HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1822-2024
Submission Date : 20-01-2025 10:38:04 AM
Applicant Type : Company
Project Type: NEW




SADAN REALTECHPRIVATE LIMITED
4TH FLOOR, M2KCORPORATE PARKBLOCK N, MAYFIELDGARDEN, SECTOR-51GURUGRAM - 122003
01244525000
9818199921 (Number Shared by Promoter in Public)
olivegreens@m2kindia.com
https://www.m2kindia.com
XXXX844C
U70102HR2010PTC075381
 
 


 
 


 
 


 
 







M2K OLIVE GREEN FLOORS
M2K OLIVE GREENS, VILLAGE DHANWAPUR,SECTOR - 104
KADIPUR ST
GURUGRAM
01244525000
9818199921 (Number Shared by Promoter in Public)
olivegreens@m2kindia.com
MOHIT SHARMA
01244525000
9818199921 (Number Shared by Promoter in Public)
olivegreens@m2kindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
131216-12-202441339AXIS BANK LTD.HRERA Gurugram
231316-12-2024109135AXIS BANK LTD.HRERA Gurugram
333010-02-2025246780AXIS BANK LTD.HRERA Gurugram







1.0215 (Acre)
2.64
2.6367
14.1375 (Acre)
174 OF 2022
Yes







10835.31 Lakhs
809.35 Lakhs
6395.72 Lakhs
630.96 Lakhs
2999.28 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.0215
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total1.0215




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS32.77AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM29.34AS PER PROJECT REPORT
3STORM WATER DRAINAGE25.68AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM29.44AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL38.36AS PER PROJECT REPORT
6STREET LIGHTING6.39AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1.18AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS17.66AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE117.75AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP10.60YET TO BE PREPARED
16UNDER GROUND WATER TANK4.83YET TO BE PREPARED
17ELECT SUB STATION11.66YET TO BE PREPARED
18CONT OF CIRCULATION ROAD59.47YET TO BE PREPARED
19MISC CIVIL STRUCTURE81.01YET TO BE PREPARED
20ELECTRIFICATION COST UPTO PROJECT SITE41.21YET TO BE PREPARED


NA (date)
NA (date)
01-01-2025
31-12-2029
Plot Area(In Square Meter)Number of plots in the project
120.1918
132.4961
132.0641
131.9501
132.1411
132.3321
132.5191
132.7071
132.8981
133.0891
133.2761
133.4671
133.6581
133.8461
133.9701
134.0001
136.0201
129.7621
130.0585
130.9552


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings67.93480
Apartment/Shops/Other Buildings69.171240
Apartment/Shops/Other Buildings77.14340
Apartment/Shops/Other Buildings76.92540
Apartment/Shops/Other Buildings76.92540
Apartment/Shops/Other Buildings76.9540
Apartment/Shops/Other Buildings76.98640
Apartment/Shops/Other Buildings77.13540
Apartment/Shops/Other Buildings77.13540
Apartment/Shops/Other Buildings77.3640
Apartment/Shops/Other Buildings77.43640
Apartment/Shops/Other Buildings77.55640
Apartment/Shops/Other Buildings77.63140
Apartment/Shops/Other Buildings77.66140
Apartment/Shops/Other Buildings77.73640
Apartment/Shops/Other Buildings77.73680
Apartment/Shops/Other Buildings77.73640
Apartment/Shops/Other Buildings74.28840
Apartment/Shops/Other Buildings75.628200
Apartment/Shops/Other Buildings76.22240
Apartment/Shops/Other Buildings75.00840





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments3145.44
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments380.48533.05591.19738.78
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments738.78738.78738.78556.05
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments556.05556.05271.80271.80
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments271.80182.28182.28182.28
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments19191919
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements32.77
Water Supply System29.34
Sewerage treatment & garbage disposal38.36
Electricity Supply System29.44
Storm Water Drainage25.68
Parks and Playgrounds17.66
Clubhouse/community centres117.75
Shopping area0
Other0
Construction of Circular road59.47
Electric Sub Station11.66
Electrification cost upto project41.21
Misc Civil Structure81.01
Security and fire Fighting1.18
STP10.60
Street Lighting6.39
Underground water Tank4.83

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Electrification3.215.93
Storm water0.240.45
Sewerage0.370.69
Construction of water tank1.542.84
Rain water Harvesting0.250.46

