HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2097-2025
Submission Date : 06-12-2025 09:25:55 PM
Applicant Type : Firm
Project Type: NEW


LAMOSE INFRA LLP
SECTOR 84, GURUGRAM
9211310082
9211310082 (Number Shared by Promoter in Public)
lamoseinfrallp@gmail.com
ACI1398
AALFL6585A

















GRATITUDE 84
SECTOR 84, VILLAGE SIKANDEPUR BADHA, GURUGRAM
MANESAR
GURUGRAM
9211310082
9211310082 (Number Shared by Promoter in Public)
lamoseinfrallp@gmail.com
ASHOK KUMAR
9211310082
9211310082 (Number Shared by Promoter in Public)
lamoseinfrallp@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
14049403-12-2025501521HDFC BANK LIMITEDHRERA Gurugram
266546531-12-202573587HDFC BANK LIMITEDHRERA Gurugram







1.69375 (Acre)
2.40
2.39
1.69375 (Acre)
LC-68 OF 2025 dated 07.05.2025
Yes







22765.95 Lakhs
5800.77 Lakhs
9019.52 Lakhs
3680.48 Lakhs
4265.18 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1357.98
3CONSTRUCTION OF ROADS 446.44
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 2003.57
6GREEN BELTS 0
7VEHICLE PARKINGS 385.00
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13GUARD AND METER ROOM 11.97
14INTERNAL ROADS AND PAVEMENTS 2180.142
15AREA UNDER COMMERCIAL 469.25
Total6854.352




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS20.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM17.17AS PER PROJECT REPORT
3STORM WATER DRAINAGE18.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM95.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL18.00AS PER PROJECT REPORT
6STREET LIGHTING19.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING33.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS20.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15PARKING18.00AS PER PROJECT REPORT
16STP90.00AS PER PROJECT REPORT
17UNDERGROUND WATER TANK72.00AS PER PROJECT REPORT
18RAIN WATER HARVESTING30.00AS PER PROJECT REPORT
19CONSTRUCTION OF CIRCULATION ROAD50.00AS PER PROJECT REPORT
20BASEMENT AREA2668.64AS PER PROJECT REPORT
21GUARD AND METER ROOM AREA3.22AS PER PROJECT REPORT
22CONSTRUCTION RAW MATERIAL IRON RODS CEMENT AND MORE110.52AS PER PROJECT REPORT


NA (date)
25-11-2025 (date)
01-05-2026
30-04-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0.00 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings81.301522
Apartment/Shops/Other Buildings67.6222
Apartment/Shops/Other Buildings12.00302
Apartment/Shops/Other Buildings992





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0225.40225.40
Shops06.366.36
Plots000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments225.40225.40225.40225.94
Shops6.366.366.366.37
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments631.11631.11631.11631.11
Shops16.9616.9616.9616.96
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments914.47915.99553.83553.83
Shops27.8627.9025.4325.43
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments553.83553.83554.63270.48
Shops25.4325.4325.4714.53
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments271.24
Shops14.57
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Construction of circulation road25.00
Construction raw material Iron rods Cement and more110.52

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System1.561.56
Sewerage treatment & garbage disposal1.641.64
Electricity Supply System00
Storm Water Drainage1.641.64
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Basement Area140.37140.37
Parking0.950.95
STP4.734.73
Underground water tank3.793.79
Rain water harvesting1.581.58

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System1.561.561.561.56
Sewerage treatment & garbage disposal1.641.641.641.64
Electricity Supply System0000
Storm Water Drainage1.641.641.641.64
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground water tank3.793.793.793.79
Basement Area140.37140.37140.37140.37
Rain water harvesting1.581.581.581.58
STP4.734.734.734.73
Parking0.950.950.950.95

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System1.561.561.561.56
Sewerage treatment & garbage disposal1.641.641.641.64
Electricity Supply System0000
Storm Water Drainage1.641.641.641.64
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Basement Area140.37140.37140.37140.37
Parking0.950.950.950.95
Rain water harvesting1.581.581.581.58
Underground water tank3.793.793.793.79
STP4.734.734.734.73

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System1.56000
Sewerage treatment & garbage disposal1.64000
Electricity Supply System23.7523.7523.7523.75
Storm Water Drainage1.64000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Basement Area140.37140.37140.37140.37
Parking0.950.950.950.95
STP4.734.734.734.73
Underground water tank3.793.793.793.79
Rain water harvesting1.581.581.581.58

