70A, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
46 |
166 OF 2017 DATED 29.08.2017 |
RERA-GRG-567-2020 |
AIPL BUSINESS CLUB |
ADVANCE INDIA PROJECTS LTD. |
SECTOR 62, MEDAWAS, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2019 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
47 |
GGM/780/512/2024/07 DATED 02.02.2024 |
RERA-GRG-1477-2023 |
AIPL JOY DISTRICT |
ADVANCE INDIA PROJECTS LIMITED |
VILLAGE HAYATPUR, SECTOR 88
|
GURUGRAM |
HRERA |
|
30/06/2028 |
|
View |
-- |
|
48 |
GGM/404/136/2020/20 DATED 17.08.2020 |
RERA-GRG-650-2020 |
AIPL JOY GALLERY |
ADVANCE INDIA PROJECTS LIMITED |
SECTOR 66
|
GURUGRAM |
HRERA |
|
13/05/2025 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
49 |
259 OF 2017 DATED 03.10.2017 |
RERA-GRG-591-2020 |
AIPL JOY SQUARE |
ADVANCE INDIA PROJECTS LTD. |
SECTOR-63A, VILLAGE KADARPUR, TEHSIL AND DIST. GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
50 |
157 OF 2017 DATED 28.08.2017 |
RERA-GRG-599-2020 |
AIPL JOY STREET |
ADVANCE INDIA PROJECTS LTD. |
SECTOR-66, VILLAGE MEDAWAS & BADSHAHPUR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
51 |
GGM/632/364/2022/107 DATED 21.11.2022 |
RERA-GRG-1144-2022 |
ALAMEDA CENTRAL |
DLF HOME DEVELOPERS LIMITED |
SECTOR 73, GURUGRAM
|
GURUGRAM |
HRERA |
|
08/09/2027 |
|
View |
-- |
|
52 |
GGM/796/528/2024/23 DATED 11.03.2024 |
RERA-GRG-1503-2023 |
ALBAN |
PYRAMID INFRATECH PRIVATE LIMITED |
VILLAGE BEGAMPUR KHATOLA SECT OR 71 |
GURUGRAM |
HRERA |
|
31/05/2030 |
|
View |
View Monitoring Cases |
|
53 |
GGM/835/567/2024/62 DATED 13.06.2024 |
RERA-GRG-1563-2024 |
ALPHA CORP SKY1 (POCKET A) |
ALPHA CORP DEVELOPMENT PRIVATE LIMITED |
SECTOR - 15, GURUGRAM, HARYAN A |
GURUGRAM |
HRERA |
|
09/03/2030 |
|
View |
-- |
|
54 |
GGM/836/568/2024/63 DATED 13.06.2024 |
RERA-GRG-1567-2024 |
ALPHA CORP SKY1 (POCKET B) |
ALPHA CORP DEVELOPMENT PRIVATE LIMITED |
SECTOR - 15, GURUGRAM, HARYAN A |
GURUGRAM |
HRERA |
|
09/03/2031 |
|
View |
-- |
|
55 |
GGM/270/2018/02 DATED 23.04.2018 Lapsed Project |
NA |
AMAARA RESIDENCY |
STANFORD DEVELOPERS AND INFRASTRUCTURE |
SECTOR 12A, GURUGRAM
|
GURUGRAM |
HRERA |
N/A |
31/08/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
|
56 |
18 OF 2017 DATED 06.07.2017 Lapsed Project |
RERA-GRG-549-2020 |
AMALTAAS TOWER (TOWER-B) |
RAHEJA DEVELOPERS LTD. |
RAHEJA VANYA SECTOR-99-A, GUR UGRAM |
GURUGRAM |
INTERIM RERA |
|
05/07/2022 |
|
View |
View Monitoring Cases |
|
57 |
212 OF 2017 DATED 18.09.2017 |
NA |
AMAYA GREENS( DDJAY) |
SAVYASACHI INFRASTRUCTURE PVT LTD |
SECTOR-3, FARRUKHNAGAR, GURUG RAM |
GURUGRAM |
INTERIM RERA |
N/A |
17/09/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
58 |
318 OF 2017 DATED 17.10.2017 Lapsed Project |
RERA-GRG-402-2019 |
AMBIENCE CREACIONS |
AMBIENCE PROJECTS & INFRASTRUCTURE PVT. LTD. |
SECTOR 22, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
29/09/2023 |
View Corrigendum |
View |
View Monitoring Cases |
|
59 |
GGM/813/545/2024/40 DATED 08.04.2024 |
RERA-GRG-1570-2024 |
AMBROSIA |
M/S DECENT BUILDHOMES PVT LTD |
SECTOR - 70
|
GURUGRAM |
HRERA |
|
31/12/2030 |
|
QPR not Uploaded |
-- |
|
60 |
57 OF 2017 DATED 17.8.2017 Lapsed Project |
RERA-GRG-573-2020 |
AMB SELFIE SQUARE ( COMMERCIAL PROJECT) |
VS REALPROJECTS PVT.LTD |
SECTOR-37D, HARSARU, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
16/08/2022 |
|
View |
View Monitoring Cases |
|
61 |
80 OF 2017 DATED 23.08.2017 |
RERA-GRG-579-2020 |
AMB SELFIE STREET |
AMB INFRAVENTURES PVT LTD |
SECTOR 92, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
20/02/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
62 |
GGM/565/297/2022/40 DATED 23.05.2022 |
RERA-GRG-1035-2022 |
AMB SELFIE WALK |
AMB INFRABUILD PRIVATE LIMITED |
VILLAGE HAYATPUR, SECTOR 88
|
GURUGRAM |
HRERA |
|
30/06/2028 |
|
View |
View Monitoring Cases |
|
63 |
GGM/633/365/2022/108 DATED 28.11.2022 (SUPERSEDED BY GGM/761/493/2023/105 DATED 04.12.2023) |
RERA-GRG-1131-2022 |
ANAND NIKETAN |
N. S. BUILDTECH PRIVATE LIMITED |
SECTOR 2, SOHNA
|
GURUGRAM |
HRERA |
|
26/07/2027 |
|
View |
-- |
|
64 |
GGM/761/493/2023/105 DATED 04.12.2023 |
RERA-GRG-1393-2023 |
ANAND NIKETAN |
N S BUILDTECH PVT LTD |
SECTOR 2, SOHNA
|
GURUGRAM |
HRERA |
|
26/07/2027 |
|
View |
-- |
|
65 |
GGM/829/561/2024/56 DATED 03.06.2024 |
RERA-GRG-1615-2024 |
ANANTAM |
JAI GANGA REALTECH LLP |
VILLAGE BADHA, SECTOR-85
|
GURUGRAM |
HRERA |
|
21/10/2028 |
|
View |
-- |
|
66 |
142 OF 2017 DATED 28.08.2017 Lapsed Project |
RERA-GRG-1080-2022 |
ANANT RAJ ESTATE |
ANANT RAJ LTD. |
SECTOR-63-A,GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
27/02/2024 |
View Corrigendum |
View |
View Monitoring Cases |
|
67 |
GGM/490/222/2021/58 DATED 14.09.2021 Lapsed Project |
RERA-GRG-4-2018 |
ANANT RAJ ESTATE |
ANANT RAJ LIMITED |
63 A VILLAGE KADARPUR AND ULL AHAWAS |
GURUGRAM |
HRERA |
|
31/03/2024 |
|
View |
View Monitoring Cases |
|
68 |
12 OF 2017 DATED 03.07.2017 |
RERA-GRG-396-2019 |
ANDOUR HEIGHTS |
SARVPRIYA SECURITIES PVT.LTD. |
SECTOR-71, GURURGAM
|
GURUGRAM |
INTERIM RERA |
|
14/03/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
69 |
09 OF 2018 DATED 08.01.2018 Lapsed Project |
RERA-GRG-581-2020 |
ANSAL HUB 83 BOULEVARD |
ANSAL HOUSING & CONSTRUCTION LTD. |
SECTOR-83, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
|
70 |
GGM/322/54/2019/16 DATED 01.04.2019 Lapsed Project |
RERA-GRG-146-2019 |
ANSALS HIGHLAND PARK |
IDENTITY BUILDTECH PVT. LTD. |
SECTOR- 103, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/05/2024 |
View Corrigendum |
View |
View Monitoring Cases |
|
71 |
308 OF 2017 DATED 17.10.2017 Lapsed Project |
NA |
APPUGHAR RETAIL MALL |
INTERNATIONAL RECREATION & AMUSEMENT LTD. |
SECTOR 29, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
31/03/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
72 |
251 OF 2017 DATED 29.09.2017 Lapsed Project |
NA |
ARABELLA |
SOHNA CITY LLP |
SEC- 11&14;, VILLAGE RAIPUR, TEHSIL SOHNA, DIST. GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
30/09/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
73 |
GGM/411/143/2020/27 DATED 22.06.2020 Lapsed Project |
RERA-GRG-652-2020 |
ARADHYA HOMES |
4S DEVELOPERS PVT. LTD. |
SECTOR 67-A, GURUGRAM, HARYAN A |
GURUGRAM |
HRERA |
|
30/09/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
74 |
GGM/284/2018/16 DATED 13.10.2018 Lapsed Project |
RERA-GRG-482-2019 |
ARAVILLE |
SUPERTECH LIMITED |
SECTOR-79,NAURANGPUR,MANESAR, GURGAON |
GURUGRAM |
HRERA |
|
31/12/2019 |
|
View |
View Monitoring Cases |
|
75 |
GGM/389/121/2020/05 DATED 20.01.2020 |
RERA-GRG-338-2019 |
ARAWALI HOMES-2 |
GLS INFRATECH PVT. LTD. |
VILLAGE KHAIKA & SOHNA, TEHSI L SOHNA,SECOR- 4, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
07/03/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
76 |
GGM/698/430/2023/42 DATED 20.02.2023 |
RERA-GRG-1202-2022 |
ARCADE 68 |
DLF HOME DEVELOPERS LIMITED |
SECTOR 68, GURGAON
|
GURUGRAM |
HRERA |
|
10/11/2027 |
|
View |
-- |
|
77 |
GGM/732/464/2023/76 DATED 10.07.2023 (SUPERSEDED BY GGM/817/549/2024/44 DATED 22.04.2024) |
RERA-GRG-1330-2023 |
ARDEN 45 |
UDAY BUILDWELL PRIVATE LIMITED |
VILLAGE KANAHI, SECTOR-45,
|
GURUGRAM |
HRERA |
|
31/10/2026 |
|
View |
-- |
|
78 |
GGM/817/549/2024/44 DATED 22.04.2024 |
RERA-GRG-1517-2023 |
ARDEN 45 |
UDAY BUILDLWELL PRIVATE LIMITED |
VILLAGE KANHAI, SECTOR-45
|
GURUGRAM |
HRERA |
|
31/10/2026 |
|
View |
-- |
|
79 |
GGM/312/44/2019/06 DATED 08.02.2019 Lapsed Project |
RERA-GRG-151-2019 |
ARETE, PHASE I |
INTERNATIONAL LAND DEVELOPERS PVT. LTD. |
SECTOR- 33, SOHNA, GURUGRAM
|
GURUGRAM |
HRERA |
|
02/07/2022 |
|
View |
View Monitoring Cases |
|
80 |
GGM/797/529/2024/24 DATED 14.03.2024 |
RERA-GRG-1440-2023 |
ASHIANA AMARAH PHASE 3 & 3A |
ASHIANA HOUSING LIMITED |
REVENUE ESTATE OF VILLAGE- WA ZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
16/10/2028 |
|
View |
-- |
|
81 |
GGM/845/577/2024/72 DATED 01.07.2024 |
RERA-GRG-1594-2024 |
ASHIANA AMARAH PHASE 4 |
ASHIANA HOUSING LIMITED |
REVENUE ESTATE OF VILLAGE- WA ZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/04/2029 |
|
NA |
-- |
|
82 |
GGM/685/417/2023/29 DATED 02.02.2023 |
RERA-GRG-1249-2022 |
ASHIANA AMARAH PHASE II |
ASHIANA HOUSING LIMITED |
REVENUE ESTATE OF VILLAGE- WA ZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
15/10/2027 |
|
View |
-- |
|
83 |
GGM/590/322/2022/65 DATED 18.07.2022 |
RERA-GRG-1058-2022 |
ASHIANA AMARAH PHASE I & IA |
ASHIANA HOUSING LIMITED |
VILL. WAZIRPUR , SEC 93 , GUR UGRAM |
GURUGRAM |
HRERA |
|
15/01/2027 |
View Corrigendum |
View |
-- |
|
84 |
26 OF 2017 DATED 28.07.2017 |
RERA-GRG-372-2019 |
ASHIANA ANMOL |
ASHIANA HOUSING LTD |
PHASE 1, VILLAGE DHULENA, TEH SIL SOHNA, SECTOR-33,GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/10/2020 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
85 |
GGM/482/214/2021/50 DATED 07.09.2021 |
RERA-GRG-841-2021 |
ASHIANA ANMOL PHASE II |
ASHIANA HOUSING LIMITED |
VILL. DHUNELA, SECTOR - 33, T ESHIL SOHNA |
GURUGRAM |
HRERA |
|
30/04/2026 |
|
View |
View Monitoring Cases |
|
86 |
GGM/579/311/2022/54 DATED 27.06.2022 |
RERA-GRG-929-2021 |
ASHIANA ANMOL PHASE III & PLAZA PH II |
ASHIANA HOUSING LIMITED |
VILL. DHUNELA SEC 33 SOHNA
|
GURUGRAM |
HRERA |
|
31/12/2028 |
|
View |
-- |
|
87 |
GGM/363/95/2019/57 DATED 03.10.2019 Lapsed Project |
RERA-GRG-273-2019 |
ASHIANA ANMOL PLAZA PHASE I |
ASHIANA HOUSING LIMITED |
REVENUE VILLAGE DHUNELA , SEC TOR 33 , TEHSIL SHONA |
GURUGRAM |
HRERA |
|
31/10/2019 |
|
View |
View Monitoring Cases |
|
88 |
GGM/290/2018/22 DATED 23.10.2018 |
RERA-GRG-449-2019 |
ASHIANA MULBERRY |
ASHIANA DWELLINGS PVT LTD |
SECTOR-2, SOHNA, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/09/2027 |
View Corrigendum |
View |
View Monitoring Cases |
|
89 |
44 OF 2017 DATED 11.08.2017 Lapsed Project |
RERA-GRG-438-2019 |
ASHIANA MULBERRY PHASE 1[TOWER 1,2, 3 & EWS] |
ASHIANA DWELLINGS PVT. LTD. |
SEC 2, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2020 |
|
View |
View Monitoring Cases |
|
90 |
GGM/589/321/2022/64 DATED 18.07.2022 |
RERA-GRG-1085-2022 |
ASHOK ESTATE |
ANANT RAJ LIMITED |
SECTOR-63A
|
GURUGRAM |
HRERA |
|
31/12/2025 |
|
View |
View Monitoring Cases |
|
91 |
GGM/827/559/2024/54 DATED 27.05.2024 |
RERA-GRG-1442-2023 |
ASPEN ONE |
WHITELAND CORPORATION PVT LTD |
DARBARIPUR ROAD SECTOR-76
|
GURUGRAM |
HRERA |
|
30/06/2031 |
|
View |
-- |
|
92 |
GGM/655/387/2022/130 DATED 23.12.2022 Lapsed Project |
RERA-GRG-1170-2022 |
ASPIRATION |
VATIKA LIMITED |
SECTOR - 88B
|
GURUGRAM |
HRERA |
|
30/06/2024 |
|
View |
View Monitoring Cases |
|
93 |
83 OF 2017 DATED 23.08.2017 |
RERA-GRG-434-2019 |
ASSOTECH BLITH |
ASSOTECH MOONSHINE URBAN DEVELOPERS PVT. LTD |
SECTOR 99, DHANKOT, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
20/02/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
94 |
GGM/487/219/2021/55 DATED 21.09.2021 |
RERA-GRG-912-2021 |
ASTAIRE GARDENS |
COUNTRYWIDE PROMOTERS PRIVATE LIMITED |
SECTOR 70 A GURUGRAM
|
GURUGRAM |
HRERA |
|
31/08/2026 |
|
View |
-- |
|
95 |
GGM/877/609/2024/104 DATED 10.10.2024 |
RERA-GRG-1693-2024 |
ASTER AVENUE 36 |
4S DEVELOPERS PRIVATE LIMITED |
VILLAGE DHUNELA, SECTOR 36 SO HNA GURGAON |
GURUGRAM |
HRERA |
|
31/12/2029 |
|
NA |
-- |
|
96 |
GGM/287/2018/19 DATED 13.10.2018 |
RERA-GRG-415-2019 |
ASTER COURT PREMIER |
ORRIS INFRASTRUCTURE PVT LTD |
SECTOR-85, BADHA, MANESAR
|
GURUGRAM |
HRERA |
|
31/12/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
97 |
205 OF 2017 DATED 15.09.2017 Lapsed Project |
RERA-GRG-534-2019 |
ATHENA |
BRAHMA CENTER DEVELOPERS PVT. LTD |
SECTOR-16, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
View |
View Monitoring Cases |
|
98 |
239 OF 2017 DATED 20.09.2017 Lapsed Project |
RERA-GRG-529-2019 |
ATHENA |
BRAHMA DEVELOPERS PVT. LTD. |
SECTOR-16, SITE NO. 02, GURUG RAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
|
99 |
06 OF 2018 DATED 02.01.2018 Lapsed Project |
RERA-GRG-379-2019 |
ATS GRANDSTAND PHASE 1 |
ATS REALWORTH PVT.LTD. |
SECTOR-99A , VILLAG GOPALPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
01/01/1970 |
|
View |
View Monitoring Cases |
|
100 |
384 OF 2017 (SUPERSEDED BY 06 OF 2018) Lapsed Project |
NA |
ATS GRANDSTAND PHASE-1 |
ATS REALWORTH PRIVATE LIMITED |
SECTOR 99A
|
GURUGRAM |
INTERIM RERA |
N/A |
01/01/1970 |
|
QPR not Uploaded |
View Monitoring Cases |
|
101 |
55 OF 2017 DATED 17.08.2017 |
RERA-GRG-345-2019 |
ATS MARIGOLD |
ATS REAL ESTATE BUILDERS PVT.LTD. |
SECTOR 89-A, VILLAGE-HARSARU, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
28/02/2027 |
View Corrigendum |
View |
View Monitoring Cases |
|
102 |
41 OF 2017 DATED 10.08.2017 Lapsed Project |
RERA-GRG-382-2019 |
ATS TOURMALINE |
ALMOND INFRABUILD PVT. LTD. |
SEC 109, VILLAGE BABUPUR, GUR UGRAM |
GURUGRAM |
INTERIM RERA |
|
09/08/2023 |
|
View |
View Monitoring Cases |
|
103 |
GGM/679/411/2023/23 DATED 30.01.2023 |
RERA-GRG-1272-2023 |
ATULYAM 83 |
PEGASUS DEVELOPERS PRIVATE LIMITED |
SECTOR - 83, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2026 |
|
View |
View Monitoring Cases |
|
104 |
04 OF 2018 DATED 02.01.2018 |
RERA-GRG-527-2019 |
AUTO MAX A UNIT OF OMAXE AUTO LTD, (BOULEVARD I) |
SPAZE TOWERS PVT. LTD. |
SECTOR 47, VILLAGE TIKRI, GUR UGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
10/09/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
105 |
387 OF 2017 DATED 19.12.2017 |
RERA-GRG-524-2019 |
AUTO MAX A UNIT OF OMAXE AUTO LTD, (BOULEVARD II) |
SPAZE TOWERS PVT. LTD. |
SECTOR 47, VILLAGE TIKRI, GUR UGRAM , HARYANA |
GURUGRAM |
INTERIM RERA |
|
30/06/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
106 |
233 OF 2017 DATED 19.09.2017 |
RERA-GRG-409-2019 |
