IMPERIAL GARDEN PHASE 2
SECTOR- 102, GURUGRAM
GURGAON
GURUGRAM
01244421155
9999014121 (Number Shared by Promoter in Public)
coordination@emaar-india.com
AVINASH NAGPAL
01244421155
9999014121 (Number Shared by Promoter in Public)
avinash.nagpal@emaar-india.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
603945
07-07-2017
485623
HDFC BANK
HRERA Gurugram
2
958535
11-07-2017
2063987
HDFC BANK
HRERA Gurugram
3
200133
23-01-2019
42000
HSBC
HRERA Gurugram
4.57 (Acre)
1.75
1.75
12 (Acre)
107 of 2012 (validity dated 09.10.2020)
No
Address 306-308 SQUARE ONE
C2 DISTRICT CENTRE, SAKET, DELHI-110017
Annexure-B- COLLABORATION AGREEMENT
LICENCE 107 OF 2012 DATED 10/ 10/2012
COLLABORATION AGREEMENT DATED 29 MAY 2006
No
THE COLLABORATION AGREEMENT WAS EXECUTED ON DATED 29 MAY 2016 AND THE DEVELOPER SHALL DEVELOP THE GROUP HOUSING PROJECT AND A SUPPLEMENTARY COLLABORATION AGREEMENT WAS REGISTERED ON 17.05.2013 WITH A CONDITION THAT THE COLLABORATION AGREEMENT IS IRREVOCABLE AND NO MODIFICATION/ ALTERATION IN TERMS OF COLLABORATION AGREEMENT CAN BE UNDERTAKEN EXCEPT AFTER OBTAINING PRIOR APPROVAL OF DTCP. THE OWNER SHALL BE ENTITLED TO RETAIN SUCH PORTION OF THE REVENUE AS IS EQUIVALENT TO
(A) COST OF LAND AND ONE PERCENT MARKUP COST OF LAND
(B) THE CIRCLE RATE APPLICABLE TO THE STATE
(C) RS 25000 PER ACER
WHICH EVER IS LOWER AS PER AMENDMENT LETTER DATED 31.12.2009
No
Yes
Yes
18004.85 Lakhs
560.95 Lakhs
13962.50 Lakhs
0 Lakhs
3481.38 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
6096.23
3
CONSTRUCTION OF ROADS
12530
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
21595
6
GREEN BELTS
0
7
VEHICLE PARKINGS
6969.21
8
ELECTRICITY SUB-STATION
510
9
CLUB HOUSE
431.57
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
475
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
534.18
13
SCHOOL
346.16
Total
49487.35
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
GMDA
No
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
No
STORM WATER DRAINAGE
GMDA
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
160
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
58.5
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
177.8
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
128
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
75
AS PER PROJECT REPORT
6
STREET LIGHTING
0
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
18
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
100
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
111
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
0
AS PER PROJECT REPORT
12
SCHOOL
12
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
385
AS PER PROJECT REPORT
NA (date)
NA (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type A 1
114.10
30
25
5
0
2
APARTMENT/SHOPS/OTHER BUILDINGS Type A 1
116.66
29
17
12
0
3
APARTMENT/SHOPS/OTHER BUILDINGS Type A 2
114.10
30
17
13
0
4
APARTMENT/SHOPS/OTHER BUILDINGS Type A 2
116.66
29
12
17
0
5
APARTMENT/SHOPS/OTHER BUILDINGS Type C 3
114.10
29
22
7
0
6
APARTMENT/SHOPS/OTHER BUILDINGS Type C 3
116.66
29
21
8
0
7
APARTMENT/SHOPS/OTHER BUILDINGS Type C 4
114.10
30
25
5
0
8
APARTMENT/SHOPS/OTHER BUILDINGS Type C 4
116.66
29
24
5
0
9
APARTMENT/SHOPS/OTHER BUILDINGS Type EWS
15.9
103
103
0
0
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
RESIDENTIAL
163
100% OCCUPATION CERTIFICATE RECEIVED
18-10-2013
30-06-2016
31-12-2018
18-10-2013
100
31-12-2018
OC HAS BEEN RECEIVED FOR 4 TOWERS (35350 SQ MTRS) WITH REGARD TO BALANCE AREA, THE RERA REGISTRATION NO. 208 OF 2017 IS VALID TILL 31/12/18.
