HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1734-2024
Submission Date : 04-09-2024 02:29:30 PM
Applicant Type : Company
Project Type: NEW




CONSOLIDATE REALTORS PRIVATE LIMITED
41ST FLOOR, TOWER-1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66,GURUGRAM,HARYANA
01244732000
9711348349 (Number Shared by Promoter in Public)
consolidaterealtors@gmail.com
http://www.consolidaterealtors.com/
XXXX796N
U70109HR2006PTC047030
 
 


 
 


 
 


 
 







M3M OPUS AT M3M MERLIN
SECTOR-67, GURUGRAM
BADSHAHPUR ST
GURUGRAM
01244732000
8929012754 (Number Shared by Promoter in Public)
consolidaterealtors@gmail.com
UJJWAL GUPTA
01244732000
0000000000 (Number Shared by Promoter in Public)
rera@m3mindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150238402-09-2024424100ICICI BANK,GURUGRAMHRERA Gurugram
250238502-09-2024198600ICICI BANK,GURUGRAMHRERA Gurugram
350009518-09-2024117000ICICI BANKHRERA Gurugram
442683267140724-09-2024918ICICI BANKHRERA Gurugram







1.000 (Acre)
2.14
2.14
13.344 (Acre)
License No. 53 of 2011 dated 10.06.2011 renewed up to 09.06.2029
Yes







19402.28 Lakhs
2370.14 Lakhs
10829.99 Lakhs
527.01 Lakhs
5675.14 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1ANY OTHER 0
2PLOTS TO BE SOLD 0
3LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1
4CONSTRUCTION OF ROADS 0
5PAVEMENTS 0
6PARKS AND PLAYGROUNDS 0
7GREEN BELTS 0
8VEHICLE PARKINGS 0
9ELECTRICITY SUB-STATION 0
10CLUB HOUSE 0
11SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
12AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
Total1




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS39.40AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM18.43AS PER PROJECT REPORT
3STORM WATER DRAINAGE8.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM70.62AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL13.34AS PER PROJECT REPORT
6STREET LIGHTING6.42AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING34.20AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS4.73AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER87.00AS PER PROJECT REPORT
15HARDSCAPE AND SOFTSCAPE96.13AS PER PROJECT REPORT
16BOUNDARY WALL33.10AS PER PROJECT REPORT
17GAURD HOUSE15.76AS PER PROJECT REPORT
18PARKING12.89AS PER PROJECT REPORT
19CONSULTANCY87.00AS PER PROJECT REPORT


NA (date)
NA (date)
01-10-2024
30-04-2030
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings164951341





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments78.16
Shops0
Plots0

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments54.71115.51236.44379.08
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments504.6435.74526.18761.23
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments429.73483.18643.16742.84
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments849.74735.71735.71628.80
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments499.73318.64350.56
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other1.74
Consultancy1.74

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other1.741.743.483.48
Consultancy1.741.743.483.48

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other3.485.228.708.70
Consultancy3.485.228.708.70

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0001.9
Water Supply System0001.84
Sewerage treatment & garbage disposal0001.33
Electricity Supply System0000
Storm Water Drainage0000.80
Parks and Playgrounds0000.47
Clubhouse/community centres0000
Shopping area0000
Other8.708.705.225.22
Consultancy8.708.705.225.22
Boundary Wall3.313.31
Fire Fighting Service1.29

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3.943.947.887.88
Water Supply System1.841.843.693.69
Sewerage treatment & garbage disposal1.331.332.672.67
Electricity Supply System014.1214.1214.12
Storm Water Drainage0.800.801.601.60
Parks and Playgrounds0.470.470.950.95
Clubhouse/community centres0000
Shopping area0000
Other4.352.612.612.61
Hardscape and Softscape19.2319.23
Boundary wall3.316.623.313.31
Street light1.281.281.28
Fire Fighting Services1.291.292.572.57
Consultancy4.352.612.612.61

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements5.913.943.94
Water Supply System1.841.841.84
Sewerage treatment & garbage disposal1.331.331.33
Electricity Supply System14.127.067.06
Storm Water Drainage0.800.800.80
Parks and Playgrounds0.470.470.47
Clubhouse/community centres000
Shopping area000
Other2.612.613.48
Parking marking6.446.44
Street lights1.280.64
Fire Fighting Services1.291.291.29
Security10.6710.67
Hardscape and Softscape19.239.619.61
Consultancy2.612.613.48
Boundary wall3.313.313.31
Main entrance or Guard house7.887.88
Street light0.64