AVENUE 51 ( AFFORDABLE GROUP HOUSING PROJECT) |
GLS INFRAPROJECTS PVT.LTD |
SECTOR-92, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
07/02/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
107 |
GGM/442/174/2021/10 DATED 01.03.2021 |
RERA-GRG-808-2021 |
AVENUE 81 |
M/S GLS INFRACON PVT. LTD. |
SECTOR 81,GURUGRAM, SITUATED IN THE REVENUE ESTATE OF VILLAGE NAWADA FATEHPUR, DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/12/2025 |
|
View |
View Monitoring Cases |
|
108 |
GGM/724/456/2023/68 DATED 29.05.2023 |
RERA-GRG-1257-2023 |
AVENUE 81 PHASE-2 |
GLS INFRACON PVT. LTD. |
SECTOR 81, GURUGRAM, SITUATED IN THE REVENUE ESTATE OF VILLAGE NAWADA FATEHPUR, DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
03/10/2027 |
|
View |
View Monitoring Cases |
|
109 |
GGM/498/230/2021/66 DATED 19.10.2021 |
RERA-GRG-926-2021 |
AVENUE 86 |
GLS INFRAPROJECTS PVT. LTD. |
REVENUE ESTATE OF VILLAGE BAD HA, SECTOR-86 |
GURUGRAM |
HRERA |
|
11/07/2026 |
|
View |
View Monitoring Cases |
|
110 |
GGM/723/455/2023/67 DATED 29.05.2023 |
RERA-GRG-1366-2023 |
AVENUE CITY |
GLS INFRAPROJECTS PVT. LTD |
REVENUE ESTATE OF VILLAGE WAZ IRPUR, SECTOR-92, DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
16/04/2028 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
111 |
106 OF 2017 DATED 24.08.2017 |
RERA-GRG-461-2019 |
AVL 36 GURGAON |
AVL INFRASTRUCTURE PVT.LTD. |
SECTOR-36-A,GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
112 |
GGM/591/323/2022/66 DATED 18.07.2022 |
RERA-GRG-1005-2022 |
BAANI CITY CENTER |
AALIYAH REAL ESTATES PVT. LTD. |
KHASRA NO 24-25,VILLAGE MAIDA WAS,SECTOR-63, GURUGRAM-122101 HARYANA |
GURUGRAM |
HRERA |
|
17/02/2025 |
|
View |
-- |
|
113 |
GGM/379/111/2019/73 DATED 23.12.2019 Lapsed Project |
RERA-GRG-330-2019 |
BELLA VISTA - CENTRAL PARK RESORTS |
SWETA ESTATES PVT. LTD. |
SECTOR 48, SOHNA ROAD, NEAR S UBHASH CHOWK, GURGAON |
GURUGRAM |
HRERA |
|
31/08/2024 |
|
View |
View Monitoring Cases |
|
114 |
GGM/380/112/2019/74 DATED 09.12.2019 |
RERA-GRG-304-2019 |
BESTCEH 92 MARKET PLACE |
BESTECH INDIA PVT LTD |
SECTOR 92, VILLAGE WAZIRPUR, GURUGRAM |
GURUGRAM |
HRERA |
|
31/03/2025 |
|
View |
View Monitoring Cases |
|
115 |
GGM/739/471/2023/83 DATED 24.07.2023 |
RERA-GRG-1355-2023 |
BESTECH CITY 1 |
BESTECH INDIA PRIVATE LIMITED |
SECTOR 89A, VILLAGE HARSARU, GURUGRAM |
GURUGRAM |
HRERA |
|
16/09/2026 |
|
View |
-- |
|
116 |
GGM/730/462/2023/74 DATED 03.07.2023 |
RERA-GRG-1362-2023 |
BESTECH CITY 2 |
BESTECH INDIA PRIVATE LIMITED |
SECTOR 89A, VILLAGE HARSARU, GURUGRAM |
GURUGRAM |
HRERA |
|
07/10/2026 |
|
View |
-- |
|
117 |
GGM/596/328/2022/71 DATED 27.07.2022 |
RERA-GRG-1012-2022 |
BIRLA NAVYA (ANAIKA) |
AVARNA PROJECTS LLP |
SECTOR 63A GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2025 |
|
View |
-- |
|
118 |
GGM/673/405/2023/17 DATED 23.01.2023 |
RERA-GRG-1233-2022 |
BIRLA NAVYA (AVIK PHASE-1) |
AVARNA PROJECTS LLP |
SECTOR- SECTOR-63A,VILLAGE- K ADARPUR, MAIDAWAS, ULLAHWAS |
GURUGRAM |
HRERA |
|
30/04/2027 |
|
View |
-- |
|
119 |
GGM/553/285/2022/28 DATED 25.04.2022 |
RERA-GRG-1011-2022 |
BIRLA NAVYA (DRISHA 1B) |
AVARNA PROJECTS LLP |
SECTOR 63A GURUGRAM
|
GURUGRAM |
HRERA |
|
29/12/2025 |
View Corrigendum |
View |
-- |
|
120 |
GGM/390/122/2020/06 DATED 27.01.2020 Lapsed Project |
RERA-GRG-499-2019 |
BIRLA NAVYA PHASE-I (AMODA I AND II) |
AVARNA PROJECTS LLP |
POCKETS D & H, BIRLA NAVYA, S ECTOR-63A, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/06/2024 |
|
View |
View Monitoring Cases |
|
121 |
GGM/391/123/2020/07 DATED 27.01.2020 |
RERA-GRG-505-2019 |
BIRLA NAVYA (PHASE-II DRISHA 1A) |
AVARNA PROJECTS LLP |
POCKET G, BIRLA NAVYA, SECTOR -63A, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/12/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
122 |
GGM/548/280/2022/23 DATED 07.04.2022 |
RERA-GRG-984-2021 |
BODH 79 |
TOP HAVEN DEVELOPERS PRIVATE LIMITED |
VILLAGE NAURANGPUR, SECTOR-79 , DISTRICT GURGAON |
GURUGRAM |
HRERA |
|
09/11/2026 |
|
View |
View Monitoring Cases |
|
123 |
GGM/606/338/2022/81 DATED 12.09.2022 |
RERA-GRG-1070-2022 |
BONHEUR AVENUE |
CLARIKA INFRA PVT LTD |
SECTOR-35,VILLAGE DHUNELA, SO HNA |
GURUGRAM |
HRERA |
|
31/12/2026 |
|
View |
-- |
View OC/CC/PCC |
124 |
GGM/725/457/2023/69 DATED 07.06.2023 |
RERA-GRG-1287-2023 |
BONHEUR AVENUE GROW+ |
CLARIKA INFRA PVT LTD |
SECTOR-35, VILLAGE DHUNELA, S OHNA |
GURUGRAM |
HRERA |
|
31/12/2026 |
|
View |
-- |
|
125 |
GGM/712/444/2023/56 DATED 08.05.2023 |
RERA-GRG-1323-2023 |
BONHEUR AVENUE PHASE 2 |
ATS COMMERCIAL REAL ESTATE PRIVATE LIMITED |
SECTOR 35, VILLAGE DHUNELA
|
GURUGRAM |
HRERA |
|
30/04/2025 |
|
View |
-- |
|
126 |
GGM/820/552/2024/47 DATED 29.04.2024 |
RERA-GRG-1470-2023 |
BPTP THE AMAARIO |
COUNTRYWIDE PROMOTERS PRIVATE LIMITED |
37 D GURUGRAM
|
GURUGRAM |
HRERA |
|
30/09/2031 |
|
QPR not Uploaded |
-- |
|
127 |
277 OF 2017 DATED 09.10.2017 |
RERA-GRG-513-2019 |
BRAHMA CITY J-BLOCK |
BRAHMA CITY PVT. LTD. |
SECTOR-63, TEHSIL WAZIRABAD, DIST. GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
20/08/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
128 |
268 OF 2017 DATED 09.10.2017 |
RERA-GRG-519-2019 |
BRAHMA CITY K-BLOCK |
BRAHMA CITY PVT. LTD. |
SECTOR-63, TEHSIL WAZIRABAD, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/06/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
129 |
274 OF 2017 DATED 09.10.2017 |
RERA-GRG-417-2019 |
BRAHMA CITY M-BLOCK |
BRAHMA CITY PVT. LTD. |
SECTOR 60-61, VILLAGE ULLAWAS , TEHSIL WAZIRABAD |
GURUGRAM |
INTERIM RERA |
|
30/06/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
130 |
GGM/640/372/2022/115 DATED 05.12.2022 |
RERA-GRG-867-2021 |
BRAHMA CITY PHASE-V |
BRAHMA CITY PVT LTD |
SECTOR 60, 61,62, 63 GURUGRAM
|
GURUGRAM |
HRERA |
|
20/08/2025 |
|
View |
-- |
|
131 |
GGM/370/102/2019/64 DATED 07.11.2019 Lapsed Project |
RERA-GRG-240-2019 |
CANARY GREENS |
TODAY HOMES & INFRASTRUCTURE PVT LTD |
VILLAGE- BEHRAMPUR, SECTOR-73 , GURUGRAM. HARYANA |
GURUGRAM |
HRERA |
|
21/07/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
132 |
12 OF 2018 DATED 10.01.2018 |
RERA-GRG-577-2020 |
CAPITAL GATEWAY(PHASE-1) |
KNS INFRACON PVT.LTD |
SECTOR-110A/111, VILLAGE CHAU MA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/06/2025 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
|
133 |
331 OF 2017 DATED 24.10.2017 |
RERA-GRG-606-2020 |
CAPITAL TOWERS |
EMAAR MGF LAND LTD. |
VILLAGE SIKANDARPUR GHOSI, SE CTOR 28, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
31/07/2020 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
134 |
GGM/768/500/2023/112 DATED 04.12.2023 |
RERA-GRG-1458-2023 |
CENTRAL 67 |
DLF HOME DEVELEOPERS LIMITED |
SECTOR 67
|
GURUGRAM |
HRERA |
|
31/12/2027 |
|
View |
-- |
|
135 |
GGM/782/514/2024/09 DATED 07.02.2024 |
RERA-GRG-1451-2023 |
CENTRAL 74 |
DLF HOME DEVELOPERS LIMITED |
SECTOR 74 A GURUGRAM
|
GURUGRAM |
HRERA |
|
06/09/2028 |
|
View |
-- |
|
136 |
GGM/600/332/2022/75 DATED 08.08.2022 |
RERA-GRG-1076-2022 |
CENTRAL AVENUE |
GLS INFRAPRROJECTS PVT. LTD |
SECTOR 92 GURUGRAM, IN THE RE VENUE ESTATE OF VILLAGE WAZIRPUR, DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
17/11/2026 |
|
View |
View Monitoring Cases |
|
137 |
GGM/460/192/2021/28 DATED 06.07.2021 |
RERA-GRG-791-2020 |
CENTRAL AVENUE |
ANTRIKSH INDIA PROJECTS PRIVATE LIMITED |
CENTRAL AVENUE, SUBASH CHOWK, SECTOR 33 |
GURUGRAM |
HRERA |
|
01/02/2025 |
|
View |
-- |
|
138 |
GGM/430/162/2020/46 DATED 18.12.2020 |
RERA-GRG-756-2020 |
CENTRAL BOULEVARD |
BESTECH INDIA PVT. LTD. |
PLOTTED COMMERCIAL- SCO , VI LLAGE - HAYATPUR SECTOR 88 GURUGRAM |
GURUGRAM |
HRERA |
|
27/07/2025 |
|
View |
View Monitoring Cases |
|
139 |
GGM/826/558/2024/53 DATED 24.05.2024 |
RERA-GRG-1618-2024 |
CENTRAL PARK BIGNONIA TOWERS |
ST. PATRICKS REALTY PVT. LTD. |
VILLAGE DHUNELA, SECTOR-32 SO HNA- GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
29/06/2028 |
|
View |
-- |
|
140 |
GGM/395/127/2020/11 DATED 18.03.2020 |
RERA-GRG-619-2020 |
CENTRAL PARK FLOWER VALLEY |
ST. PATRICKS REALTY PVT. LTD. |
SECTOR 29, 30, 32 & 33 OF VIL LAGE DHUNELA & BERKA, TEHSIL SOHNA, DISTRICT GURUGRAM |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
|
141 |
GGM/624/356/2022/99 DATED 27.10.2022 |
RERA-GRG-1084-2022 |
CENTRAL PARK FLOWER VALLEY FLOORS AND VILLAS |
CENTRAL PARK FLOWER VALLEY |
VILLAGE DHUNELA & BERKA, SECT OR-29,30,32 AND 33, SOHNA |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
-- |
|
142 |
GGM/562/294/2022/37 DATED 16.05.2022 |
RERA-GRG-997-2021 |
CENTRAL PARK FLOWER VALLEY - PHASE III |
ST. PATRICKS REALTY PVT LTD |
SECTOR 29,30, 32 & 33, SOHNA, DIST. GURUGRAM |
GURUGRAM |
HRERA |
|
09/12/2026 |
|
View |
View Monitoring Cases |
|
143 |
GGM/672/404/2023/16 DATED 23.01.2023 |
RERA-GRG-1158-2022 |
CENTRAL PARK THE ORCHARD |
ST PATRICKS REALTY PRIVATE LIMITED |
SITUATED IN SECTOR-32, TEHSIL -SOHNA, GURUGRAM |
GURUGRAM |
HRERA |
|
30/06/2026 |
|
View |
-- |
|
144 |
GGM/684/416/2023/28 DATED 30.01.2023 |
RERA-GRG-845-2021 |
CENTRA ONE |
COUNTRYWIDE PROMOTERS PRIVATE LIMITED |
SECTOR 61 GURUGRAM HARYANA
|
GURUGRAM |
HRERA |
|
31/10/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
145 |
11 OF 2018 DATED 08.01.2018 |
RERA-GRG-531-2019 |
CENTRUM PARK (PH-I) |
SELENE CONSTRUCTION LTD |
SECTOR-103, DAULTABAD, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
31/07/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
146 |
10 OF 2018 DATED 08.01.2018 |
RERA-GRG-533-2019 |
CENTRUM PARK (PH-II) |
SELENE CONSTRUCTION LTD |
SECTOR-103, DAULTABAD, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
31/10/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
147 |
19 OF 2017 DATED 06.07.2017 Lapsed Project |
RERA-GRG-554-2020 |
CHANDAN TOWER(TOWER-D) |
RAHEJA DEVELOPERS LTD. |
RAHEJA VANYA SECTOR-99-A, GUR UGRAM |
GURUGRAM |
INTERIM RERA |
|
01/01/1970 |
|
View |
View Monitoring Cases |
|
148 |
GGM/675/407/2023/19 DATED 30.01.2023 |
RERA-GRG-1230-2022 |
CHINTAMANIS |
AVIANA GREENS ESTATES PVT LTD |
SECTOR 103,VILL DAULTABAD, GU RUGRAM |
GURUGRAM |
HRERA |
|
10/11/2026 |
|
View |
View Monitoring Cases |
|
149 |
GGM/307/39/2019/01 DATED 24.01.2019 |
RERA-GRG-122-2018 |
CHINTELS SERENITY POCKET B PHASE II |
CHINTELS INDIA LTD |
SECTOR - 109, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
150 |
125 OF 2017 DATED 28.08.2017 |
RERA-GRG-459-2019 |
CHINTELS SERENITY-TOWER NO.3,4,5, EWS BLOCK |
CHINTELS INDIA LTD. |
VILLAGE BABUPUR,SECTOR-109 GU RUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
151 |
GGM/874/606/2024/101 DATED 07.10.2024 |
RERA-GRG-1722-2024 |
CITY OF COLOURS NH-8 |
SIGNATUREGLOBAL (INDIA) LIMITED |
VILLAGE-SIDHRAWALI, GURUGRAM HARYANA |
GURUGRAM |
HRERA |
|
31/12/2028 |
|
NA |
-- |
|
152 |
252 OF 2017 DATED 09.10.2017 Lapsed Project |
RERA-GRG-572-2020 |
CITY RESIDENCIES |
MAXWORTH INFRASTRUCTURE PVT. LTD. |
SECTOR 10-A, VILLAGE KADIPUR, TEHSIL AND DIST. GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
08/10/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
153 |
GGM/806/538/2024/33 DATED 01.04.2024 |
RERA-GRG-1545-2024 |
CLUB ARCADE |
DLF LIMITED |
SECTOR 91
|
GURUGRAM |
HRERA |
|
31/03/2028 |
|
View |
-- |
|
154 |
GGM/419/151/2020/35 DATED 16.10.2020 |
RERA-GRG-575-2020 |
COBAN RESIDENCES |
PAREENA INFRASTRUCTURES PVT. LTD. |
GARHI HARSARU ROAD VILLAGE GO PALPUR, SECTOR 99A, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
11/03/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
155 |
156 OF 2017 DATED 28.08.2017 |
RERA-GRG-644-2020 |
COLONNADE |
EMAAR MGF LAND LTD. |
SECTOR-66, VILLAGE BADSHAHPUR , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2023 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
156 |
183 OF 2017 DATED 14.09.2017 |
RERA-GRG-615-2020 |
COMERCIAL COLONY |
WELLWORTH PROJECT DEVELOPERS PVT. LTD. |
VILLAGE BADSHAHPUR, SECTOR 65 , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
157 |
GGM/867/599/2024/94 DATED 09.09.2024 |
RERA-GRG-1703-2024 |
COMMERCIAL-01 IN M3M ANTALYA HILLS PHASE-I |
LOON LAND DEVELOPMENT LIMITED |
SECTOR-79,GURUGRAM,HARYANA
|
GURUGRAM |
HRERA |
|
01/08/2027 |
|
NA |
-- |
|
158 |
329 OF 2017 DATED 23.10.2017 |
RERA-GRG-1318-2023 |
COMMERCIAL COLONY |
EXPERION DEVELOPERS PVT. LTD. & OTHERS |
PART-II, SECTOR-15, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
22/10/2018 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
159 |
153 0F 2017 DATED 28.08.2017 Lapsed Project |
RERA-GRG-467-2019 |
COMMERCIAL COLONY |
AMEYA COMMERICAL PROJECTS PVT.LTD. |
VILLAGE HAYATPUR,SECTOR-93,GU RUGRAM |
GURUGRAM |
INTERIM RERA |
|
27/08/2024 |
|
View |
View Monitoring Cases |
|
160 |
159 OF 2017 DATED 29.08.2017 Lapsed Project |
NA |
COMMERCIAL COLONY |
CHD DEVELOPERS LTD. |
SECTOR 34, DHUNELA, SOHNA
|
GURUGRAM |
INTERIM RERA |
N/A |
28/07/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
161 |
155 OF 2017 DATED 28.08.2017 Lapsed Project |
RERA-GRG-429-2019 |
COMMERCIAL COLONY |
AMEYA COMMERCIALS PROJECTS PVT. LTD |
SECTOR-92, MEWKA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
27/08/2024 |
|
View |
View Monitoring Cases |
|
162 |
74 OF 2017 DATED 21.08.2017 |
RERA-GRG-426-2019 |
COMMERCIAL COLONY |
EMINENCE TOWNSHIPS INDIA PVT. LTD |
SECTOR 112, SECTOR ROAD, BAJG HERA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
163 |
190 OF 2017 DATED 14.09.2017 |
RERA-GRG-400-2019 |
COMMERCIAL COLONY |
ELAN BUILDCON PVT. LTD. |
SECTOR 84, VILLAGE HAYATPUR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
13/09/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
164 |
273 OF 2017 DATED 09.10.2017 Lapsed Project |
NA |
COMMERCIAL COLONY 2.00625 ACRES |
MAHAMAY BUILDING SOLUTION PVT. LTD. |
