HRERA GurugramTemp Project Id : RERA-GRG-PROJ-500-2019
Submission Date : 07-02-2020 02:59:28 AM
Applicant Type : Company
Project Type: ONGOING




VATIKA LIMITED
VATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002.
01244177777
9810566938 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
http://www.vatikagroup.com
XXXX647G
U74899HR1998PLC054821
 
 


 
 


 
 


 
 


 
 







HIGH STREET (PHASE-I)
SECTOR-83, VILLAGE SHIKOHPUR
MANESAR
GURUGRAM
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
ARUP KUMAR DAS
0000000000
8800772626 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15694728-07-2017299000HDFC BANK LIMITEDHRERA Gurugram







3.34 (Acre)
175
173.304
182.796 (Acre)
3.34 Acres is part of License No. 113 of 2008 dated 01-06-2008.
No
Address     FLAT NO. 714, HEMKUNT CHAMBERS, 89, NEHRU PLACE, NEW DELHI - 110019.
Annexure-B- COLLABORATION AGREEMENT, REVENUE RECORDS, ETC.
BEFORE GRANT OF LICENSE
No
PROVIDED
No
Yes
Yes







8981.00 Lakhs
41.00 Lakhs
5989.47 Lakhs
260.53 Lakhs
2690.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS5916.902
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS2375
8ELECTRICITY SUB-STATION17.140
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER5207.437
Total13516.479




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/HSVPNo
WATER SUPPLYHUDA/HSVPNo
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDA/HSVPNo
STORM WATER DRAINAGEHUDA/HSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS70.34AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM23.45AS PER PROJECT REPORT
3STORM WATER DRAINAGE26.05AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM39.08AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL15.63AS PER PROJECT REPORT
6STREET LIGHTING0AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING7.82AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER78.16AS PER PROJECT REPORT


NA (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX-208629.37310187143






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
ANNEX-2087ANNEXURE-21


18-02-2018
30-07-2020
30-07-2020
04-03-2020
0
30-07-2020
PROVIDED
PROVIDED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NOT APPLICABLE
04-03-2020
0
30-07-2020
NOT APPLICABLE
NOT APPLICABLE


0
0
298
50
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops2560.79
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops115.00110.64
Plots00

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops66.9051.40123.9088.60
Plots0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops304.1512.2923.54100.00
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops700.00700.001032.260
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub station0
Rain Water Harvesting0
Security and fire fighting0
STP0
Street lighting0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Electrical Sub station00
Street lighting00
Security and fire fighting00
STP00
Rain Water Harvesting00

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street lighting0000
Security and fire fighting0000
STP0000
Rain Water Harvesting0000
Electrical Sub station0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrical Sub station0000
Rain Water Harvesting0000
Street lighting0000
Security and fire fighting0000
STP0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements18.9024.3027.14
Water Supply System6.308.109.05
Sewerage treatment & garbage disposal7.009.0010.05
Electricity Supply System10.5013.5015.08
Storm Water Drainage7.009.0010.05
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Rain Water Harvesting2.102.703.02
Electrical Sub station7.009.0010.05
Security and fire fighting2.102.703.02
STP4.205.406.03
Street lighting4.906.307.04












Particulars Remarks, if any
i. No. of Flats/Apartments constructed101To be Constructed
ii. No. of Flats/ Apartments booked87.00
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter8463.00 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter6264.49 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter2198.51 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter2198.51 Lakhs
vii. Amount invested in the project upto the date of application4482.67 Lakhs
Land cost (If any)41.00 Lakhs
Apartments2560.79 Lakhs
Infrastructure0.00 Lakhs
EDC/ Taxes Etc.1880.88 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession4498.33 Lakhs
(a) In respect of existing allottees3799.56 Lakhs
(b) In respect of rest of the project698.77 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
5326.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 4823.00 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS70.340
II. WATER SUPPLY SYSTEM23.450
III. STORM WATER DRAINAGE26.050
IV. ELECTRICITY SUPPLY SYSTEM39.080
V. SEWAGE TREATMENT & GARBAGE DISPOSAL15.630
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM7.820
XVII. OTHER FACILITIES AS PER PROJECT REPORT78.160









Yes
Yes
HDFC BANK LTD., BANK HOUSE,WAZIRABAD VILLAGE ROAD, DLF PH-5, SECTOR-53 GRUUGRAM HARYANA-122002.
05720310004140
HDFC0000572
110240093
000572
Mr. Anil Bhalla Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030. Mr. Gautam Bhalla LCG05 PHB, The Laburnam, Nathupur (67), Nathupur Gurgaon, Gurgaon, Haryana 122002. MR. K.V. George Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075. Ms Veena Bhoomia C1/577B,Rear Block, 1st Floor, Near Euro Kids School, Palam Vihar,Choma (62), Gurgaon, Haryana-122017.
Uploaded











