HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2126-2025
Submission Date : 05-12-2025 02:42:44 PM
Applicant Type : Company
Project Type: NEW




SVABHUMI REALTORS PRIVATE LIMITED
12A FLOOR, TOWER-2, M3M INTERNATIONAL, FINANCIAL CENTER, SECTOR-66, GURUGRAM, HARYANA
01246600000
8929012754 (Number Shared by Promoter in Public)
swcorporate2021@gmail.com
https://svabhumirealtorspvtltd.com/
XXXX025F
U68100HR2023PTC111218
 
 


 
 


 
 


 
 







SMARTWORLD NATURE'S COURT I
SECTOR M9, M10 AND M11
HARSARU ST
GURUGRAM
01246600000
8929012754 (Number Shared by Promoter in Public)
swcorporate2021@gmail.com
CHATTER SINGH
01246600000
8929012754 (Number Shared by Promoter in Public)
swcorporate2021@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151086404-12-20252486416.00ICICI BANK LIMITEDHRERA Gurugram
251086504-12-20251043349.00ICICI BANK LIMITEDHRERA Gurugram







8.28 (Acre)
2.37
2.34
139.79375 (Acre)
Licence no 168 of 2025 dated 08.09.2025 Granted by Department of Town and Country Planning Haryana
No
Address     41ST FLOOR, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR 66, GURUGRAM
Annexure-B- ANNEXURE-B- BY THE TERMS AND CONDITIONS OFTHE COLLABORATION AGREEMENT NO. 8775 DATED 17-09-2025.
AFTER GRANT OF LICENCE BY DTCP
Yes
ANNEXED IN FOLDER-A
No
Yes
Yes







177860.37 Lakhs
56000.00 Lakhs
66597.02 Lakhs
7573.47 Lakhs
47689.88 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0.00
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.48
3CONSTRUCTION OF ROADS 2.22
4PAVEMENTS 0.60
5PARKS AND PLAYGROUNDS 0.67
6GREEN BELTS 1.27
7VEHICLE PARKINGS 0.56
8ELECTRICITY SUB-STATION 0.14
9CLUB HOUSE 0.00
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.00
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0.00
12ANY OTHER 0.69
13COMMUNITY AND TEMPLE 0.63
14HSD TANK 0.02
Total8.28




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP No
WATER SUPPLYHSVP Yes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVP Yes
STORM WATER DRAINAGEHSVP Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS204.08AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM49.55AS PER PROJECT REPORT
3STORM WATER DRAINAGE74.32AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM502.10AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL74.32AS PER PROJECT REPORT
6STREET LIGHTING78.47AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING88.89AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS139.50AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15HARDSCAPE AND SOFTSCAPE104.63AS PER PROJECT REPORT
16BOUNDARY WALL104.63AS PER PROJECT REPORT
17MAIN ENTRANCE WORK AND GUARD HOUSE39.35AS PER PROJECT REPORT
18PARKING MARKING5.17AS PER PROJECT REPORT
19STP188.92AS PER PROJECT REPORT
20UNDERGROUND TANK130.61AS PER PROJECT REPORT
21RAIN WATER HARVESTING35.92AS PER PROJECT REPORT
22ELECTRICAL SUB STATION1350.70AS PER PROJECT REPORT
23CONSULTANCY2449.03AS PER PROJECT REPORT
24INFRASTRUCTURE ESTABLISHMENT COST1749.30AS PER PROJECT REPORT
25DEWATERING103.44AS PER PROJECT REPORT
26GAS AND PNG WORKS100.47AS PER PROJECT REPORT


08-09-2025 (date)
09-12-2025 (date)
01-01-2026
30-06-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings43.131414
Apartment/Shops/Other Buildings58.5628614
Apartment/Shops/Other Buildings60.0091414





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments90.41105.48135.26156.46
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments171.67202.03659.23762.91
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments844.73956.681086.091467.86
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2090.602674.933040.403449.36
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3657.123948.944265.184669.39
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4077.754453.224906.135065.19
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3460.273460.273371.753367.68
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System002.48
Sewerage treatment & garbage disposal003.72
Electricity Supply System000
Storm Water Drainage003.72
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Infrastructure Establishment Cost87.4787.4787.47
Gas and PNG Works5.025.025.02
Dewatering5.175.175.17
Main Entrance work and Guard House0.79
Boundary Wall4.19