OC HAS BEEN RECEIVED FOR 4 TOWERS (35350 SQ MTRS) WITH REGARD TO BALANCE AREA, THE RERA REGISTRATION NO. 208 OF 2017 IS VALID TILL 31/12/18
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
NA
18-10-2013
100
31-12-2018
OC HAS BEEN RECEIVED FOR 4 TOWERS (35350 SQ MTRS) WITH REGARD TO BALANCE AREA, THE RERA REGISTRATION NO. 208 OF 2017 IS VALID TILL 31/12/18
31.12.2018 HOWEVER EXTENSION HAS BEEN APPLIED FOR FURTHER PERIOD OF ONE YEAR.
0
66
547
386
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
13962.52
Shops
0
Plots
0
EDC and IDC
3481.38
Expenditure to be made in each quarter (In Lakhs)
Particulars
Expenditure to be made in each quarter ()
Apr-June
July-Sep
Oct-Dec
Jan-Mar
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
354
Water Supply System
58.5
Sewerage treatment & garbage disposal
86
Electricity Supply System
744
Storm Water Drainage
177.8
Parks and Playgrounds
100
Clubhouse/community centres
257
Shopping area
0
Other
721.7
renewable energy system
22
school
12
security and fire fighting
18
Expenditure to be made in each quarter (In Lakhs)
Particulars
Expenditure to be made in each quarter ()
Apr-June
July-Sep
Oct-Dec
Jan-Mar
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
338
-
ii. No. of Flats/ Apartments booked
266
-
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
24382.95 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
21378.26 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
3153.42 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
3153.42 Lakhs
vii. Amount invested in the project upto the date of application
18004.85 Lakhs
Land cost (If any)
560.95 Lakhs
Apartments
13962.52 Lakhs
Includes construction and infrastructure cost for apartment and schools
Infrastructure
0 Lakhs
EDC/ Taxes Etc.
3481.38 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
0 Lakhs
(a) In respect of existing allottees
0 Lakhs
-
(b) In respect of rest of the project
0 Lakhs
-
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
-
x. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs
-
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
160
354
II. WATER SUPPLY SYSTEM
58.50
58.50
III. STORM WATER DRAINAGE
177.80
177.80
IV. ELECTRICITY SUPPLY SYSTEM
128
744
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
75
86
VI. CLUB HOUSE/COMMUNITY CENTRE
111
257
VII. SCHOOL
12
12
VIII. ANY OTHER
385
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
0
100
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0
18
XVII. OTHER FACILITIES AS PER PROJECT REPORT
0
743.70
Yes
Yes
HSBC, 25, BARAKHAMBA ROAD, NEW DELHI - 110001
052857273001
HSBC011002
110039002
NA
Mr. rahul Bindal Sr. General Manager EMAAR business park MG road sikandarpur sector 28 Gurugram
Attached
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE
ALREADY BEEN OBTAINED
10-10-2012
II. FOREST NOC
ALREADY BEEN OBTAINED
10-10-2013
III. AIRPORT CLEARANCE
ALREADY BEEN OBTAINED
26-04-2018
IV. HUDA CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
