HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1545-2024
Submission Date : 22-02-2024 12:43:37 PM
Applicant Type : Company
Project Type: NEW




DLF LIMITED
3RD FLOOR, DLF SHOPPING MALL, ARJUN MARG, DLF CITY PHASE I, GURUGRAM, HARYANA - 122002
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in
XXXX494N
L7010HR1963PLC002484
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







CLUB ARCADE
SECTOR 91
GURGAON
GURUGRAM
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
YUDHVEER SINGH
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152307015-02-2024180000ICICI BANK LIMITEDHRERA Gurugram
252322628-03-2024104000ICICI BANK LIMITEDHRERA Gurugram







0.89 (Acre)
1.75
1.1
179.924 (Acre)
59 of 2011 dated 28/06/2011, 14 of 2012 dated 27/02/2012, 13 of 2019 dated 06/02/2019
No
Address     3RD FLOOR, DLF SHOPPING MALL, ARJUN MARG, DLF CITY PHASE I, GURUGRAM, HARYANA - 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX. ARJUN MARG, DLF PHASE-I, DLF CITY, GURUGRAM
Address     1ST FLOOR, SHOPPING MALL COMPLEX. ARJUN MARG, DLF PHASE-I, DLF CITY, GURUGRAM
Annexure-B- COLLABORATOR (DEVELOPMENT AGREEMENTS AND SPA ANNEXED)
BEFORE
Yes
ANNEXED
No
Yes
Yes







4427 Lakhs
52.71 Lakhs
2574 Lakhs
500 Lakhs
1300 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.4005
3CONSTRUCTION OF ROADS0.273
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.083
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.1335
Total0.89




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDAYes
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS50AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM20AS PER PROJECT REPORT
3STORM WATER DRAINAGE20AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM175AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL10AS PER PROJECT REPORT
6STREET LIGHTING15AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING20AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS25AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM10AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER155AS PER PROJECT REPORT


01-07-2020 (date)
13-03-2024 (date)
01-04-2024
31-03-2028
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings2545721





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops39
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2024)
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
ICICI BANK LIMITED, 9A PHELPS BUILDING, CONNAUGHT PLACE, NEW DELHI 110001
017705014317
ICIC0000007
110229002
0007
01. Mr. Vivek Anand (E1001, Palm Springs, Golf Course Road, opposite IBIS Hotel, Sector 54, Gurgaon, Haryana 122002) 02. Mr. Puneet Rakheja (H.No. 386, Sector 31, Faridabad, Haryana 121003) 03. Mr. Pankaj Jain (C701, Apex Acacia Valley, Sector 3, Ghaziabad, Uttar Pradesh 201010) 04. Mr. Saurabh Kumar Gupta (1116, Vikas Kunj, Vikaspuri, Delhi 110018) 05. Mr. Gaurav Arora (A-33, Near Mehfil Banquet Hall, Mahendru Enclave, GT Karnal Road, Delhi 110009) 06. Ms. Sandhya Singla (Neelanchal Apartments, Plot No. 3, Sector 4, Swarka, Delhi 110075) 07. Mr. Ashok Nanda (A255, Surya Nagar, Chander Nagar, Ghaziabad, Uttar Pradesh 201011) 08. Mr. Rajeev Singhal (Flat No. 14, Tower No. 4, Raj Nagar Extension, Signature Homes, Ghaziabad, Uttar Pradesh 201001) 09. Mr. Pankaj Kumar (A3, Rajcottage 1/18, Rajendra Nagar, Ghaziabad, Uttar Pradesh 201005) 10. Mr. Amit Bansal (472, Sector 10, Panchkula, Haryana 134113)
No Default Certificate Annexed











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE 59 OF 2011ALREADY BEEN OBTAINED28-06-2011
II. LICENSE 14 OF 2012ALREADY BEEN OBTAINED27-02-2012
III. LICENSE 13 OF 2019ALREADY BEEN OBTAINED06-02-2019
IV. LAYOUT PLAN DTCP 7452ALREADY BEEN OBTAINED01-07-2020
V. ZONING PLAN DTCP 8547ALREADY BEEN OBTAINED18-08-2022
VI. BUILDING PLAN MEMO 1507ALREADY BEEN OBTAINED13-03-2024








Yes


Yes


As per RERA Format







INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91 92, GURUGRAM, HARYANA
2.246
124
0
124
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
12801132006918
Cost of the apartments10030114805218
Cost of the infrastructure000
Others costs277117201700


11456 Lakhs
11938 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2025
31-03-2025




GARDENCITY ARCADE, SECTOR 92, GURUGRAM, HARYANA
1.42
99
0
99
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
630862133320
Cost of the apartments416246582084
Cost of the infrastructure000
Others costs214615551236


1502 Lakhs
7249 Lakhs
0 Lakhs
0 Lakhs
No
29-04-2025
29-04-2025




THE GROVE, DLF V, SECTOR 54, GURUGRAM, HARYANA
5.3073
292
0
292
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
473465201616767
Cost of the apartments385324923915273
Cost of the infrastructure000
Others costs881427771494


75754 Lakhs
112556 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2025
31-12-2025




INDEPENDENT FLOORS AT DLF CITY PH IV, SECTOR 27, GURUGRAM, HARYANA
1.625
60
0
60
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
823881923669
Cost of the apartments644478873396
Cost of the infrastructure7900
Others costs1715305273