SECTOR-81A, VILLAGE NAKHROLA, TEHSIL MANESAR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
31/03/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
165 |
102 OF 2017 DATED 24.08.2017 Lapsed Project |
RERA-GRG-1692-2024 |
COMMERCIAL COLONY (MANAGED SERVICED APARTMENTS) |
IREO PVT LTD |
SECTOR 59 GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2020 |
|
View |
View Monitoring Cases |
|
166 |
94 OF 2017 DATED 28.08.2017 |
RERA-GRG-383-2019 |
COMMERCIAL COLONY (SS OMNIA) |
SS GROUP PVT LTD |
SECTOR 86, BADHA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
27/02/2022 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
167 |
17 OF 2018 DATED 24.01.2018 |
RERA-GRG-593-2020 |
COMMERCIAL IN GROUP HOUSING COLONY |
PROMPT ENGINEERING PVT. LTD |
SECTOR-74, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/03/2025 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
168 |
GGM/760/492/2023/104 DATED 20.11.2023 |
RERA-GRG-1471-2023 |
COMMERCIAL PLOTTED COLONY - MAG MILE |
ST. PATRICKS REALTY PVT LTD |
VILLAGE DHUNELA, SECTOR-32, T EHSIL SOHNA |
GURUGRAM |
HRERA |
|
26/03/2028 |
|
View |
-- |
|
169 |
65 OF 2017 DATED 18.08.2017 |
RERA-GRG-566-2020 |
COMMERCIAL PROJECT |
MAGIC EYE DEVELOPERS PRIVATE LIMITED |
SECTOR 106, VILLAGE DAULATABA D, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
|
170 |
20 OF 2018 DATED 02.02.2018 |
RERA-GRG-600-2020 |
COMMERCIAL PROJECT |
GENTLE REALTORS PVT. LTD & LUMINOS BUILDERS PVT. LTD |
SECTOR-66, BADSHAHPUR, GURUGR AM- MANESAR URBAN COMPLEX, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2024 |
|
QPR not Uploaded |
View Monitoring Cases |
|
171 |
187 OF 2017 DATED 14.09.2017 Lapsed Project |
RERA-GRG-356-2019 |
COMMERCIAL PROJECT |
GREEN HEIGHTS PROJECTS PVT. LTD. |
SECTOR M1D, TEHSIL MANESAR, G URUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
13/09/2019 |
|
View |
View Monitoring Cases |
|
172 |
189 OF 2017 DATED 14.09.2017 |
RERA-GRG-398-2019 |
COMMERCIAL PROJECT |
ELAN LIMITED |
SECTOR 80, VILLAGE NAURANGPUR , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
13/09/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
173 |
22 OF 2018 DATED 02.02.2018 Lapsed Project |
RERA-GRG-149-2019 |
COMMERCIAL PROJECT |
JMS BUILDTECH PVT. LTD |
SECTOR-102, DHANKOT, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
02/08/2024 |
View Corrigendum |
View |
View Monitoring Cases |
|
174 |
03 OF 2018 DATED 01.01.2018 |
RERA-GRG-589-2020 |
COMMERCIAL PROJECT OF AREA 0.4875 ACRES |
ROF HOUSING & INFRASTRUCTURE PVT. LTD. |
SECTOR-43, VILLAGE KANHAI, GU RUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
01/01/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
175 |
02 OF 2018 DATED 01.01.2018 Lapsed Project |
NA |
COMMERCIAL PROJECT OF AREA 2.0229 ACRES |
CAPITAL SKYSCRAPER PVT. LTD. |
SECTOR 66, VILLAGE MAIDAWAS, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
|
176 |
390 OF 2017 DATED 22.12.2017 Lapsed Project |
RERA-GRG-616-2020 |
COMMERCIAL PROJECT OF AREA 2 ACRES |
VICTORY INFRAEDGE PVT.LTD. |
SECTOR 48,FAZILPUR JHARSA, GU RUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
31/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
177 |
382 OF 2017 DATED 12.12.2017 Lapsed Project |
RERA-GRG-371-2019 |
COMMERCIAL PROJECT OF AREA 3.725 ACRES |
MANISH BUILDWELL PVT. LTD. |
SECTOR -91, VILLAGE MEWKA, GU RUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
11/12/2022 |
|
View |
View Monitoring Cases |
|
178 |
GGM/308/40/2019/02 DATED 16.01.2019 Lapsed Project |
RERA-GRG-159-2019 |
CONSCIENT ONE |
CONSCIENT INFRASTRUCTURE PVT LTD |
SECTOR - 109, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/04/2021 |
|
View |
View Monitoring Cases |
|
179 |
GGM/385/117/2020/01 DATED 01.01.2020 |
RERA-GRG-320-2019 |
CORONA GREENS |
RAMBHA CONSTRUCTION PRIVATE LIMITED |
SECTOR-5
|
GURUGRAM |
HRERA |
|
04/09/2024 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
180 |
GGM/368/100/2019/62 DATED 14.10.2019 |
RERA-GRG-276-2019 |
COSMOS EXPRESS99 / CASCADE GARDEN |
COSMOS INFRA ENGINEERING INDIA PVT LTD |
VILLAGE DHANKOT, SECTOR-99
|
GURUGRAM |
HRERA |
|
31/03/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
181 |
GGM/577/309/2022/52 DATED 27.06.2022 |
RERA-GRG-1027-2022 |
COUNTRYSIDE RESIDENCES |
COUNTRYSIDE PROPERTIES PRIVATE LIMITED |
SECTOR-65 GURGAON
|
GURUGRAM |
HRERA |
|
31/01/2026 |
View Corrigendum |
View |
-- |
|
182 |
GGM/798/530/2024/25 DATED 15.03.2024 |
RERA-GRG-1499-2023 |
COURTYARD 37D |
ETERNAL HOUSING INFRA LLP |
SECTOR 37-D VILL HARSARU, GUR UGRAM |
GURUGRAM |
HRERA |
|
30/09/2028 |
|
View |
-- |
|
183 |
GGM/727/459/2023/71 DATED 19.06.2023 (SUPERSEDED BY GGM/798/530/2024/25 DATED 15.03.2024) |
RERA-GRG-1360-2023 |
COURTYARD 37D |
ETERNAL HOUSING INFRA LLP |
REVENUE ESTATE OF VILL- HARSA RU, SECTOR - 37D, GURURGAM |
GURUGRAM |
HRERA |
|
29/02/2028 |
|
View |
-- |
|
184 |
GGM/313/45/2019/07 DATED 18.02.2019 |
RERA-GRG-143-2018 |
CROSSWALK |
JMS BUILDTECH PVT. LTD./RAMAPRASTHA ESTATE PVT. LTD. |
SECTOR -93, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
185 |
GGM/697/429/2023/41 DATED 20.02.2023 (REGISTRATION SUSPENDED) |
RERA-GRG-1250-2022 |
CZARR VILLAS 59 |
CZARR VILLAS PRIVATE LTD |
VILL BEHRAMPUR, SECTOR 59, GU RGAON HARYANA |
GURUGRAM |
HRERA |
|
18/03/2027 |
|
QPR not Uploaded |
View Monitoring Cases |
|
186 |
GGM/500/232/2021/68 DATED 25.10.2021 Lapsed Project |
RERA-GRG-920-2021 |
DDJAY RESIDENTIAL PLOTTED COLONY |
ADHIKAANSH REALTORS PRIVATE LIMITED ,AAWAM RESIDENCY PRIVATE LIMITED |
SECTOR-89, GURUGRAM MANESAR U RBAN COMPLEX, GURUGRAM, HARYANA. |
GURUGRAM |
HRERA |
|
31/10/2024 |
|
View |
View Monitoring Cases |
|
187 |
GGM/853/585/2024/80 DATED 29.07.2024 |
RERA-GRG-1307-2023 |
DDJAY RESIDENTIAL PLOTTED COLONY |
ADHIKAANSH REALTORS PRIVATE LIMITED ,AAWAM RESIDENCY PRIVATE LIMITED |
SECTOR-89, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
03/04/2027 |
|
NA |
-- |
|
188 |
GGM/783/515/2024/10 DATED 07.02.2024 |
RERA-GRG-1507-2023 |
DE-LUXE DXP |
SIGNATUREGLOBAL BUSINESS PARK PRIVATE LIMITED |
VILLAGE - GADAULI KALAN, SECT OR-37D, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/03/2031 |
|
View |
-- |
|
189 |
229 OF 2017 DATED 19.09.2017 Lapsed Project |
NA |
DEVAAN ( AFFORDABLE GROUP HOUSING PROJECT) |
PIVOTAL INFRASTRUCTURE PVT. LTD |
SECTOR-84, SIHI, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
09/06/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
190 |
322 OF 2017 DATED 17.10.2017 Lapsed Project |
NA |
DIPLOMATS GOLF LINK |
MILLENIUM DIPLOMATS PVT. LTD. |
SECTOR-110, GURUGRAM, HARYANA
|
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
191 |
GGM/465/197/2021/33 DATED 10.08.2021 Lapsed Project |
RERA-GRG-763-2020 |
DIPLOMATS GOLF LINK |
MILLENNIUM DIPLOMATS PVT.LTD. |
VILLAGE SARAI ALWARDI,SECTOR- 110 |
GURUGRAM |
HRERA |
|
04/09/2024 |
|
View |
View Monitoring Cases |
|
192 |
GGM/871/603/2024/98 DATED 30.09.2024 |
RERA-GRG-1575-2024 |
DIPLOMATS GREEN VISTA |
U V LANDBASE PRIVATE LIMITED |
SECTOR 3 , FARUKHNAGAR
|
GURUGRAM |
HRERA |
|
28/02/2029 |
|
NA |
-- |
|
193 |
GGM/455/187/2021/23 DATED 15.06.2021 |
RERA-GRG-834-2021 |
DLF GARDENCITY |
DLF UTILITIES LIMITED |
DLF GARDENCITY, SECTOR 91/92
|
GURUGRAM |
HRERA |
|
27/06/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
194 |
GGM/550/282/2022/25 DATED 11.04.2022 |
RERA-GRG-1008-2022 |
DLF GARDENCITY ENCLAVE |
M/S. DLF LIMITED |
SECTOR 93
|
GURUGRAM |
HRERA |
|
28/03/2025 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
195 |
GGM/772/504/2023/116 DATED 18.12.2023 |
RERA-GRG-1406-2023 |
DLF PRIVANA SOUTH |
DLF LIMITED |
SECTOR 76/77
|
GURUGRAM |
HRERA |
|
30/06/2031 |
|
View |
-- |
|
196 |
GGM/819/551/2024/46 DATED 22.04.2024 |
RERA-GRG-1540-2024 |
DLF PRIVANA WEST |
DLF LIMITED |
SECTOR 76/77
|
GURUGRAM |
HRERA |
|
31/12/2031 |
|
View |
-- |
|
197 |
GGM/709/441/2023/53 DATED 10.04.2023 |
RERA-GRG-1306-2023 |
DOWNTOWN AVENUE |
ADANI BRAHMA SYNERGY PVT LTD |
SECTOR-62, VILLAGE -ULLAHAWAS , |
GURUGRAM |
HRERA |
|
20/08/2025 |
|
View |
View Monitoring Cases |
|
198 |
144 OF 2017 DATED 28.08.2017 Lapsed Project |
RERA-GRG-751-2020 |
EASY HOMES |
TULSIANI CONSTRUCTIONS AND DEVELOPERS PVT.LTD. |
VILLAGE SOHNA SECTOR-35 GURUG RAM |
GURUGRAM |
INTERIM RERA |
|
27/08/2022 |
|
View |
View Monitoring Cases |
|
199 |
GGM/344/76/2019/38 DATED 08.07.2019 |
RERA-GRG-202-2019 |
EKAM |
REGIONAL CONSTRUCTION PVT. LTD. |
SECTOR-5, SOHNA, GURUGRAM
|
GURUGRAM |
HRERA |
|
08/03/2025 |
|
QPR not Uploaded |
View Monitoring Cases |
|
200 |
GGM/736/468/2023/80 DATED 24.07.2023 |
RERA-GRG-1370-2023 |
ELAN EMPIRE |
ELAN CITY LLP |
REVENUE ESTATE VILLAGE MAIDAW AS , SECTOR-66 , GURUGRAM , HARYANA |
GURUGRAM |
HRERA |
|
30/04/2028 |
|
View |
-- |
|
201 |
GGM/469/201/2021/37 DATED 27.07.2021 (SUPERSEDED BY GGM/736/468/2023/80 DATED 24.07.2023) |
RERA-GRG-852-2021 |
ELAN EMPIRE |
ELAN CITY LLP |
REVENUE ESTATE VILLAGE MAIDAW AS , SECTOR-66 , GURUGRAM , HARYANA |
GURUGRAM |
HRERA |
|
14/04/2026 |
|
View |
-- |
|
202 |
GGM/298/2018/30 DATED 06.12.2018 |
RERA-GRG-102-2018 |
ELAN EPIC |
ELAN LIMITED |
SECTOR - 70, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
203 |
GGM/788/520/2024/15 DATED 21.02.2024 |
RERA-GRG-1508-2023 |
ELAN IMPERIAL |
ELAN IMPERIAL PVT LTD (FORMERLY KNOWN AS AMBIENCE INFRASTRUCTURE DEVELOPERS PVT LTD) |
VILLAGE- NAKHNOULA, SECTOR-82 , GURUGRAM |
GURUGRAM |
HRERA |
|
31/12/2028 |
|
View |
-- |
|
204 |
GGM/447/179/2021/15 DATED 22.03.2021 (SUPERSEDED BY GGM/584/316/2022/59 DATED 04.07.2022) |
RERA-GRG-813-2021 |
ELAN PARADISE |
ELAN LIMITED |
REVENUE ESTATE OF VILLAGE ADA MPUR, SUB TEHSIL- WAZIRABAD, SECTOR-50, DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/09/2025 |
|
View |
View Monitoring Cases |
|
205 |
GGM/584/316/2022/59 DATED 04.07.2022 |
RERA-GRG-1062-2022 |
ELAN PARADISE |
ELAN LIMITED |
REVENUE ESTATE OF VILLAGE ADA MPUR, SUB TEHSIL- WAZIRABAD, SECTOR-50, DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
16/06/2026 |
|
View |
-- |
|
206 |
GGM/702/434/2023/46 DATED 06.03.2023 |
RERA-GRG-1273-2023 |
ELAN THE MARK |
ELAN AVENUE LIMITED |
SITUATED IN SECTOR 106 IN THE REVENUE ESTATE OF VILLAGE PAWALA KHUSRUPUR TEHSIL KADIPUR DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
15/01/2028 |
|
View |
-- |
|
207 |
GGM/626/358/2022/101 DATED 21.11.2022 |
RERA-GRG-1194-2022 |
ELAN THE PRESIDENTIAL |
ELAN AVENUE LIMITED (FORMERLY KNOWN AS AIRMID DEVELOPERS LIMITED) |
SITUATED IN SECTOR 106 IN THE REVENUE ESTATE OF VILLAGE PAWALA KHUSRUPUR TEHSIL KADIPUR DISTRICT GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/10/2027 |
|
View |
-- |
|
208 |
23 OF 2018 DATED 02.02.2018 |
RERA-GRG-367-2019 |
ELAN TOWN CENTRE, COMMERCIAL PROJECT |
ELAN BUILDCON PVT. LTD |
SECTOR-67, BADSHAHPUR, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
01/02/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
209 |
81 OF 2017 DATED 23.08.2017 |
RERA-GRG-247-2019 |
ELDECO ACCOLADE |
ELDECO SOHNA PROJECTS LTD |
GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2025 |
|
View |
View Monitoring Cases |
|
210 |
GGM/880/612/2024/107 DATED 23.10.2024 |
RERA-GRG-1680-2024 |
ELDECO FAIRWAY RESERVE |
ELDECO INFRASTRUCTURE AND PROPERTIES LIMITED |
SECTOR-80, MANESAR, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/12/2029 |
|
NA |
-- |
|
211 |
GGM/325/57/2019/19 DATED 01.04.2019 |
RERA-GRG-120-2018 |
ELEVATE PHASE I |
HERITAGE MAX REALTECH PVT. LTD. |
SECTOR-59, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
|
212 |
GGM/459/191/2021/27 DATED 22.06.2021 |
RERA-GRG-710-2020 |
ELEVATE (PHASE II) |
HERITAGE MAX REALTECH PVT. LTD. |
VILLAGE BEHRAMPUR, SECTOR-59, GURUGRAM |
GURUGRAM |
HRERA |
|
31/01/2025 |
|
View |
-- |
|
213 |
GGM/757/489/2023/101 DATED 06.11.2023 |
RERA-GRG-1448-2023 |
ELEVATE RESERVE |
CONSCIENT INFRASTRUCTURE PRIVATE LIMITED |
SECTOR-62, VILLAGE ULLHAWAS, WAZIRABAD, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/10/2030 |
|
View |
View Monitoring Cases |
|
214 |
GGM/691/423/2023/35 DATED 02.02.2023 |
RERA-GRG-1103-2022 |
EMAAR BUSINESS DISTRICT 114 NXT |
EMAAR INDIA LIMITED |
SECTOR 114, GURUGRAM
|
GURUGRAM |
HRERA |
|
23/08/2027 |
|
View |
-- |
|
215 |
GGM/751/483/2023/95 DATED 16.10.2023 |
RERA-GRG-1397-2023 |
EMAAR BUSINESS DISTRICT 65NXT (EBD 65NXT) |
EMAAR INDIA LIMITED |
VILLAGE - BADSHAHPUR, SECTOR 65, GURUGRAM |
GURUGRAM |
HRERA |
|
10/08/2027 |
|
View |
-- |
|
216 |
GGM/690/422/2023/34 DATED 02.02.2023 |
RERA-GRG-1135-2022 |
EMAAR BUSINESS DISTRICT 75A |
EMAAR INDIA LIMITED |
VILLAGE - BEGAMPUR KHATOLA, S ECTOR 75A, GURUGRAM |
GURUGRAM |
HRERA |
|
23/08/2027 |
|
View |
View Monitoring Cases |
|
217 |
GGM/777/509/2024/04 DATED 22.01.2024 |
RERA-GRG-1474-2023 |
EMAAR BUSINESS DISTRICT 83 |
EMAAR INDIA LIMITED |
VILLAGE KHERKI DAULA, SECTOR 83, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/12/2028 |
|
View |
-- |
|
218 |
GGM/524/256/2021/92 DATED 24.12.2021 |
RERA-GRG-892-2021 |
EMAAR BUSINESS DISTRICT 99 (EBD 99) |
EMAAR INDIA LIMITED |
SECTOR - 99, VILLAGE KHERKI M AJRA, GURUGRAM |
GURUGRAM |
HRERA |
|
17/08/2026 |
|
View |
View Monitoring Cases |
|
219 |
GGM/525/257/2021/93 DATED 24.12.2021 |
RERA-GRG-893-2021 |
EMAAR BUSINESS DISTRICT 99 NXT (EBD 99 NXT) |
EMAAR INDIA LIMITED |
VILLAGE - KHERKI MAJRA, SECTO R 99, GURUGRAM |
GURUGRAM |
HRERA |
|
17/08/2026 |
|
View |
View Monitoring Cases |
|
220 |
GGM/451/183/2021/19 DATED 19.04.2021 |
RERA-GRG-796-2021 |
EMAAR BUSINESS DISTRICT (EBD) 114 |
EMAAR INDIA |
SECTOR-114
|
GURUGRAM |
HRERA |
|
11/03/2026 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
221 |
GGM/409/141/2020/25 DATED 15.09.2020 |
RERA-GRG-714-2020 |
EMAAR BUSINESS DISTRICT ( EBD) 65 |
EMAAR MGF LAND LTD |
SECTOR 65
|
GURUGRAM |
HRERA |
|
