HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2117-2025
Submission Date : 01-12-2025 12:44:53 PM
Applicant Type : Company
Project Type: NEW




LANDMARK APARTMENTS PRIVATELIMITED
65, SECTOR 44, GURUGRAM
01244850000
9650255664 (Number Shared by Promoter in Public)
abhishek.kanodia@landmarkgoc.com
http://www.landmarkgoc.com
XXXX120Q
U70109DL2006PTC150028
 
 


 
 


 
 


 
 







LANDMARK ONE
SECTOR 67, GURUGRAM
BADSHAHPUR ST
GURUGRAM
0000000000
9818794949 (Number Shared by Promoter in Public)
info@landmarkgoc.com
NARENDER MALIK
1244850000
9818794949 (Number Shared by Promoter in Public)
n.malik@landmarkgoc.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
149426128-11-2025100000KARNATAKA BANK LTDHRERA Gurugram
249433824-12-2025424464KARNATAKA BANK LTDHRERA Gurugram
317810724-12-20252664276KARNATAKA BANK LTDHRERA Gurugram
417810802-01-202619362150KARNATAKA BANK LTDHRERA Gurugram







4.43702 (Acre)
2.54
2.54
8.3125 (Acre)
License No. 97 of 2008 dated 12.05.2008 renewed upto 11.05.2026
Yes







65666.95 Lakhs
1430.71 Lakhs
44594.40 Lakhs
5224.40 Lakhs
14417.44 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 8234.04
3CONSTRUCTION OF ROADS 3786
4PAVEMENTS 364
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 950
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 60
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 4480.966
12ANY OTHER 0
13HSD YARD 75
14GUARD ROOM 6
Total17956.006




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS77.50YET TO BE PREPARED
2WATER SUPPLY SYSTEM72.45YET TO BE PREPARED
3STORM WATER DRAINAGE6.00YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM1351.35YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL125.85YET TO BE PREPARED
6STREET LIGHTING35.00YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING750.00YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM35.00YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15STP76.00YET TO BE PREPARED
16UNDERGROUND WATER TANK62.50YET TO BE PREPARED
17RAIN WATER HARVESTING52.75YET TO BE PREPARED
18ELECTRICAL SUB STATION2580.00YET TO BE PREPARED


09-09-2025 (date)
27-11-2025 (date)
01-06-2026
31-05-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings93.4911
Apartment/Shops/Other Buildings90.1211
Apartment/Shops/Other Buildings85.6611
Apartment/Shops/Other Buildings83.5711
Apartment/Shops/Other Buildings79.6911
Apartment/Shops/Other Buildings80.7811
Apartment/Shops/Other Buildings66.4711
Apartment/Shops/Other Buildings68.0511
Apartment/Shops/Other Buildings36.611
Apartment/Shops/Other Buildings37.3311
Apartment/Shops/Other Buildings40.4711
Apartment/Shops/Other Buildings45.811
Apartment/Shops/Other Buildings43.1511
Apartment/Shops/Other Buildings23.5311
Apartment/Shops/Other Buildings33.6711
Apartment/Shops/Other Buildings36.8311
Apartment/Shops/Other Buildings25.8811
Apartment/Shops/Other Buildings11.0211
Apartment/Shops/Other Buildings16.0611
Apartment/Shops/Other Buildings25.611
Apartment/Shops/Other Buildings31.0711
Apartment/Shops/Other Buildings175.2311
Apartment/Shops/Other Buildings328.6711
Apartment/Shops/Other Buildings447.911
Apartment/Shops/Other Buildings504.0811
Apartment/Shops/Other Buildings514.5611
Apartment/Shops/Other Buildings54011
Apartment/Shops/Other Buildings550.411
Apartment/Shops/Other Buildings693.2311
Apartment/Shops/Other Buildings752.7211
Apartment/Shops/Other Buildings754.5511
Apartment/Shops/Other Buildings784.0121
Apartment/Shops/Other Buildings800.8171
Apartment/Shops/Other Buildings822.4831
Apartment/Shops/Other Buildings823.8911
Apartment/Shops/Other Buildings834.2441
Apartment/Shops/Other Buildings836.3731
Apartment/Shops/Other Buildings887.9411
Apartment/Shops/Other Buildings90521
Apartment/Shops/Other Buildings905.521
Apartment/Shops/Other Buildings915.2111
Apartment/Shops/Other Buildings1975.7311
Apartment/Shops/Other Buildings2038.3111
Apartment/Shops/Other Buildings2076.221
Apartment/Shops/Other Buildings2203.9621