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0006.67
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds00010.00
Clubhouse/community centres0000
Shopping area0000
Other0000
Basement Area140.37140.37140.37140.37
Underground water tank3.793.793.793.79
STP4.734.734.734.73
Parking0.950.950.950.95
Rain water harvesting1.581.581.581.58
Security and fire fighting16.50
Construction of circulation road8.34
Guard and Meter room area1.61

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.003.33
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds10.000
Clubhouse/community centres00
Shopping area00
Other00
Construction of circulation road12.504.17
Street Lighting12.676.33
Underground water tank3.83
STP4.79
Security and fire fighting16.50
Parking0.96
Basement Area141.97
Guard and Meter room area1.61
Rain water harvesting1.60












No
No
HDFC BANK LIMITED, VATIKA ATRIUM, BLOCK-A, KHASRANO 1742/1/2 1743, VILLAGE WAZIRABAD, GURGAON SECTOR 53
99998130381303
HDFC0000572
110240093
000572
Ashok Kumar, Udaka (181), Sohna, Mewat, Haryana, 122103 Garvit Gupta, E-4/66, Sector 7, Near Post Office, Rohini, Sector 7, North West Delhi, Delhi
Yes











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
No
No
No
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LC V ALREADY BEEN OBTAINED07-05-2025
II. BR IIIALREADY BEEN OBTAINED25-11-2025
III. ZONING PLANALREADY BEEN OBTAINED09-05-2025
IV. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED16-07-2025
V. FOREST NOCALREADY BEEN OBTAINED11-02-2025








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING ROOM, DINING ROOM, INTERNAL LOBBY AREA -IMPORTED MARBLE / VETRIFIED TILE. MASTER BEDROOM, OTHER BEDROOM-LAMINATED WOODEN FLOORING. MASTER TOILET, OTHER TOILET, KITCHEN, ROOM/UTILITY ROOM - ANTI SKID TILES. STAIR CASE-P- WHITE
2WALL FINISHING DETAILSINTERNAL WALL-OBD & PLASTIC EMULSION. EXTERN/AL WALL-TEXTURE
3KITCHEN DETAILSSEMI FURNISHED WITHOUT MODULAR
4BATHROOM FITTINGSFAUCET, BASIN, WC
5WOOD WORK ETCWOODEN DOORS AND FLOORING
6DOORS AND WINDOS FRAMESLAMINATED SHUTTER & "ALUMINIUM WITH 6MM TOUGHENE D GLASS"
7GLASS WORK6MM TOUGHENED GLASS
8ELECTRIC FITTINGSONLY PROVISIONS
9CONDUCTING AND WIRING DETAILSFRLS- HAVELLS OR EQUIVALENT
10CUPBOARD DETAILSN/A
11WATER STORAGENA
12LIFT DETAILS4 NO'S UNITS PER FLOOR, 2 PASSENGER LIFT, 1 SERVICE LIFT-JOHNSON, THYSSENKR UPP OR EQUIVALENT
13EXTERNAL GLAZINGS"ALUMINIUM WITH 6MM TOUGHENE D GLASS"
13.1WINDOWS/GLAZINGS"ALUMINIUM WITH 6MM TOUGHENE D GLASS"
14DOORSENTRANCE DOOR- LAMINATED SHUTTER INTERN/AL DOORS-PAINTED SHUTTER
14.1MAIN DOORSLAMINATED SHUTTER
14.2INTERNAL DOORSPAINTED SHUTTER
15AIR CONDITIONINGWITHOUT AND WITH SPLIT AC
16ELECTRICAL FITTINGSPROVISIONS
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYAVAILABLE
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE
20INTERNAL FINISHINGOBD & PLASTIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE / VETRIFIED TILE
1 . 2 WALLSPLASTIC EMULSION
1 . 3 CEILINGOIL BOND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSPLASTIC EMULSION
2 . 3 CEILINGOIL BOND DISTEMPER
2 . 4 MODULAR WARDROBESN.A
3 . MASTER TOILET
3 . 1 FLOORANTI SKID TILES
3 . 2 WALLSCERAMIC TILES
3 . 3 CEILINGOIL BOND DISTEMPER
3 . 4 COUNTERSCOUNTERS
3 . 5 SANITARY WARE/CP FITTINGSSINK, WASH BASIN, WASHING MACHINE, TAPS AND FITTING
3 . 6 FITTING/FIXTURESFITTINGS
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSPLASTIC EMULSION
4 . 3 CEILINGOIL BOND DISTEMPER
4 . 4 WARDROBESN.A
5 . TOILET
5 . 1 FLOORANTI SKID TILES
5 . 2 WALLSCERAMIC TILES
5 . 3 CEILINGOIL BOND DISTEMPER
5 . 4 COUNTERSCOUNTERS
5 . 5 SANITARY WARE/CP FITTINGSSINK, WASH BASIN, TAPS & FITTING
5 . 6 FIXTURESFITTINGS
6 . KITCHEN
6 . 1 FLOORANTI SKID TILES
6 . 2 WALLSCERAMIC TILES/ PAINT
6 . 3 CEILINGOIL BOND DISTEMPER
6 . 4 COUNTERSCOUNTERS
6 . 5 FIXTURESSINK, WASH BASIN, TAPS & FITTING
6 . 6 KITCHEN APPLIANCESN.A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID TILES
7 . 2 WALLS & CEILINGCERAMIC TILES & OIL BOND DISTEMPER
7 . 3 TOILETN.A
7 . 4 BALCONYAVAILABLE
8 . SIT-OUTS
8 . 1 FLOORN.A
8 . 2 WALLS & CEILINGN.A
8 . 3 RAILINGSN.A
8 . 4 FIXTURESN.A