31/08/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
222 |
GGM/507/239/2021/75 DATED 09.11.2021 |
RERA-GRG-901-2021 |
EMAAR BUSINESS DISTRICT (EBD-89) |
EMAAR INDIA LIMITED |
VILLAGE - BADHA, SECTOR-89, G URUGRAM |
GURUGRAM |
HRERA |
|
17/08/2026 |
|
View |
View Monitoring Cases |
|
223 |
GGM/508/240/2021/76 DATED 09.11.2021 |
RERA-GRG-909-2021 |
EMAAR BUSINESS DISTRICT (EBD-89 NXT) |
EMAAR INDIA LIMITED |
VILLAGE-BADHA, SECTOR-89, GUR UGRAM |
GURUGRAM |
HRERA |
|
17/08/2026 |
|
View |
View Monitoring Cases |
|
224 |
GGM/337/69/2019/31 DATED 24.05.2019 |
RERA-GRG-180-2019 |
EMAAR DIGIHOMES |
EMAAR MGF LAND LIMITED |
SECTOR 62, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
225 |
GGM/362/94/2019/56 DATED 01.10.2019 |
RERA-GRG-260-2019 |
EMERALD CLASSIC |
EMAAR MGF LAND LIMITED |
SECTOR 65
|
GURUGRAM |
HRERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
226 |
104 OF 2017 DATED 24.08.2017 |
RERA-GRG-442-2019 |
EMERALD ESTATE |
EMAAR MGF LAND LTD |
SECTOR 65, MAIDAWAS, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
23/08/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
227 |
162 OF 2017 DATED 29.08.2017 |
RERA-GRG-643-2020 |
EMERALD HILLS |
EMAAR MGF LAND LTD. |
SECTOR 62 AND 65, BADSHAHPUR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
28/08/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
228 |
GGM/716/448/2023/60 DATED 08.05.2023 |
RERA-GRG-1342-2023 |
EMERALD HILLS - PHASE 2 |
EMAAR INDIA LIMITED |
VILLAGE BADSHAHPUR, MAIDAWAS, NANGLI UMARPUR, SECTOR - 62 & 65, GURUGRAM |
GURUGRAM |
HRERA |
|
10/08/2027 |
|
View |
View Monitoring Cases |
|
229 |
GGM/387/119/2020/03 DATED 27.01.2020 Lapsed Project |
RERA-GRG-453-2019 |
EMERALD NUEVO |
EMAAR MGF LAND LTD. |
SECTOR 65 & 62 BADSHAHPUR NAN GLI MAIDAWAS |
GURUGRAM |
HRERA |
|
31/12/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
|
230 |
136 OF 2017 DATED 28.08.2017 |
RERA-GRG-259-2019 |
EMERALD RAY |
PURI CONSTRUCTIONS LTD. |
SECTOR - 104, DHANWAPUR,GURUG RAM |
GURUGRAM |
INTERIM RERA |
|
28/02/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
231 |
GGM/850/582/2024/77 DATED 22.07.2024 |
RERA-GRG-1651-2024 |
EMPERIUM PREMIO |
EMPERIUM INFRASTRUCTURE PRIVATE LIMITED |
SECTOR 37 C
|
GURUGRAM |
HRERA |
|
31/03/2030 |
|
NA |
-- |
|
232 |
66 OF 2017 DATED 18.8.2017 Lapsed Project |
RERA-GRG-564-2020 |
ENGRACIA BY ILD ( PLOTTED COLONY) |
JUBILIANT MALLS PVT. LTD |
SECTOR- 37D, VILLAGE BASAI, G URUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/08/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
233 |
351 OF 2017 DATED 20.11.2017 |
RERA-GRG-538-2019 |
ENIGMA |
ATHENA INFRASTRUCTURE LTD. |
SECTOR-110, VILLAGE PAWALA KH USRUPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
31/08/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
234 |
346 OF 2017 DATED 08.11.2017 Lapsed Project |
NA |
ENIGMA, PHASE-1 |
VARALI PROPERTIES LTD. |
SECTOR-110, VILLAGE PAWALA KH USRUPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
N/A |
31/08/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
235 |
353 OF 2017 DATED 20.11.2017 |
RERA-GRG-535-2019 |
ENIGMA, PHASE-1A |
ATHENA INFRASTRUCTURES LTD. |
SECTOR-110, VILLAGE PAWALA KH USRUPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
31/03/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
236 |
354 OF 2017 DATED 17.11.2017 Lapsed Project |
RERA-GRG-537-2019 |
ENIGMA, PHASE-2 |
ATHENA INFRASTRUCTURE LTD. |
SECTOR-110, VILLAGE PAWALA KH USRUPUR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/09/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
237 |
313 OF 2017 DATED 17.10.2017 Lapsed Project |
RERA-GRG-754-2020 |
ESENCIA |
ANSAL INFRASTRUCTURE PRIVATE LIMITED |
SECTOR 67 GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/10/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
238 |
336 OF 2017 DATED 27.10.2017 Lapsed Project |
NA |
ESENCIA |
ANSAL PHALAK INFRASTRUCTURE PVT. LTD. |
SECTOR-67, GURUGRAM, HARYANA
|
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
239 |
352 OF 2017 DATED 17.11.2017 |
RERA-GRG-355-2019 |
ESFERA, PHASE-II |
IMPERIA STRUCTURES LTD. |
SECTOR-37-C, VILLAGE GHAROLI KHURD AND BASAI, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
30/06/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
240 |
GGM/860/592/2024/87 DATED 16.08.2024 |
RERA-GRG-1675-2024 |
ESTATE 360 |
MAX ESTATES GURGAON LIMITED |
VILLAGE-HARSARU, SECTOR 36-A,
|
GURUGRAM |
HRERA |
|
31/08/2030 |
|
NA |
-- |
|
241 |
GGM/721/453/2023/65 DATED 23.05.2023 |
RERA-GRG-1361-2023 |
ESTATE 95 |
3B HOMES PVT LTD |
VILLAGE- DHORKA SECTOR-95
|
GURUGRAM |
HRERA |
|
30/11/2026 |
|
View |
-- |
|
242 |
341 OF 2017 DATED 27.10.2017 |
NA |
EWS |
HAAMID REAL ESTATES PVT. LTD. |
SECTOR-70 A, VILLAGE PALRA, G URUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
243 |
319 OF 2017 DATED 23.10.2017 Lapsed Project |
RERA-GRG-569-2020 |
EWS |
AMBIENCE DEVELOPERS & INFRASTRUCTURE PVT. LTD. |
AMBIENCE ISLAND, VILLAGE NATH UPUR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/03/2022 |
|
View |
View Monitoring Cases |
|
244 |
GGM/609/341/2022/84 DATED 19.09.2022 |
RERA-GRG-1125-2022 |
EXPRESS GREENS |
HARYANA STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED |
SECTOR-M1A IMT MANESAR
|
GURUGRAM |
HRERA |
|
31/12/2026 |
|
QPR not Uploaded |
-- |
|
245 |
GGM/608/340/2022/83 DATED 19.09.2022 |
RERA-GRG-1122-2022 |
EXPRESS GREENS |
HARYANA STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED |
SECTOR-M1 IMT MANESAR
|
GURUGRAM |
HRERA |
|
31/12/2026 |
|
QPR not Uploaded |
-- |
|
246 |
301 OF 2017 DATED 13.10.2017 Lapsed Project |
NA |
EXPRESSWAY TOWERS |
OCEAN SEVEN BUILDTECH PVT. LTD. |
SECTOR 109, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
12/10/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
247 |
392 OF 2017 DATED 22.12.2017 Lapsed Project |
RERA-GRG-719-2020 |
FERNHILL (PHASE I) |
ANSAL PROPERTIES & INFRASTRUCTURE LTD. |
SECTOR 91, GURUGRAM, HARYANA
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
248 |
389 OF 2017 DATED 22.12.2017 Lapsed Project |
RERA-GRG-718-2020 |
FERNHILL (PHASE II) |
ANSAL PROPERTIES & INFRASTRUCTURE LTD. |
SECTOR 91, GURUGRAM, HARYANA
|
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
|
249 |
GGM/452/184/2021/20 DATED 15.07.2021 |
RERA-GRG-814-2021 |
FLORA AVENUE 33 |
M/S GLOBAL HORIZON HOLDINGS PVT. LTD. |
VILLAGE DHUNELA, SECTOR-33, T EHSIL SOHNA, DISTT. GURUGRAM |
GURUGRAM |
HRERA |
|
06/09/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
250 |
GGM/453/185/2021/21 DATED 15.07.2021 |
RERA-GRG-846-2021 |
FLORA AVENUE 33 PHASE-I |
M/S GLOBAL HORIZON HOLDINGS PVT. LTD. |
VILLAGE DHUNELA, SECTOR-33,TE HSIL SOHNA, DISTT.GURUGRAM |
GURUGRAM |
HRERA |
|
07/03/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
251 |
GGM/621/353/2022/96 DATED 27.10.2022 (SUPERSEDED BY GGM/674/406/2023/18 DATED 23.01.2023) |
RERA-GRG-1145-2022 |
FLORA AVENUE 88A |
GCC INFRA |
VILLAGE-HARSARU, SECTOR-88A, GURUGRAM MANESAR URBAN COMPLEX |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
-- |
|
252 |
GGM/674/406/2023/18 DATED 23.01.2023 |
RERA-GRG-1271-2023 |
FLORA AVENUE 88A |
GCC INFRA |
SECTOR-88A, VILLAGE-HARSARU, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA-122505 |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
|
253 |
287 OF 2017 DATED 10.10.2017 Lapsed Project |
RERA-GRG-618-2020 |
FLORENCE ESTATE |
ANGLE INFRASTRUCTURE PVT. LTD. |
SECTOR 70, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
254 |
231 OF 2017 DATED 19.09.2017 Lapsed Project |
RERA-GRG-646-2020 |
FLORENCE ESTATE, PHASE-2( TOWER D& E) |
ANGLE INFRASTRUCTURE PVT. LTD |
SECTOR-70, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
255 |
GGM/755/487/2023/99 DATED 06.11.2023 |
RERA-GRG-1450-2023 |
FLORET CENTRAL |
CORNONA REALTORS PRIVATE LIMITED |
SECTOR 59, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/06/2027 |
View Corrigendum |
View |
-- |
|
256 |
GGM/537/269/2022/12 DATED 21.02.2022 |
RERA-GRG-980-2021 |
GARDENCITY ARCADE |
DLF UTILITIES LIMITED |
SECTOR 92, GURUGRAM
|
GURUGRAM |
HRERA |
|
29/04/2025 |
|
View |
-- |
|
257 |
GGM/512/244/2021/80 DATED 16.11.2021 |
RERA-GRG-951-2021 |
GARDENCITY CENTRAL |
DLF HOME DEVELOPERS LIMITED |
SECTOR 84, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
23/08/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
258 |
GGM/607/339/2022/82 DATED 12.09.2022 |
RERA-GRG-1126-2022 |
GATEWAY95 |
SOLUTREAN BUILDING TECHNOLOGIES PVT LTD |
GATEWAY95 SECTOR95 VILLAGE DH ORKA TEHSIL HARSARU DISTRICT GURUGRAM HARYANA |
GURUGRAM |
HRERA |
|
30/08/2025 |
View Corrigendum |
View |
-- |
|
259 |
GGM/884/616/2024/111 DATED 14.11.2024 |
RERA-GRG-1718-2024 |
GATEWAY PLAZA 95 |
SOLUTREAN BUILDING TECHNOLOGIES PRIVATE LIMITED |
SECTOR-95, GURUGRAM
|
GURUGRAM |
HRERA |
|
09/09/2027 |
|
NA |
-- |
|
260 |
210 OF 2017 DATED 18.09.2017 Lapsed Project |
NA |
GH-24 (GROUP HOUSING SOCIETY) |
THE BAJRANG CO-OPERATIVE GROUP HOUSING SOCIETY LTD |
SECTOR- 43, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
261 |
GGM/532/264/2022/07 DATED 01.02.2022 |
RERA-GRG-992-2021 |
GLOBAL HEIGHTS 88A |
GCC INFRA |
P903-905, SECTOR 48, JMD MEGA POLIS, GURUGRAM |
GURUGRAM |
HRERA |
|
23/09/2026 |
|
View |
View Monitoring Cases |
|
262 |
GGM/536/268/2022/11 DATED 08.03.2022 |
RERA-GRG-993-2021 |
GLOBAL HEIGHTS 89 |
BREEZ INFRA |
SECTOR-89, VILLAGE- BADHA, TE HSIL- MANESAR, GURUGRAM |
GURUGRAM |
HRERA |
|
18/10/2026 |
|
View |
View Monitoring Cases |
|
263 |
84 OF 2017 DATED 21.08.2017 |
RERA-GRG-366-2019 |
GLOBAL HILL VIEW |
V.K.MOTORS PVT LTD |
SECTOR 11, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/07/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
264 |
GGM/719/451/2023/63 DATED 23.05.2023 |
RERA-GRG-1353-2023 |
GLS ARAWALI CITY |
GLS INFRATECH PVT. LTD. |
VILLAGE KHAIKA, SECTOR-4, SOH NA |
GURUGRAM |
HRERA |
|
01/04/2028 |
|
View |
View Monitoring Cases |
|
265 |
GGM/563/295/2022/38 DATED 23.05.2022 (SUPERSEDED BY GGM/815/547/2024/42 DATED 15.04.2024) |
RERA-GRG-998-2022 |
GLS COURTYARD |
GLS INFRAPROJECTS PVT. LTD. |
707, 7TH FLOOR, JMD PACIFIC S QUARE |
GURUGRAM |
HRERA |
|
31/03/2025 |
|
View |
-- |
|
266 |
GGM/815/547/2024/42 DATED 15.04.2024 |
RERA-GRG-1416-2023 |
GLS COURTYARD |
GLS INFRAPROJECTS PVT. LTD |
REVENUE ESTATE OF VILLAGE DHO RKA, SECTOR 95, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
10/07/2028 |
|
View |
-- |
|
267 |
GGM/713/445/2023/57 DATED 08.05.2023 |
RERA-GRG-1314-2023 |
GLS LANSDOWNE |
GLS INFRATECH PVT. LTD. |
SECTOR 67A, GURUGRAM
|
GURUGRAM |
HRERA |
|
02/02/2028 |
|
View |
View Monitoring Cases |
|
268 |
GGM/274/2018/06 DATED 18.05.2018 |
RERA-GRG-436-2019 |
GODREJ 24 K (PHASE-2) |
GODREJ REAL VIEW DEVELOPERS PVT. LTD. |
SECTOR-106,BABUBPUR, GURUGRAM
|
GURUGRAM |
HRERA |
|
28/03/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
269 |
GGM/273/2018/05 DATED 18.05.2018 |
RERA-GRG-433-2019 |
GODREJ 24K (PHASE I) |
GODREJ REAL VIEW DEVELOPERS PVT. LTD. |
SECTOR 106, VILLAGE BABUPUR, GURUGRAM |
GURUGRAM |
HRERA |
|
30/09/2023 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
270 |
GGM/300/2018/32 DATED 07.12.2018 Lapsed Project |
RERA-GRG-7-2018 |
GODREJ AIR PHASE-I |
GODREJ DEVELOPERS & PROPERTIES LLP |
SECTOR-85, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2023 |
|
View |
View Monitoring Cases |
|
271 |
GGM/301/2018/33 DATED 07.12.2018 Lapsed Project |
RERA-GRG-94-2018 |
GODREJ AIR PHASE-II |
GODREJ DEVELOPERS & PROPERTIES LLP |
SECTOR-85
|
GURUGRAM |
HRERA |
|
31/05/2023 |
|
View |
View Monitoring Cases |
|
272 |
GGM/302/2018/34 DATED 07.12.2018 Lapsed Project |
RERA-GRG-95-2018 |
GODREJ AIR PHASE-III |
GODREJ DEVELOPERS & PROPERTIES LLP |
SECTOR-85, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/09/2023 |
|
View |
View Monitoring Cases |
|
273 |
GGM/303/2018/35 DATED 07.12.2018 Lapsed Project |
RERA-GRG-96-2018 |
GODREJ AIR PHASE-IV |
GODREJ DEVELOPERS & PROPERTIES LLP |
SECTOR-85, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
|
274 |
61 OF 2017 DATED 17.8.2017 |
RERA-GRG-403-2019 |
GODREJ ARIA @ 101 ( VOL. I) |
WONDER CITY BUILDCON PVT.LTD |
SECTOR-79, VILLAGE NAURANGPUR , MANESAR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
28/02/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
275 |
GGM/746/478/2023/90 DATED 18.09.2023 |
RERA-GRG-947-2021 |
GODREJ ARIA & 101 (VOL. II) |
WONDER CITY BUILDCON LIMITED |
SEC 79, NAURANGPUR
|
GURUGRAM |
HRERA |
|
30/08/2028 |
|
View |
-- |
|
276 |
GGM/747/479/2023/91 DATED 18.09.2023 |
RERA-GRG-1369-2023 |
GODREJ ARIA & 101 (VOL. III) |
GODREJ PROPERTIES LIMITED |
NAURANGPUR
|
GURUGRAM |
HRERA |
|
30/08/2028 |
|
View |
-- |
|
277 |
GGM/767/499/2023/111 DATED 04.12.2023 |
RERA-GRG-1480-2023 |
GODREJ ARISTOCRAT |
GODREJ PROPERTIES LTD |
SECTOR 49, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
31/12/2030 |
|
View |
View Monitoring Cases |
|
278 |
GGM/317/49/2019/11 DATED 08.03.2019 |
RERA-GRG-163-2019 |
GODREJ HABITAT |
GODREJ PROPERTIES LTD. |
SECTOR-3, GURUGRAM
|
GURUGRAM |
HRERA |
|
23/08/2026 |
View Corrigendum |
View |
View Monitoring Cases |
|
279 |
50 OF 2017 DATED 12.08.2017 |
RERA-GRG-421-2019 |
GODREJ ICON |
OASIS LANDMARKS LLP |
SECTOR 88-A & 89-A, HARSARU, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
280 |
54 OF 2017 DATED 17.08.2017 |
RERA-GRG-991-2021 |
GODREJ ICON (ICONIC TOWER) |
OASIS LANDMARKS LLP |
SECTOR 88-A & 89-A, HARSARU, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/04/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
281 |
GGM/670/402/2023/14 DATED 16.01.2023 |
RERA-GRG-1224-2022 |
GODREJ ICON TOWER 4/E AND TOWER 5/F |
OASIS LANDMARKS LLP |
SECTOR 88A & 89A
|
GURUGRAM |
HRERA |
|
31/12/2029 |
|
View |