23-10-2012
V. ELECTRICAL LOAD AVAILABILITY
ALREADY BEEN OBTAINED
13-10-2017
VI. ENVIRONMENT CLEARANCE
ALREADY BEEN OBTAINED
06-09-2013
VII. CONSENT TO ESTABLISH
ALREADY BEEN OBTAINED
20-12-2017
VIII. MINING PERMISSION
ALREADY BEEN OBTAINED
25-10-2013
IX. FIRE SCHEME
ALREADY BEEN OBTAINED
25-10-2013
X. SERVICE ESTIMATES PLAN
ALREADY BEEN OBTAINED
24-03-2014
XI. COMMENCEMENT CERTIFICATE
ALREADY BEEN OBTAINED
30-10-2012
XII. OCCUPATION CERTIFICATE FOR 4 TOWERS
ALREADY BEEN OBTAINED
17-10-2018
Yes
Yes
Enclosed
GURGAON GREENS
13.51
672
0
542
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
43167
38678
30865
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
43215 Lakhs
11360 Lakhs
15000 Lakhs
15000 Lakhs
No
30-11-2017
31-12-2018
PALM GARDEN
21.90
1054
0
999
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
63552
56609
43498
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
98769 Lakhs
4076 Lakhs
0 Lakhs
0 Lakhs
No
01-11-2015
31-12-2018
PALM PREMIER
29.347
102
0
0
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
6355
6355
717
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
1107 Lakhs
9111 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2022
28-02-2022
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
TILES & WOODEN FLOORING
2
WALL FINISHING DETAILS
ACRYLIC EMULSION PAINTS
3
KITCHEN DETAILS
MODULAR TYPE
4
BATHROOM FITTINGS
CHROME PLATED FITTINGS
5
WOOD WORK ETC
HARD WOODEN D/F AND BLOCK WOOD SHUTTERS
6
DOORS AND WINDOS FRAMES
UPVC D/W WITH 6MM THK TOUGHENED GLASS FITTINGS AND HARD WOODEN D/F AND BLOCK WOOD SHUTTERS
7
GLASS WORK
BALCONY RAILINGS
8
ELECTRIC FITTINGS
6 AMP /16 AMP MODULAR SWITCH AND SOCKETS
9
CONDUCTING AND WIRING DETAILS
PVC /MS CONDUTING AND 1.5SQM TO 10 SQM WIRING.
10
CUPBOARD DETAILS
PROVISION IN M. BED ROOM.( UNIT 2025 SQFT AREA)
11
WATER STORAGE
OVER HEAD TANKS AND U.G.T
12
LIFT DETAILS
1PASSANGER + 1 SERVICE / EACH TOWER
13
EXTERNAL GLAZINGS
YES
13.1
WINDOWS/GLAZINGS
UPVC D/W WITH 6MM TOUGHENED GLASS , FITTINGS
14
DOORS
PROVIDED
14.1
MAIN DOORS
HARD WOOD DOOR WITH EYE AND SS FITTINGS
14.2
INTERNAL DOORS
HARD WOODEN D/F AND BLOCK WOOD SHUTTERS WITH SS FITTINGS
15
AIR CONDITIONING
5 NOS AIR CONDITIONING WITH 1.5 TON CAPACITY.
16
ELECTRICAL FITTINGS
6 AMP /16 AMP MODULAR SWITCH AND SOCKETS
17
CNG PIPE LINE
MDPE PIPE + MS PIPE WITH PNG/ LPG METER
18
PROVISION OF WIFI AND BROADBAND FACILITY
YES
19
EXTERNAL FINISHING/COLOUR SCHEME
TEXTURE PAINTS
20
INTERNAL FINISHING
WALLS AND CEILING- ACRYLIC EMULSION PAINTS AND GLASS RAILING WITH DUCO PAINTS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
VITRIFIED TILES( BRAND-NITCO BAVERIA)
1 . 2
WALLS
ACRYLIC EMULSION PAINTS( ASIAN-MILKEYWAY)
1 . 3
CEILING
ACRYLIC EMULSION PAINTS( ASIAN-WHITE)
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
WOODEN FLOORING (BRAND-EGGER)
2 . 2
WALLS
ACRYLIC EMULSION PAINTS( ASIAN-MILKEYWAY)
2 . 3
CEILING
ACRYLIC EMULSION PAINTS( ASIAN-WHITE)
2 . 4
MODULAR WARDROBES
PROVISION IN M. BED ROOM.( UNIT 2025 SQFT AREA.)
