HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2333-2026
Submission Date : 21-09-2026 06:06:27 PM
Applicant Type : Company
Project Type: NEW




M/S SIGNATUREGLOBAL HOMES LIMITED
UNIT NO.101,GROUND FLOOR, TOWER-A, SIGNATURE TOWER SOUTH CITY-1, GURUGRAM, HARAYNA-122001
911244908200
7303918365 (Number Shared by Promoter in Public)
compliance@signatureglobal.in
Https://www.signatureglobal.in
XXXX888R
U70100DL2008PLC176641
 
 


 
 


 
 


 
 







THE ICONIC RESIDENCES GURUGRAM
VILLAGE- GADAULI KALAN, SECTOR-37D, GURUGRAM, HARYANA
KADIPUR ST
GURUGRAM
911244908200
7303918365 (Number Shared by Promoter in Public)
compliance@sigantureglobal.in
SANJAY KUMAR VARSHNEY
911244908200
7303918365 (Number Shared by Promoter in Public)
compliance@signatureglobal.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques/Online Banking:-

Drafts/ Banker’s Cheques

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
12202609080070612408-09-2026266345INDUSIND BANKHRERA Gurugram
22202609080070612208-09-2026498066INDUSIND BANKHRERA Gurugram

Online Banking








2.303 (Acre)
1.87
1.72
60.511 (Acre)
33 OF 2008 Dated 19.02.2008 renewed and valid upto 18.02.2030
No
Address     PLOT NO.-114, SECTOR-44, GURUGRAM, HARYANA-122002
Address     PLOT NO.-114, SECTOR-44, GURUGRAM, HARYANA-122002
Address     PLOT NO.-114, SECTOR-44, GURUGRAM, HARYANA-122002
Address     PLOT NO.-114, SECTOR-44, GURUGRAM, HARYANA-122002
Annexure-B- BENEFICIAL INTEREST PERMISSION (ATTACHED)
AS PER JOINT DEVELOPMENT AGREEMENT (JDA)
Yes
AS PER JOINT DEVELOPMENT AGREEMENT (JDA)
No
Yes
Yes







50971.67 Lakhs
3504.71 Lakhs
31817.48 Lakhs
449.80 Lakhs
15199.68 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.245
3CONSTRUCTION OF ROADS 0.693
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.046
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0.481
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13ELECTRIC METER ROOM 0.016
14PODIUM AREA EXCLUDING APARTMENT AREA 0.521
15GUARD ROOM 0.010
16AREA TO BE TRANSFERRED TO GOVERNMENT FOR CIRCULATION ROADS FREE OF COST 0.291
Total2.303




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA (CONNECTED)No
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDA (OWN ARRANGEMENT)No




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS136.29SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM146.60SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE57.40SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL61.29SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING7.07SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS2.38SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15MS CHARGES38.77SUBMITTED TO TOWN & COUNTRY PLANNING


NA (date)
21-10-2024 (date)
01-12-2026
30-11-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings165.183521
Apartment/Shops/Other Buildings139.736571
Apartment/Shops/Other Buildings129.07931
Apartment/Shops/Other Buildings303.40421
Apartment/Shops/Other Buildings321.37321





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments6048.65
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00300500
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments750750750750
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1000.001000.001100.001100.00
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1100.001100.001100.001100.00
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1100.001100.001100.001100.00
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1100.001100.001100.001100.00
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments110011001000.001368.83
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00045.88
Water Supply System00049.351
Sewerage treatment & garbage disposal00020.632
Electricity Supply System0000
Storm Water Drainage00019.323
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
street light2.38
Horticulture0.801

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements53.32228.8358.2530
Water Supply System88.3728.87700
Sewerage treatment & garbage disposal36.9463.71200
Electricity Supply System0000
Storm Water Drainage34.6013.47600
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Horticulture1.4350.144
street light2.7661.4960.428
MS Charges38.77








Cash Flow in each quarter (In Lakhs)