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.1220.4120.4114.29
Water Supply System4.952.482.482.97
Sewerage treatment & garbage disposal7.433.723.724.46
Electricity Supply System0000
Storm Water Drainage7.433.723.724.46
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Dewatering5.175.1710.3410.34
Boundary Wall5.235.235.237.32
Security and Firefighting0000
Gas and PNG Works5.025.0210.0510.05
Infrastructure Establishment Cost87.4787.47174.93174.93
Rain water harvesting1.801.802.16
Main Entrance work and Guard House1.972.752.752.75
STP7.56

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements14.2920.4124.4924.49
Water Supply System4.954.954.462.97
Sewerage treatment & garbage disposal7.437.436.694.46
Electricity Supply System025.1150.2275.33
Storm Water Drainage6.697.437.434.46
Parks and Playgrounds013.9520.9327.90
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground tank6.5313.0613.0613.06
Rain water harvesting2.162.873.593.59
Infrastructure Establishment Cost94.9231174.9387.4787.47
Street Light7.853.927.85
Dewatering5.1710.345.175.17
Parking Marking000.78
Gas and PNG Works5.0210.055.025.02
Hardscape and Softscape10.4610.4615.6920.93
Boundary Wall7.3210.4612.5612.56
Security and Firefighting08.890.8714.82
STP7.5613.2218.8918.89
Main Entrance work and Guard House3.933.932.753.93

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.3316.3314.2912.25
Water Supply System2.973.964.954.95
Sewerage treatment & garbage disposal4.465.957.437.43
Electricity Supply System25.1175.33125.55125.55
Storm Water Drainage4.465.957.437.43
Parks and Playgrounds13.9520.9320.9320.93
Clubhouse/community centres0000
Shopping area0000
Other0000
Gas and PNG Works10.055.025.0210.05
Infrastructure Establishment Cost174.9387.4787.47174.93
Consultancy612.26612.26612.26612.26
STP28.3447.2326.4520.78
Rain water harvesting7.183.593.593.59
Underground tank19.5932.6519.5913.06
Parking Marking0.781.291.291.03
Street Light19.6219.627.8511.77
Hardscape and Softscape10.4620.9310.465.23
Boundary Wall10.465.238.3710.46
Security and Firefighting12.8113.3318.299.88
Electrification cost337.67337.67337.67337.67
Main Entrance work and Guard House3.154.333.153.15
Dewatering10.345.175.1710.34












Yes
No
ICICI BANK LIMITED, SECTOR-54, SUNCITY BRANCH, GURUGRAM
777705702501
ICIC0000399
110229060
000399
1) Gaurav Bansal-C-501, Lions Society, Opposite Tau Devi Lal Park, Sector 56, Gurgaon Sector 56, Gurgaon, Haryana - 122011. 2) Rajat Jain-Villa no 44, Tulip Lvory, Gurgaon, Sector 70, Badshahpur, Gurgaon, Haryana-122101. 3) Anuj Kumar Goel- House No- C-25, Street No-1, Near Sunrise Public School, Bhajanpura, North East, Delhi- 110053. 4) Anil Mittal H No 723, Sector 31 Gurugram. 5) Meenal Sood-C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015. 6) Nitesh Goyal h no 241, Ward no 6, Tauru, Mewat, Haryana-122105.
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCEALREADY BEEN OBTAINED08-09-2025
II. ELECTRIFICATION PLAN APPROVALALREADY BEEN OBTAINED01-09-2025
III. FOREST NOCALREADY BEEN OBTAINED24-05-2025
IV. ASSURANCE STP TREATED CONSTRUCTION WATERALREADY BEEN OBTAINED12-09-2025
V. ASSURANCE DRINKING WATER CONNECTIONALREADY BEEN OBTAINED12-09-2025
VI. ASSURANCE SEWERAGE CONNECTIONALREADY BEEN OBTAINED12-09-2025
VII. ASSURANCE STORM WATER CONNECTIONALREADY BEEN OBTAINED12-09-2025








