HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2086-2025
Submission Date : 09-10-2025 02:47:43 PM
Applicant Type : Company
Project Type: NEW




EKAAKSHARA BUILDERS LLP
UNIT NO. 303, SUNCITY SUCCESS TOWER, GOLF COURSE EXTENSION ROAD, SECTOR-65
09896384833
9896384833 (Number Shared by Promoter in Public)
info@ekaakshara.com
http://www.ekaakshara.co.in/
XXXX003A
5303
 
 


 
 


 
 







GARDEN RESIDENCY
REVENUE ESTATE OF VILLAGE SOHNA, SECTOR 5 SOHNA
SOHNA
GURUGRAM
9873511315 (Number Shared by Promoter in Public)
info@ekaakshara.co.in
MAHESH PATTAK
9873511315 (Number Shared by Promoter in Public)
mahesh.pathak@meffierinfra.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
143003204-10-2025370000YES BANK LTD. HRERA Gurugram
243005830-10-202535500YES BANK LTD. HRERA Gurugram







1.247 (Acre)
2.64
2.64
11.0875 (Acre)
The Department of Town and Country Planning (DTCP) has granted Licence No. 118 of 2025, dated 14.07.2025, to the Promoter, M/s Ekaakshara Builders LLP, for the development of an Affordable Plotted Colony under the Deen Dayal Jan Awas Yojana, 2016. The project pertains to land measuring 11.0875 acres, situated in the revenue estate of Village Sohna, Sector 5 Sohna, Tehsil Sohna, District Gurugram, Haryana. The said licence is valid up to 13. 07.2030.
No
Address     SEC-45, NOIDA, GAUTAM BUDDHA NAGAR, U.P.-201301
Address     H. NO. 133, SEC-45, NOIDA, GAUTAM BUDDHA NAGAR, U.P.-201301
Address     WARD NO. 11, SOHNA, GURUGAM-122103
Address     WARD NO. 11, SOHNA, GURUGAM-122103
Address     206, TOWER P1, ELDECO ACCOLADE, SOHNA, GURUGRAM-122103
Annexure-B- LANDOWNERS FOR THE DEVELOPMENT OF AN AFFORDABLE PLOTTED COLONY UNDER THE DEEN DAYAL JAN AWAS YOJANA (DDJAY), 2016. THE DETAILS OF THE EXECUTED AGREEMENTS ARE AS FOLLOWS: JOINT DEVELOPMENT AGREEMENT DATED 27.03.2025, BEARING REGISTRATION NO. 17469, REGISTRATION YEAR 2024-2025, BOOK NO. 01, EXECUTED BETWEEN SH. PRAVEEN KUMAR ALIAS PRAVEEN KUMAR RAGHAV AND SH. LOKESH KUMAR ALIAS LOKESH RAGHAV AND M/S EKAAKSHARA BUILDERS LLP, FOR THE DEVELOPMENT OF LAND ADMEASURING 3.91875 ACRES, SITUATED IN THE REVENUE ESTATE OF VILLAGE SOHNA, TEHSIL SOHNA, DISTRICT GURUGRAM, HARYANA. JOINT DEVELOPMENT AGREEMENT DATED 27.03.2025, BEARING REGISTRATION NO. 17468, REGISTRATION YEAR 2024-2025, BOOK NO. 01, EXECUTED BETWEEN SH. RAVINDER ALIAS RAVINDER RAGHAV AND M/S EKAAKSHARA BUILDERS LLP, FOR THE DEVELOPMENT OF LAND ADMEASURING 2.8 ACRES, SITUATED IN THE REVENUE ESTATE OF VILLAGE SOHNA, TEHSIL SOHNA, DISTRICT GURUGRAM, HARYANA. JOINT DEVELOPMENT AGREEMENT DATED 24.03.2025, BEARING REGISTRATION NO. 17134, REGISTRATION YEAR 2024-2025, BOOK NO. 01, EXECUTED BETWEEN SH. SATPAL SINGH AND SH. BHOPAL SINGH AND M/S EKAAKSHARA BUILDERS LLP, FOR THE DEVELOPMENT OF LAND ADMEASURING 6.13125 ACRES, SITUATED IN THE REVENUE ESTATE OF VILLAGE SOHNA, TEHSIL SOHNA, DISTRICT GURUGRAM, HARYANA.
THE APPLICANT IS APPLYING FOR REGISTRATION OF PROJECT BEFORE HRERA BY VIRTUE OF JOINT DEVELOPMENT AGREEMENT(S) WHICH WERE REGISTERED IN MARCH 2025 AND SUBSEQUENTLY, APPLICATION FOR GRANT OF LICENCE BEFORE DTCP WAS MADE ON 04.04.2025.
Yes
YES
No
Yes
Yes







7925.26 Lakhs
1225.74 Lakhs
5368.82 Lakhs
0 Lakhs
1330.7 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 1.247
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total1.247




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM0AS PER PROJECT REPORT
3STORM WATER DRAINAGE0AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0AS PER PROJECT REPORT
6STREET LIGHTING0AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT


14-07-2025 (date)
25-09-2025 (date)
31-10-2025
30-06-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 4219.653 33
Total33


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings10655.4413233





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments92.03
Shops0
Plots0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments92.0392.03226.23353.11
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments353.11353.11475.81475.81
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments475.81475.81475.81475.81
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments475.81475.81
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00












Yes
Yes
YES BANK, CROSS POINT BRANCH UPPER GROUND FLOOR B-247 SUPER MART-1, GURGAON
048772500000048
YESB0000487
110532094
000487
Sanjeet Singh











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
No
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENCE NO. 118 OF 2025 ALREADY BEEN OBTAINED14-07-2025
II. ELECTRIFICATION PLAN APPROVAL ALREADY BEEN OBTAINED27-08-2025
III. FOREST CLEARANCEALREADY BEEN OBTAINED01-07-2025
IV. ARAVALI CLEARANCEALREADY BEEN OBTAINED26-08-2025
V. CONSENT TO ESTABLISHALREADY BEEN OBTAINED11-09-2025
VI. DEMARCATION CUM ZONING PLANALREADY BEEN OBTAINED11-08-2025
VII. SERVICE PLAN ESTIMATES APPROVALALREADY BEEN OBTAINED20-08-2025
VIII. STORM WATER ASSURANCEALREADY BEEN OBTAINED22-07-2025
IX. SEWERAGE CONNECTION ASSURANCEALREADY BEEN OBTAINED22-07-2025
X. WATER SUPPLY ASSURANCEALREADY BEEN OBTAINED22-07-2025
XI. TREATED WATER NOC ALREADY BEEN OBTAINED06-08-2025
XII. LAYOUT PLAN ALREADY BEEN OBTAINED14-07-2025








Yes


Yes


As per the Model Agreement for Sale under RERA, five key clauses that protect the interests of both the promoter and the allottee include: Clause 1.2, which outlines the Total Price payable by the buyer, ensuring all-inclusive and transparent costing; Clause 3, which stipulates the Possession Schedule, clearly defining the handover date and remedies for delay; Clause 7, concerning the Promoter’s Representations and Warranties, assures buyers of the promoter’s legal right over the land and valid project approvals; Clause 9, detailing the Events of Default and Consequences, provides legal remedies in case either party breaches the agreement; and Clause 11, which addresses the Maintenance of the Project, laying down the promoter’s responsibilities towards upkeep and the eventual transfer of maintenance to the society or association of allottees. These clauses collectively aim to ensure legal certainty, promote accountability, and protect the buyer’s investment under the regulatory framework of the Real Estate (Regulation and Development) Act, 2016.







GARDEN AVENUE , SOHNA, SECTOR-5
11.0875
0
153
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16895.6616895.660
Cost of the apartments10061.9010061.90680.92
Cost of the infrastructure1663.1251663.125382.21
Others costs5170.0355170.035619.90