Yes
No
100% Account Details70% Account Details30% Account Details
YES BANK LIMITED, GROUND AND MEZZANINE,FLOOR 56JANPATHALPS BLDG NEXT TO PIZZA HUT,CONNAUGHT PLACE, NEW DELHI-110001YES BANK LIMITED, GROUND AND MEZZANINE,FLOOR 56JANPATHALPS BLDG NEXT TO PIZZA HUT,CONNAUGHT PLACE, NEW DELHI-110001YES BANK LIMITED, GROUND AND MEZZANINE,FLOOR 56JANPATHALPS BLDG NEXT TO PIZZA HUT,CONNAUGHT PLACE, NEW DELHI-110001
013672500000264013672500000214013672400000058
YESB0000136YESB0000136YESB0000136
110532031110532031110532031
000136000136000136
Mr.Pradeep Kumar Aggarwal and Lalit Aggarwal R/oAashirwad, Palam Farm 6, Salahapur, Bijwasan, SouthWest Delhi-110061
Attached











No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED27-09-2024
II. AIRPORT AUTHORITY OF INDIA (AAI)ALREADY BEEN OBTAINED14-09-2023
III. FIRE NOCALREADY BEEN OBTAINED28-12-2024
IV. PHASING APPROVAL ALREADY BEEN OBTAINED21-11-2023
V. BUILDING PLAN APPROVAL ALREADY BEEN OBTAINED21-10-2024
VI. ELECTRICAL PLAN APPROVALALREADY BEEN OBTAINED23-12-2024
VII. FOREST NOCALREADY BEEN OBTAINED03-02-2020
VIII. BIPALREADY BEEN OBTAINED23-12-2024
IX. RENEWAL OF LICENCEALREADY BEEN OBTAINED07-09-2026
X. SERVICE PLANS AND ESTIMATESAPPLIED FOR BUT YET TO RECEIVE26-10-2024








Yes


Yes


As per RERA norms







SIGNATURE GLOBAL PARK- I (1), SECTOR-36, SOHNA, GURUGRAM, HARYANA
3.91
116
0
114
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7986.2606758.52
Cost of the apartments480004158.47
Cost of the infrastructure000
Others costs3186.2602600.05


8154.74 Lakhs
658.94 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2027
28-02-2027




SIGNATURE GLOBAL PARK- I (2), SECTOR-36, SOHNA, GURUGRAM, HARYANA
1.09
144
0
125
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7682.9603363.71
Cost of the apartments600002075.24
Cost of the infrastructure000
Others costs1682.9601288.47


3640.8 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
29-07-2027
29-07-2027




SIGNATURE GLOBAL PARK- I EXT., SECTOR-36, SOHNA, GURUGRAM, HARYANA
1.581
188
0
62
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
15105.230867.43
Cost of the apartments11142.300190.47
Cost of the infrastructure000
Others costs3962.930676.96


906.44 Lakhs
517.55 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2029
31-07-2029




SIGNATURE GLOBAL SARVAM AT DXP ESTATE, SECTOR-37D, GURUGRAM, HARYANA
13.5656
1841
0
735
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
384441.24021622.58
Cost of the apartments311477.2601618.19
Cost of the infrastructure000
Others costs72963.98020004.39