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0500550
Shops000
Plots000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments600650700900
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments984118415341984
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2500250025002500
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2500250025002500
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2500250022001930
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments16784931398540
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1768.8000
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground Water Tank16161616

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System000270
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements003939
Water Supply System036360
Sewerage treatment & garbage disposal063630
Electricity Supply System270270270270
Storm Water Drainage2220
Parks and Playgrounds001818
Clubhouse/community centres0000
Shopping area0000
Other0000
Rainwater Harvesting026260
Electrical Sub Station0860860860
Street Lighting0000
Renewable Energy System00035
STP003838
Security and fire fighting2502502500

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00












Yes
No
SBI, JAWAHAR VYAPAR BHAWAN, TOLSTOY MARG, NEW DELHI
44750131612
SBIN0009601
110002188
009601
Sandeep Chhillar : 9210, DLF Phase 4, Gurugram Dinesh Kumar : 310, Sector 45, Gurugram
Yes











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED12-05-2008
II. DEMARCATION-CUM-ZONING AND PHASING PLANALREADY BEEN OBTAINED09-09-2025
III. BUILDING PLANSALREADY BEEN OBTAINED27-11-2025
IV. AAI-NOCALREADY BEEN OBTAINED07-11-2025








Yes


Yes


Yes







LANDMARK AVANA, SECTOR 95, GURUGRAM
14.209
0
246
0
99
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10917.5210917.523720.12
Cost of the apartments000
Cost of the infrastructure2890.742890.74964.00
Others costs8026.788026.782756.12


3632.57 Lakhs
5909.06 Lakhs
5350.00 Lakhs
5300.00 Lakhs
No
29-01-2028
29-01-2028




LANDMARK AVANA-1ST ,PHASE, SECTOR 95, GURUGRAM
1.3004
114
0
100
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7652.87652.82308.67
Cost of the apartments3585.853585.851822.90
Cost of the infrastructure000
Others costs4066.954066.95485.77


2011.14 Lakhs
6920.71 Lakhs
45 Lakhs
22.50 Lakhs
No
31-07-2027
31-07-2027




SKYVUE, SECTOR 103, GURUGRAM
3.9705
240
0
7
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
60133.9260133.922753.35
Cost of the apartments31284.0331284.030
Cost of the infrastructure5017.295017.290
Others costs23832.623832.62753.35


123.00 Lakhs
2406.60 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2031
31-03-2031










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSN.A.
4BATHROOM FITTINGSCERA/ HINDWARE OR EQUIVALENT
5WOOD WORK ETCAS PER MARKET STANDARDS
6DOORS AND WINDOS FRAMESAS PER MARKET STANDARDS
7GLASS WORKAS PER MARKET STANDARDS
8ELECTRIC FITTINGSISI MARK FITINGS
9CONDUCTING AND WIRING DETAILSISI MARK FITINGS
10CUPBOARD DETAILSN.A.
11WATER STORAGEN.A.
12LIFT DETAILSJONSON OR EQUIVALENT
13EXTERNAL GLAZINGSAS PER MARKET STANDARDS
13.1WINDOWS/GLAZINGSAS PER MARKET STANDARDS
14DOORSAS PER MARKET STANDARDS
14.1MAIN DOORSAS PER MARKET STANDARDS
14.2INTERNAL DOORSAS PER MARKET STANDARDS
15AIR CONDITIONINGN.A.
16ELECTRICAL FITTINGSISI MARK FITINGS
17CNG PIPE LINEN.A.
18PROVISION OF WIFI AND BROADBAND FACILITYN.A.
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT OR AS PER ELEVATION
20INTERNAL FINISHINGAS PER MARKET STANDARDS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN.A.
1 . 2 WALLSN.A.
1 . 3 CEILINGN.A.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORN.A.
2 . 2 WALLSN.A.
2 . 3 CEILINGN.A.
2 . 4 MODULAR WARDROBESN.A.
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES ANTI SKID
3 . 2 WALLSACRYLIC EMULSION PAINT
3 . 3 CEILINGACRYLIC EMULSION PAINT
3 . 4 COUNTERSGRENITE
3 . 5 SANITARY WARE/CP FITTINGSCERA/ HINDWARE OR EQUIVALENT
3 . 6 FITTING/FIXTURESMODERN STEEL TAPS & FIXTURE
4 . BED ROOMS
4 . 1 FLOORN.A.
4 . 2 WALLSN.A.
4 . 3 CEILINGN.A.
4 . 4 WARDROBESN.A.
5 . TOILET
5 . 1 FLOORVITRIFIED TILES ANTI SKID
5 . 2 WALLSACRYLIC EMULSION PAINT
5 . 3 CEILINGACRYLIC EMULSION PAINT
5 . 4 COUNTERSN.A.
5 . 5 SANITARY WARE/CP FITTINGSCERA/ HINDWARE OR EQUIVALENT
5 . 6 FIXTURESMODERN STEEL TAPS & FIXTURE
6 . KITCHEN
6 . 1 FLOORN.A.
6 . 2 WALLSN.A.
6 . 3 CEILINGN.A.
6 . 4 COUNTERSN.A.
6 . 5 FIXTURESN.A.
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A.
7 . 2 WALLS & CEILINGN.A.
7 . 3 TOILETN.A.
7 . 4 BALCONYN.A.
8 . SIT-OUTS
8 . 1 FLOORVITRIFIED TILES
8 . 2 WALLS & CEILINGTEXTURE PAINT OR AS PER ELEVATION
8 . 3 RAILINGSAS PER MARKET STANDARDS
8 . 4 FIXTURESAS PER MARKET STANDARDS