-- |
|
282 |
GGM/393/125/2020/09 DATED 10.02.2020 |
RERA-GRG-517-2019 |
GODREJ MERIDIEN PHASE III |
GODREJ REAL VIEW DEVELOPERS PRIVATE LIMITED |
SECTOR 106
|
GURUGRAM |
HRERA |
|
30/09/2025 |
|
View |
View Monitoring Cases |
|
283 |
GGM/870/602/2024/97 DATED 24.09.2024 |
RERA-GRG-1698-2024 |
GODREJ MIRAYA |
GODREJ PROJECTS DEVELOPMENT LIMITED |
SECTOR 43, URBAN ESTATE, GURU GRAM II |
GURUGRAM |
HRERA |
|
30/09/2031 |
|
NA |
-- |
|
284 |
18 OF 2018 DATED 30.01.2018 |
RERA-GRG-359-2019 |
GODREJ NATURE PLUS |
GODREJ HIGHVIEW LLP |
SECTOR-33, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/01/2028 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
285 |
53 OF 2017 DATED 17.08.2017 |
RERA-GRG-628-2020 |
GODREJ OASIS |
OASIS LANDMARKS LLP |
SECTOR 88-A & 89-A, HARSARU, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/09/2019 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
286 |
75 OF 2017 DATED 21.08.2017 |
RERA-GRG-653-2020 |
GODREJ SUMMIT |
GODREJ PROJECTS DEVELOPMENT PVT LTD |
SECTOR 104 GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/09/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
287 |
GGM/846/578/2024/73 DATED 01.07.2024 |
RERA-GRG-1650-2024 |
GODREJ VRIKSHYA |
GODREJ VESTAMARK LLP |
SECTOR 103
|
GURUGRAM |
HRERA |
|
30/06/2031 |
|
NA |
-- |
|
288 |
GGM/799/531/2024/26 DATED 18.03.2024 |
RERA-GRG-1536-2024 |
GODREJ ZENITH |
GODREJ PROPERTIES LTD |
SECTOR 89, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
31/03/2031 |
|
View |
-- |
|
289 |
GGM/654/386/2022/129 DATED 23.12.2022 Lapsed Project |
RERA-GRG-1209-2022 |
GOKULAM |
NB BUILDCON PVT. LTD. |
SECTOR 7 , SOHNA
|
GURUGRAM |
HRERA |
|
31/08/2024 |
|
View |
-- |
|
290 |
GGM/748/480/2023/92 DATED 09.10.2023 |
RERA-GRG-1444-2023 |
GOLDEN GATE RESIDENCY |
YASHVI HOMES PVT. LTD. |
SECTOR-3, FARUKHNAGAR
|
GURUGRAM |
HRERA |
|
31/07/2028 |
|
View |
View Monitoring Cases |
|
291 |
GGM/614/346/2022/89 DATED 03.10.2022 |
RERA-GRG-1099-2022 |
GOLDEN PARK |
GOEL & SON'S DEVELOPERS PRIVATE LIMITED |
SECTOR 4, SOHNA
|
GURUGRAM |
HRERA |
|
24/06/2027 |
|
View |
View Monitoring Cases |
|
292 |
GGM/399/131/2020/15 DATED 23.06.2020 |
RERA-GRG-633-2020 |
GOLF GREENS-79 |
SIGNATUREGLOBAL (INDIA) PRIVATE LIMITED |
VILLAGE NAURANGPUR, SECTOR 79
|
GURUGRAM |
HRERA |
|
31/07/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
293 |
GGM/285/2018/17 DATED 12.10.2018 Lapsed Project |
RERA-GRG-456-2019 |
GOLF HEIGHTS |
OCEAN SEVEN BUILDTECH PVT. LTD. |
SECTOR-69, BADSHAHPUR, GURUGR AM |
GURUGRAM |
HRERA |
|
20/04/2023 |
|
QPR not Uploaded |
View Monitoring Cases |
|
294 |
GGM/540/272/2022/15 DATED 21.02.2022 |
RERA-GRG-990-2021 |
GRAND CENTRAL 114 |
CANDEO PROJECTS PVT. LTD. |
SECTOR 114, GURUGRAM
|
GURUGRAM |
HRERA |
|
18/01/2027 |
|
View |
View Monitoring Cases |
|
295 |
13 OF 2017 DATED 03.07.2017 |
RERA-GRG-386-2019 |
GRAND IVA |
JMK HOLDING PVT.LTD. |
SECTOR-103, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
28/09/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
296 |
GGM/560/292/2022/35 DATED 16.05.2022 |
RERA-GRG-1055-2022 |
GRAND VISTA |
PYRAMID INFRATECH PVT LTD |
SECTOR- 73
|
GURUGRAM |
HRERA |
|
15/12/2026 |
|
View |
-- |
|
297 |
GGM/669/401/2023/13 DATED 16.01.2023 |
RERA-GRG-1211-2022 |
GREEN BHOOMI |
BST DEVELOPERS INDIA PVT LTD |
SECTOR 99A, VILLAGE GOPALPUR, TEHSIL HARSARU |
GURUGRAM |
HRERA |
|
25/01/2027 |
|
View |
View Monitoring Cases |
|
298 |
137 OF 2017 DATED 28.08.2017 |
RERA-GRG-412-2019 |
GREEN COURT |
ASTER INFRAHOME PVT. LTD. |
SECTOR-90, VILLAGE- HAYATPUR, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
22/07/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
299 |
GGM/503/235/2021/71 DATED 27.10.2021 |
RERA-GRG-928-2021 |
GREEN OAKS |
COUNTRYWIDE PROMOTERS PRIVATE LIMITED |
SECTOR 70 A GURUGRAM
|
GURUGRAM |
HRERA |
|
27/08/2026 |
|
View |
View Monitoring Cases |
|
300 |
GGM/311/43/2019/05 DATED 23.01.2019 Lapsed Project |
RERA-GRG-165-2019 |
GREENOPOLIS |
RADHA ESTATES PVT. LTD. ,ORRIS INFRASTRUCTURES PVT. LTD. & THREE C SHELTERS PVT. LTD. |
SECTOR-89, MANESAR, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
|
301 |
GGM/351/83/2019/45 DATED 30.08.2019 |
RERA-GRG-279-2019 |
GREEN VALLEY |
LION INFRADEVELOPERS LLP |
SEC 35,SOHNA, GURUGRAM, HARYA NA |
GURUGRAM |
HRERA |
|
19/08/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
302 |
GGM/805/537/2024/32 DATED 01.04.2024 |
RERA-GRG-1513-2023 |
GREEN VALLEY 2 |
LION INFRADEVELOPERS LLP |
REVENUE ESTATE OF VILLAGE SOH NA, SECTOR-6, GURURGRAM |
GURUGRAM |
HRERA |
|
30/06/2028 |
|
View |
-- |
|
303 |
GGM/479/211/2021/47 DATED 07.09.2021 |
RERA-GRG-890-2021 |
GREEN VALLEY INDEPENDENT FLOORS |
LION INFRADEVELOPERS LLP |
SEC 35,SOHNA, GURUGRAM, HARYA NA |
GURUGRAM |
HRERA |
|
19/02/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
304 |
175 OF 2017 DATED 30.08.2017 Lapsed Project |
NA |
GROUP HOUSING COLONY |
RAMPRASTHA SARE GURUGRAM PRIVATE LIMITED |
SECTOR 92, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
30/09/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
305 |
161 OF 2017 DATED 29.08.2017 Lapsed Project |
RERA-GRG-373-2019 |
GROUP HOUSING COLONY |
RAM AVTAR YADAV |
SECTOR 67, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/07/2022 |
|
View |
View Monitoring Cases |
|
306 |
170 OF 2017 DATED 29.08.2017 |
RERA-GRG-632-2020 |
GROUP HOUSING COLONY |
ADANI M2K PROJECTS LLP |
KHEDKI MAZRA, SECTOR 102/102A , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/09/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
307 |
171 OF 2017 DATED 29.08.2017 |
NA |
GROUP HOUSING COLONY |
ADANI M2K PROJECTS LLP |
KHEDKI MAZRA, SECTOR 102/102A , GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
30/09/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
308 |
186 OF 2017 DATED 14.09.2017 |
RERA-GRG-730-2020 |
GROUP HOUSING COLONY |
GATEVIDA DEVELOPERS PRIVATE LIMITED |
SECTOR 112/113, VILLAGE BAJGH ERA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
30/06/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
309 |
179 OF 2017 DATED 01.09.2017 |
NA |
GROUP HOUSING COLONY |
HAAMID REAL ESTATE PVT. LTD. |
VILLAGE PALRA, SECTOR 70 A, G URUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
31/05/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
310 |
03 OF 2017 DATED 20.06.2017 |
RERA-GRG-360-2019 |
GROUP HOUSING COLONY |
SIGNATURE GLOBAL (INDIA) PVT.LTD |
SEC-37-D, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/01/2023 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
311 |
02 OF 2017 DATED 19.06.2017 |
RERA-GRG-361-2019 |
GROUP HOUSING COLONY |
STERNAL BUILDCON ART, LTD |
SEC-36, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
17/05/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
312 |
04 OF 2017 DATED 20.06.2017 |
RERA-GRG-389-2019 |
GROUP HOUSING COLONY |
SIGNATURE BUILDERS PVT. LTD |
SEC-107, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/05/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
313 |
96 OF 2017 DATED 28.08.2017 |
RERA-GRG-397-2019 |
GROUP HOUSING COLONY |
BESTECH INDIA PVT LTD |
SECTOR 79, NAURANGPUR, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
30/09/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
314 |
101 OF 2017 DATED 24.08.2017 |
RERA-GRG-346-2019 |
GROUP HOUSING COLONY |
PIONEER URBAN LAND AND INFRASTRUCTURE LTD |
SECTOR 62, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
315 |
100 OF 2017 DATED 28.08.2017 Lapsed Project |
RERA-GRG-578-2020 |
GROUP HOUSING COLONY |
SONI INFRATECH PVT LTD |
SECTOR 68, BADSHAHPUR, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
31/12/2023 |
|
QPR not Uploaded |
View Monitoring Cases |
|
316 |
99 OF 2017 DATED 28.08.2017 |
RERA-GRG-558-2020 |
GROUP HOUSING COLONY (MICASA) |
PAREENA INFRASTRUCTURE PVT LTD |
SECTOR 68, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/12/2025 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
317 |
150 OF 2017 DATED 28.08.2017 |
RERA-GRG-665-2020 |
GROUP HOUSING COLONY OF 10.925 ACRES |
ST. PATRICKS REALTY PVT.LTD. |
SECTOR-32, SOHNA GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/01/2026 |
View Corrigendum |
View |
View Monitoring Cases |
|
318 |
270 OF 2017 DATED 09.10.2017 |
NA |
GROUP HOUSING COLONY(TOWER P1,P2,P3,P4,P5,P6,T15 AND T16, PHASE 4 |
RAMPRASTHA SARE REALTY PVT. LTD. |
SECTOR 92, VILLAGE WAZIRPUR A ND MEWKA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2030 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
|
319 |
160(A) OF 2017 DATED 21.11.2017 Lapsed Project |
RERA-GRG-539-2019 |
GROUP HOUSING PROJECT |
JUVENTUS ESTATE LTD. |
SECTOR 104, DHANWAPUR, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
30/04/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
|
320 |
11 OF 2017 DATED 30.06.2017 |
RERA-GRG-352-2019 |
GROUP HOUSING PROJECT(ORCHARD AVENUE) |
SIGNATURE BUILDERS. PVT. LTD. |
SECTOR-93, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
29/09/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
321 |
20 OF 2017 DATED 06.07.2017 Lapsed Project |
RERA-GRG-428-2019 |
GROUP HOUSING PROJECT ( TOWER A,B,C, D AND E) |
RAHEJA DEVELOPERS LTD. |
RAHEJA MAHESHWARA SECTOR-11 A ND 14, SOHNA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
05/07/2022 |
|
View |
View Monitoring Cases |
|
322 |
09 OF 2017 DATED 30.06.2017 |
RERA-GRG-553-2020 |
GROUP HOUSTNG PROJECT LN (SOLERA) |
SIGNATURE BUILDERS. PVT. LTD. |
SEC-107, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
05/01/2019 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
323 |
68 OF 2017 DATED 18.8.2017 Lapsed Project |
NA |
GSR DRIVE BY ILD- PHASE I |
INTERNATIONAL LAND DEVELOPERS PVT. LTD |
SECTOR- 36, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
N/A |
17/12/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
324 |
8(A) OF 2018 DATED 01.02.2018 Lapsed Project |
RERA-GRG-444-2019 |
GULMOHAR TOWER (TOWER-A) |
RAHEJA DEVELOPERS LTD |
SECTOR- 99A
|
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
|
325 |
36(A) OF 2017 DATED 05.12.2017 |
RERA-GRG-585-2020 |
GURGAON GREENS |
EMAAR MGF LAND LTD. |
SECTOR -102, VILLAGE DHANKOT, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
326 |
222 OF 2017 DATED 18.09.2017 Lapsed Project |
RERA-GRG-385-2019 |
GURGAON SPECTRUM CENTRE (PHASE-1) ( COMMERCIAL PROJECT) |
BURMAN GSC ESTATE PVT. LTD |
SECTOR- 82A, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2020 |
|
View |
View Monitoring Cases |
|
327 |
27 OF 2017 DATED 28.08.2017 |
RERA-GRG-357-2019 |
HABITAT |
PRIME INFRASTRUCTURE PVT. LTD |
99-A, VILLAGE DHANKOT, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
22/01/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
328 |
GGM/523/255/2021/91 DATED 20.12.2021 |
RERA-GRG-950-2021 |
HABITAT 102 |
HABITAT TOWNSHIP PVT. LTD |
VILLAGE KHERKI MAJRA, SEC-102 , GURUGRAM |
GURUGRAM |
HRERA |
|
24/07/2026 |
|
View |
View Monitoring Cases |
|
329 |
GGM/458/190/2021/26 DATED 22.06.2021 |
RERA-GRG-806-2021 |
HABITAT PRIME |
PRIME INFRADEVELOPERS PVT LTD |
VILLAGE DHANKOT, SEC-99A, GUR UGRAM |
GURUGRAM |
HRERA |
|
24/11/2025 |
|
View |
-- |
|
330 |
GGM/728/460/2023/72 DATED 26.06.2023 |
RERA-GRG-1243-2022 |
HANU RESIDENCY |
PAREENA INFRASTRUCTURES PVT. LTD. |
HANU RESIDENCY BADSHAHPUR AKL IMPUR ROAD, SECTOR-68, |
GURUGRAM |
HRERA |
|
31/05/2027 |
|
View |
-- |
|
331 |
GGM/499/231/2021/67 DATED 12.10.2021 |
RERA-GRG-913-2021 |
HCBS AUROVILLE |
HCBS DEVELOPMENTS LTD |
SECTOR 103 GURGAON
|
GURUGRAM |
HRERA |
|
31/08/2025 |
|
View |
View Monitoring Cases |
|
332 |
GGM/360/92/2019/54 DATED 03.10.2019 |
RERA-GRG-249-2019 |
HEARTSONG PHASE 6 |
EXPERION DEVELOPERS PVT. LTD. |
SECTOR 108
|
GURUGRAM |
HRERA |
|
13/05/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
333 |
GGM/276/2018/08 DATED 23.07.2018 |
RERA-GRG-458-2019 |
HERITAGE MAX |
DREAMHOME INFRASTRUCTURE PVT. LTD. |
SECTOR 102, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
334 |
GGM/807/539/2024/34 DATED 01.04.2024 |
RERA-GRG-1555-2024 |
HERO EARTH COMMERCIAL SHOPS |
HERO REALTY PRIVATE LIMITED |
SECTOR 85, VILLAGE SIKANDARPU R BADHA, GURGRAM-122004 |
GURUGRAM |
HRERA |
|
30/06/2027 |
|
View |
-- |
|
335 |
GGM/292/2018/24 DATED 13.11.2018 |
RERA-GRG-294-2019 |
HERO HOMES |
VIKAS PARK PVT LTD |
SECTOR-104, DHANWAPUR, GURUGR AM |
GURUGRAM |
HRERA |
|
28/02/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
336 |
GGM/743/475/2023/87 DATED 28.08.2023 |
RERA-GRG-1417-2023 |
HERO HOMES TOWER 8 |
VIKAS PARKS PRIVATE LIMITED |
SECTOR 104, DWARKA EXPRESSWAY , GURUGRAM, HARYANA, 122006 |
GURUGRAM |
HRERA |
|
30/09/2027 |
|
View |
-- |
|
337 |
263 OF 2017 DATED 03.10.2017 Lapsed Project |
RERA-GRG-500-2019 |
HIGH STREET (PHASE I) |
VATIKA LTD. |
SECTOR-83, VILLAGE SHIKOHPUR, SUB-TEHSIL MANESAR, DIST. GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
02/10/2022 |
|
View |
View Monitoring Cases |
|
338 |
GGM/406/138/2020/22 DATED 01.09.2020 |
RERA-GRG-337-2019 |
HIGHTOWN |
SILVERGLADES INFRASTRUCTURE PRIVATE LIMITED |
REVENUE ESTATE OF VILLAGE SUK HRALI, SECTOR 28 |
GURUGRAM |
HRERA |
|
11/10/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
339 |
258 OF 2017 DATED 03.10.2017 Lapsed Project |
RERA-GRG-551-2020 |
HILL CREST/OFFICER ENCLAVE(LOW RISE FLOOR) |
SUPERTECH LTD. |
SECTOR -02, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
02/10/2020 |
|
View |
View Monitoring Cases |
|
340 |
GGM/433/165/2021/01 DATED 08.01.2021 |
RERA-GRG-784-2020 |
HILL ESTATE |
SUPERTECH LIMITED |
SECTOR-2, SOHNA
|
GURUGRAM |
HRERA |
|
30/11/2025 |
|
View |
View Monitoring Cases |
|
341 |
97 OF 2017 DATED 24.08.2017 Lapsed Project |
RERA-GRG-486-2019 |
HILL VIEW PROJECT (TOWER 1 TO 8) |
SUPERTECH LTD |