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification5.935.935.935.93
Rain water Harvesting0.460.460.460.46
Storm water0.450.450.450.45
Sewerage0.690.690.690.69
Construction of water tank2.842.842.842.84

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Storm water0.450.450.450.45
Construction of water tank2.842.842.842.84
Sewerage0.690.690.690.69
Electrification5.935.935.935.93
Rain water Harvesting0.460.460.460.46

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Sewerage0.690.310.310.31
Construction of water tank2.841.301.301.30
Storm water0.450.210.210.21
Rain water Harvesting0.460.210.210.21
Electrification5.932.722.722.72












Yes
No
IDBI LIMITED, PALAM DABRIROAD, DELHI
0169102000029740
IBKL0000169
110259016
000169
Gautam Kumar Bhartia, Ajikumar Veetil Kizhakkilottu, Gaurav Tyagi, Yankush Govil and Harish Pandey
ATTACHED











Yes
Yes
Yes
Yes
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED21-10-2022
II. LAYOUT PLANALREADY BEEN OBTAINED28-10-2022
III. DEMARCATION PLANALREADY BEEN OBTAINED16-12-2022
IV. BUILDING PLAN APPROVALALREADY BEEN OBTAINED14-01-2025








Yes


Yes


As per HRERA Norms







M2K OLIVE GREENS AT VILLAGE DHANWAPUR, SECTOR-104, GURUGRAM, HARYANA
14.1375
0
283
0
157
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17287.69015571.22
Cost of the apartments000
Cost of the infrastructure1348.4001907.00
Others costs15939.29013364.22


12490.28 Lakhs
5818.46 Lakhs
0 Lakhs
8604.52 Lakhs
No
20-10-2025
20-10-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE LAMINATED WOODEN FLOOR/ VITRIFIED TILES/ ANTISKID TILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT / OBD
3KITCHEN DETAILSMODULAR KITCHEN, GRANITE COUNTER
4BATHROOM FITTINGSJAQUAR OR EQUIVALENT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMIRANDI WOOD
7GLASS WORKNA
8ELECTRIC FITTINGSISI STANDARD
9CONDUCTING AND WIRING DETAILSISI STANDARD
10CUPBOARD DETAILSMODULAR CUPBOARDS IN BEDROOMS WHERE INDICATED
11WATER STORAGEHDPE TANKS
12LIFT DETAILSKONE/ SCHINDLER/JOHNSON/OTHERS
13EXTERNAL GLAZINGSUPVC DOOR/ WINDOWS ON EXTERIOR
13.1WINDOWS/GLAZINGSUPVC DOOR/ WINDOWS ON EXTERIOR
14DOORSN.A.
14.1MAIN DOORSSS SECURITY DOOR
14.2INTERNAL DOORSLAMINATED FLUSH DOORS WITH DORSET HARDWARE FITTINGS
15AIR CONDITIONINGSPLIT AC'S IN LIVING ROOM & ALL BEDROOMS
16ELECTRICAL FITTINGSHAVELLS OR EQUIVALENT
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYYES
19EXTERNAL FINISHING/COLOUR SCHEMEAPEX ULTIMA FROM ASIAN PAINT / ICI OR EQUIVALENT
20INTERNAL FINISHINGPOP & ACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE FLOORING
1 . 2 WALLSPOP & ACRYLIC EMULSION PAINT
1 . 3 CEILINGDECORATIVE FALSE CEILING /POP OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESAS INDICATED ON PLANS
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED/CERAMIC TILES
3 . 2 WALLSVITRIFIED/CERAMIC TILES UP TO DOOR HEIGHT
3 . 3 CEILINGDECORATIVE FALSE CEILING /POP OR EQUIVALENT
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSJAQUAR / HINDWARE OR EQUIVALENT
3 . 6 FITTING/FIXTURESVANITY BELOW COUNTER WILL BE PROVIDED
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESAS INDICATED ON PLANS
5 . TOILET
5 . 1 FLOORTILES
5 . 2 WALLSVITRIFIED TILES UP TO DOOR HEIGHT
5 . 3 CEILINGACRYLIC EMULSION PAINT
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSJAQUAR / HINDWARE OR EQUIVALENT
5 . 6 FIXTURESVANITY BELOW COUNTER WILL BE PROVIDED
6 . KITCHEN
6 . 1 FLOORTILES
6 . 2 WALLSTILES DADO 2FT ABOVE COUNTER, ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE/STONE
6 . 5 FIXTURESISI MARKED FITTING & SS SINK
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A.
7 . 2 WALLS & CEILINGN.A.
7 . 3 TOILETN.A.
7 . 4 BALCONYN.A.
8 . SIT-OUTS
8 . 1 FLOORN.A.
8 . 2 WALLS & CEILINGN.A.
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT28-12-2024 View Document
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN28-12-2024 View Document
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN28-12-2024 View Document
4BUILDING PLAN- PLOT NO. 20805-03-2025 ------
5BUILDING PLAN- PLOT NO. 18205-03-2025 ------
6BUILDING PLAN- PLOT NO. 21005-03-2025 ------
7DEMARCATION PLAN05-03-2025 View Document
8BUILDING PLAN- PLOT NO. 19205-03-2025 ------
9ONLINE REPORT_ EC APPLICATION SUBMITTED05-03-2025 ------
10DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD05-03-2025 View Document
11BUILDING PLAN- PLOT NO. 20205-03-2025 ------
12BUILDING PLAN- PLOT NO. 18405-03-2025 ------
13BUILDING PLAN- PLOT NO. 20405-03-2025 ------
14REVISED SERVICE ESTIMATES05-03-2025 ------
15LC-IV05-03-2025 ------
16CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT05-03-2025 View Document
17BUILDING PLAN- PLOT NO. 18505-03-2025 ------
18BUILDING PLAN- PLOT NO. 19305-03-2025 ------
19BUILDING PLAN- PLOT NO. 20605-03-2025 ------
20DRAINAGE SERVICE LAYOUT (REVISED)05-03-2025 ------
21BUILDING PLAN- PLOT NO. 17905-03-2025 ------
22BUILDING PLAN- PLOT NO. 19705-03-2025 ------
23WATER SUPPLY SERVICE LAYOUT (REVISED)05-03-2025 ------
24CASH FLOW STATEMENT OF THE PROPOSED PROJECT05-03-2025 View Document
25BUILDING PLAN- PLOT NO. 18105-03-2025 ------
26EC APPLICATION SUBMISSION SCREENSHOT05-03-2025 ------
27DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.05-03-2025 View Document
28BUILDING PLAN- PLOT NO. 19405-03-2025 ------
29LOI05-03-2025 ------
30CA CERTIFICATE (COST INCURRED AND TO BE INCURRED WITH SOURCE OF FUNDS)05-03-2025 ------
31BUILDING PLAN- PLOT NO. 18305-03-2025 ------
32ZONING PLAN05-03-2025 View Document
33BUILDING PLAN- PLOT NO. 17805-03-2025 ------
34COPY OF LICENSE ALONG WITH SCHEDULE OF LAND05-03-2025 View Document
35BUILDING PLAN- PLOT NO. 20005-03-2025 ------
36APPROVAL OF REVISED SERVICE ESTIMATES & PLAN05-03-2025 ------
37BUILDING PLAN- PLOT NO. 20105-03-2025 ------
38SEWERAGE SERVICE LAYOUT (REVISED)05-03-2025 ------
39A15 TOR APPROVAL (MOEF)05-03-2025 ------
40BUILDING PLAN- PLOT NO. 19905-03-2025 ------
41BUILDING PLAN- PLOT NO. 19005-03-2025 ------
42BUILDING PLAN- PLOT NO. 20505-03-2025 ------
43BUILDING PLAN- PLOT NO. 20705-03-2025 ------
44BUILDING PLAN- PLOT NO. 19505-03-2025 ------
45BUILDING PLAN- PLOT NO. 18805-03-2025 ------
46BUILDING PLAN- PLOT NO. 21105-03-2025 ------
47BUILDING PLAN- PLOT NO. 19105-03-2025 ------
48BUILDING PLAN- PLOT NO. 18005-03-2025 ------
49BUILDING PLAN- PLOT NO. 20905-03-2025 ------
50BUILDING PLAN- PLOT NO. 20305-03-2025 ------
51BUILDING PLAN- PLOT NO. 19805-03-2025 ------
52ROAD SERVICE LAYOUT (REVISED)05-03-2025 ------
53BUILDING PLAN- PLOT NO. 18905-03-2025 ------
54BUILDING PLAN- PLOT NO. 19605-03-2025 ------