Yes
No
AXIS BANK, M3M URBANA, SECTOR-67, GURUGRAM, HARYANA
923020022059174
UTIB0004343
110211305
004343
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4)Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 5) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Ms. Meenal Sood- C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015 8) Mr. Anurag Kulshrestha- 1 F Pocket-3, Mayur Vihar, Phase 1, Chilla Saroda Khadar, East Delhi 9) Mr. Surender Kumar Gupta- 954 Gokul Dham, Society 1st Floor Krishna Colony, Gurugram 10) Mr.Rajiv Kumar Verma- House No.-06 E,Pratap Enclave,Mohan Garden,Uttam Nagar,,West Delhi 11) Mr.Ashok Kumar- Hajipur(15),Guragon,Haryana 12) Mr.Amit Saxena- 163,Sarai Nazar Ali,Behind M.M,G Hospital,Ghaziabad Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLAN APPROVALALREADY BEEN OBTAINED03-09-2024
II. ELECTRICITY APPROVALALREADY BEEN OBTAINED03-05-2017
III. ASSURANCE TREATEED WATERALREADY BEEN OBTAINED04-09-2024
IV. ASSURANCE SEWERAGEALREADY BEEN OBTAINED04-09-2024
V. ASSURANCE WATER SUPPLYALREADY BEEN OBTAINED28-08-2024








Yes


Yes


As per the rules and regulations of HARERA













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOMBINATION OF TILE/WOODEN FLOORING/ ANTI SKID TILES IN DRAWING/DINING ROOM/BEDROOM/KITCHEN/TOILETS
2WALL FINISHING DETAILSCEMENT PLASTER/GYPSUM PLASTER/OBD/ACRYLIC EMULSION PAINT/DADO TILE/STONE AS APPLICABLE IN BEDROOM/KITCHEN/DRAWING/DINING/TOILETS ETC.
3KITCHEN DETAILSSTONE OVER KITCHEN COUNTER AND SS SINK.
4BATHROOM FITTINGSCP FITTINGS AND CHINAWARE
5WOOD WORK ETCWOODEN FLOORING AS APPLICABLE
6DOORS AND WINDOS FRAMESFLUSH DOORS/LAMINATED DOORS WITH HARDWARES
7GLASS WORKGLASS RAILING
8ELECTRIC FITTINGSBRANDED CEILING LIGHTS/ BRANDED CEILING LIGHTS
9CONDUCTING AND WIRING DETAILSFR WIRES, PVC CONDUITS
10CUPBOARD DETAILSNA
11WATER STORAGEUGWT AND OHWT
12LIFT DETAILSELEVATORS WITH SPEED AS PER VERTICAL TRAFFIC
13EXTERNAL GLAZINGSALUMINIUM / UPVC FRAMING SLIDING
13.1WINDOWS/GLAZINGSALUMINIUM / UPVC FRAMING SLIDING
14DOORSHARD WOOD DOOR FRAME WITH FLUSH DOOR / LAMINATE / SKIN DOOR
14.1MAIN DOORSHARD WOOD DOOR FRAME WITH FLUSH DOOR / LAMINATE / SKIN DOOR
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITH FLUSH DOOR / LAMINATE / SKIN DOOR
15AIR CONDITIONINGAS PER DESIGN
16ELECTRICAL FITTINGSAS PER DESIGN
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR / TEXTURE
20INTERNAL FINISHINGAS STATED ABOVE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILES/STONE AS APPLICABLE
1 . 2 WALLSOBD / ACRYLIC EMULSION PAINT
1 . 3 CEILINGOBD/ ACRYLIC EMULSION PAINT OR AS APPROVED
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORENGINEERED WOODEN FLOORING
2 . 2 WALLSOBD/ ACRYLIC EMULSION PAINT OR AS APPROVED
2 . 3 CEILINGOBD/ ACRYLIC EMULSION PAINT OR AS APPROVED
2 . 4 MODULAR WARDROBESAS PER DESIGN
3 . MASTER TOILET
3 . 1 FLOORANTISKID VITRIFIED TILES
3 . 2 WALLSDADO TILES
3 . 3 CEILINGGRID FALSE CEILING / MR BOARD / OBD
3 . 4 COUNTERSAS PER APPROVED MAKE
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOOR LAMINATED WOODEN FLOORING
4 . 2 WALLSOBD/ ACRYLIC EMULSION PAINT OR AS APPROVED
4 . 3 CEILINGOBD/ ACRYLIC EMULSION PAINT OR AS APPROVED
4 . 4 WARDROBESAS PER DESIGN
5 . TOILET
5 . 1 FLOORVITRIFIED TILES
5 . 2 WALLSDADO TILES
5 . 3 CEILINGGRID FALSE CEILING / MR BOARD / OBD
5 . 4 COUNTERSAS PER DESIGN
5 . 5 SANITARY WARE/CP FITTINGSAS PER DESIGN
5 . 6 FIXTURESAS PER DESIGN
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSTILES AS PER DESIGN
6 . 3 CEILINGOBD/ ACRYLIC EMULSION PAINT OR AS APPROVED
6 . 4 COUNTERSAS PER DESIGN
6 . 5 FIXTURESAS PER DESIGN
6 . 6 KITCHEN APPLIANCESAS PER DESIGN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID CERAMIC TILE
7 . 2 WALLS & CEILINGVITRIFIED TILES / OBD
7 . 3 TOILETAS PER APPROVED MAKE
7 . 4 BALCONYAS PER APPROVED MAKE
8 . SIT-OUTS
8 . 1 FLOORANTISKID CERAMIC TILE
8 . 2 WALLS & CEILINGVITRIFIED TILES / OBD
8 . 3 RAILINGSAS PER APPROVED MAKE
8 . 4 FIXTURESAS PER APPROVED MAKE












