HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1578-2024
Submission Date : 29-02-2024 02:58:33 PM
Applicant Type : Company
Project Type: NEW




LOON LAND DEVELOPMENT LIMITED
OFFICE NO. 1221-A, DEVIKA TOWER, 12TH FLOOR, 6, NEHRU PLACE, NEW DELHI -110019
01244732000
9811348349 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com
http://www.loonlanddevelopment.in
XXXX705A
U70109DL2014PLC267465
 
 


 
 


 
 


 
 


 
 







M3M GOLF HILLS PHASE 2
SECTOR-79 & 79B, GURUGRAM, HARYANA
MANESAR
GURUGRAM
01244732000
8929012754 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com
ANUJ GUPTA
01244732000
8929012754 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150199327-02-20241244310ICICI BANKHRERA Gurugram
250199227-02-2024901100ICICI BANKHRERA Gurugram
340811165335321-03-20248203IMPS (TRANSACTION ID -408111653353)HRERA Gurugram







14.64375 (Acre)
1.381
1.381
75.3458 (Acre)
19 OF 2019, 226 OF 2023 AND 227 OF 2023
No
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Address     NA
Annexure-B- THE PROMOTER HAS OBTAINED THE CHANGE OF DEVELOPER PERMISSION FROM DTCP, HARYANA.
NO
No
NA
No
Yes
Yes







103599.45 Lakhs
6939.39 Lakhs
56155.77 Lakhs
4442.96 Lakhs
36061.33 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.038
3CONSTRUCTION OF ROADS1.683
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.576
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13PARKING9.98
14STP0.185
15UNDERGROUNDWATERTANK0.185
Total14.647




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS307.47AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM118.99AS PER PROJECT REPORT
3STORM WATER DRAINAGE150.98AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM81.99AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL156.99AS PER PROJECT REPORT
6STREET LIGHTING47.62AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING123.34AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS116.18AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00AS PER PROJECT REPORT
10SHOPPING AREA0.00AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0.00AS PER PROJECT REPORT
12SCHOOL0.00AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0.00AS PER PROJECT REPORT
14ANY OTHER0.00AS PER PROJECT REPORT
15HARDSCAPE AND SOFTSCAPE941.59AS PER PROJECT REPORT
16BOUNDARY WALL95.51AS PER PROJECT REPORT
17GUARD HOUSE35.06AS PER PROJECT REPORT
18PARKING16.03AS PER PROJECT REPORT
19STP119.05AS PER PROJECT REPORT
20UNDERGROUND WATER TANK145.83AS PER PROJECT REPORT
21RAIN WATER HARVESTING147.62AS PER PROJECT REPORT
22ELECTRICAL SUB STATION255.56AS PER PROJECT REPORT
23ELECTRIFICATION TILL SITE709.68AS PER PROJECT REPORT
24CONSULTANCY590.20AS PER PROJECT REPORT
25INFRA ESTABLISHMENTS283.27AS PER PROJECT REPORT


23-02-2024 (date)
23-02-2024 (date)
01-04-2024
30-04-2032
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings74531.355905





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments464.63331.88733.41
Shops000
Plots000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments479.871059.761738.111816.94
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2564.343457.013830.833653.41
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3526.744196.224547.774761.92
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3329.763338.342790.292819.32
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2097.691245.101043.721043.72
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1285.01000
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements09.2230.7530.75
Water Supply System5.9511.905.955.95
Sewerage treatment & garbage disposal7.8515.707.857.85
Electricity Supply System0000
Storm Water Drainage7.5515.107.557.55
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain Water Harvesting007.387.38
Infra Establishments14.1614.1614.1628.33
Boundary Wall3.824.784.784.78
Main Entrance work0.701.752.452.45
Consultancy29.5129.5129.5159.02

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements21.5221.5230.7536.90
Water Supply System7.1411.9011.9010.71
Sewerage treatment & garbage disposal9.4215.7015.7014.13
Electricity Supply System0000
Storm Water Drainage9.0613.5915.1015.10
Parks and Playgrounds0011.6217.43
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light004.762.38
Hardscape and Softscape094.1694.16141.24
Infra Establishments28.3314.1628.3314.16
Consultancy59.0229.5159.0229.51
Electrical Sub Station0000
Rain Water Harvesting8.868.8611.8114.76
Underground Tank07.2914.5814.58
Security008.358.35
STP4.764.768.3311.91
Main Entrance work2.453.513.512.45
Boundary Wall6.696.699.5511.46
Firefighting Services003.995.58
Electrification004.108.20

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements36.9024.6024.6021.52
Water Supply System7.147.149.5211.90
Sewerage treatment & garbage disposal9.429.4212.5615.70
Electricity Supply System0000
Storm Water Drainage9.069.0612.0815.10
Parks and Playgrounds23.2411.6217.4317.43
Clubhouse/community centres0000
Shopping area0000
Other0000
Switching Station0177.42177.42177.42
Consultancy29.5159.0229.5129.51
Infra Establishments14.1628.3314.1614.16
Parking Marking2.402.404.014.01
Main Entrance work3.512.803.862.80
Electrification12.304.1012.3020.50
Street Light4.7611.9111.914.76
Security12.5220.8612.5212.52
Firefighting Services7.182.395.989.97
STP11.9117.8629.7616.67
Underground Tank14.5821.8736.4621.87
Rain Water Harvesting14.7629.5214.7614.76
Electrical Sub Station063.8963.8963.89
Hardscape and Softscape188.3294.16188.3294.16
Boundary Wall11.469.554.787.64

