HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1253-2022
Submission Date : 15-03-2023 02:42:48 PM
Applicant Type : Firm
Project Type: NEW


DIVERSE DEVELOPERS LLP
BUILDING NO 80 1ST FLOOR SECTOR 44 GURUGRAM HARYANA-122003
01244399399
9560890400 (Number Shared by Promoter in Public)
INFO@ROF.CO.IN
AAO8202
AAPFD9125N













ROF INSIGNIA PARK
VILLAGE BADHA & HAYATPUR SECTOR 93 GURUGRAM
MANESAR
GURUGRAM
01244399399
9560890400 (Number Shared by Promoter in Public)
INFO@ROF.CO.IN
MUKESH KUMAR
01244399399
9560890400 (Number Shared by Promoter in Public)
INFO@ROF.CO.IN








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150362906-03-2023334653ICICI BANK HRERA Gurugram
250366712-04-20233599ICICI BANK HRERA Gurugram







0.9281 (Acre)
2.64
2.64
9.3694 (Acre)
75 of 2021 (24.09.2021)
Yes







4711.22 Lakhs
1655.36 Lakhs
2660.72 Lakhs
0 Lakhs
395.14 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0.00
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.5535
3CONSTRUCTION OF ROADS0
4PAVEMENTS0.00
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0.00
7VEHICLE PARKINGS0.00
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0.00
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.00
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.00
13COMMERCIAL0.3746
Total0.9281




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYGMDAYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE0SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL0SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING0SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS0SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0.00YET TO BE PREPARED
10SHOPPING AREA0.00YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0.00YET TO BE PREPARED
12SCHOOL0.00YET TO BE PREPARED
13HOSPITAL/DISPENSARY0.00YET TO BE PREPARED
14ANY OTHER0.00YET TO BE PREPARED


27-09-2021 (date)
06-01-2023 (date)
06-01-2023
30-09-2026
Plot Area(In Square Meter)Number of plots in the project
14016


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings76.566416
Apartment/Shops/Other Buildings31.75521
Apartment/Shops/Other Buildings50.68111
Apartment/Shops/Other Buildings26.980151
Apartment/Shops/Other Buildings30.86011
Apartment/Shops/Other Buildings28.50611
Apartment/Shops/Other Buildings39.49111
Apartment/Shops/Other Buildings21.23611
Apartment/Shops/Other Buildings35.77011
Apartment/Shops/Other Buildings23.180301
Apartment/Shops/Other Buildings30.0021
Apartment/Shops/Other Buildings17.31621
Apartment/Shops/Other Buildings29.20011
Apartment/Shops/Other Buildings33.81011
Apartment/Shops/Other Buildings22.03811
Apartment/Shops/Other Buildings23.65011
Apartment/Shops/Other Buildings31.79911
Apartment/Shops/Other Buildings343.71011





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments203.137792101.5689101.5689203.137792
Shops62.93431.46731.46762.934
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments203.137792203.137792203.137792101.5689
Shops62.93462.93462.93431.467
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments101.5689101.5689101.5689101.5689
Shops31.46731.46731.46731.467
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments101.5689137.74101.56890
Shops31.46731.46731.4670
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements86.06.006
Water Supply System106.156.156.15
Sewerage treatment & garbage disposal3.403.403.403.40
Electricity Supply System0.540.540.540.87
Storm Water Drainage3.453.453.453.45
Parks and Playgrounds0.850.850.850.85
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting Services0.610.610.610.61
Other Maintenance of IDW Services1.350.890.890.89
Underground Tank1.351.351.35
Street Light0.550.550.550.55
STP1.651.65

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements66.0012.0012
Water Supply System6.156.1512.3012.30
Sewerage treatment & garbage disposal3.403.406.806.80
Electricity Supply System0.870.871.091.09
Storm Water Drainage3.453.456.906.90
Parks and Playgrounds0.850.851.701.70
Clubhouse/community centres0000
Shopping area0000
Other0000
STP1.551.653.303.30
Security and Fire Fighting Services0.610.611.221.22
Other Maintenance of IDW Services0.890.891.781.78
Underground Tank1.351.352.702.70
Street light0.550.551.221.22

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.0066.006.00
Water Supply System12.3012.306.156.15
Sewerage treatment & garbage disposal6.806.803.403.40
Electricity Supply System1.091.090.540.54
Storm Water Drainage6.906.903.453.45
Parks and Playgrounds1.701.700.850.85
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light1.101.100.550.55
STP3.303.301.651.65
Security and Fire Fighting Services0.610.610.610.61
Other Maintenance of IDW Services1.781.780.890.89
Underground Tank2.702.701.351.35

