HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1822-2024
Submission Date : 20-01-2025 10:38:04 AM
Applicant Type : Company
Project Type: NEW




SADAN REALTECHPRIVATE LIMITED
4TH FLOOR, M2KCORPORATE PARKBLOCK N, MAYFIELDGARDEN, SECTOR-51GURUGRAM - 122003
01244525000
9818199921 (Number Shared by Promoter in Public)
olivegreens@m2kindia.com
https://www.m2kindia.com
XXXX844C
U70102HR2010PTC075381
 
 


 
 


 
 


 
 







M2K OLIVE GREEN FLOORS
M2K OLIVE GREENS, VILLAGE DHANWAPUR,SECTOR - 104
KADIPUR ST
GURUGRAM
01244525000
9818199921 (Number Shared by Promoter in Public)
olivegreens@m2kindia.com
MOHIT SHARMA
01244525000
9818199921 (Number Shared by Promoter in Public)
olivegreens@m2kindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
131216-12-202441339AXIS BANK LTD.HRERA Gurugram
231316-12-2024109135AXIS BANK LTD.HRERA Gurugram
333010-02-2025246780AXIS BANK LTD.HRERA Gurugram







1.0215 (Acre)
2.64
2.6367
14.1375 (Acre)
174 OF 2022
Yes







10835.31 Lakhs
809.35 Lakhs
6395.72 Lakhs
630.96 Lakhs
2999.28 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.0215
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total1.0215




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS32.77AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM29.34AS PER PROJECT REPORT
3STORM WATER DRAINAGE25.68AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM29.44AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL38.36AS PER PROJECT REPORT
6STREET LIGHTING6.39AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1.18AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS17.66AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE117.75AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP10.60YET TO BE PREPARED
16UNDER GROUND WATER TANK4.83YET TO BE PREPARED
17ELECT SUB STATION11.66YET TO BE PREPARED
18CONT OF CIRCULATION ROAD59.47YET TO BE PREPARED
19MISC CIVIL STRUCTURE81.01YET TO BE PREPARED
20ELECTRIFICATION COST UPTO PROJECT SITE41.21YET TO BE PREPARED


NA (date)
NA (date)
01-01-2025
31-12-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 120.191 8
2 132.496 1
3 132.064 1
4 131.950 1
5 132.141 1
6 132.332 1
7 132.519 1
8 132.707 1
9 132.898 1
10 133.089 1
11 133.276 1
12 133.467 1
13 133.658 1
14 133.846 1
15 133.970 1
16 134.000 1
17 136.020 1
18 129.762 1
19 130.058 5
20 130.955 2
Total32


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings67.93480
Apartment/Shops/Other Buildings69.171240
Apartment/Shops/Other Buildings77.14340
Apartment/Shops/Other Buildings76.92540
Apartment/Shops/Other Buildings76.92540
Apartment/Shops/Other Buildings76.9540
Apartment/Shops/Other Buildings76.98640
Apartment/Shops/Other Buildings77.13540
Apartment/Shops/Other Buildings77.13540
Apartment/Shops/Other Buildings77.3640
Apartment/Shops/Other Buildings77.43640
Apartment/Shops/Other Buildings77.55640
Apartment/Shops/Other Buildings77.63140
Apartment/Shops/Other Buildings77.66140
Apartment/Shops/Other Buildings77.73640
Apartment/Shops/Other Buildings77.73680
Apartment/Shops/Other Buildings77.73640
Apartment/Shops/Other Buildings74.28840
Apartment/Shops/Other Buildings75.628200
Apartment/Shops/Other Buildings76.22240
Apartment/Shops/Other Buildings75.00840





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments3145.44
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments380.48533.05591.19738.78
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments738.78738.78738.78556.05
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments556.05556.05271.80271.80
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments271.80182.28182.28182.28
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments19191919
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements32.77
Water Supply System29.34
Sewerage treatment & garbage disposal38.36
Electricity Supply System29.44
Storm Water Drainage25.68
Parks and Playgrounds17.66
Clubhouse/community centres117.75
Shopping area0
Other0
Construction of Circular road59.47
Electric Sub Station11.66
Electrification cost upto project41.21
Misc Civil Structure81.01
Security and fire Fighting1.18
STP10.60
Street Lighting6.39
Underground water Tank4.83

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Sewerage0.370.69
Storm water0.240.45
Rain water Harvesting0.250.46
Electrification3.215.93
Construction of water tank1.542.84