Sr. No.Document DescriptionDate of Document UploadView Document
1 DEMARCATION PLAN 30-11-2025 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 01-12-2025 View Document
3 ZONING PLAN 30-11-2025 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 30-11-2025 View Document
5 PROMOTER'S AFFIDAVIT FOR BANK ACCOUNT REGULATIONS-67 07-01-2026 ------
6 SALE DEED 8K 8M 07-01-2026 ------
7 SECTION PLAN 07-01-2026 ------
8 DEMAND DRAFT - REGISTRATION, PROCESSING & LATE 07-01-2026 ------
9 BR FOR AUTHORIZING 07-01-2026 ------
10 ESCROW ACCOUNT AGREEMENT 07-01-2026 ------
11 SALE DEED 13K 7M 07-01-2026 ------
12 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 07-01-2026 View Document
13 SALE DEED 1K 1M 07-01-2026 ------
14 BUILDING PLANS APPROVAL LETTER-67-2ND PHASE 07-01-2026 ------
15 CA CERTIFICATE OF NET WORTH OF PROMOTER ON LATEST DATE 07-01-2026 ------
16 DRAFT APPLICATION FORM 07-01-2026 ------
17 BR LAPL OPENING OF CURRENT AC 07-01-2026 ------
18 SALE DEED 33K 8M 07-01-2026 ------
19 TITLE SEARCH REPORT 07-01-2026 ------
20 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 07-01-2026 View Document
21 SUPERIMPOSED KHASRA PLAN-2ND PHASE-67 07-01-2026 ------
22 JAMABANDI 07-01-2026 ------
23 MUTATION 07-01-2026 ------
24 APPROVED PHASING -LETTER AND DRAWING 07-01-2026 ------
25 BANK UNDERTAKING 07-01-2026 ------
26 SALE DEED 4K 4M 07-01-2026 ------
27 LOI CYBER PARK 07-01-2026 ------
28 AKS SIZRA 07-01-2026 ------
29 DRAFT PAYMENT RECEIPT 07-01-2026 ------
30 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 07-01-2026 View Document
31 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 07-01-2026 View Document
32 PERT CHART 07-01-2026 ------
33 SALE DEED 16K 15.5M 07-01-2026 ------
34 LITIGATION DETAILS 07-01-2026 ------
35 LC-IV - 67 07-01-2026 ------
36 PROJECT REPORT 07-01-2026 ------
37 PARKING PLAN 07-01-2026 ------
38 DRAFT ALLOTMENT LETTER 07-01-2026 ------
39 CA CERTIFICATE OF EXPENDITURE INCURRED AND TO BE INCURRED 07-01-2026 ------
40 IGBC CERTIFICATE-LANDMARK ONE 07-01-2026 ------
41 SALE DEED 3K 10M 07-01-2026 ------
42 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 07-01-2026 View Document
43 PREVIOUS SITE PLAN 07-01-2026 ------
44 DRAFT BUILDER BUYER AGREEMENT 07-01-2026 ------
45 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 07-01-2026 View Document
46 DRAFT CONVEYANCE DEED 07-01-2026 ------
47 COMPARISON OC VS REVISED 07-01-2026 ------
48 BG - EC, FIRE, SPE 07-01-2026 ------
49 ELEVATIONS_11ZON 07-01-2026 ------
50 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 07-01-2026 View Document
51 NON-ENCUMBRANCE CERTIFICATE 07-01-2026 ------
52 SITE PLAN-2ND PHASE-67 07-01-2026 ------