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2028
30-07-2029










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE / SUNHEART OR EQUIVALENT
2WALL FINISHING DETAILSPAINT / ASIAN OR EQUIVALENT
3KITCHEN DETAILSASIAN OR EQUIVALENT
4BATHROOM FITTINGSFLOORS TILE SUNHEART OR EQUIVALENT
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESENTRANCE DOOR FLUSH DOOR SHUTTER MASONITE OR EQUIVALENT 110 TO 170/- PER SFT INTERNAL DOORS FLUSH DOOR SHUTTER MASONITE OR EQUIVALENT
7GLASS WORKN/A
8ELECTRIC FITTINGSN/A
9CONDUCTING AND WIRING DETAILSN/A
10CUPBOARD DETAILSN/A
11WATER STORAGEN/A
12LIFT DETAILSN/A
13EXTERNAL GLAZINGSN/A
13.1WINDOWS/GLAZINGSWINDOW SHUTTER UPVC VEKA OR EQUIVALENT
14DOORSN/A
14.1MAIN DOORSENTRANCE DOOR FLUSH DOOR SHUTTER MASONITE OR EQUIVALENT
14.2INTERNAL DOORSENTRANCE DOOR FLUSH DOOR SHUTTER MASONITE OR EQUIVALENT
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSN/A
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEN/A
20INTERNAL FINISHINGN/A
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORFLOORS VITRIFIED TILE SUNHEART OR EQUIVALENT
1 . 2 WALLSWALLS PAINT ASIAN OR EQUIVALENT
1 . 3 CEILINGCEILING PAINT ASIAN OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORFLOORS TILE SUNHEART OR EQUIVALENT
2 . 2 WALLSNA
2 . 3 CEILINGWALLS PAINT ASIAN OR EQUIVALENT
2 . 4 MODULAR WARDROBESCEILING PAINT ASIAN OR EQUIVALENT
3 . MASTER TOILET
3 . 1 FLOORN/A
3 . 2 WALLSFLOORS TILE SUNHEART OR EQUIVALENT
3 . 3 CEILINGFLOORS TILE SUNHEART OR EQUIVALENT
3 . 4 COUNTERSWALLS TILE SUNHEART OR EQUIVALENT
3 . 5 SANITARY WARE/CP FITTINGSCEILING PAINT ASIAN OR EQUIVALENT
3 . 6 FITTING/FIXTURESN/A
4 . BED ROOMS
4 . 1 FLOORMASTER TOILET TILE SUNHEART OR EQUIVALENT
4 . 2 WALLSWINDOW/GLAZING UPVC VEKA OR EQUIVALENT
4 . 3 CEILINGWINDOW/GLAZING UPVC VEKA OR EQUIVALENT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORTILE SUNHEART OR EQUIVALENT
5 . 2 WALLSWINDOW/GLAZING UPVC VEKA OR EQUIVALENT
5 . 3 CEILINGWINDOW/GLAZING UPVC VEKA OR EQUIVALENT
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSN/A
5 . 6 FIXTURESN/A
6 . KITCHEN
6 . 1 FLOORN/A
6 . 2 WALLSN/A
6 . 3 CEILINGN/A
6 . 4 COUNTERSN/A
6 . 5 FIXTURESN/A
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN/A
7 . 2 WALLS & CEILINGN/A
7 . 3 TOILETN/A
7 . 4 BALCONYN/A
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1 DEMARCATION PLAN 08-10-2025 View Document
2 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 08-10-2025 View Document
3 ZONING PLAN 08-10-2025 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 08-10-2025 View Document
5 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 08-10-2025 View Document
6 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 08-10-2025 View Document
7 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 08-10-2025 View Document
8 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 08-10-2025 View Document
9 NON ENCUMBRANCE 11-11-2025 ------
10 ASSURANCE- STORM WATER 11-11-2025 ------
11 DRAFT ALLOTMENT LETTER 11-11-2025 ------
12 ELECTRIFICATION PLAN APPROVAL 11-11-2025 ------
13 JAMABANDI 11-11-2025 ------
14 NET WORTH SANJEET SINGH 11-11-2025 ------
15 SERVICE PLAN ESTIMATES 11-11-2025 ------
16 ARAVALI 11-11-2025 ------
17 LC IV B 11-11-2025 ------
18 LLP AGREEMENT 12-11-2025 ------
19 TYPE E LAYOUT PLANS 12-11-2025 ------
20 DEMARCATION SUPERIMPOSED ON LAYOUT 11-11-2025 ------
21 TYPE J LAYOUT PLANS -138 -144 18-11-2025 ------
22 AFFIDAVIT NON APPLICABILITY OF VARIOUS PERMISSIONS 11-11-2025 ------
23 ASSURANCE- WATER SUPPLY 11-11-2025 ------
24 DRAFT CONVEYANCE DEED 11-11-2025 ------
25 NET WORTH SURENDER DAGAR 11-11-2025 ------
26 TYPE B LAYOUT PLANS 12-11-2025 ------
27 AFFIDAVIT UNDER SECTION 4 2 L D 11-11-2025 ------
28 AKS SAJRA 11-11-2025 ------
29 ASSURANCE- SEWERAGE CONNECTION 11-11-2025 ------
30 BANK UNDERTAKING 11-11-2025 ------
31 BR BANK ACCOUNT OPERATION 11-11-2025 ------
32 COST CUM PROFITABILITY SHEET 11-11-2025 ------
33 CA CERTIFICATE NET WORTH OF LLP 11-11-2025 ------
34 DEMAND DRAFT DEFICIT FEES 11-11-2025 ------
35 DEMAND DRAFT SUBMITTED ON APPLICATION 11-11-2025 ------
36 DRAFT AGREEMENT FOR SALE 11-11-2025 ------
37 DRAFT APPLICATION FORM 11-11-2025 ------
38 OWNERSHIP 11-11-2025 ------
39 EMAIL TCP STATEMENT OF FLOORS 12-11-2025 ------
40 BRS III 12-11-2025 ------
41 EDC UNDERTAKING 11-11-2025 ------
42 FOREST NOC 11-11-2025 ------
43 INDIVIDUAL ACCEPTANCE-LANDOWNERS 11-11-2025 ------
44 ROC FORM 11-11-2025 ------
45 LANDOWNERS ACCEPTANCE OF SHARE--- LAYOUT 11-11-2025 ------
46 LOI 11-11-2025 ------
47 PROJECT REPORT 11-11-2025 ------
48 STP LETTER- APPROVAL OF DEMARCATION PLAN 11-11-2025 ------
49 TREATED WATER NOC 11-11-2025 ------
50 TSR 11-11-2025 ------
51 ZONING LETTER DTCP 11-11-2025 ------
52 TYPE K LAYOUT PLANS 12-11-2025 ------
53 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 12-11-2025 View Document
54 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 12-11-2025 View Document
55 MUTATION 12-11-2025 ------
56 COLLABORATION AGREEMENT AND ITS ADDENDUM 12-11-2025 ------
57 BRS II 12-11-2025 ------
58 BRS I 12-11-2025 ------
59 TYPE D LAYOUT PLANS-68-72 18-11-2025 ------
60 TYPE D LAYOUT PLANS-63-67 18-11-2025 ------
61 TYPE J LAYOUT PLANS-117-123 18-11-2025 ------