HRERA GurugramTemp Project Id : RERA-GRG-PROJ-363-2019
Submission Date : 07-12-2019 04:00:30 AM
Applicant Type : Company
Project Type: ONGOING




ANANT RAJ LIMITED AND JUBILANT SOFTWARE SERVICES PVT. LTD.
H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
01143034400
9810585435 (Number Shared by Promoter in Public)
ajay.pathania@anantrajglobal.com
http://www.anantrajlimited.com
XXXX972B
L45400HR1985PLC021622
 
 


 
 


 
 







MACEO
SECTOR 91, GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
01245082424
9871692150 (Number Shared by Promoter in Public)
maceo@anantrajglobal.com
VIKAS SHARMA
01245082424
9871692150 (Number Shared by Promoter in Public)
vikassharma@anantrajglobal.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
110201929-07-20171900000SBIHRERA Gurugram







15.575 (Acre)
175
175
15.575 (Acre)
71 of 2008 dated 25.03.2008
Yes







41350 Lakhs
6140 Lakhs
25280 Lakhs
5890 Lakhs
4040 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS6391
3CONSTRUCTION OF ROADS13612
4PAVEMENTS4960
5PARKS AND PLAYGROUNDS11825
6GREEN BELTS2745
7VEHICLE PARKINGS4534
8ELECTRICITY SUB-STATION232
9CLUB HOUSE656
10SEWAGE AND SOLID WASTE TREATMENT FACILITY421
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER17672
Total63048




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP (COMPLETED)Yes
WATER SUPPLYHSVP (APPLIED)Yes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVP (TO BE APPLIED)No
STORM WATER DRAINAGEHSVP (COMPLETED)Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS457.57SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM283.78SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE159.06SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM80.05SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL201.61SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING59.76SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING35.04SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS11.65SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER4038.52SUBMITTED TO TOWN & COUNTRY PLANNING
15MTC OF SERVICES INCLUDING RESURFACING OF ROADS562.96SUBMITTED TO TOWN & COUNTRY PLANNING


19-09-2017 (date)
18-05-2011 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK73.8140121190
2APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK74.3135120150
3APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK100.84192172200
4APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK119.5184115690
5APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK149.199628680
6APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK146.03160160
7APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK181.10160160
8APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK217.8490916






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2 BHK275COMPLETED
3BHK392COMPLETED
4 BHK105 COMPLETED
3BHK392COMPLETED
4 BHK105 COMPLETED


29-05-2014
16-08-2019
16-08-2020
29-05-2014
95
31-03-2020


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NOT APPLICABLE
29-11-2014
95
31-03-2020
MARCH 2020


683
63
142
297
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments22350.00
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments900.000
Shops200.000
Plots00

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0450.00580.00
Shops0800.000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements474.30
Water Supply System53.19
Sewerage treatment & garbage disposal136.66
Electricity Supply System294.99
Storm Water Drainage97.12
Parks and Playgrounds67.1
Clubhouse/community centres0
Shopping area0
Other873.57
Security and Fire Fighting43.07
Street Lighting59.76

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements434.260
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System0230.59
Sewerage treatment & garbage disposal064.95
Electricity Supply System00
Storm Water Drainage061.94
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other03164.95
MTC of Services562.76












Particulars Remarks, if any
i. No. of Flats/Apartments constructed788142 EWS
ii. No. of Flats/ Apartments booked556
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter39207.70 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter26642.8 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter12564.90 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application36880.00 Lakhs
Land cost (If any)6140.00 Lakhs
Apartments22350.00 Lakhs
Infrastructure4340.00 Lakhs
EDC/ Taxes Etc.4040.00 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession4470.00 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
24000.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS457.57474.30
II. WATER SUPPLY SYSTEM283.7853.19
III. STORM WATER DRAINAGE159.0697.12
IV. ELECTRICITY SUPPLY SYSTEM80.05294.99
V. SEWAGE TREATMENT & GARBAGE DISPOSAL201.61136.66
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.11.6567.1
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT4696.28976.4









Yes
Yes
INDUSIND BANK LIMITED, GOPAL DAS BHAWAN, 28 BARAKHAMBA RAOD NEW DELHI
201001128629
INDB0000005
110234002
5
Rajeev shukla
Certificate attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINEDNA








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
2WALL FINISHING DETAILSEMULSION PAINT
3KITCHEN DETAILSVITRIFED TILES, DADO GLAZED CERAMIC TILES
4BATHROOM FITTINGSPREMIUM WASH BASIN AND WC, SINGLY LEVER CP FITTINGS
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESPREMIUM HARD WOOD FRAMES FOR DOORS AND UPVC WINDOW FRAMES
7GLASS WORK5 MM THICK TOUGHNED GLASS
8ELECTRIC FITTINGSMODULAR TYPE SWITCHES AND SOCKETS
9CONDUCTING AND WIRING DETAILSCOPPER WIRINGS
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEPROVIDED
12LIFT DETAILS8 AND 13 PASSENGERS LIFT IN EACH TOWER
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSUPVC WINDOWS
14DOORSMOULDED SKIN DOORS
14.1MAIN DOORSBOTH SIDE DARK WOOD LAMINATED FLUSH DOOR WITH EMBEDDED LOCK
14.2INTERNAL DOORSMOULDED SKIN DOORS
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSMODULAR TYPE SWITCHES AND SOCKETS
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITY 50 MBPS MINIMUM SPEED PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER RESISTANT PAINT
20INTERNAL FINISHINGEMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSEMULSION PAINT
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSEMULSION PAINT
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORANTI SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES UP TO 2400 MM AND PAINT ABOVE
3 . 3 CEILINGFALSE CEILING
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSPREMIUM WASH-BASIN AND WC, SINGLE LEVER CP FITTINGS
3 . 6 FITTING/FIXTURESWHITE CHINA WARE AND MIRROR
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSEMULSION PAINT
4 . 3 CEILINGOBD
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORANTI SKID CERAMIC TILES
5 . 2 WALLSCERAMIC TILES UPTO 2400 MM
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSPREMIUM WASH BASIN AND WC, SINGLE LEVER CP FITTINGS
5 . 6 FIXTURESWHITE CHINA WARE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSDEDO GLAZED CERAMIC TILES
6 . 3 CEILINGOBD
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESPREMIUM STAINLESS STEEL DOUBLE SINK WITH DRAIN BOARD
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES
7 . 2 WALLS & CEILINGOBD
7 . 3 TOILETCERAMIC TILES. OBD
7 . 4 BALCONYANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORANTI SKID CERAMIC TILES
8 . 2 WALLS & CEILINGOBD
8 . 3 RAILINGSENAMEL PAINTED MS RAILING AND HANDRAIL
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1CASH FLOW STATEMENT OF THE PROPOSED PROJECT28-11-2019 View Document
2A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS29-11-2019 View Document
3DEMARCATION PLAN29-11-2019 View Document
4COPY OF LICENSE ALONG WITH SCHEDULE OF LAND04-12-2019 View Document
5CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT30-11-2019 View Document
6BOARD RESOLUTION07-08-2020 ------
7IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN04-12-2019 View Document
8ELEVATION & SECTION (3)07-08-2020 ------
9LEGAL CAPACITY07-08-2020 ------
10NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT04-12-2019 View Document
11IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN04-12-2019 View Document
12SERVICE PLANS- WATER SUPPLY LINE LAYOUT07-08-2020 ------
13SITE PLAN-AREA CALCULATION07-08-2020 ------
14SITE PLAN-GREEN AREA CALCULATION07-08-2020 ------
15COMMUNITY BUILDING-FLOOR PLAN AND AREA CALCULATION II07-08-2020 ------
16SITE PLAN-SERVICES LAYOUT07-08-2020 ------
17BASEMENT PLAN07-08-2020 ------
18SECTION AND ELEVATION-TOWER G AND H07-08-2020 ------
19TYP FLOOR PLANS-TOWER J,L,M,N,K07-08-2020 ------
20FOREST NOC 207-08-2020 ------
21TOWER H-FLOOR PLAN07-08-2020 ------
22STILT AND GROUND FLOOR PLANS -TOWER J,L,M,N, K07-08-2020 ------
23SITE PLAN07-08-2020 ------
24COMMUNITY BUILDING-ELEVATION AND SECTION07-08-2020 ------
25SERVICE PLANS- SEWER LAYOUT07-08-2020 ------
26STILT AND GROUND AND TERRACE FLOOR PLANS -TOWER R07-08-2020 ------
27EWS FLOOR PLANS AND AREA CALCULATIONS-BLOCK B07-08-2020 ------
28LOWER UPPER PENTHOUSE-TOWER G AND H07-08-2020 ------
29TOWER G-FLOOR PLAN07-08-2020 ------
30EWS BLOCK A-ELEVATION AND SECTION07-08-2020 ------
31TOWER A TO F ELEVATION AND SECTION07-08-2020 ------
32ELEVATION & SECTION07-08-2020 ------
33TOWER A-F-FLOOR PLAN07-08-2020 ------
34ELEVATION AND SECTION-TOWER J,K,L,M,N07-08-2020 ------
35SERVICE PLANS- ELECTRICAL LAYOUT07-08-2020 ------
36DD07-08-2020 ------
37MACEO RERA DD (2)07-08-2020 ------
38ORIGINAL LICENCE 7107-08-2020 ------
39SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN23-12-2019 View Document
40ZONING PLAN23-12-2019 View Document
41DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.23-12-2019 View Document
42LOWER AND UPPER PENTHOUSE FLOOR PLANS07-08-2020 ------
43FIRE NOC07-08-2020 ------
44NURSERY SCHOOL07-08-2020 ------
45TOWER A TO F FLOOR PLAN07-08-2020 ------
46SERVICE PLANS- STREET LIGHTING LAYOUT07-08-2020 ------
47CONVENIENT SHOPPING-PLAN, SECTION,ELEVATION07-08-2020 ------
48SERVICE ESTIMATE07-08-2020 ------
49TYP FLOOR PLANS AND AREA CALCLUATION-TOWER P, Q,R07-08-2020 ------
50SERVICE PLANS- STORM WATER LAYOUT07-08-2020 ------
51AFFIDAVIT07-08-2020 ------
52APPROVED PLANS07-08-2020 ------
53ELEVATION & SECTION (2)07-08-2020 ------
54COMMUNITY BUILDING-FLOOR PLAN AND AREA CALCULATION07-08-2020 ------
55COPY OF LICENSE AND LAND SCHEDULE BR III07-08-2020 ------
56FOREST NOC07-08-2020 ------
57ORIGINAL LICENCE07-08-2020 ------
58EWS FLOOR PLANS-BLOCK B07-08-2020 ------
59ROC ARL07-08-2020 ------
60ROC JUBILIANT07-08-2020 ------
61SECTION AND ELEVATION PLAN-TOWER P,Q,R07-08-2020 ------
62TOWER A TO F LOWER AND UPPER PENTHOUSE FLOOR PLAN07-08-2020 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 Extension No. 09 OF 2019 DATED-25.11.2019 07-02-2020 View Document
2 OC uploaded 04-08-2023 View Document
3 OC uploaded 08-08-2023 View Document