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain water Harvesting0.460.460.460.46
Electrification5.935.935.935.93
Storm water0.450.450.450.45
Construction of water tank2.842.842.842.84
Sewerage0.690.690.690.69

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification5.935.935.935.93
Construction of water tank2.842.842.842.84
Sewerage0.690.690.690.69
Storm water0.450.450.450.45
Rain water Harvesting0.460.460.460.46

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain water Harvesting0.460.210.210.21
Construction of water tank2.841.301.301.30
Sewerage0.690.310.310.31
Storm water0.450.210.210.21
Electrification5.932.722.722.72












Yes
No
IDBI LIMITED, PALAM DABRIROAD, DELHI
0169102000029740
IBKL0000169
110259016
000169
Gautam Kumar Bhartia, Ajikumar Veetil Kizhakkilottu, Gaurav Tyagi, Yankush Govil and Harish Pandey
ATTACHED











Yes
Yes
Yes
Yes
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED21-10-2022
II. LAYOUT PLANALREADY BEEN OBTAINED28-10-2022
III. DEMARCATION PLANALREADY BEEN OBTAINED16-12-2022
IV. BUILDING PLAN APPROVALALREADY BEEN OBTAINED14-01-2025








Yes


Yes


As per HRERA Norms







M2K OLIVE GREENS AT VILLAGE DHANWAPUR, SECTOR-104, GURUGRAM, HARYANA
14.1375
0
283
0
157
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17287.69015571.22
Cost of the apartments000
Cost of the infrastructure1348.4001907.00
Others costs15939.29013364.22


