HRERA GurugramTemp Project Id : RERA-GRG-PROJ-506-2019
Submission Date : 30-01-2020 01:10:25 AM
Applicant Type : Company
Project Type: ONGOING




VATIKA LIMITED
VATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002.
01244177777
9810566938 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
http://www.vatikagroup.com
XXXX647G
U74899HR1998PLC054821
 
 


 
 


 
 


 
 


 
 







TRANQUIL HEIGHTS (PHASE-I)
SECTOR-82A, VILLAGE SHIKOHPUR
MANESAR
GURUGRAM
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
ARUP KUMAR DAS
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15694028-07-2017229000HDFC BANK LIMITEDHRERA Gurugram







11.218 (Acre)
175
57.094
11.218 (Acre)
22 of 2011 dated 24-03-2011
No
Address     FLAT NO. 224A, 2ND FLOOR, DEVIKA TOWER, 6, NEHRU PLACE, NEW DELHI - 110019.
Address     FLAT NO. 224A, 2ND FLOOR, DEVIKA TOWER, 6, NEHRU PLACE, NEW DELHI - 110019.
Address     FLAT NO. 224A, 2ND FLOOR, DEVIKA TOWER, 6, NEHRU PLACE, NEW DELHI - 110019.
Annexure-B- REVENUE RECORDS SALE DEEDS ETC.
BEFORE THE GRANT OF LICENSE
No
PROVIDED
No
Yes
Yes







13461.00 Lakhs
405.00 Lakhs
7664.22 Lakhs
335.78 Lakhs
5056.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1993.393
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS6816.20
6GREEN BELTS0
7VEHICLE PARKINGS4930.91
8ELECTRICITY SUB-STATION128.985
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER31528.0753
Total45397.5633




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/HSVPNo
WATER SUPPLYHUDA/HSVPNo
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDA/HSVPNo
STORM WATER DRAINAGEHUDA/HSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS90.66AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM26.86AS PER PROJECT REPORT
3STORM WATER DRAINAGE33.58AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM50.37AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL30.22AS PER PROJECT REPORT
6STREET LIGHTING20.15AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING6.72AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS16.79AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15ELECTRICAL SUB STATION33.58AS PER PROJECT REPORT
16RAIN WATER HARVESTING6.72AS PER PROJECT REPORT
17STP20.15AS PER PROJECT REPORT


16-02-2017 (date)
16-02-2017 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX-2017835.5516999700






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
ANNEX-2099ANNEXURE-20 & 21


18-02-2017
30-01-2022
30-01-2022
02-06-2020
0
30-01-2022
PROVIDED
PROVIDED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
02-06-2020
0
30-01-2022
NOT APPLICABLE
NOT APPLICABLE


0
0
255
16
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Cost of Construction818.08
EDC1760.47
IDC204.77
Land Cost405.00
Other Cost223.66

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00
Other Cost40.0050.00
Cost of Construction350.00450.00
EDC45.0040.00

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Cost of Construction410.00380.00375.00415.24
Other Cost60.0075.00100.00125.00
EDC48.0032.0045.0043.07

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Other Cost200.00100.00100.00100.00
Cost of Construction234.75264.848.5950.00

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
IDW30.0030.0030.00
Cost of Construction100.00100.00100.00100.00
Other Cost100.00150.00150.00150.00

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Other Cost200.00200.00200.00250.00
Cost of Construction500.00550.00800.00800.00
IDW30.0030.0055.0065.00

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0
IDW65.78
Cost of Construction857.72
Other Cost264.03




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub station0
Rain Water Harvesting0
Security and fire fighting0
STP0
Street lighting0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Security and fire fighting00
Street lighting00
STP00
Rain Water Harvesting00
Electrical Sub station00

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP0000
Rain Water Harvesting0000
Electrical Sub station0000
Street lighting0000
Security and fire fighting0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street lighting0000
Electrical Sub station0000
STP0000
Rain Water Harvesting0000
Security and fire fighting0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements05.005.005.00
Water Supply System02.002.002.00
Sewerage treatment & garbage disposal04.004.003.56
Electricity Supply System03.004.004.00
Storm Water Drainage02.002.002.00
Parks and Playgrounds02.003.003.00
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain Water Harvesting00.500.500.72
Electrical Sub station04.004.004.00
Street lighting03.003.003.00
Security and fire fighting00.500.500.72
STP04.002.002.00

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.0010.0015.0020.00
Water Supply System2.004.004.005.00
Sewerage treatment & garbage disposal1.001.005.006.00
Electricity Supply System4.003.008.0011.00
Storm Water Drainage2.004.005.006.00
Parks and Playgrounds1.002.004.001.00
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrical Sub station3.002.005.007.00
Rain Water Harvesting1.001.001.001.00
STP2.001.003.004.00
Security and fire fighting1.001.001.001.00
Street lighting3.001.004.003.00

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements20.66
Water Supply System5.86
Sewerage treatment & garbage disposal5.66
Electricity Supply System13.37
Storm Water Drainage10.58
Parks and Playgrounds0.79
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub station4.58
STP2.15
Security and fire fighting1.00
Street lighting0.15
Rain Water Harvesting1.00












Particulars Remarks, if any
i. No. of Flats/Apartments constructed169To be Constructed
ii. No. of Flats/ Apartments booked99
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter14100.88 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter4761.72 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter9339.16 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter9339.16 Lakhs
vii. Amount invested in the project upto the date of application3411.98 Lakhs
Land cost (If any)405.00 Lakhs
Apartments818.08 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.2188.90 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession10049.02 Lakhs
(a) In respect of existing allottees5886.70 Lakhs
(b) In respect of rest of the project4162.32 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
22000.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 10974.50 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS90.660
II. WATER SUPPLY SYSTEM26.860
III. STORM WATER DRAINAGE33.580
IV. ELECTRICITY SUPPLY SYSTEM50.370
V. SEWAGE TREATMENT & GARBAGE DISPOSAL20.150
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.16.790
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM6.720
XVII. OTHER FACILITIES AS PER PROJECT REPORT90.660









Yes
Yes
HDFC BANK LTD., BANK HOUSE, WAZIRABAD VILLAGE RD, PARSVNATH EXOTICA, DLF PHASE 5, SECTOR 53, GURUGRAM, HARYANA 122002
05720310004140
HDFC0000572
110240093
000572
1. Mr. Anil Bhalla Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030. 2. Mr. Gautam Bhalla LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002. 3. Mr. K V George Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075. 4. Mrs Veena Bhomia C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon,
Uploaded











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LAY OUT PLANALREADY BEEN OBTAINED16-02-2017
II. ZONING PLANALREADY BEEN OBTAINED16-12-2015
III. BUILDING PLANALREADY BEEN OBTAINED16-02-2017
IV. SITE PLANALREADY BEEN OBTAINED16-02-2017
V. FLOOR PLANALREADY BEEN OBTAINED16-02-2017
VI. APARTMENT PLANSALREADY BEEN OBTAINED16-02-2017
VII. ELEVATION SECTIONALREADY BEEN OBTAINED16-02-2017








Yes


Yes


Provided







“TOWN SQUARE” (BLOCK-D) SECTOR 82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA
13809.560
188
0
22
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10586.0010586.009646.93
Cost of the apartments4500.004500.003835.50
Cost of the infrastructure500.00500.00426.00
Others costs5586.005586.005385.43


486.26 Lakhs
798.92 Lakhs
14600.00 Lakhs
14600.00 Lakhs
No
30-07-2018
30-07-2018




SOVEREIGN NEXT (PHASE - I) SECTOR-82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA
34519.201
151
0
81
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
18175.0018175.009849.29
Cost of the apartments10350.0010350.005266.00
Cost of the infrastructure1150.001150.00585.00
Others costs6675.006675.003998.29


7602.94 Lakhs
4179.31 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-07-2022
30-07-2022




“TURNING POINT” (PHASE - I) SECTOR 88B, VILLAGE HARSARU, SUB-TEHSIL HARSARU, DISTRICT GURUGRAM, STATE HARYANA
93588.71
703
0
99
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
33415.0033415.004081.38
Cost of the apartments25200.0025200.00453.31
Cost of the infrastructure2800.002800.0050.00
Others costs5415.005415.003578.07


975.94 Lakhs
7752.46 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-01-2025
30-01-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEREFER SECTION BELOW
2WALL FINISHING DETAILSREFER SECTION BELOW
3KITCHEN DETAILSREFER SECTION BELOW
4BATHROOM FITTINGSREFER SECTION BELOW
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESPAINTED HARDWOOD FRAMES FOR DOORS/ALUMINUM OR UPVC FRAME WINDOWS
7GLASS WORKALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
8ELECTRIC FITTINGSIS COMPLIANT MODULAR SWITCHES / SOCKETS, SWITCHGEAR AND DISTRIBUTION BOXES FROM REPUTED MAKES AND BRAND
9CONDUCTING AND WIRING DETAILSIS COMPLIANT COPPER WIRING IN CONCEALED CONDUITS.
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEOHT & UG TANKS
12LIFT DETAILSSPACIOUS ELEVATORS WITH PLEASING INTERIORS. PROVISION OF A STRETCHER LIFT IN ALL THE CORES
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNA
14.1MAIN DOORSPOLISHED HARDWOOD FRAME WITH POLISHED VENEERED DOORS
14.2INTERNAL DOORSPAINTED HARDWOOD FRAMES AND PAINTED/LAMINATED FLUSH DOORS
15AIR CONDITIONINGAIR-CONDITIONING THROUGH ENERGY EFFICIENT VRV / VRF SYSTEMS IN ALL BEDROOMS AND LIVING ROOMS
16ELECTRICAL FITTINGSREFER POINT NO.8 MENTIONED ABOVE.
17CNG PIPE LINEPROVISION FOR SUPPLY OF PIPED NATURAL GAS / LPG SUPPLY TO THE KITCHEN
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE ANTI FUNGAL / ANTI ALGAL PAINT FROM REPUTED MAKES AND BRANDS
20INTERNAL FINISHINGREFER SECTION BELOW.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORHIGH QUALITY, ABRASION RESISTANT MATT FINISHED VITREOUS CERAMIC TILES
1 . 2 WALLSPREMIUM EMULSION PAINT ON PLASTER
1 . 3 CEILINGOBD ON PLASTER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSPREMIUM EMULSION PAINT ON PLASTER
2 . 3 CEILINGOBD ON PLASTER
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES
3 . 2 WALLSGLAZED / MATT FINISHED CERAMIC WALL TILES UP TO DADO LEVEL. PREMIUM EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
3 . 3 CEILINGFALSE CEILING
3 . 4 COUNTERSGRANITE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
3 . 6 FITTING/FIXTURESBASIN MIXER, SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSPREMIUM EMULSION PAINT ON PLASTER
4 . 3 CEILINGOBD ON PLASTER
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES
5 . 2 WALLSGLAZED / MATT FINISHED CERAMIC WALL TILES UP TO DADO LEVEL. PREMIUM EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
5 . 6 FIXTURESBASIN MIXER, SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
6 . KITCHEN
6 . 1 FLOORMATT FINISHED CERAMIC TILES
6 . 2 WALLS2’ HIGH CERAMIC TILES DADO ABOVE COUNTER. PREMIUM EMULSION ON PLASTER IN REMAINING AREAS
6 . 3 CEILINGOBD ON PLASTER.
6 . 4 COUNTERSGRANITE COUNTER TOP
6 . 5 FIXTURESDOUBLE BOWL SINK,MIXER
6 . 6 KITCHEN APPLIANCESA COOK TOP & A CHIMNEY INSTALLATION
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORMATT FINISHED CERAMIC TILES
7 . 2 WALLS & CEILINGPAINT ON PLASTER
7 . 3 TOILETMATT FINISHED CERAMIC TILES ON FLOOR, DADO OF GLAZED / MATT FINISHED CERAMIC WALL TILES
7 . 4 BALCONYMATT FINISHED / ANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORMATT FINISHED / ANTI SKID CERAMIC TILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT ON PLASTER
8 . 3 RAILINGSMS
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1COLLABORATION AGREEMENTS29-01-2020 ------
2HRERA AFS RESIDENTIAL APARTMENT FINAL29-01-2020 ------
3CASH FLOW STATEMENT30-01-2020 ------
4MOA AND AOA29-01-2020 ------
5ARCHITECT AND ENGINEER CERTIFICATE29-01-2020 ------
6IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN30-01-2020 View Document
7DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.29-01-2020 View Document
8TIME PERIOD COMMITED TO ALLOTTEE29-01-2020 ------
9IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-01-2020 View Document
101 ALL DRAWINGS30-01-2020 ------
11COPY OF LICENSE ALONG WITH SCHEDULE OF LAND29-01-2020 View Document
12ANNEXURE-3 329-01-2020 ------
13DEVELOPMENT WORK PLAN29-01-2020 ------
14ENCUMBRANCES29-01-2020 ------
15DETAIL OF UNITS AND CONSTRUCTION STATUS30-01-2020 ------
16CASH FLOW STATEMENT OF THE PROPOSED PROJECT30-01-2020 View Document
17NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT29-01-2020 View Document
18PROJECT DESCRIPTION AND COST29-01-2020 ------
19DETAIL OF PARKING29-01-2020 ------
20CA CERTIFICATE -NON DEFAULT29-01-2020 ------
212 ALL DRAWINGS30-01-2020 ------
22A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS29-01-2020 View Document
23PROJECT REPORT30-01-2020 ------
24REGISTRATION CERTIFICATE29-01-2020 ------
25BALANCE SHEETS29-01-2020 ------
26SITE PLAN29-01-2020 ------
27SHAREHOLDERS29-01-2020 ------
28SECTORIAL MAP29-01-2020 ------
29REGISTRATION CERTIFICATE OF TRANQUIL HEIGHT30-01-2020 ------
30RESOLUTION29-01-2020 ------
31PAN CARD29-01-2020 ------
32AKS SHEJRA WITH LAND DETAILS29-01-2020 ------
33 LOCATION PLAN29-01-2020 ------
34CA CERTIFICATE29-01-2020 ------
35LIST OF ARCHITECT ENGINEER ETC29-01-2020 ------
36BUILDING PLAN BR III29-01-2020 ------
37BOOKING APPLICATION FORM RESIDENTIAL FINAL29-01-2020 ------
38ALLOTTMENT LETTER RESIDENTIAL29-01-2020 ------
39CONVEYANCE DEED RESIDENTIAL FINAL29-01-2020 ------
40SANCTION LETTER AND HOME LOAN TIE UPS29-01-2020 ------
41 REP I (OLD)29-01-2020 ------
42 LIST OF DIRECTORS29-01-2020 ------
43COLLECTION STATEMENT29-01-2020 ------
44REVENUE RECORDS SALE DEED ETC29-01-2020 ------