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements18.45000
Water Supply System11.90000
Sewerage treatment & garbage disposal15.70000
Electricity Supply System0000
Storm Water Drainage15.10000
Parks and Playgrounds17.43000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security8.35
Street Light7.14
Hardscape and Softscape47.08
Underground Tank14.58
Electrification20.50
Main Entrance work2.80
Boundary Wall9.55
Parking Marking3.21
Infra Establishments28.33
Consultancy59.02
Switching Station177.42
Electrical Sub Station63.89
Rain Water Harvesting14.76
STP13.10
Firefighting Services4.79

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
Yes
ICICI BANK LIMITED, SHOP NO 107,108, EMAAR EMERALD PLAZA, SECTOR-65, GURUGRAM
777705006321
ICIC0001031
1031
1031
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor,Sector-103, grandiva, Daultabad, Gurgaon, Haryana-1220065) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP
UPLOADED











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCEALREADY BEEN OBTAINED31-10-2023








Yes


Yes


AS PER RULES AND REGULATIONS OF HARERA







M3M ANTALYA HILLS PHASE 1, SECTOR 79, GURUGRAM
5.215
636
0
518
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
29946.18011585.79
Cost of the apartments19053.5706721.07
Cost of the infrastructure2823.9600
Others costs6482.1904864.72


22204.45 Lakhs
62717.53 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2025
31-12-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATED WOODEN FLOOR/CERAMIC TILE
2WALL FINISHING DETAILSPLASTER WITH OBD
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESEXTERNAL ALUMINIUM WITH GLASS INTERNAL – WOODEN
7GLASS WORKONLY EXTERNAL DOOR/ WINDOW
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSNA
11WATER STORAGEAS PER NORMS
12LIFT DETAILSLIFTS AS PER BUILDING PLANS
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
14DOORSNA
14.1MAIN DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINESERVICE PROVIDER
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEWATER PROOF PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER /OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODENFLOORING
2 . 2 WALLSPLASTER + OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER +DADO
3 . 3 CEILINGGRID FALSE CEILING/OBD
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATE WOODENFLOORING
4 . 2 WALLSPLASTER /OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER +DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER+DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSSTONE / MARBLE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER + PAINT
7 . 3 TOILETANTI SKID CERAMIC TILES
7 . 4 BALCONYANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1T-19 (ICONIC)- TYPICAL FLOOR PLAN- 1ST TO 17TH, 19TH TO 27TH & 29TH FLOOR29-02-2024 ------
2T-17- SECTION PLAN29-02-2024 ------
3APPROVED ZONING PLAN29-02-2024 ------
4T-20 & 21- TYPICAL FLOOR PLAN- 1ST TO 17TH, 19TH TO 27TH & 29TH FLOOR29-02-2024 ------
5T-17- ELEVATION PLAN29-02-2024 ------
6T-20- ELEVATION PLAN29-02-2024 ------
7CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT29-02-2024 View Document
8IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN29-02-2024 View Document
9SUPERIMPOSED DEMARCATION OF APPROVED LAYOUT PLAN29-02-2024 ------
10T-21- ELEVATION PLAN29-02-2024 ------
11COPY OF LICENSE ALONG WITH SCHEDULE OF LAND29-02-2024 View Document
12APPROVED SITE PLAN29-02-2024 ------
13NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT29-02-2024 View Document
14T-21- SECTION PLAN29-02-2024 ------
15T-20- SECTION PLAN29-02-2024 ------
16T-18- SECTION PLAN29-02-2024 ------
17T-19- ELEVATION PLAN29-02-2024 ------
18IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-02-2024 View Document
19T-19- SECTION PLAN29-02-2024 ------
20T-18- ELEVATION PLAN29-02-2024 ------
21T-17 & 18- TYPICAL FLOOR PLAN- 1ST TO 17TH, 19TH TO 27TH & 29TH FLOOR29-02-2024 ------
22APPROVED DEMARCATION PLAN29-02-2024 ------
23BASEMENT-2 PLAN29-02-2024 ------
24T-17 & 18- 18TH & 28TH FLOOR28-05-2024 ------
25T-17 & 18- 30TH FLOOR PLAN28-05-2024 ------
26LANDSCAPE PLAN28-05-2024 ------
27T-19 (ICONIC)- 18TH & 28TH FLOOR PLAN28-05-2024 ------
28T-20 & 21- TERRACE FLOOR PLAN28-05-2024 ------
29T-20 & 21- STILT FLOOR PLAN28-05-2024 ------
30T-20 & 21- 18TH & 28TH FLOOR28-05-2024 ------
31T-19 (ICONIC)- 30TH FLOOR PLAN28-05-2024 ------
32CASH FLOW STATEMENT OF THE PROPOSED PROJECT28-05-2024 View Document
33DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.28-05-2024 View Document
34ROAD LAYOUT28-05-2024 ------
35SEWER LAYOUT28-05-2024 ------
36STORM WATER LAYOUT PLAN28-05-2024 ------
37STRUCTURAL PLAN-128-05-2024 ------
38STRUCTURAL PLAN-228-05-2024 ------
39T-17 & 18- STILT FLOOR PLAN28-05-2024 ------
40T-17 & 18- TERRACE FLOOR PLAN28-05-2024 ------
41T-19 (ICONIC)- STILT FLOOR PLAN28-05-2024 ------
42T-19 (ICONIC)- TERRACE FLOOR PLAN28-05-2024 ------
43T-20 & 21- 30TH FLOOR PLAN28-05-2024 ------