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 03-09-2024 View Document
2 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 03-09-2024 View Document
3 APPROVED SITE PLAN 03-09-2024 View Document
4 APPROVED LAYOUT PLAN 03-09-2024 View Document
5 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 03-09-2024 View Document
6 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 03-09-2024 View Document
7 APPROVED DEMARCATION PLAN 03-09-2024 View Document
8 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 03-09-2024 View Document
9 APPROVED ZONING PLAN 03-09-2024 View Document
10 ZONING PLAN 03-09-2024 View Document
11 DEMARCATION PLAN 03-09-2024 View Document
12 APPROVED BR-III 11-10-2024 View Document
13 CA CERTIFICATE- NON DEFAULT 11-10-2024 View Document
14 REVISED ZONING PLAN 11-10-2024 View Document
15 SPE APPLICATION 11-10-2024 View Document
16 ELECTRICAL LOAD CONNECTION APPROVAL 11-10-2024 View Document
17 NON-ENCUMBRANCE CERTIFICATE 11-10-2024 View Document
18 AIRPORT HEIGHT CLEARENCE 11-10-2024 View Document
19 ASSURANCE STORM WATER 11-10-2024 View Document
20 ASSURANCE WATER SUPPLY 11-10-2024 View Document
21 BASEMENT-2 FLOOR PLAN 11-10-2024 View Document
22 SECTION PLAN 11-10-2024 View Document
23 BANK UNDERTAKING 11-10-2024 View Document
24 BASEMENT-1 FLOOR PLAN 11-10-2024 View Document
25 CA CERTIFICATE INCURRED 11-10-2024 View Document
26 CA CERTIFICATE INVENTORY 11-10-2024 View Document
27 CA CERTIFICATE NET WORTH 11-10-2024 View Document
28 ELECTRICAL LAYOUT PLAN 11-10-2024 View Document
29 ELEVATION PLAN A&C 11-10-2024 View Document
30 ELEVATION PLAN B & D 11-10-2024 View Document
31 ENVIRONMENT CLEARENCE APPROVAL 11-10-2024 View Document
32 FIRE SCHEME APPLICATION 11-10-2024 View Document
33 INFORMATION TO REVENUE DEPARTMENT 11-10-2024 View Document
34 JAMABANDI 11-10-2024 View Document
35 LC-IV & IV A 11-10-2024 View Document
36 LOI 11-10-2024 View Document
37 PHASING PLAN APPROVED 11-10-2024 View Document
38 ROAD LAYOUT PLAN 11-10-2024 View Document
39 TERRACE PLAN 11-10-2024 View Document
40 SEWERAGE ASSURANCE 11-10-2024 View Document
41 STORM WATER LAYOUT 11-10-2024 View Document
42 SEWERAGE LAYOUT PLAN 11-10-2024 View Document
43 SHAJRA 11-10-2024 View Document
44 STP TREATED WATER NOC 11-10-2024 View Document
45 SUPERIMPOSED KHASRA ON APPROVED LAYOUT PLAN 11-10-2024 View Document
46 TITLE SEARCH REPORT 11-10-2024 View Document
47 TYPICAL FLOOR PLAN 11-10-2024 View Document
48 WATER LAYOUT PLAN 11-10-2024 View Document