19316 Lakhs
9392 Lakhs
0 Lakhs
0 Lakhs
No
15-05-2025
15-05-2025




DLF GARDENCITY ENCLAVE, SECTOR 93, GURUGRAM, HARYANA
26.91875
0
367
0
101
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1199951971415
Cost of the apartments000
Cost of the infrastructure47383241232
Others costs726119561183


2807 Lakhs
8658 Lakhs
0 Lakhs
0 Lakhs
No
29-03-2024
29-03-2024




INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE, SECTOR 93, GURUGRAM, HARYANA
3.569
388
0
383
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23468281857306
Cost of the apartments18345258745984
Cost of the infrastructure136700
Others costs375623111322


13024 Lakhs
38175 Lakhs
0 Lakhs
0 Lakhs
No
19-08-2027
19-08-2027




INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PH II, SECTOR 93, GURUGRAM, HARYANA
5.01
544
0
536
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
40606381984590
Cost of the apartments30890353843082
Cost of the infrastructure300200
Others costs671428141508


17236 Lakhs
59200 Lakhs
0 Lakhs
0 Lakhs
No
31-10-2028
31-10-2028




SIRIS ESTATE, DLF CITY PH III SECTOR 24, GURUGRAM HARYANA
1.243
48
0
47
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
542865056505
Cost of the apartments394260736073
Cost of the infrastructure000
Others costs148669546954


16701 Lakhs
120 Lakhs
0 Lakhs
0 Lakhs
No
31-10-2024
31-10-2024




INDEPENDENT FLOORS AT DLF CITY PH III, SECTOR 24, GURUGRAM HARYANA
1.243
48
0
48
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
608865446544
Cost of the apartments406361066106
Cost of the infrastructure000
Others costs2025438438


17365 Lakhs
1253 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2024
31-12-2024




INDEPENDENT FLOORS AT DLF CITY PH I, SECTOR 26, GURUGRAM HARYANA
0.621
28
0
28
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
390837712469
Cost of the apartments261835612275
Cost of the infrastructure000
Others costs1290210193


10769 Lakhs
1516 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2024
28-02-2024




INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91 92, GURUGRAM, HARYANA
0.969
72
0
72
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
484757474238
Cost of the apartments411354924007
Cost of the infrastructure000
Others costs734255231


7525 Lakhs
1153 Lakhs
0 Lakhs
0 Lakhs
No
20-06-2024
20-06-2024




INDEPENDENT FLOORS AT DLF GARDENCITY SECTOR 91 92, GURUGRAM, HARYANA
1.096
52
0
52
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
613363303735
Cost of the apartments453553202735
Cost of the infrastructure000
Others costs159810101000


7252 Lakhs
2778 Lakhs
0 Lakhs
0 Lakhs
No
19-11-2024
19-11-2024




DLF GARDENCITY, GURUGRAM, HARYANA
16.25
0
109
0
109
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
143921291566
Cost of the apartments000
Cost of the infrastructure119220991545
Others costs2463021


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
27-06-2023
27-06-2023




SUMMIT PLAZA, SECTOR 54, GURUGRAM, HARYANA
2.65
311
0
311
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
235383199111944
Cost of the apartments15098291189887
Cost of the infrastructure53600
Others costs790428732057


3285 Lakhs
7340 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2026
30-06-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEGRANITE FLOORING
2WALL FINISHING DETAILSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR, PAINT
3KITCHEN DETAILSNA
4BATHROOM FITTINGSSS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR FITTINGS (ONLY IN COMMON AREA)
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FR PVC INSULATED MULTI STRAND COPPER WIRE (ONLY IN COMMON AREA)
10CUPBOARD DETAILSNA
11WATER STORAGEOHT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSWOODEN
14.2INTERNAL DOORSWOODEN
15AIR CONDITIONINGHIWALL SPLIT AC
16ELECTRICAL FITTINGSMODULAR FITTINGS (ONLY IN COMMON AREA)
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEACRYLIC EMULSION / OBD
20INTERNAL FINISHINGACRYLIC EMULSION / OBD
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORTILES
5 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR, PAINT
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSSTANDARD MAKE
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1ZONING PLAN31-01-2024 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN31-01-2024 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT21-02-2024 View Document
4DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.19-02-2024 View Document
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN16-02-2024 View Document
6DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD16-02-2024 View Document
7CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT21-02-2024 View Document
8CASH FLOW STATEMENT OF THE PROPOSED PROJECT20-02-2024 View Document
9COPY OF LICENSE ALONG WITH SCHEDULE OF LAND16-02-2024 View Document
10DEMARCATION PLAN20-02-2024 View Document
11IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN19-06-2024 View Document
12A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS19-06-2024 View Document
13BASEMENT PLAN19-06-2024 ------
14EC FOR RPC19-06-2024 ------
15ELEVATION I19-06-2024 ------
16FLOOR PLANS19-06-2024 ------
17JAMABANDI19-06-2024 ------
18LAND TITLE SEARCH REPORT19-06-2024 ------
19LICENSES AND PART CC19-06-2024 ------
20MUTATION19-06-2024 ------
21NEC19-06-2024 ------
22SECTION PLAN19-06-2024 ------
23SHIJRA19-06-2024 ------
24SPE APPROVAL LETTER FOR RPC19-06-2024 ------
25SPE BOOKLET19-06-2024 ------
26SPE PLANS RPC19-06-2024 ------