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 06-12-2025 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 06-12-2025 View Document
3 ZONING PLAN 02-12-2025 View Document
4 DEMARCATION PLAN 02-12-2025 View Document
5 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 02-12-2025 View Document
6 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 06-12-2025 View Document
7 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 06-12-2025 View Document
8 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 06-12-2025 View Document
9 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 06-12-2025 View Document
10 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 06-12-2025 View Document
11 BANK UNDERTAKING 21-01-2026 ------
12 FOREST NOC 21-01-2026 ------
13 SECTION1- TOWER A 21-01-2026 ------
14 DHBVN-EP PERMISSION 21-01-2026 ------
15 UNIT PLANS- TOWER B 21-01-2026 ------
16 AFF NCZ 21-01-2026 ------
17 AIRPORT HEIGHT CLEARANCE 21-01-2026 ------
18 GMDA ASSURANCE- SEWARAGE CONNECTION 21-01-2026 ------
19 SITE PLAN 21-01-2026 ------
20 SECTION2 - TOWER A 21-01-2026 ------
21 LOI 21-01-2026 ------
22 19 FLOOR PLAN, TERRACE PLAN & AREA DIAGRAM- TOWER B 21-01-2026 ------
23 AFFIDAVIT 4(2)(L)(D) 21-01-2026 ------
24 ELEVATIONS - BLOCK B 21-01-2026 ------
25 SECTIONS- BLOCK B 21-01-2026 ------
26 2ND TO 18TH FLOOR PLAN & AREA DIAGRAM - TOWER A 21-01-2026 ------
27 19 FLOOR PLAN, TERRACE PLAN & AREA DIAGRAM- TOWER A 21-01-2026 ------
28 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 21-01-2026 View Document
29 GMDA ASSURANCE- STORM WATER DRAINAGE 21-01-2026 ------
30 COMMERCIAL ELEVATIONS 21-01-2026 ------
31 AFF- POWER LINE SHIFTING 21-01-2026 ------
32 CA CERTIFICATE-NET WORTH 21-01-2026 ------
33 GROUND FLOOR PLAN & AREA DIAGRAM - TOWER A 21-01-2026 ------
34 GMDA ASSURANCE- CONSTRUCTION WATER 21-01-2026 ------
35 SECTION3 - TOWER A 21-01-2026 ------
36 CA CERTIFICATE - PROJECT COST INCURRED 21-01-2026 ------
37 LC IV-A 21-01-2026 ------
38 UNIT PLANS- TOWER A 21-01-2026 ------
39 FLOORS PLANS & AREA DIAGRAM - TOWER B 21-01-2026 ------
40 LC IV 21-01-2026 ------
41 GROUND FLOOR PLAN & AREA DIAGRAM - TOWER B 21-01-2026 ------
42 NON ENCUMBRANCE CERTIFICATE 21-01-2026 ------
43 GMDA ASSURANCE- DRINKING WATER 21-01-2026 ------
44 COMMERCIAL PLANS 21-01-2026 ------
45 1ST TO 20TH FLOOR PLAN & AREA DIAGRAM - TOWER A 21-01-2026 ------
46 AFF NO FOREST LAND 21-01-2026 ------
47 ALLOTMENT LETTER 22-01-2026 ------
48 AFF NO TREE CUTTING 21-01-2026 ------
49 BBA 22-01-2026 ------
50 BASEMENT FLOOR PLAN & AREA DIAGRAM 21-01-2026 ------
51 EC APPLIED 21-01-2026 ------
52 SITE PLAN (SHOWING GREEN) 21-01-2026 ------
53 AFF NO MINING 21-01-2026 ------