SECTOR 2, SOHNA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/06/2021 |
|
View |
View Monitoring Cases |
|
342 |
GGM/615/347/2022/90 DATED 03.10.2022 Lapsed Project |
RERA-GRG-1154-2022 |
HUB 108 |
EXPERION DEVELOPERS PRIVATE LIMITED |
SECTOR 108, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
05/05/2024 |
|
View |
View Monitoring Cases |
|
343 |
182 OF 2017 DATED 04.09.2017 Lapsed Project |
RERA-GRG-450-2019 |
HUES TOWERS AND AZALIA TOWERS |
SUPERTECH LIMITED |
VILLAGE BADSHAHPUR, SECTOR 68 , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2021 |
|
View |
View Monitoring Cases |
|
344 |
GGM/771/503/2023/115 DATED 11.12.2023 |
RERA-GRG-1415-2023 |
ICONIC |
CELESTIAL ESTATE PRIVATE LIMITED |
C25H+X7W, BEHRAMPUR VILLAGE, SECTOR 71, GURUGRAM, HARYANA 122004 |
GURUGRAM |
HRERA |
|
31/12/2025 |
|
View |
View Monitoring Cases |
|
345 |
386 OF 2017 DATED 18.12.2017 Lapsed Project |
RERA-GRG-463-2019 |
ILD GRAND |
ALM INFOTECH CITY PVT.LTD. |
SECTOR 37 C, TEHSIL AND DISTR ICT GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
30/06/2023 |
View Corrigendum |
View |
View Monitoring Cases |
|
346 |
62 OF 2017 DATED 17.8.2017 Lapsed Project |
RERA-GRG-557-2020 |
ILD GRAND CENTRA ( TOWER 1) |
ILD MILLENNIUM PVT. LTD |
SECTOR- 37C, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
16/02/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
|
347 |
60 OF 2017 DATED 18.8.2017 |
RERA-GRG-510-2019 |
ILD GREENS ( TOWER 2,6 AND 7) |
ILD MILLENNIUM PVT. LTD |
SECTOR- 37C, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
16/08/2018 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
348 |
GGM/559/291/2022/34 DATED 16.05.2022 |
RERA-GRG-1046-2022 |
IMPERIAL ESTATE |
PYRAMID INFRATECH PVT LTD |
SECTOR- 70 A,
|
GURUGRAM |
HRERA |
|
20/12/2026 |
|
View |
-- |
|
349 |
208 OF 2017 DATED 15.09.2017 |
RERA-GRG-613-2020 |
IMPERIAL GARDEN |
EMAAR MGF LAND LTD |
SECTOR-102, KHERKI DAULLA, GU RUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
350 |
GGM/320/52/2019/14 DATED 28.03.2019 |
RERA-GRG-110-2018 |
IMPERIAL GARDEN PHASE 2 |
EMAAR MGF LAND LTD. |
SECTOR- 102, GURUGRAM
|
GURUGRAM |
HRERA |
|
17/10/2018 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
351 |
GGM/587/319/2022/62 DATED 11.07.2022 |
RERA-GRG-1009-2022 |
IMPERIA SHOPPING CENTRAL |
IMPERIA WISHFIELD PRIVATE LIMITED |
VILLAGE GADOLI KHURD, SECTOR- 37, GURUGRAM |
GURUGRAM |
HRERA |
|
31/03/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
352 |
GGM/491/223/2021/59 DATED 21.09.2021 |
RERA-GRG-898-2021 |
INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73 |
DLF HOME DEVELOPERS LIMITED |
SECTOR 73
|
GURUGRAM |
HRERA |
|
24/11/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
353 |
GGM/448/180/2021/16 DATED 25.03.2021 |
RERA-GRG-840-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE I |
DLF REAL ESTATE BUILDERS LIMITED |
DLF CITY PHASE - I
|
GURUGRAM |
HRERA |
|
28/02/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
354 |
GGM/461/193/2021/29 DATED 06.07.2021 |
RERA-GRG-866-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE II |
DLF PROJECTS LIMITED |
DLF CITY PHASE II
|
GURUGRAM |
HRERA |
|
30/06/2024 |
|
View |
-- |
View OC/CC/PCC |
355 |
GGM/431/163/2020/47 DATED 22.12.2020 |
RERA-GRG-778-2020 |
INDEPENDENT FLOORS AT DLF CITY PHASE III |
DLF LIMITED |
DLF CITY PHASE-III, SECTOR 24 , GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
QPR not Uploaded |
-- |
|
356 |
GGM/521/253/2021/89 DATED 20.12.2021 |
RERA-GRG-963-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE III |
DLF BUILDERS & DEVELOPERS PRIVATE LIMITED |
DLF CITY PHASE III, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
14/02/2025 |
|
View |
-- |
|
357 |
GGM/441/173/2021/08(A) DATED 22.02.2021 |
RERA-GRG-810-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE III |
DLF LUXURY HOMES LIMITED |
DLF CITY PHASE-III, SECTOR 24 , GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/03/2025 |
|
View |
View Monitoring Cases |
|
358 |
GGM/509/241/2021/77 DATED 09.11.2021 |
RERA-GRG-930-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE I & II |
DLF HOME DEVELOPERS LIMITED |
DLF CITY PHASE I AND DLF CITY PHASE II, GURUGRAM |
GURUGRAM |
HRERA |
|
15/12/2024 |
|
View |
-- |
|
359 |
GGM/547/279/2022/22 DATED 02.04.2022 |
RERA-GRG-1014-2022 |
INDEPENDENT FLOORS AT DLF CITY PHASE I & III |
M/S DLF EXCLUSIVE FLOORS PRIVATE LIMITED |
DLF CITY PHASE I & DLF CITY P HASE III, GURUGRAM |
GURUGRAM |
HRERA |
|
15/05/2025 |
|
View |
-- |
|
360 |
GGM/528/260/2022/03 DATED 24.01.2022 |
RERA-GRG-986-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE I & III |
DLF HOMES PANCHKULA PRIVATE LIMITED |
DLF CITY PHASE I AND DLF CITY PHASE III, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
14/02/2025 |
|
View |
-- |
|
361 |
GGM/520/252/2021/88 DATED 20.12.2021 |
RERA-GRG-969-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE I, II & III |
DLF RESIDENTIAL DEVELOPERS LIMITED |
DLF CITY PHASE I, II & III, G URUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
14/02/2025 |
|
View |
-- |
|
362 |
GGM/558/290/2022/33 DATED 02.05.2022 |
RERA-GRG-1016-2022 |
INDEPENDENT FLOORS AT DLF CITY PHASE I, II & III |
DLF PROPERTY DEVELOPERS LIMITED |
DLF CITY PHASE I, DLF CITY PH ASE II & DLF CITY PHASE III |
GURUGRAM |
HRERA |
|
15/05/2025 |
|
View |
-- |
|
363 |
GGM/483/215/2021/51 DATED 14.09.2021 Lapsed Project |
RERA-GRG-897-2021 |
INDEPENDENT FLOORS AT DLF CITY PHASE IV |
DLF HOME DEVELOPERS LIMITED |
DLF CITY PHASE IV, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
14/11/2024 |
|
View |
-- |
|
364 |
GGM/539/271/2022/14 DATED 14.03.2022 |
RERA-GRG-1001-2022 |
INDEPENDENT FLOORS AT DLF CITY PHASE IV |
DLF LIMITED |
DLF CITY PHASE IV, SECTOR-27, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
15/05/2025 |
|
View |
-- |
|
365 |
GGM/522/254/2021/90 DATED 20.12.2021 |
RERA-GRG-974-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY |
DLF UTILITIES LIMITED |
DLF GARDENCITY, SECTOR 91/92
|
GURUGRAM |
HRERA |
|
31/03/2025 |
|
View |
-- |
|
366 |
GGM/603/335/2022/78 DATED 17.08.2022 |
RERA-GRG-1060-2022 |
INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE |
DLF LIMITED |
SECTOR 93
|
GURUGRAM |
HRERA |
|
19/08/2027 |
|
View |
-- |
|
367 |
GGM/657/389/2023/01 DATED 02.01.2023 |
RERA-GRG-1223-2022 |
INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2 |
DLF LIMITED |
SECTOR 93
|
GURUGRAM |
HRERA |
|
30/10/2028 |
|
View |
-- |
|
368 |
GGM/457/189/2021/25 DATED 15.06.2021 |
RERA-GRG-848-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF PROJECTS LIMITED |
DLF GARDEN CITY, SECTOR 91 / 92, |
GURUGRAM |
HRERA |
|
21/06/2024 |
|
View |
-- |
View OC/CC/PCC |
369 |
GGM/444/176/2021/12 DATED 22.03.2021 |
RERA-GRG-817-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF LUXURY HOMES LIMITED |
DLF GARDEN CITY, SECTOR 91 / 92, |
GURUGRAM |
HRERA |
|
20/06/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
370 |
GGM/443/175/2021/11 DATED 15.03.2021 |
RERA-GRG-822-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF UTILITIES LIMITED |
DLF GARDEN CITY, SECTOR 91 / 92, |
GURUGRAM |
HRERA |
|
20/06/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
371 |
GGM/446/178/2021/14 DATED 22.03.2021 |
RERA-GRG-830-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF HOME DEVELOPERSLIMITED |
DLF GARDENCITY, SECTOR 91 / 9 2, |
GURUGRAM |
HRERA |
|
16/06/2025 |
|
View |
View Monitoring Cases |
|
372 |
GGM/445/177/2021/13 DATED 22.03.2021 |
RERA-GRG-828-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF BUILDERS & DEVELOPERS PRIVATE LIMITED |
DLF GARDENCITY, SECTOR 91 / 9 2, |
GURUGRAM |
HRERA |
|
16/06/2025 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
373 |
GGM/456/188/2021/24 DATED 15.06.2021 |
RERA-GRG-853-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF RESIDENTIAL PARTNERS LIMITED |
DLF GARDENCITY, SECTOR 91 / 9 2, |
GURUGRAM |
HRERA |
|
21/06/2024 |
|
View |
-- |
View OC/CC/PCC |
374 |
GGM/475/207/2021/43 DATED 17.08.2021 |
RERA-GRG-891-2021 |
INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91/92 |
DLF UTILITIES LIMITED |
DLF GARDENCITY, SECTOR 91/92, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
19/11/2024 |
|
View |
-- |
View OC/CC/PCC |
375 |
298 OF 2017 DATED 13.10.2017 Lapsed Project |
RERA-GRG-1611-2024 |
INDIABULLS ONE09 |
CITRA PROPERTIES LTD. |
SECTOR 109, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/05/2024 |
View Corrigendum |
View |
View Monitoring Cases |
|
376 |
333 OF 2017 DATED 24.10.2017 Lapsed Project |
RERA-GRG-1613-2024 |
INDIABULLS ONE 09, PHASE-1 |
CITRA PROPERTIES LTD. |
SECTOR-109, VILLAGE PAWALA KH USRUPUR, GURGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
04/05/2023 |
View Corrigendum |
View |
View Monitoring Cases |
|
377 |
GGM/631/363/2022/106 DATED 21.11.2022 |
RERA-GRG-1174-2022 |
INDIA RASHTRA |
NEXT GENERATION PROJECTS PVT LTD |
SECTOR 88A
|
GURUGRAM |
HRERA |
|
30/11/2026 |
|
View |
-- |
|
378 |
GGM/436/168/2021/04 DATED 18.01.2021 |
RERA-GRG-798-2021 |
INFINITY |
PYRAMID DREAM HOMES LLP |
VILLAGE BADSHAHPUR, SECTOR-70
|
GURUGRAM |
HRERA |
|
24/09/2025 |
|
View |
View Monitoring Cases |
|
379 |
327 OF 2017 DATED 23.10.2017 |
RERA-GRG-520-2019 |
INSPIRE |
BRAHMA CITY PVT. LTD. |
SECTOR-60, TEHSIL-WAZIRABAD, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
20/08/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
380 |
367 OF 2017 DATED 24.11.2017 Lapsed Project |
RERA-GRG-1789-2024 |
IREO SKYON |
IREO PVT.LTD. |
SECTOR -60, VILLAGE ULLHAWAS, GURUGRAM,HARYANA |
GURUGRAM |
INTERIM RERA |
|
21/11/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
381 |
13 OF 2018 DATED 11.01.2018 |
RERA-GRG-528-2019 |
ISHAN SINGH ( COMMERCIAL) |
SPAZE TOWERS PVT. LTD |
SECTOR-78, VILLAGE- NAURANGPU R |
GURUGRAM |
INTERIM RERA |
|
31/12/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
382 |
58 OF 2017 DATED 17.08.2017 Lapsed Project |
RERA-GRG-670-2020 |
IT COLONY ( COMMERCE PARK) |
EMAAR MGF LAND LTD |
SECTOR- 61, GHATA, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/03/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
383 |
143 OF 2017 DATED 28.08.2017 |
RERA-GRG-374-2019 |
IT COMMERICAL LAND |
INDRA TECHNOLOGIES PVT.LTD. |
VILLAGE BEHRAMPUR,SECTOR-58,G URUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2017 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
384 |
67 OF 2017 DATED 18.8.2017 |
RERA-GRG-5-2018 |
JMD EMPIRE ( TOWER A AND B) |
JMD LIMITED |
SECTOR-62, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
385 |
GGM/555/287/2022/30 DATED 25.04.2022 |
RERA-GRG-762-2020 |
JMD SUBURBIO-1 |
JMD LIMITED |
SECTOR 67
|
GURUGRAM |
HRERA |
|
30/12/2024 |
|
View |
-- |
|
386 |
312 OF 2017 DATED 17.10.2017 Lapsed Project |
RERA-GRG-399-2019 |
JMD SUBURBIO-II |
JMD LTD. |
SECTOR 67, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
View |
View Monitoring Cases |
|
387 |
GGM/855/587/2024/82 DATED 02.08.2024 |
RERA-GRG-1626-2024 |
JMS GROUP CAPITAL SQUARE |
JMS INFRA REALITY PVT. LTD. |
SECTOR 95, VILLAGE-WAZIRPUR
|
GURUGRAM |
HRERA |
|
31/03/2028 |
|
NA |
-- |
|
388 |
GGM/295/2018/27 DATED 29.11.2018 Lapsed Project |
RERA-GRG-75-2018 |
JOYVILLE GURUGRAM-I |
JOYVILLE SHAPOORJI HOUSING PVT LTD |
VILLAGE-KHERKI MAJRA, SECTOR- 102, TEHSIL-GURUGRAM, DISTRICT-GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
15/03/2023 |
View Corrigendum |
View |
View Monitoring Cases |
|
389 |
GGM/296/2018/28 DATED 29.11.2018 Lapsed Project |
RERA-GRG-82-2018 |
JOYVILLE GURUGRAM-II |
JOYVILLE SHAPOORJI HOUSING PVT LTD |
VILLAGE-KHERKI MAJRA, SECTOR- 102, TEHSIL- GURUGRAM, DISTRICT-GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
15/09/2023 |
View Corrigendum |
View |
View Monitoring Cases |
|
390 |
GGM/335/67/2019/29 DATED 24.05.2019 Lapsed Project |
RERA-GRG-211-2019 |
JOYVILLE GURUGRAM PHASE III |
JOYVILLE SHAPOORJI HOUSING PVT. LTD. |
SECTOR-102, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/04/2024 |
|
View |
View Monitoring Cases |
|
391 |
GGM/336/68/2019/30 DATED 24.05.2019 |
RERA-GRG-213-2019 |
JOYVILLE GURUGRAM PHASE IV |
JOYVILLE SHAPOORJI HOUSING PVT. LTD. |
SECTOR-102, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2024 |
View Corrigendum |
View |
View Monitoring Cases |
|
392 |
GGM/434/166/2021/02 DATED 08.01.2021 |
RERA-GRG-781-2020 |
JOYVILLE GURUGRAM PHASE VI |
JOYVILLE SHAPOORJI HOUSING PRIVATE LIMITED |
KHERKI MAJRA, SECTOR 102, GUR UGRAM |
GURUGRAM |
HRERA |
|
31/07/2025 |
|
View |
View Monitoring Cases |
|
393 |
GGM/345/77/2019/39 DATED 06.09.2019 |
RERA-GRG-236-2019 |
JOYVILLE GURUGRAM V |
JOYVILLE SHAPOORJI HOUSING PRIVATE LIMITED |
VILLAGE - KHERKI,MAJRA HADUST - 52, SEC 102 ,GURUGRAM |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
|
394 |
GGM/291/2018/23 DATED 27.11.2018 Lapsed Project |
RERA-GRG-639-2020 |
KAVYAM-PHASE-1 |
AGRANTE REALTY LTD |
SECTOR-108, DHARAMPUR, GURUGR AM |
GURUGRAM |
HRERA |
|
30/11/2022 |
|
View |
View Monitoring Cases |
|
395 |
GGM/759/491/2023/103 DATED 20.11.2023 |
RERA-GRG-1460-2023 |
KESHAV KUNJ |
AJK DEVELOPERS |
SECTOR-3
|
GURUGRAM |
HRERA |
|
31/07/2028 |
|
QPR not Uploaded |
-- |
|
396 |
234 OF 2017 DATED 19.09.2017 |
RERA-GRG-1544-2024 |
KLJ SQUARE ( COMMERCIAL PROJECT) |
KLJ REALTECH PRIVATE LIMITED |
SECTOR-83, SHIKOHPUR, GURUGRA M |
GURUGRAM |
INTERIM RERA |
|
30/06/2024 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
397 |
GGM/812/544/2024/39 DATED 08.04.2024 |
RERA-GRG-1562-2024 |
KRISUMI WATERSIDE RESIDENCES |
KRISUMI CORPORATION PVT. LTD. |
SECTOR- 36A, GURUGRAM, HARYAN A |
GURUGRAM |
HRERA |
|
14/10/2029 |
|
View |
-- |
|
398 |
GGM/371/103/2019/65 DATED 22.10.2019 Lapsed Project |
RERA-GRG-221-2019 |
KRRISH WORLD |
KRRISH REALTECH PVT. LTD |