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.006.0000
Water Supply System6.156.1500
Sewerage treatment & garbage disposal3.403.4000
Electricity Supply System0.540.5400
Storm Water Drainage3.453.4500
Parks and Playgrounds0.850.8500
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground Tank1.35
Other Maintenance of IDW Services0.890.89
Street light0.550.55
STP1.651.65
Security and Fire Fighting Services0.610.61












Yes
No
ICICI BANK LTD
777705000364
ICIC0001652
110229131
001652
MOHIT MITTAL R/O B-62, SOUTH EXTENSION-I, NEW DELHI-110049
ANNEXED











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. I. LICENSEALREADY BEEN OBTAINED24-09-2021
II. II. LAYOUT PLAN ALREADY BEEN OBTAINED27-09-2021
III. III. LETTER OF INTENTALREADY BEEN OBTAINED21-06-2021
IV. IV. ZONING PLANALREADY BEEN OBTAINED16-03-2022








Yes


Yes


ANNEXED







ROF INSIGNIA PARK
9.3694
0
173
0
139
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2866.082866.082517.20
Cost of the apartments000
Cost of the infrastructure000
Others costs468.50468.50403.51


6608.01 Lakhs
7471.76 Lakhs
0 Lakhs
0 Lakhs
No
31-05-2026
31-05-2026




ROF INSIGNIA SOUK
2.14305
0
30
0
18
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1443.381443.38314.64
Cost of the apartments000
Cost of the infrastructure000
Others costs330.00330.0018.95


1365 Lakhs
1045 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2023
30-09-2023




ROF INSIGNIA PARK II
10.6875
0
169
0
61
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4814.024814.021067.67
Cost of the apartments000
Cost of the infrastructure000
Others costs96.0096.0042.66


1758.72 Lakhs
3797.19 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2026
31-03-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE (VITRIFIED AND CERAMIC)
2WALL FINISHING DETAILSCEMENT / GYPSUM PLASTER, PAINT
3KITCHEN DETAILSTILE / MARBLE / GRANITE, PAINT
4BATHROOM FITTINGSCERA / HINDWARE OR EQUIVALENT
5WOOD WORK ETCFLUSH DOOR
6DOORS AND WINDOS FRAMESWOODEN / ALUMINIUM / PVC FRAMES
7GLASS WORKTOUGHENED GLASS
8ELECTRIC FITTINGSISI MARKED
9CONDUCTING AND WIRING DETAILSISI MARKED
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD RCC / PVC TANK
12LIFT DETAILS8 PASSANGER (THYSSENKRUPP / JOHNSON / OTIS OR EQUIVALENT )
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINIUM FRAME AND TOGHENED GLASS
14DOORSFLUSH DOOR
14.1MAIN DOORSFLUSH DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSISI MARKED
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL PAINT
20INTERNAL FINISHINGTILE / PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILE (VITRIFIED AND CERAMIC)
1 . 2 WALLSCEMENT / GYPSUM PLASTER, PAINT
1 . 3 CEILINGCEMENT / GYPSUM PLASTER, PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORTILE (VITRIFIED AND CERAMIC)
2 . 2 WALLSCEMENT / GYPSUM PLASTER, PAINT
2 . 3 CEILINGCEMENT / GYPSUM PLASTER, PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORTILE (CERAMIC)
3 . 2 WALLSTILE (CERAMIC) / CEMENT / GYPSUM PLASTER, PAINT
3 . 3 CEILINGFALSE CELING
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSCERA / HINDWARE OR EQUIVALENT
3 . 6 FITTING/FIXTURESCERA / HINDWARE OR EQUIVALENT
4 . BED ROOMS
4 . 1 FLOORTILE (VITRIFIED AND CERAMIC)
4 . 2 WALLSCEMENT / GYPSUM PLASTER, PAINT
4 . 3 CEILINGCEMENT / GYPSUM PLASTER, PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORTILE (CERAMIC)
5 . 2 WALLSTILE (CERAMIC) / CEMENT / GYPSUM PLASTER, PAINT
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSCERA / HINDWARE OR EQUIVALENT
5 . 6 FIXTURESCERA / HINDWARE OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORTILE (VITRIFIED AND CERAMIC)
6 . 2 WALLSTILE (CERAMIC) / CEMENT / GYPSUM PLASTER, PAINT
6 . 3 CEILINGCEMENT / GYPSUM PLASTER, PAINT
6 . 4 COUNTERSTILE / MARBLE / GRANITE
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILE (VITRIFIED AND CERAMIC)
7 . 2 WALLS & CEILINGCEMENT / GYPSUM PLASTER, PAINT
7 . 3 TOILETCERA / HINDWARE OR EQUIVALENT
7 . 4 BALCONYTILE (VITRIFIED AND CERAMIC), CEMENT PLASTER, PAINT
8 . SIT-OUTS
8 . 1 FLOORTILE (VITRIFIED AND CERAMIC)
8 . 2 WALLS & CEILINGCEMENT / GYPSUM PLASTER, PAINT
8 . 3 RAILINGSMS / SS RAILING
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1BUILDING PLANS 5 & 614-03-2023 ------
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN14-03-2023 View Document
3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND14-03-2023 View Document
4BUILDING PLANS 7 & 814-03-2023 ------
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN14-03-2023 View Document
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT14-03-2023 View Document
7DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD14-03-2023 View Document
8A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS14-03-2023 View Document
9BUILDING PLANS 3 & 414-03-2023 ------
10NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT14-03-2023 View Document
11IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN14-03-2023 View Document
12DEMARCATION PLAN14-03-2023 View Document
13LETTER B-50 & 5105-07-2023 ------
14LETTER B-52 & 5305-07-2023 ------
15LC IV05-07-2023 ------
16SUPERIMPOSED DEMARCATION05-07-2023 ------
17STREET LIGHT PLAN05-07-2023 ------
18BUILDING PLAN B-47 & B-5505-07-2023 ------
19ARAVALI_NOC05-07-2023 ------
20SERVICE ESTIMATES PLAN 05-07-2023 ------
21FOREST NOC_HAYATPUR_DDJAY_DIVERSE 9305-07-2023 ------
22ELECTRICAL LAYOUT05-07-2023 ------
23LEGAL TITLE SEARCH REPORT_DDJAY05-07-2023 ------
24LETTER B-56 & 5705-07-2023 ------
25WATER SUPPLY LAYOUT05-07-2023 ------
26COMMERCIAL BUILDING PLAN LETTER05-07-2023 ------
27LETTER B-47 & 5505-07-2023 ------
28BUILDING PLAN B-52 & B-5305-07-2023 ------
29STORM WATER LAYOUT05-07-2023 ------
30DE-FREEZE LETTER05-07-2023 ------
31LC IV B05-07-2023 ------
32LETTER B-60 & 6105-07-2023 ------
33BUILDING PLAN B-58 & B-5905-07-2023 ------
34LAYOUT PLAN-93 DDJAY_DEMARCATION05-07-2023 ------
35BUILDING PLAN B-48 & B-4905-07-2023 ------
36BUILDING PLAN B-56 & B-5705-07-2023 ------
37CASH FLOW STATEMENT OF THE PROPOSED PROJECT05-07-2023 View Document
38PROMOTER AFFIDAVIT05-07-2023 ------
39COMMERICAL ZONING PLAN05-07-2023 ------
40SWM & SEWRAGE LAYOUT05-07-2023 ------
41DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.05-07-2023 View Document
42LETTER B-54 & 6205-07-2023 ------
43APPROVED COMMERCIAL BUILDING PLAN05-07-2023 ------
44MEP LAYOUT SITE PLAN05-07-2023 ------
45LETTER B-48 & 4905-07-2023 ------
46ZONING PLAN05-07-2023 View Document
47LOI05-07-2023 ------
48NEC HARSARU 9305-07-2023 ------
49LETTER B-58 & 5905-07-2023 ------
50BUILDING PLAN B-60 & B-6105-07-2023 ------
51BANK UNDERTAKING05-07-2023 ------
52COLONY LAYOUT PLAN05-07-2023 ------
53ASSURANCE OF SEWERAGE CONNECTION DISPOSAL05-07-2023 ------
54MINING SECTOR 9305-07-2023 ------
55BUILDING PLAN B-50 & B-5105-07-2023 ------
56BUILDING PLAN B-54 & B-6205-07-2023 ------
57LAYOUT PLAN-93 DDJAY_10%05-07-2023 ------
58FIRE SCHME APPLICATION_COMMERCIAL05-07-2023 ------
59N E C BADHA 93 N E C05-07-2023 ------
60POWER ASSURANCE05-07-2023 ------
61RESIDENTIAL FLOOR DETAILS05-07-2023 ------