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LAYOUT PLANALREADY BEEN OBTAINED16-02-2018
II. ZONING PLAN DATED 11/11/2008ALREADY BEEN OBTAINED11-11-2008
III. BUILDING PLANALREADY BEEN OBTAINED16-02-2018
IV. SITE PLANALREADY BEEN OBTAINED16-02-2018
V. FLOOR PLANALREADY BEEN OBTAINED16-02-2018
VI. APARTMENT PLANSALREADY BEEN OBTAINED16-02-2018
VII. ELEVATION SECTIONALREADY BEEN OBTAINED16-02-2018
VIII. DETAIL OF PERMISSIBLE FARALREADY BEEN OBTAINED16-02-2018
IX. DETAIL OF COVERED AREA ACHIEVED FAR.ALREADY BEEN OBTAINED16-02-2018








Yes


Yes


Provided







SOVEREIGN NEXT (PHASE - I) SECTOR-82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA.
34519.201
151
0
81
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
18175.0018175.009849.29
Cost of the apartments10350.0010350.005266.00
Cost of the infrastructure1150.001150.00585.00
Others costs6675.006675.003998.29


7602.94 Lakhs
4179.31 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-07-2022
30-07-2022




TURNING POINT (PHASE - I) SECTOR 88B, VILLAGE HARSARU, SUB-TEHSIL HARSARU, DISTRICT GURUGRAM, STATE HARYANA.
93588.71
703
0
99
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
33415.0033415.004081.38
Cost of the apartments25200.0025200.00453.31
Cost of the infrastructure2800.002800.0050.00
Others costs5415.005415.003578.07


975.94 Lakhs
7752.46 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-01-2025
30-01-2025




TOWN SQUARE (BLOCK-D) SECTOR 82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA.
13809.560
188
0
22
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10586.0010586.009646.93
Cost of the apartments4500.004500.003835.50
Cost of the infrastructure500.00500.00426.00
Others costs5586.005586.005385.43