3 . MASTER TOILET
3 . 1
FLOOR
VITRIFIED TILES ( BRAND-TILE CRAFT TK-112)
3 . 2
WALLS
CERAMIC TILES( BRAND- NITCO PRO IG-2)AND ACRYLIC EMULSION PAINTS( ASIAN-MILKEYWAY)
3 . 3
CEILING
FALSE CEILING WITH ACRYLIC EMULSION PAINTS ( ASIAN-WHITE)
3 . 4
COUNTERS
GRANITE-KOTKASTA
3 . 5
SANITARY WARE/CP FITTINGS
BRAND- PARRYWARE(CARDIFF- WALL HUNG WC FULL SET , COUNTER BELOW WASHBASIN-CASCADE NXT BELOW TOP WASH BASIN OVAL,) CP- BRAND –JAQUAR (BASIN MIXTURE , WALL MIXTURE, ANGULAR STOP COCK,OVER HEAD SHOWER HEALTH FAUCET AND BIB COCKS)
3 . 6
FITTING/FIXTURES
5 AMP /16 AMP MODULAR SWITCH AND SOCKETS , PROVISION FOR ELECTRIC GYESER
4 . BED ROOMS
4 . 1
FLOOR
WOODEN FLOORING (BRAND-EGGER)
4 . 2
WALLS
ACRYLIC EMULSION PAINTS( ASIAN-MILKEYWAY)
4 . 3
CEILING
ACRYLIC EMULSION PAINTS( ASIAN-WHITE)
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
VITRIFIED TILES ( BRAND-TILE CRAFT TK-112)
5 . 2
WALLS
CERAMIC TILES( BRAND- NITCO PRO IG-2)AND ACRYLIC EMULSION PAINTS( ASIAN-MILKEYWAY)
5 . 3
CEILING
FALSE CEILING WITH ACRYLIC EMULSION PAINTS ( ASIAN-WHITE)
5 . 4
COUNTERS
NA
5 . 5
SANITARY WARE/CP FITTINGS
BRAND- PARRYWARE(CARDIFF- WALL HUNG WC FULL SET , FLAIR SHORT PEDESTAL TYPE WASH BASIN,) CP- BRAND –JAQUAR (BASIN MIXTURE , WALL MIXTURE, ANGULAR STOP COCK,OVER HEAD SHOWER HEALTH FAUCET AND BIB COCKS)
5 . 6
FIXTURES
5 AMP /16 AMP MODULAR SWITCH AND SOCKETS , PROVISION FOR ELECTRIC GYESER
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED TILES( BRAND-NITCO BAVERIA)
6 . 2
WALLS
CERAMIC TILES( BRAND- NITCO PRO IG-1)AND ACRYLIC EMULSION PAINTS( ASIAN-MILKEYWAY)
6 . 3
CEILING
ACRYLIC EMULSION PAINTS ( ASIAN-WHITE)
6 . 4
COUNTERS
GRANITE-KOTKASTA INCLUDING MODULAR KITCHEN WITH SINK-SINGLE BOWEL INCLUDING SINK MIXTURE)
6 . 5
FIXTURES
CP- BRAND –JAQUAR ( SHORT BIB COCK, ANGLE VALVE)
5 AMP /16 AMP MODULAR SWITCH AND SOCKETS , PROVISION FOR ELECTRIC GYESER
6 . 6
KITCHEN APPLIANCES
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
CERAMIC TILES ( BRAND-ORIENT MOON)
7 . 2
WALLS & CEILING
ACRYLIC EMULSION PAINTS WALLS( ASIAN-MILKEYWAY) AND ASIAN WHITE IN CEILING
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
15-11-2018
------
9
OC FOR 4 TOWERS
15-11-2018
------
10
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT