HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2345-2026
Submission Date : 16-10-2026 03:07:07 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28 GURUGRAM- 122001
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar-india.com
https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 


 
 







EMAAR BUSINESS SQUARE
SECTOR 66
BADSHAHPUR ST
GURUGRAM
01244421155
8448295834 (Number Shared by Promoter in Public)
Coordination.in@emaar-india.com
RADHA KRISHNA
01244421155
8448295834 (Number Shared by Promoter in Public)
Coordination.in@emaar-india.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
130920129-09-20261441000.00THE HONGKONG AND SHANGHAI BANKING CORPORATION LIMITEDHRERA Gurugram







1.548 (Acre)
1
1
114.419 (Acre)
97 of 2010 dt 18.11.2010, 41 of 2011 dt. 03.05.2011, 101 of 2023 dt. 06.05.2023, 265 of 2025dt. 31.12.2025
No
Address     306-308, SQUARE ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI - 110017
Annexure-B- COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT.
No
THE DEVELOPER SHALL BE RESPONSIBLE FOR THE DEVELOPMENT OF THE SAID LAND. SUBSEQUENT TO THE GRANT OF THE LICENSE. IT UNDERTAKES TO OBTAIN ALL REQUISITE APPROVALS AND SANCTION SUCH AS BUILDING PLANS, DRAWINGS STC. FOR THE DEVELOPMENT OF THE SAID LAND. AT ITS OWN COST AND IN ACCORDANCE WITH THE APPLICABLE LAWS, BYE LAWS, RULES AND OR GUIDELINE AS IN FORCE BY THE STATUTORY BODIES AND AUTHORITIES IN THIS REGARDS.
No
Yes
Yes







142337.40 Lakhs
740.41 Lakhs
82073.01 Lakhs
11693.47 Lakhs
47830.51 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.54460
3CONSTRUCTION OF ROADS 0.65
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0.20
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.1534
Total1.548




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS186AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM194AS PER PROJECT REPORT
3STORM WATER DRAINAGE22AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM43AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL36AS PER PROJECT REPORT
6STREET LIGHTING40AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING33AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS43AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15PARKING134YET TO BE PREPARED
16STP89YET TO BE PREPARED
17UNDERGROUND WATERGROUND47YET TO BE PREPARED
18RAINWATER HARVESTING28YET TO BE PREPARED
19ELECTRICAL SUBSTATION174YET TO BE PREPARED


21-08-2026 (date)
15-10-2026 (date)
01-10-2026
30-09-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings44.2810
Apartment/Shops/Other Buildings50.5110
Apartment/Shops/Other Buildings50.5910
Apartment/Shops/Other Buildings50.9610
Apartment/Shops/Other Buildings51.9310
Apartment/Shops/Other Buildings55.9010
Apartment/Shops/Other Buildings57.4510
Apartment/Shops/Other Buildings68.1510
Apartment/Shops/Other Buildings75.4510
Apartment/Shops/Other Buildings80.8510
Apartment/Shops/Other Buildings84.3510
Apartment/Shops/Other Buildings88.6210
Apartment/Shops/Other Buildings115.0910
Apartment/Shops/Other Buildings115.1010
Apartment/Shops/Other Buildings116.5220
Apartment/Shops/Other Buildings122.7910
Apartment/Shops/Other Buildings137.8010
Apartment/Shops/Other Buildings137.8030
Apartment/Shops/Other Buildings149.5640
Apartment/Shops/Other Buildings150.1010
Apartment/Shops/Other Buildings167.4610
Apartment/Shops/Other Buildings167.4640
Apartment/Shops/Other Buildings169.6110
Apartment/Shops/Other Buildings169.9230
Apartment/Shops/Other Buildings169.9910
Apartment/Shops/Other Buildings202.2810
Apartment/Shops/Other Buildings204.5210
Apartment/Shops/Other Buildings204.5230
Apartment/Shops/Other Buildings204.5310
Apartment/Shops/Other Buildings214.0750
Apartment/Shops/Other Buildings223.7910
Apartment/Shops/Other Buildings240.2320
Apartment/Shops/Other Buildings243.5310
Apartment/Shops/Other Buildings255.2250
Apartment/Shops/Other Buildings255.48100
Apartment/Shops/Other Buildings265.80100
Apartment/Shops/Other Buildings275.2710
Apartment/Shops/Other Buildings306.6310
Apartment/Shops/Other Buildings377.2110





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
STP4
ELECTRIFICATION SUB STATION917
ELECTRIFICATION COST510
UNDERGROUND WATER TANK2
RAIN WATER HARVESTING1
STP MEP9
RAIN WATER HARVESTING3
UNDERGRPUND WATER TANK5