486.26 Lakhs
798.92 Lakhs
14600.00 Lakhs
14600.00 Lakhs
No
30-07-2018
30-07-2018










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOMBINATION OF MATERIALS SUCH AS STONE, HIGH QUALITY TILES IN COMMON AREAS
2WALL FINISHING DETAILSSMOOTH PLASTER ON WALLS
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSSANITARY WARE OF STANDARD MAKE AND BRANDS FOR COMMON TOILETS.
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSDUAL ENERGY METERS INSTALLED FOR EACH TENANT ,IS COMPLIANT PROVISIONING FOR CRITICAL LIGHTING IN AREAS OF CIRCULATION
9CONDUCTING AND WIRING DETAILSIS COMPLIANT WIRING IN COMMON AREAS.
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEOHT & UG TANKS
12LIFT DETAILSPASSENGER ELEVATORS DESIGNED TO CATER FOR THE EXPECTED TRAFFIC WITH HIGH QUALITY FINISHES. DEDICATED SERVICE LIFT FOR MOVEMENT OF GOODS AND MATERIALS.
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSARCHITECTURALLY DESIGNED SHOP FRONT WITH GLAZING FOR SHOPS.
14DOORSNA
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGAIR CONDITIONED SHOPS WITH CHILLED WATER SUPPLY
16ELECTRICAL FITTINGSIS COMPLIANT PROVISIONING FOR CRITICAL LIGHTING IN AREAS OF CIRCULATION AND EMERGENCY USAGE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMEA COMBINATION OF MATERIALS OF INTERNATIONAL STANDARDS SUCH AS CLADDING, HIGH QUALITY PAINT ETC
20INTERNAL FINISHINGCOMBINATION OF MATERIALS SUCH AS STONE, HIGH QUALITY TILES, WALL AND CEILING FINISHES FOR COMMON AREAS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD20-02-2020 View Document
2IDW DESIGN AND COST ESTIMATES20-02-2020 ------
3CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT20-02-2020 View Document
4BUILDING PLAN (BR- III)20-02-2020 ------
5ZONING PLAN20-02-2020 View Document
6DETAILS OF ALL AUTHORISED SIGNATROIES20-02-2020 ------
7SITE PLAN20-02-2020 ------
8DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.20-02-2020 View Document
9ENVIRONMENT CLEARANCE20-02-2020 ------
10CASH FLOW STATEMENT OF THE PROPOSED PROJECT20-02-2020 View Document
11FIRE SCHEME20-02-2020 ------
12 FOREST NOC20-02-2020 ------
13ENCUMBRANCES20-02-2020 ------
14NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT20-02-2020 View Document
15SERVICE PLANS20-02-2020 ------
16LC IV20-02-2020 ------
17 LIST OF DIRECTORS07-02-2020 ------
18RERA REGISTRATION CERTIFICATE07-02-2020 ------
19OFFICE TOWER GF TO 6TH FLOOR PLAN07-02-2020 ------
20PROJECT DESCRIPTION AND COST07-02-2020 ------
21LOCATION PLAN07-02-2020 ------
22TOWER A B C 4TH FLOOR PLAN07-02-2020 ------
23 MOA AND AOA07-02-2020 ------
24HRERA AFS COMMERCIAL FINAL LEASE ARRANGEMENT07-02-2020 ------
25A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS07-02-2020 View Document
26ZONING PLAN07-02-2020 ------
27DETAIL OF UNITS AND CONSTRACTION STATUS07-02-2020 ------
28CONSENT TO ESTABLISH07-02-2020 ------
29TOWER A B C 2ND FLOOR PLAN07-02-2020 ------
30SITE PLAN07-02-2020 ------
31BR (AUTHORISED SIGNATORY)07-02-2020 ------
32SANCTION AA AND BB07-02-2020 ------
33BALANCE SHEET (3 YEARS)07-02-2020 ------
34PROJECT REPORT07-02-2020 ------
35SCHEMATICS DAIGRAM07-02-2020 ------
36SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN07-02-2020 View Document
37ELEVATION 1 2 3 407-02-2020 ------
38LICENSE NO 113 OF 200807-02-2020 ------
39REVENUE RECORDS SALE DEED ETC07-02-2020 ------
40TIME PERIOD COMMITED TO ALLOTTEE07-02-2020 ------
41CA CERTIFICATE -NON DEFAULT07-02-2020 ------
4233-2 CA CERTIFICATE RELATED TO REP-I (PART CX)07-02-2020 ------
43REP-II07-02-2020 ------
44IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN07-02-2020 View Document
45COLLABORATION AGREEMENT ETC07-02-2020 ------
46AKS SHEJRA WITH LAND DETAILS07-02-2020 ------
47REGISTRATION CERTIFICATE OF COMPANY07-02-2020 ------
48PAN CARD07-02-2020 ------
49SECTORIAL MAP07-02-2020 ------
50HRERA AFS COMMERCIAL FINAL07-02-2020 ------
51AREA CALCULATION GF07-02-2020 ------
52ALLOTTMENT LETTER COMMERCIAL07-02-2020 ------
53BASEMENT 1 2 307-02-2020 ------
54OFFICE TOWER ELEVATION 1 2 3 407-02-2020 ------
55CONVEYANCE DEED COMMERCIAL FINAL07-02-2020 ------
56BASEMENT 1 2 3 AREA CALCULATION07-02-2020 ------
57TOILET DETAIL07-02-2020 ------
58AREA CALCULATION 3RD AND 4TH07-02-2020 ------
59LIST OF ARCHITECT ENGINEER ETC07-02-2020 ------
60SHAREHOLDERS07-02-2020 ------
61DEVELOPMENT WORK PLAN07-02-2020 ------
62COPY OF LICENSE ALONG WITH SCHEDULE OF LAND06-02-2020 View Document
63REP-I (OLD)07-02-2020 ------
64TOWER A B C 3RD FLOOR PLAN07-02-2020 ------
65COLLECTION STATEMENT07-02-2020 ------
66BOOKING APPLICATION FORM COMMERCIAL FINAL07-02-2020 ------
67IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN07-02-2020 View Document
68AREA CALCULATION 1ST AND 2ND07-02-2020 ------
69CASH FLOW STATEMENT07-02-2020 ------
70LETTER W R T REVENUE RECORD07-02-2020 ------
71ANNEXURE 3-307-02-2020 ------
72SANCTION AA AND CC07-02-2020 ------
73DETAILS OF PARKING07-02-2020 ------
74GROUND FLOOR PLAN BLOCK 1A, 1B AND 1C07-02-2020 ------
75SITE PLAN -ST-02 07-02-2020 ------
76ELECTRIC LOAD07-02-2020 ------
77SANCTION CC AND DD07-02-2020 ------
78SITE PLAN 307-02-2020 ------
79TERRACE PLAN07-02-2020 ------
80TOWER A B C 1ST FLOOR PLAN07-02-2020 ------
81LOI OF LICENSE NO 11320-02-2020 ------
82APPROVAL OF SERVICE ESTIMATE20-02-2020 ------