12490.28 Lakhs
5818.46 Lakhs
0 Lakhs
8604.52 Lakhs
No
20-10-2025
20-10-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE LAMINATED WOODEN FLOOR/ VITRIFIED TILES/ ANTISKID TILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT / OBD
3KITCHEN DETAILSMODULAR KITCHEN, GRANITE COUNTER
4BATHROOM FITTINGSJAQUAR OR EQUIVALENT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMIRANDI WOOD
7GLASS WORKNA
8ELECTRIC FITTINGSISI STANDARD
9CONDUCTING AND WIRING DETAILSISI STANDARD
10CUPBOARD DETAILSMODULAR CUPBOARDS IN BEDROOMS WHERE INDICATED
11WATER STORAGEHDPE TANKS
12LIFT DETAILSKONE/ SCHINDLER/JOHNSON/OTHERS
13EXTERNAL GLAZINGSUPVC DOOR/ WINDOWS ON EXTERIOR
13.1WINDOWS/GLAZINGSUPVC DOOR/ WINDOWS ON EXTERIOR
14DOORSN.A.
14.1MAIN DOORSSS SECURITY DOOR
14.2INTERNAL DOORSLAMINATED FLUSH DOORS WITH DORSET HARDWARE FITTINGS
15AIR CONDITIONINGSPLIT AC'S IN LIVING ROOM & ALL BEDROOMS
16ELECTRICAL FITTINGSHAVELLS OR EQUIVALENT
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYYES
19EXTERNAL FINISHING/COLOUR SCHEMEAPEX ULTIMA FROM ASIAN PAINT / ICI OR EQUIVALENT
20INTERNAL FINISHINGPOP & ACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE FLOORING
1 . 2 WALLSPOP & ACRYLIC EMULSION PAINT
1 . 3 CEILINGDECORATIVE FALSE CEILING /POP OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESAS INDICATED ON PLANS
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED/CERAMIC TILES
3 . 2 WALLSVITRIFIED/CERAMIC TILES UP TO DOOR HEIGHT
3 . 3 CEILINGDECORATIVE FALSE CEILING /POP OR EQUIVALENT
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSJAQUAR / HINDWARE OR EQUIVALENT
3 . 6 FITTING/FIXTURESVANITY BELOW COUNTER WILL BE PROVIDED
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESAS INDICATED ON PLANS
5 . TOILET
5 . 1 FLOORTILES
5 . 2 WALLSVITRIFIED TILES UP TO DOOR HEIGHT
5 . 3 CEILINGACRYLIC EMULSION PAINT
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSJAQUAR / HINDWARE OR EQUIVALENT
5 . 6 FIXTURESVANITY BELOW COUNTER WILL BE PROVIDED
6 . KITCHEN
6 . 1 FLOORTILES
6 . 2 WALLSTILES DADO 2FT ABOVE COUNTER, ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE/STONE
6 . 5 FIXTURESISI MARKED FITTING & SS SINK
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A.
7 . 2 WALLS & CEILINGN.A.
7 . 3 TOILETN.A.
7 . 4 BALCONYN.A.
8 . SIT-OUTS
8 . 1 FLOORN.A.
8 . 2 WALLS & CEILINGN.A.
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 28-12-2024 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 28-12-2024 View Document
3 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 28-12-2024 View Document
4 BUILDING PLAN- PLOT NO. 208 05-03-2025 ------
5 BUILDING PLAN- PLOT NO. 182 05-03-2025 ------
6 BUILDING PLAN- PLOT NO. 210 05-03-2025 ------
7 DEMARCATION PLAN 05-03-2025 View Document
8 BUILDING PLAN- PLOT NO. 192 05-03-2025 ------
9 ONLINE REPORT_ EC APPLICATION SUBMITTED 05-03-2025 ------
10 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 05-03-2025 View Document
11 BUILDING PLAN- PLOT NO. 202 05-03-2025 ------
12 BUILDING PLAN- PLOT NO. 184 05-03-2025 ------
13 BUILDING PLAN- PLOT NO. 204 05-03-2025 ------
14 REVISED SERVICE ESTIMATES 05-03-2025 ------
15 LC-IV 05-03-2025 ------
16 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 05-03-2025 View Document
17 BUILDING PLAN- PLOT NO. 185 05-03-2025 ------
18 BUILDING PLAN- PLOT NO. 193 05-03-2025 ------
19 BUILDING PLAN- PLOT NO. 206 05-03-2025 ------
20 DRAINAGE SERVICE LAYOUT (REVISED) 05-03-2025 ------
21 BUILDING PLAN- PLOT NO. 179 05-03-2025 ------
22 BUILDING PLAN- PLOT NO. 197 05-03-2025 ------
23 WATER SUPPLY SERVICE LAYOUT (REVISED) 05-03-2025 ------
24 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 05-03-2025 View Document
25 BUILDING PLAN- PLOT NO. 181 05-03-2025 ------
26 EC APPLICATION SUBMISSION SCREENSHOT 05-03-2025 ------
27 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 05-03-2025 View Document
28 BUILDING PLAN- PLOT NO. 194 05-03-2025 ------
29 LOI 05-03-2025 ------
30 CA CERTIFICATE (COST INCURRED AND TO BE INCURRED WITH SOURCE OF FUNDS) 05-03-2025 ------
31 BUILDING PLAN- PLOT NO. 183 05-03-2025 ------
32 ZONING PLAN 05-03-2025 View Document
33 BUILDING PLAN- PLOT NO. 178 05-03-2025 ------
34 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 05-03-2025 View Document
35 BUILDING PLAN- PLOT NO. 200 05-03-2025 ------
36 APPROVAL OF REVISED SERVICE ESTIMATES & PLAN 05-03-2025 ------
37 BUILDING PLAN- PLOT NO. 201 05-03-2025 ------
38 SEWERAGE SERVICE LAYOUT (REVISED) 05-03-2025 ------
39 A15 TOR APPROVAL (MOEF) 05-03-2025 ------
40 BUILDING PLAN- PLOT NO. 199 05-03-2025 ------
41 BUILDING PLAN- PLOT NO. 190 05-03-2025 ------
42 BUILDING PLAN- PLOT NO. 205 05-03-2025 ------
43 BUILDING PLAN- PLOT NO. 207 05-03-2025 ------
44 BUILDING PLAN- PLOT NO. 195 05-03-2025 ------
45 BUILDING PLAN- PLOT NO. 188 05-03-2025 ------
46 BUILDING PLAN- PLOT NO. 211 05-03-2025 ------
47 BUILDING PLAN- PLOT NO. 191 05-03-2025 ------
48 BUILDING PLAN- PLOT NO. 180 05-03-2025 ------
49 BUILDING PLAN- PLOT NO. 209 05-03-2025 ------
50 BUILDING PLAN- PLOT NO. 203 05-03-2025 ------
51 BUILDING PLAN- PLOT NO. 198 05-03-2025 ------
52 ROAD SERVICE LAYOUT (REVISED) 05-03-2025 ------
53 BUILDING PLAN- PLOT NO. 189 05-03-2025 ------
54 BUILDING PLAN- PLOT NO. 196 05-03-2025 ------