VILLAGE MAIDAWAS & ULLAWAS
|
GURUGRAM |
HRERA |
|
22/10/2019 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
|
399 |
133 OF 2017 DATED 28.08.2017 |
RERA-GRG-563-2020 |
KSHITIJ |
RAMSONS ORGANICS LTD. |
SECTOR-95, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
25/08/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
400 |
GGM/432/164/2020/48 DATED 22.12.2020 |
RERA-GRG-711-2020 |
LA CENTRAL |
DIVINE VISION INFRA RETAIL PVT. LTD. |
REVENUE ESTATE OF VILLAGE BEG AMPUR KHATOLA, SECTOR 74A, DISTRICT GURUGRAM. |
GURUGRAM |
HRERA |
|
31/12/2024 |
View Corrigendum |
View |
View Monitoring Cases |
|
401 |
GGM/695/427/2023/39 DATED 13.02.2023 |
RERA-GRG-1244-2022 |
LANDMARK AVANA |
LANDMARK APARTMENTS PRIVATE LIMITED |
SECTOR 95, GURUGRAM
|
GURUGRAM |
HRERA |
|
29/01/2028 |
|
View |
-- |
|
402 |
GGM/740/472/2023/84 DATED 24.07.2023 |
RERA-GRG-1374-2023 |
LANDMARK AVANA - 1ST PHASE |
LANDMARK APARTMENTS PRIVATE LIMITED |
SECTOR 95, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/07/2027 |
|
View |
-- |
|
403 |
GGM/367/99/2019/61 DATED- 25.11.2019 Lapsed Project |
RERA-GRG-220-2019 |
LANDMARK CYBERPARK |
LANDMARK APARTMENTS PVT. LTD. |
SECTOR 67, GURGAON
|
GURUGRAM |
HRERA |
|
26/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
404 |
GGM/468/200/2021/36 DATED 16.07.2021 |
RERA-GRG-844-2021 |
LANDMARK THE HOMES 81 |
SRV AUTOMOTIVES PVT. LTD. |
SECTOR 81, GURUGRAM
|
GURUGRAM |
HRERA |
|
28/02/2026 |
View Corrigendum |
View |
View Monitoring Cases |
|
405 |
148 OF 2017 DATED 28.08.2017 |
RERA-GRG-326-2019 |
LA VIDA |
SECTOR -113,GATEVIDA DEVELOPERS PVT.LTD. |
VILLAGE BAJGHERA SECTOR-112/1 13,GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
406 |
GGM/639/371/2022/114 DATED 28.11.2022 |
RERA-GRG-1118-2022 |
LA VIDA PHASE 2 |
SECTOR 113 GATEVIDA DEVELOPERS PRIVATE LTD |
SECTOR 112/113 , VILLAGE BAJG HERA, GURUGRAM |
GURUGRAM |
HRERA |
|
11/08/2027 |
|
View |
-- |
|
407 |
25 OF 2017 DATED 27.07.2017 |
RERA-GRG-556-2020 |
LAXMI APARTMENTS |
PAREENA INFRASTRUCTURE PVT. LTD. |
VILLAGE GOPAL PUR, SECTOR-99, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
14/09/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
408 |
272 OF 2017 DATED 09.10.2017 Lapsed Project |
RERA-GRG-491-2019 |
LIFESTYLE HOMES |
VATIKA LTD. |
SECTOR 83, VILLAGE HARSARU, G URUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
View |
View Monitoring Cases |
|
409 |
GGM/377/109/2019/71 DATED 25.11.2019 |
RERA-GRG-314-2019 |
LOTUS ELISE |
LOTUS REALTECH PVT. LTD. |
VILLAGE DHANKOT, SECTOR-99, G URUGRAM |
GURUGRAM |
HRERA |
|
30/09/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
410 |
42 OF 2017 DATED 26.10.2017 |
RERA-GRG-408-2019 |
LUMINARE PHASE 2(SOLARIS) |
MAHINDRA HOMES PVT. LTD. |
SEC 59, VILLAGE BEHRAMPUR, SO HNA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/03/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
411 |
GGM/551/283/2022/26 DATED 15.03.2022 |
RERA-GRG-934-2021 |
LUMINARE PHASE 3 (TOWER B) |
MAHINDRA HOMES PRIVATE LIMITED |
SECTOR 59 ,BEHRAMPUR ,GURUGRA M ,HARYANA 122001 |
GURUGRAM |
HRERA |
|
23/08/2026 |
|
View |
View Monitoring Cases |
|
412 |
47 OF 2017 DATED 26.10.2017 |
RERA-GRG-512-2019 |
LUMINARE PHASE I(SIRIUS) |
MAHINDRA HOMES PVT. LTD |
SECTOR 59, VILLAGE BEHRAMPUR, TEHSIL SOHNA, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
31/03/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
413 |
GGM/837/569/2024/64 DATED 14.06.2024 |
RERA-GRG-1526-2024 |
LUSHLANDS |
ADANI INFRASTRUCTURE AND DEVELOPERS PRIVATE LIMITED |
VILLAGE GWAL PAHARI, SECTOR 0 2, GURUGRAM |
GURUGRAM |
HRERA |
|
31/03/2029 |
|
View |
-- |
|
414 |
GGM/705/437/2023/49 DATED 29.03.2023 |
RERA-GRG-1277-2023 |
LUXE RESIDENCY - 112 |
RISHALI DEVELOPERS LLP |
REVENUE ESTATE OF VILLAGE BAJ GHERA, SECTOR 112, GURUGRAM |
GURUGRAM |
HRERA |
|
02/11/2027 |
|
View |
View Monitoring Cases |
|
415 |
GGM/428/160/2020/44 DATED 24.11.2020 Lapsed Project |
RERA-GRG-773-2020 |
LUXURY VILLA |
LUXURY INFRASTRUCTURE PVT. LTD. |
PLOT NO 4 VIJAY VIHAR SILOKHA RA ROAD SECTOR 30 GURGAON |
GURUGRAM |
HRERA |
|
26/03/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
|
416 |
GGM/786/518/2024/13 DATED 12.02.2024 |
RERA-GRG-1466-2023 |
LYKEHOMES AVENUE |
LYKEHOMES PRIVATE LIMITED |
VILLAGE FARUKHNAGAR , SECTOR 3, GURUGRAM HARYANA |
GURUGRAM |
HRERA |
|
31/10/2027 |
|
View |
-- |
|
417 |
GGM/653/385/2022/128 DATED 23.12.2022 |
RERA-GRG-1071-2022 |
M2K OLIVE GREENS |
SADAN REALTECH PRIVATE LIMITED |
VILLAGE DHANWAPUR, SECTOR - 1 04 |
GURUGRAM |
HRERA |
|
20/10/2025 |
View Corrigendum |
View |
-- |
|
418 |
GGM/365/97/2019/59 DATED- 15.10.2019 |
RERA-GRG-319-2019 |
M3M 113 MARKET |
LEKH BUILDTECH PRIVATE LIMITED |
SECTOR-113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
30/04/2023 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
419 |
GGM/585/317/2022/60 DATED 04.07.2022 |
RERA-GRG-1041-2022 |
M3M 114 MARKET |
GOLDEN GATE PROPBUILD PRIVATE LIMITED |
SECTOR -114, GURUGRAM MANESAR URBAN COMPLEX, HARYANA |
GURUGRAM |
HRERA |
|
31/08/2024 |
|
View |
-- |
View OC/CC/PCC |
420 |
GGM/366/98/2019/60 DATED-15.10.2019 |
RERA-GRG-317-2019 |
M3M 84 MARKET |
M3M INDIA PRIVATE LIMITED |
SECTOR-84, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/04/2023 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
421 |
GGM/821/553/2024/48 DATED 29.04.2024 |
RERA-GRG-1607-2024 |
M3M ALTITUDE |
MANGLAM MULTIPLEX PRIVATE LIMITED |
SECTOR 65, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/07/2031 |
|
View |
-- |
|
422 |
GGM/844/576/2024/71 DATED 01.07.2024 |
RERA-GRG-1648-2024 |
M3M ANTALYA HILLS 3 |
LOON LAND DEVELOPMENT LIMITED |
SECTOR 79 & 79B, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/10/2028 |
|
NA |
-- |
|
423 |
GGM/650/382/2022/125 DATED 23.12.2022 |
RERA-GRG-1242-2022 |
M3M ANTALYA HILLS PHASE 1 |
LOON LAND DEVELOPMENT LIMITED |
SECTOR 79, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2025 |
|
View |
-- |
|
424 |
GGM/833/565/2024/60 DATED 03.06.2024 (SUPERSEDES GGM/662/394/2023/06 DATED 12.01.2023) |
RERA-GRG-1521-2023 |
M3M ANTALYA HILLS PHASE II |
LOON LAND DEVELOPMENT LIMITED |
SECTOR-79, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
30/06/2026 |
|
View |
-- |
|
425 |
GGM/662/394/2023/06 DATED 12.01.2023 (SUPERSEDED BY GGM/833/565/2024/60 DATED 03.06.2024) |
RERA-GRG-1248-2022 |
M3M ANTALYA HILLS PHASE II |
LOON LAND DEVELOPMENT LIMITED |
SECTOR 79, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/06/2026 |
|
View |
View Monitoring Cases |
|
426 |
GGM/513/245/2021/81 DATED 29.11.2021 |
RERA-GRG-964-2021 |
M3M ATRIUM57 |
PARYAPT INFRASTRUCTURE PRIVATE LIMITED |
BLOCK-H SUSHANT LOK III SECTO R 57 GURUGRAM HARYANA |
GURUGRAM |
HRERA |
|
15/05/2025 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
427 |
GGM/299/2018/31 DATED 14.12.2018 (SUPERSEDED BY GGM/700/432/2023/44 DATED 02.03.2023) Lapsed Project |
RERA-GRG-101-2018 |
M3M BROADWAY |
ROSHNI BUILDERS PVT. LTD. |
VILLAGE- FAZILPUR JHARSA, SEC TOR-71, GURUGRAM |
GURUGRAM |
HRERA |
|
31/10/2023 |
|
QPR not Uploaded |
View Monitoring Cases |
|
428 |
GGM/700/432/2023/44 DATED 02.03.2023 |
RERA-GRG-1301-2023 |
M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT) |
ROSHNI BUILDERS PRIVATE LIMITED |
SECTOR 71, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/04/2024 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
429 |
GGM/531/263/2022/06 DATED 02.02.2022 |
RERA-GRG-1006-2022 |
M3M CAPITAL |
UNION BUILDMART PRIVATE LIMITED |
SECTOR -113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA. |
GURUGRAM |
HRERA |
|
30/06/2026 |
View Corrigendum |
View |
View Monitoring Cases |
|
430 |
GGM/612/344/2022/87 DATED 28.09.2022 |
RERA-GRG-1153-2022 |
M3M CAPITAL PHASE -2 |
UNION BUILDMART PRIVATE LIMITED |
SECTOR -113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA. |
GURUGRAM |
HRERA |
|
31/12/2026 |
|
View |
View Monitoring Cases |
|
431 |
GGM/825/557/2024/52 DATED 16.05.2024 |
RERA-GRG-1591-2024 |
M3M CAPITAL PHASE-3 |
UNION BUILDMART PRIVATE LIMITED |
SECTOR-113, VILLAGE CHAUMA, G URUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
29/02/2028 |
|
View |
-- |
|
432 |
GGM/687/419/2023/31 DATED 02.02.2023 |
RERA-GRG-1262-2023 |
M3M CROWN PHASE 1 |
METRO EDUCATION & WELFARE PRIVATE LIMITED |
SECTOR-111
|
GURUGRAM |
HRERA |
|
31/01/2028 |
|
View |
View Monitoring Cases |
|
433 |
GGM/843/575/2024/70 DATED 28.06.2024 |
RERA-GRG-907-2021 |
M3M ESCALA |
HAAMID REAL ESTATE PVT. LTD. ,RAPID INFRACON PVT. LTD., M3M INDIA PVT. LTD. |
SECTOR -70A, GURUGRAM
|
GURUGRAM |
HRERA |
|
02/08/2018 |
|
QPR not Uploaded |
-- |
View OC/CC/PCC |
434 |
GGM/594/326/2022/69 DATED 18.07.2022 |
RERA-GRG-878-2021 |
M3M FLORA68 |
HANS PROPCON PVT. LTD., GLORY INFRACON PVT. LTD., BLOSSOM PROPBUILD PVT. LTD. |
SECTOR -68, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/07/2024 |
|
View |
-- |
View OC/CC/PCC |
435 |
GGM/704/436/2023/48 DATED 29.03.2023 |
RERA-GRG-1331-2023 |
M3M GOLF HILLS PHASE 1 |
LOON LAND DEVELOPMENT LIMITED |
SECTOR 79/ 79B
|
GURUGRAM |
HRERA |
|
28/02/2031 |
|
View |
View Monitoring Cases |
|
436 |
GGM/809/541/2024/36 DATED 01.04.2024 |
RERA-GRG-1578-2024 |
M3M GOLF HILLS PHASE 2 |
LOON LAND DEVELOPMENT LIMITED |
SECTOR-79 & 79B, GURUGRAM, HA RYANA |
GURUGRAM |
HRERA |
|
31/05/2030 |
|
View |
View Monitoring Cases |
|
437 |
GGM/564/296/2022/39 DATED 23.05.2022 |
RERA-GRG-809-2021 |
M3M INTERNATIONAL FINANCIAL CENTER INCLUDING PHASE I & II |
GENTLE REALTORS PRIVATE LIMITED |
SECTOR-66, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2024 |
|
QPR not Uploaded |
-- |
View OC/CC/PCC |
438 |
GGM/635/367/2022/110 DATED 28.11.2022 (SUPERSEDED BY GGM/722/454/2023/66 DATED 29.05.2023) |
RERA-GRG-1199-2022 |
M3M JEWEL |
LEKH BUILDTECH PRIVATE LIMITED |
SECTOR-25, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/03/2026 |
|
View |
-- |
|
439 |
GGM/722/454/2023/66 DATED 29.05.2023 |
RERA-GRG-1336-2023 |
M3M JEWEL |
LEKH BUILDTECH PRIVATE LIMITED |
SECTOR-25, GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
30/03/2026 |
|
View |
-- |
|
440 |
56 OF 2017 DATED 17.8.2017 |
RERA-GRG-602-2020 |
M3M LATITUDE ( TOWER R-01) |
MANGLAM MULTIPLEX PVT. LTD AND OTHERS |
SECTOR-65, GURUGRAM, HARYANA
|
GURUGRAM |
INTERIM RERA |
|
31/01/2023 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
441 |
GGM/802/534/2024/29 DATED 18.03.2024 |
RERA-GRG-1547-2024 |
M3M MANSION |
UNION BUILDMART PRIVATE LIMITED |
VILLAGE CHAUMA,SECTOR 113,GUR UGRAM |
GURUGRAM |
HRERA |
|
31/03/2030 |
|
View |
View Monitoring Cases |
|
442 |
57(A) OF 2017 DATED 17.8.2017 |
RERA-GRG-596-2020 |
M3M MARINA/M3M SIERRA 68 ( GROUP HOUSING COLONY) |
HANS PROPCON PVT. LTD |
SECTOR-68, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
30/11/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
443 |
GGM/876/608/2024/103 DATED 10.10.2024 |
RERA-GRG-1734-2024 |
M3M OPUS AT M3M MERLIN |
CONSOLIDATE REALTORS PRIVATE LIMITED |
SECTOR-67, GURUGRAM
|
GURUGRAM |
HRERA |
|
01/11/2029 |
|
NA |
-- |
|
444 |
GGM/651/383/2022/126 DATED 23.12.2022 |
RERA-GRG-1037-2022 |
M3M PARAGON57 |
PARYAPT INFRASTRUCTUREPRIVATE LIMITED |
BLOCK A SUSHANT LOK- III, SEC TOR-57 GURUGRAM MANESAR URBAN COMPLEX |
GURUGRAM |
HRERA |
|
31/08/2026 |
|
View |
-- |
|
445 |
GGM/333/65/2019/27 DATED 24.05.2019 |
RERA-GRG-214-2019 |
M3M PRIVE 73 |
LAVISH BUILDMART PVT. LTD. |
SECTOR-73, GURUGRAM
|
GURUGRAM |
HRERA |
|
29/02/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
446 |
GGM/803/535/2024/30 DATED 27.03.2024 |
RERA-GRG-1548-2024 |
M3M ROUTE65 |
MANGLAM MULTIPLEX PRIVATE LIMITED |
VILLAGE MAIDAWAS, SECTOR-65, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
28/02/2027 |
|
View |
-- |
|
447 |
GGM/605/337/2022/80 DATED 31.08.2022 (SUPERSEDED BY GGM/803/535/2024/30 DATED 27.03.2024) |
RERA-GRG-1124-2022 |
M3M ROUTE65 |
MANGLAM MULTIPLEX PRIVATE LIMITED |
VILLAGE MAIDAWAS, SECTOR-65, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
28/02/2027 |
|
View |
-- |
|
448 |
GGM/501/233/2021/69 DATED 25.10.2021 |
RERA-GRG-940-2021 |
M3M SOULITUDE |
AAWAM RESIDENCY PRIVATE LIMITED |
SECTOR-89, GURUGRAM MANESAR U RBAN COMPLEX, GURUGRAM, HARYANA. |
GURUGRAM |
HRERA |
|
30/09/2025 |
|
View |
View Monitoring Cases |
|
449 |
349 OF 2017 DATED 09.11.2017 |
RERA-GRG-605-2020 |
M3M TEE POINT |
MARCONI INFRATECH PVT. LTD. |
SECTOR-65, VILLAGE MAIDAWAS A ND BADSHAHPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
31/07/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
450 |
GGM/341/73/2019/35 DATED 18.06.2019 |
RERA-GRG-178-2019 |
M3M URBANA |
M3M INDIA PVT. LTD. & MARTIAL BUILDCOM PVT. LTD. |
SECTOR-67, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
451 |
347 OF 2017 DATED 09.11.2017 |
RERA-GRG-603-2020 |
M3M URBANA BUSINESS PARK |
MARTIAL BUILDCON PVT. LTD. |
SECTOR-67, VILLAGE MAIDAWAS A ND BADSHAHPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
30/11/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
452 |
348 OF 2017 DATED 09.11.2017 |
RERA-GRG-604-2020 |
M3M URBANA PREMIUM |
MARTIAL BUILDCON PVT. LTD. |
SECTOR-67, VILLAGE MAIDAWAS, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
28/08/2024 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
453 |
GGM/718/450/2023/62 DATED 15.05.2023 |
RERA-GRG-1321-2023 |
M3M XPRESSWAY 114 |
GENEROUS REALTORS PRIVATE LIMITED |
SECTOR 114, GURUGRAM
|
GURUGRAM |
HRERA |
|
30/04/2025 |
|
View |
-- |
|
454 |
63 OF 2017 DATED 18.8.2017 |
RERA-GRG-363-2019 |
MACEO |
ANANT RAJ LTD. |
SECTOR-91, MANESAR, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
17/08/2020 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
455 |
227 OF 2017 DATED 19.09.2017 Lapsed Project |
RERA-GRG-464-2019 |