Yes


Yes


As Per Harera Rules













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATED WOODEN FLOOR/CERAMIC TILE
2WALL FINISHING DETAILSPLASTER WITH OBD
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESEXTERNAL ALUMINIUM WITH GLASS INTERNAL – WOODEN
7GLASS WORKONLY EXTERNAL DOOR/ WINDOW
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSNA
11WATER STORAGEAS PER NORMS
12LIFT DETAILSLIFTS AS PER BUILDING PLANS
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
14DOORSNA
14.1MAIN DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINESERVICE PROVIDER
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEWATER PROOF PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER /OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODENFLOORING
2 . 2 WALLSPLASTER + OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER +DADO
3 . 3 CEILINGGRID FALSE CEILING/OBD
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATE WOODENFLOORING
4 . 2 WALLSPLASTER /OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER +DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER+DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSSTONE / MARBLE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER + PAINT
7 . 3 TOILETANTI SKID CERAMIC TILES
7 . 4 BALCONYANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 02-12-2025 View Document
2 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 02-12-2025 View Document
3 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 02-12-2025 View Document
4 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 02-12-2025 View Document
5 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 02-12-2025 View Document
6 BASEMENT 1- PARKING PLAN 30-12-2025 ------
7 TERRACE FLOOR PLAN (T1 TO T6) 30-12-2025 ------
8 AIRPORT HEIGHT CLEARANCE 30-12-2025 ------
9 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED 30-12-2025 ------
10 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 30-12-2025 ------
11 TYPICAL FLOOR PLAN -2ND TO 18TH, 20TH TO 22ND FLOOR (T1 TO T6) 30-12-2025 ------
12 ASSURANCE- STP TREATED WATER 30-12-2025 ------
13 ELEVATION PLAN (T7 TO T14) 30-12-2025 ------
14 SECTION PLAN (T1 TO T6) 30-12-2025 ------
15 TYPICAL FLOOR PLAN -2ND TO 18TH, 20TH TO 21ST FLOOR (T7 TO T14) 30-12-2025 ------
16 ELEVATION PLAN (T1 TO T16) 30-12-2025 ------
17 LETTER OF INTENT (LOI) 30-12-2025 ------
18 MUTATIONS 30-12-2025 ------
19 TERRACE FLOOR PLAN (T7 TO T14) 30-12-2025 ------
20 STILT & GROUND FLOOR PLAN T-1 TO T-14 30-12-2025 ------
21 TERRACE MUMTY FLOOR PLAN 30-12-2025 ------
22 APPROVED LAYOUT PLAN 30-12-2025 ------
23 APPROVED SITE PLAN 30-12-2025 ------
24 REFUGE FLOOR PLAN (19TH FLOOR) T1 TO T14 30-12-2025 ------
25 CA CERTIFICATE- INVENTORY 30-12-2025 ------
26 CA CERTIFICATE INCURRED 30-12-2025 ------
27 FIRST FLOOR PLAN TOWER 1 TO TOWER 14 30-12-2025 ------
28 SITE PLAN SEWER & STORM WATER LAYOUT 30-12-2025 ------
29 ENVIRONMENTAL CLEARANCE 30-12-2025 ------
30 EP APPROVAL 30-12-2025 ------
31 SHAJRA 30-12-2025 ------
32 BASEMENT 2 - PARKING PLAN 30-12-2025 ------
33 ASSURANCE FOR SEWERAGE 30-12-2025 ------
34 ASSURANCE- STORM WATER DRAINAGE 30-12-2025 ------
35 ASSURANCE- WATER SUPPLY DRINKING WATER 30-12-2025 ------
36 BR-III 30-12-2025 ------
37 SECTION PLAN (T7 TO T14) 30-12-2025 ------
38 INFORMATION TO REVENUE DEPARTMENT 30-12-2025 ------
39 ALLOTMENT LETTER 30-12-2025 ------
40 CASHFLOW STATEMENT 30-12-2025 ------
41 CA CERTIFICATE NET WORTH 30-12-2025 ------
42 CA CERTIFICATE NON DEFAULT 30-12-2025 ------
43 JAMABANDI 30-12-2025 ------
44 LC IV-IV C 30-12-2025 ------
45 BUILDER BUYER AGREEMENT 30-12-2025 ------