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3313
Water Supply System3514
Sewerage treatment & garbage disposal63
Electricity Supply System011
Storm Water Drainage42
Parks and Playgrounds011
Clubhouse/community centres00
Shopping area00
Other00
STREET LIGHTING00
RAIN WATER HARVESTING3
ELECTRIFICATION COST55
STP MEP9
ELECTRIFICATION SUN STATION9
UNDERGROUND WATER TANK52
Parking34
Rain Water Harvesting1
STP4
SECURITY AND FIRE FIGHTING8
ELECTRIFICATION SUB STATION9

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements199
Water Supply System1910
Sewerage treatment & garbage disposal42
Electricity Supply System42
Storm Water Drainage21
Parks and Playgrounds42
Clubhouse/community centres00
Shopping area00
Other00
UNDERWATER TANK2
ELELCTRIFICATION COST0
STREET LIGHTING42
SECURITY AND FIRE FIGHTING32
PARKING137
ELECTRIFICATION SUB STATION99
STP44
Rain Water Harvesting1
RAIN WATER ARVESTING1
UNDER GROUND WATER TANK2
ELECTRIFICATION COST5












No
No
HSBC BANK, BIRLA TOWERS, 25, BARAKHAMBA ROAD, CONNAUGHT PLACE, NEW DELHI 1
057122129985
HSBC0110002
110039002
HSBCINBB
Kalyan Chakrabarti yanmendra, Khiroda Chandra Jena, Ashish Bagri, Sanjeev Sharma, Rajeev Chaudhary, Mayank Sharma, Kavita Agarwal, Kiran Pandey, Girish Kapoor, Mohit Gupta, Priyanka Goenka, Ashish Gehlot, Chinky Kindra, Swapnil Gupta, Ramesh Kumar Swami, Mayank Nathani, Emaar Business Park, Sector 28, Gurugram, Haryana











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 97 OF 2010ALREADY BEEN OBTAINED18-11-2010
II. LICENSE NO. 41 OF 2011ALREADY BEEN OBTAINED03-05-2011
III. LICENSE NO. 101 OF 2003ALREADY BEEN OBTAINED06-05-2023
IV. LICENSE NO. 265 OF 2025ALREADY BEEN OBTAINED31-12-2025
V. APPROVAL OF ZONING PLANALREADY BEEN OBTAINED24-09-2026
VI. APPROVAL OF LAYOUT PLANALREADY BEEN OBTAINED21-08-2026
VII. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED18-12-2023
VIII. APPROVAL OF PHASING PLANALREADY BEEN OBTAINED21-08-2026








No


No


As per Draft







EMAAR BUSINESS DISTRICT 65 NXT
1.148
0
12
0
12
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
219802144
Cost of the apartments000
Cost of the infrastructure5310316
Others costs166701828


9053 Lakhs
954 Lakhs
0 Lakhs
2060 Lakhs
No
10-08-2027
10-08-2027




URBAN OASIS PHASE 1&2
6.64
424
0
424
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
684146841419906
Cost of the apartments591765923213249
Cost of the infrastructure000
Others costs923891826657


79335 Lakhs
102325 Lakhs
0 Lakhs
17270 Lakhs
No
30-09-2028
30-09-2029




URBAN ASCENT
9.164
816
0
657
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
163770016251
Cost of the apartments13721805364
Cost of the infrastructure000
Others costs26552010887


51458 Lakhs
207050 Lakhs
0 Lakhs
1550 Lakhs
No
23-08-2027
23-08-2027




MARBELLA PHASE 2 SECTOR 65 & 66
66.059
0
501
0
52
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
375403754043432
Cost of the apartments000
Cost of the infrastructure131101311031008
Others costs244302443012424


17324 Lakhs
1.96 Lakhs
0 Lakhs
12306 Lakhs
No
31-12-2027
31-12-2027




EMAAR BUSINESS DISTRICT 99 SECTOR 99 GURUGRAM
3.26875
0
35
0
35
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
946394637177
Cost of the apartments000
Cost of the infrastructure18311831773
Others costs287628761671


13798 Lakhs
282 Lakhs
0 Lakhs
7569 Lakhs
No
17-08-2026
17-08-2026




THE 88 SECTOR 112 GURUGRAM HARYANA
1.847
88
0
84
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
949803623
Cost of the apartments844102267
Cost of the infrastructure000
Others costs10575461362


8583 Lakhs
6490 Lakhs
0 Lakhs
4500 Lakhs
No
31-03-2029
31-03-2029










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR SWITCH
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSPVC CONDUIT
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 15-10-2026 View Document
2 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 15-10-2026 View Document
3 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 15-10-2026 View Document
4 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 15-10-2026 View Document
5 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 15-10-2026 View Document
6 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 15-10-2026 View Document
7 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 15-10-2026 View Document
8 DEMARCATION PLAN 15-10-2026 View Document
9 ZONING PLAN 15-10-2026 View Document
10 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 15-10-2026 View Document
11 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 15-10-2026 View Document