MAGNUM CITY CENTRE ( COMMERCIAL PROJECT) |
GALAXY MONNET INFRAHEIGHTS LTD |
SECTOR-63A, ULLHAWAS, GURUGRA M |
GURUGRAM |
INTERIM RERA |
|
31/12/2022 |
|
View |
View Monitoring Cases |
|
456 |
GGM/293/2018/25 DATED 29.11.2018 Lapsed Project |
RERA-GRG-205-2019 |
MAGNUM GLOBAL PARK |
GLO TECH ENTERPRISES PVT LTD |
VILLAGE BEHRAMPUR, SECTOR-58, GURUGRAM |
GURUGRAM |
HRERA |
|
01/03/2019 |
|
View |
View Monitoring Cases |
|
457 |
225 OF 2017 DATED 19.09.2017 Lapsed Project |
RERA-GRG-631-2020 |
MAGNUM TOWERS ( TOWER A & C) |
GALAXY MONNET INFRAHEIGHTS LTD |
SECTOR-58, BEHRAMPUR, GURUGRA M |
GURUGRAM |
INTERIM RERA |
|
31/12/2018 |
|
QPR not Uploaded |
View Monitoring Cases |
|
458 |
GGM/549/281/2022/24 DATED 04.04.2022 |
RERA-GRG-1020-2022 |
MALLSTREET |
LION INFRADEVELOPERS LLP |
SECTOR 35, REVENUE ESTATE OF VILLAGE SOHNA, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
-- |
|
459 |
GGM/364/96/2019/58 DATED 24.09.2019 |
RERA-GRG-158-2019 |
MANOR ONE |
KASHISH DEVELOPERS LIMITED |
SEC-111, DWARKA EXPRESSWAY,GU RUGRAM-122017 |
GURUGRAM |
HRERA |
|
30/06/2027 |
View Corrigendum |
View |
View Monitoring Cases |
|
460 |
GGM/678/410/2023/22 DATED 30.01.2023 |
RERA-GRG-1270-2023 |
MAPSKO ASPR HILLS |
MAPSKO BUILDERS PVT. LTD. |
SECTOR 78, VILL - NAURANGPUR, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
25/12/2027 |
|
View |
-- |
|
461 |
328 OF 2017 DATED 23.10.2017 |
RERA-GRG-365-2019 |
MAPSKO MOUNT VILLE |
MAPSKO BUILDERS PVT. LTD. |
SECTOR-78 & 79, GURUGRAM, HAR YANA |
GURUGRAM |
INTERIM RERA |
|
30/08/2020 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
462 |
GGM/689/421/2023/33 DATED 02.02.2023 |
RERA-GRG-1178-2022 |
MAPSKO MOUNT VILLE PHASE - II |
MAPSKO BUILDERS PVT LTD |
SECTOR 78 & 79, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/01/2029 |
View Corrigendum |
View |
-- |
|
463 |
307 OF 2017 DATED 17.10.2017 |
RERA-GRG-610-2020 |
MARBELLA |
EMAAR MGF LAND LTD. |
SECTOR 65,66, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
16/10/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
464 |
GGM/440/172/2021/08 DATED 01.03.2021 |
RERA-GRG-755-2020 |
MARBELLA PHASE 2 |
EMAAR MGF LAND LTD |
SECTOR 65& 66
|
GURUGRAM |
HRERA |
|
31/12/2027 |
|
View |
View Monitoring Cases |
|
465 |
GGM/306/2018/38 DATED 27.12.2018 |
RERA-GRG-441-2019 |
MARKET CITY |
ORRIS INFRASTRUCTURE PVT LTD |
SECTOR - 89,90 ,GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2026 |
View Corrigendum |
View |
View Monitoring Cases |
|
466 |
GGM/422/154/2020/38 DATED 26.10.2020 Lapsed Project |
RERA-GRG-306-2019 |
MARKET WALK |
VATIKA LIMITED |
VILLAGE SHIKOHPUR, SECTOR- 82 A |
GURUGRAM |
HRERA |
|
01/08/2022 |
|
View |
View Monitoring Cases |
|
467 |
GGM/279/2018/11 DATED 21.11.2018 Lapsed Project |
RERA-GRG-272-2019 |
MARUTI KUNJ |
IRW DEVELOPERS PVT LTD |
SECTOR-1, PATAUDI, GURUGRAM
|
GURUGRAM |
HRERA |
|
20/11/2021 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
|
468 |
127 OF 2017 DATED 28.08.2017 |
RERA-GRG-661-2020 |
MARUTI KUNJ |
SILVERLAKE BUILDTECH PVT.LTD. |
TEHSIL FARRUKHNAGAR,GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
27/08/2022 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
469 |
GGM/720/452/2023/64 DATED 23.05.2023 |
RERA-GRG-1358-2023 |
MEGA CITY |
JMS INFRA BUILD PRIVATE LIMITED |
SECTOR 5 SOHNA DISTRICT GURUG RAM |
GURUGRAM |
HRERA |
|
16/04/2028 |
|
View |
View Monitoring Cases |
|
470 |
340 OF 2017 DATED 27.10.2017 |
RERA-GRG-507-2019 |
MERCHANT PLAZA |
SILVERGLADES INFRASTRUCTURE PVT. LTD. |
SECTOR-88, VILLAGE HAYATPUR, GURUGRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
20/12/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
471 |
GGM/683/415/2023/27 DATED 30.01.2023 |
RERA-GRG-1280-2023 |
MICROTEK GRANDFRONT |
ACTION CONSTRUCTWELL PRIVATE LIMITED |
VILLAGE NAHARPUR KASAN SECTOR 81 |
GURUGRAM |
HRERA |
|
31/07/2025 |
|
View |
View Monitoring Cases |
|
472 |
GGM/714/446/2023/58 DATED 08.05.2023 |
RERA-GRG-1295-2023 |
MICROTEK SUCCESS HUB |
MICROTEK URBANDEVELOPERS PVT. LTD. |
VILLAGE WAZIRPUR SECTOR 95-A GURUGRAM |
GURUGRAM |
HRERA |
|
31/07/2025 |
|
View |
-- |
|
473 |
GGM/398/130/2020/14 DATED 17.06.2020 |
RERA-GRG-672-2020 |
MIDTOWN |
PYRAMID HOME DEVELOPERS LLP |
REVENUE ESTATE OF VILLAGE BEH RAMPUR AND ULLAWAS, SECTOR-59 |
GURUGRAM |
HRERA |
|
15/12/2024 |
|
View |
View Monitoring Cases |
|
474 |
240 OF 2017 DATED 25.09.2017 |
RERA-GRG-358-2019 |
MINDSPACE |
IMPERIA STRUCTURES LTD. |
SECTOR-62, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
475 |
01 OF 2017 DATED 14.06.2017 (SUPERSEDED BY GGM/688/420/2023/32 DATED 02.02.2023) Lapsed Project |
RERA-GRG-552-2020 |
MIXED LAND USE COLONY FOR 14.4125 ACRES |
MANGLAM MULTIPLEX PVT LTD |
VILLAGE BADSHAPUR AND MAIDAWA S, SECTOR-65, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
01/05/2024 |
|
QPR not Uploaded |
View Monitoring Cases |
|
476 |
GGM/688/420/2023/32 DATED 02.02.2023 |
RERA-GRG-1284-2023 |
MIXED LAND USE (RESIDENTIAL (M3M HEIGHTS, M3M SKYCITY) & COMMERCIAL (M3M 65TH AVENUE)) |
MANGLAM MULTIPLEX PRIVATE LIMITED |
SECTOR 65, GURUGRAM
|
GURUGRAM |
HRERA |
|
01/05/2024 |
|
View |
-- |
View OC/CC/PCC |
477 |
GGM/315/47/2019/09 DATED 21.02.2019 Lapsed Project |
RERA-GRG-100-2018 |
MKS COUNTRY-PHASE I |
METRO TECHNO BUILD PVT. LTD. |
SECTOR-2, SOHNA, GURUGRAM
|
GURUGRAM |
HRERA |
|
19/05/2024 |
|
QPR not Uploaded |
View Monitoring Cases |
|
478 |
GGM/568/300/2022/43 DATED 25.05.2022 |
RERA-GRG-1043-2022 |
MKS COUNTY |
METRO TECHNOBUILD PRIVATE LIMITED |
SECTOR-2, SOHNA
|
GURUGRAM |
HRERA |
|
24/04/2026 |
|
View |
View Monitoring Cases |
|
479 |
385 OF 2017 DATED 14.12.2017 |
RERA-GRG-514-2019 |
MOHINDER KAUR & OTHERS |
SPAZE TOWERS PVT. LTD. |
SECTOR 84, VILLAGE SIHI, GURU GRAM, HARYANA |
GURUGRAM |
INTERIM RERA |
|
30/12/2020 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
480 |
266 OF 2017 DATED 09.10.2017 Lapsed Project |
NA |
MONDE-DE-PROVENCE, PHASE-1 (TOWER B & D) |
KRRISH REALTYNIRMAN PVT. LTD. |
SECTOR-02,
|
GURUGRAM |
INTERIM RERA |
N/A |
30/06/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
|
481 |
230 OF 2017 DATED 19.09.2017 Lapsed Project |
NA |
MONDE-DE-PROVENCE, PHASE-II ( TOWER-C) |
KRRISH REALTYNIRMAN PVT. LTD |
SECTOR-2, GURUGRAM FARIDABAD ROAD, GURUGRAM |
GURUGRAM |
INTERIM RERA |
N/A |
30/06/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
|
482 |
121 OF 2017 DATED 28.08.2017 Lapsed Project |
RERA-GRG-1580-2024 |
MONSOON BREEZE PHASE -I ABLM TOWERS |
UMANG REALTECH PVT. LTD |
VILLAGE NAURANGPUR ,SECTOR 78 , GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
05/03/2019 |
View Corrigendum |
View |
View Monitoring Cases |
|
483 |
14 OF 2018 DATED 16.01.2018 Lapsed Project |
RERA-GRG-1581-2024 |
MONSOON BREEZE PHASE-II |
UMANG REALTECH PVT. LTD. |
SECTOR-78
|
GURUGRAM |
INTERIM RERA |
|
31/12/2020 |
|
View |
View Monitoring Cases |
|
484 |
116 OF 2017 (SUPERSEDED BY 14 OF 2018) Lapsed Project |
NA |
MONSSON BREEZE PHASE-II |
UMANG REALTECH PRIVATE LIMITED |
SECTOR - 78
|
GURUGRAM |
INTERIM RERA |
N/A |
31/12/2020 |
|
QPR not Uploaded |
View Monitoring Cases |
|
485 |
GGM/417/149/2020/33 DATED 15.10.2020 |
RERA-GRG-753-2020 |
MOULSARI ENCLAVE |
DLF HOME DEVELOPERS LIMITED |
DLF CITY PHASE-III, SECTOR 24 , GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/10/2024 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
486 |
GGM/706/438/2023/50 DATED 29.03.2023 |
RERA-GRG-1324-2023 |
MRG CROWN |
MRG GROUP INDIA PVT. LTD. |
9TH FLOOR, IREO GRAND VIEW TO WER, SECTOR-58, GURUGRAM |
GURUGRAM |
HRERA |
|
15/11/2027 |
View Corrigendum |
View |
View Monitoring Cases |
|
487 |
GGM/703/435/2023/47 DATED 20.03.2023 |
RERA-GRG-1293-2023 |
MRG CROWN 106 |
MRG GROUP INDIA PRIVATE LIMITED (FORMERLY KNOWN AS ANUDHARA SOLUTIONS PRIVATE LIMITED)) |
VILLAGE BABUPUR, SECTOR-106, GURUGRAM |
GURUGRAM |
HRERA |
|
31/03/2027 |
|
View |
View Monitoring Cases |
|
488 |
GGM/738/470/2023/82 DATED 24.07.2023 |
RERA-GRG-1402-2023 |
MRG PRIMARK |
MRG ECOWORLD LLP |
VILLAGE BADHA, SECTOR-90, GUR UGRAM |
GURUGRAM |
HRERA |
|
31/07/2027 |
|
View |
-- |
|
489 |
GGM/889/621/2024/116 DATED 22.11.2024 |
RERA-GRG-1729-2024 |
MVN AERO ONE |
MVN INFRASTRUCTURE PROJECTS LLP |
37D, VILLAGE - HARSARU
|
GURUGRAM |
HRERA |
|
31/12/2029 |
|
NA |
-- |
|
490 |
GGM/588/320/2022/63 DATED 11.07.2022 |
RERA-GRG-1010-2022 |
MVN ATHENS |
MVN INFRASTRUCTURE PVT LTD |
SECTOR- 5, DHAULA ROAD , SOHN A |
GURUGRAM |
HRERA |
|
30/09/2025 |
|
View |
View Monitoring Cases |
|
491 |
GGM/326/58/2019/20 DATED 26.03.2019 |
RERA-GRG-105-2018 |
MVN ATHENS |
MVN INFRASTRUCTURE PVT. LTD. |
SECTOR-5,SOHNA, GURUGRAM
|
GURUGRAM |
HRERA |
|
28/02/2021 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
492 |
284 OF 2017 DATED 10.10.2017 |
RERA-GRG-446-2019 |
MVN ATHENS SOHNA |
MVN INFRASTRUCTURES PVT. LTD. |
SECTOR 5, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
09/10/2021 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
493 |
GGM/752/484/2023/96 DATED 23.10.2023 |
RERA-GRG-1452-2023 |
NANDAKA |
GANGA GLOBAL HOMES PRIVATE LIMITED |
VILLAGE SIHI, SECTOR-84,
|
GURUGRAM |
HRERA |
|
23/02/2028 |
|
View |
View Monitoring Cases |
|
494 |
GGM/613/345/2022/88 DATED 03.10.2022 |
RERA-GRG-1034-2022 |
NATURE VALLEY |
BNB COLONIZER PVT LTD |
SECTOR 70, BADSHAHPUR
|
GURUGRAM |
HRERA |
|
12/05/2027 |
|
View |
View Monitoring Cases |
|
495 |
GGM/392/124/2020/08 DATED 10.02.2020 |
RERA-GRG-256-2019 |
NEO CENTRA |
OCIMUM ESTATES PRIVATE LIMITED |
REVENUE ESTATE OF VILLAGE-DAU LATABAD, SECTOR-103, TEHSIL AND DISTRICT- GURGAON, HARYANA |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
496 |
109 OF 2017 DATED 24.08.2017 |
RERA-GRG-545-2020 |
NEO SQUARE |
NEO DEVELOPERS PVT.LTD. |
VILLAGE PAWALA KHUSRPUR,SECTO R-109, GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
22/02/2025 |
View Corrigendum |
View |
View Monitoring Cases |
|
497 |
GGM/570/302/2022/45 DATED 30.05.2022 Lapsed Project |
RERA-GRG-1054-2022 |
NEW LOOK B1 B2 108 |
NEW LOOK BUILDERS AND DEVELOPERS PRIVATE LIMITED |
SECTOR 67A GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2023 |
|
QPR not Uploaded |
View Monitoring Cases |
|
498 |
192 OF 2017 DATED 14.09.2017 |
RERA-GRG-435-2019 |
NEW TOWN SQUARE |
KPDK BUILDTECH PVT.COM |
SECTOR-95A, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
01/01/1970 |
View Corrigendum |
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
499 |
GGM/275/2018/07 DATED 13.07.2018 |
RERA-GRG-10-2018 |
NIMAI PLACE |
Y B BUILDERS PVT LTD |
SECTOR 114 GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2023 |
View Corrigendum |
View |
View Monitoring Cases |
View OC/CC/PCC |
500 |
GGM/629/361/2022/104 DATED 21.11.2022 |
RERA-GRG-1173-2022 |
NKV GOLDEN AVENUE |
WINGS REALTORS PRIVATE LIMITED |
VILLAGE SOHNA, SECTOR 35, SOH NA, GURUGRAM |
GURUGRAM |
HRERA |
|
26/09/2026 |
|
View |
View Monitoring Cases |
|
501 |
220 OF 2017 DATED 18.09.2017 |
RERA-GRG-424-2019 |
OCUS 24K ( COMMERCIAL COLONY) |
OCUS SKYCRAPERS REALTY LTD |
SECTOR-68, BADSHAHPUR, GURUGR AM |
GURUGRAM |
INTERIM RERA |
|
17/09/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
502 |
218 OF 2017 DATED 18.09.2017 |
RERA-GRG-432-2019 |
OCUS MEDLEY (COMMERCIAL COLONY) |
OCUS SKYCRAPERS REALTY LTD |
SECTOR-99, KHERKI MAJRA, GURU GRAM |
GURUGRAM |
INTERIM RERA |
|
17/09/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
503 |
GGM/330/62/2019/24 DATED 13.05.2019 Lapsed Project |
RERA-GRG-239-2019 |
OM APARTMENTS |
PAREENA BUILDERS & PROMOTERS PVT. LTD. |
SECTOR-112, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/03/2024 |
|
View |
View Monitoring Cases |
|
504 |
GGM/749/481/2023/93 DATED 16.10.2023 |
RERA-GRG-1435-2023 |
OMPEE TOWER |
OMPEE CONSTRUCTION |
GURUGRAM, HARYANA
|
GURUGRAM |
HRERA |
|
07/08/2028 |
|
View |
-- |
|
505 |
GGM/686/418/2023/30 DATED 02.02.2023 |
RERA-GRG-1274-2023 |
ONE GLOBAL |
CAPITAL HEIGHTS PRIVATE LIMITED |
SECTOR 73, VILLAGE BEGAMPUR K HATOLA |
GURUGRAM |
HRERA |
|
30/09/2025 |
|
View |
-- |
|
506 |
GGM/515/247/2021/83 DATED 16.11.2021 |
RERA-GRG-960-2021 |
ONE GOOD EARTH |
RAJ BUILDWELL PRIVATE LIMITED |
VILLAGE-FAZILPUR JHARSA, DIST RICT-GURUGRAM IN RESIDENTIAL SECTOR-71- GURGAON MANESAR URBAN COMPLEX, GURUGRAM |
GURUGRAM |
HRERA |
|
31/12/2024 |
|
View |
View Monitoring Cases |
|
507 |
237 OF 2017 DATED 20.09.2017 |
RERA-GRG-484-2019 |
ONE ON ONE PHASE-1 |
VATIKA ONE ON ONE PVT. LTD. |
SECTOR 16, VILLAGE SILOKHERA, TEHSIL AND DIST GURUGRAM |
GURUGRAM |
INTERIM RERA |
|
19/09/2022 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
508 |
294 OF 2017 DATED 13.10.2017 |
RERA-GRG-380-2019 |
OODLES SKYWALK |
HOMETOWN PROPERTIES PVT. LTD. |
VILLAGE SIHI, GURUGRAM
|
GURUGRAM |
INTERIM RERA |
|
31/12/2019 |
|
QPR not Uploaded |
View Monitoring Cases |
View OC/CC/PCC |
509 |
GGM/357/89/2019/51 DATED 11.09.2019 |
RERA-GRG-238-2019 |
ORCHARD AVENUE 2 |
SIGNATURE BUILDERS PRIVATE LIMITED |
VILLAGE HAYATPUR SECTOR 93 GU RUGRAM HARYANA |
GURUGRAM |
HRERA |
|
30/09/2024 |
|
View |
View Monitoring Cases |
View OC/CC/PCC |
510 |
GGM/789/521/2024/16 DATED 01.03.2024 |
RERA-GRG-1486-2023 |
ORCHARD AVENUE - 3 |
SIGNATURE BUILDERS PRIVATE LIMITED |
VILLAGE - HAYATPUR, SECTOR -9 3, GURUGRAM, HARYANA |
GURUGRAM |
HRERA |
|
31/07/2028 |
|
View |
-- |
|
511 |
GGM/597/329/2022/72 DATED 01.08.2022 |
RERA-GRG-996-2021 |
ORCHID IVY |
M/S ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD. |
M BLOCK, MAYFIELD GARDEN, SEC TOR-51, GURGAON, HARYANA |
GURUGRAM |
HRERA |
|
01/01/2026 |
|
View |
-- |
|
512 |
GGM/646/378/2022/121 DATED 13.12.2022 |
RERA-GRG-1141-2022 |
ORCHID IVY- 2 |
M/S ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD. |
M-BLOCK, SECTOR-51, GURUGRAM
|
GURUGRAM |
HRERA |
|
31/12/2026 |
|