23446.76 Lakhs
12397.02 Lakhs
0 Lakhs
0 Lakhs
No
31-08-2032
31-08-2032










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE / MARBLE
2WALL FINISHING DETAILSEMULSION PAINT / OBD
3KITCHEN DETAILSMODULAR KITCHEN / WOODEN CABINETS
4BATHROOM FITTINGSBRANDED CP FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESVENEER DOOR SHUTTER & FRAME IN PU PAINT FINISH/ SGU- ENERGY EFFICIENT GLASS/TINTED /REFLECTIVE/CLEAR GLASS WITH COMPOSITE ALUMINIUM FRAMES
7GLASS WORKTOUGHENED GLASS OR AS PER REQUIREMENT
8ELECTRIC FITTINGS ISI MARKED
9CONDUCTING AND WIRING DETAILS ISI MARKED
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSPASSENGER / SERVICE LIFT
13EXTERNAL GLAZINGSALUMINIUM/UPVC FRAME & GLASS
13.1WINDOWS/GLAZINGSALUMINIUM/UPVC FRAME & GLASS
14DOORSFLUSH DOOR SHUTTER & FRAME
14.1MAIN DOORSFLUSH DOOR SHUTTER & FRAME
14.2INTERNAL DOORSFLUSH DOOR SHUTTER & FRAME
15AIR CONDITIONINGISI MARKED
16ELECTRICAL FITTINGSISI MARKED
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORSTONE FINISH TILE / IMPORTED MARBLE
1 . 2 WALLSACRYLIC EMULSION / OBD PAINT
1 . 3 CEILINGACRYLIC EMULSION / OBD PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING / STONE FINISH TILE / IMPORTED MARBLE
2 . 2 WALLSACRYLIC EMULSION / OBD PAINT
2 . 3 CEILINGACRYLIC EMULSION / OBD PAINT
2 . 4 MODULAR WARDROBES
3 . MASTER TOILET
3 . 1 FLOORANTI-SKID TILES
3 . 2 WALLSTILE DADO + ACRYLIC EMULSION / OBD PAINT
3 . 3 CEILINGMR BOARD FALSE CEILING / ACRYLIC EMULSION PAINT
3 . 4 COUNTERSSTONE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSBRANDED VITREOUS CHINAWARE/BRANDED CP FITTINGS
3 . 6 FITTING/FIXTURESBRANDED CP FITTINGS
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING / STONE FINISH TILE / IMPORTED MARBLE
4 . 2 WALLSACRYLIC EMULSION / OBD PAINT
4 . 3 CEILINGACRYLIC EMULSION / OBD PAINT
4 . 4 WARDROBES
5 . TOILET
5 . 1 FLOORANTI-SKID TILES
5 . 2 WALLSTILE DADO + ACRYLIC EMULSION / OBD PAINT
5 . 3 CEILINGMR BOARD FALSE CEILING / ACRYLIC EMULSION PAINT
5 . 4 COUNTERSSTONE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSBRANDED VITREOUS CHINAWARE/BRANDED CP FITTINGS
5 . 6 FIXTURESBRANDED CP FITTINGS
6 . KITCHEN
6 . 1 FLOORSTONE FINISH TILE / IMPORTED MARBLE
6 . 2 WALLSTILE DADO + PAINT
6 . 3 CEILINGACRYLIC EMULSION / OBD PAINT
6 . 4 COUNTERSSTONE COUNTER
6 . 5 FIXTURESBRANDED CP FITTINGS
6 . 6 KITCHEN APPLIANCES
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI-SKID TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION / OBD PAINT
7 . 3 TOILETANTI-SKID TILES
7 . 4 BALCONYANTI-SKID TILES
8 . SIT-OUTS
8 . 1 FLOORVITRIFIED TILE / IMPORTED MARBLE / ANTISKID TILES / GRANITE
8 . 2 WALLS & CEILINGACRYLIC EMULSION / OBD PAINT / TEXTURE PAINT
8 . 3 RAILINGSSS GLASS RAILING
8 . 4 FIXTURESBRANDED CP FITTINGS












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 08-09-2026 View Document
2 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 11-09-2026 View Document
3 DEMARCATION PLAN 08-09-2026 View Document
4 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 15-09-2026 View Document
5 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 15-09-2026 View Document
6 AFFIDAVIT FOR NO LITIGATION ON PROJECT 03-11-2026 View Document
7 PLOT_B BUILDING SECTION 1 03-11-2026 View Document
8 SERVICE FLOOR PLAN 03-11-2026 View Document
9 ENVIRONMENT CLEARANCE 03-11-2026 View Document
10 BR FOR BANK OPERATIONS_ 03-11-2026 View Document
11 AFFIDAVIT FOR APPROVALS AND NOC 03-11-2026 View Document
12 PODIUM LEVEL_02 AREA CALCULATION 03-11-2026 View Document
13 FOREST NOC 60 ACRES_ 03-11-2026 View Document
14 FLOOR PLAN FROM 23RD TO 28TH 03-11-2026 View Document
15 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 03-11-2026 View Document
16 GROUND COVERAGE AREA CALCULATION 03-11-2026 View Document
17 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 19-11-2026 View Document
18 BENEFICIAL INTEREST PERMISSION_BIP 03-11-2026 View Document
19 BASEMENT AND AREA CALCULATION 03-11-2026 View Document
20 PENTHOUSE LOWER LEVEL FLOOR PLAN AT 29TH FLOOR 03-11-2026 View Document
21 LAND COST & COST INCURRED CA CERTIFICATES 03-11-2026 View Document
22 AFFIDAVIT FOR NO SALE AND 3RD PARTY RIGHTS_SGHL 03-11-2026 View Document
23 APPROVAL OF BUILDING_BR-III 03-11-2026 View Document
24 ELECTRICAL PLAN _EP 03-11-2026 View Document
25 GREEN AREA CALCULATION 03-11-2026 View Document
26 REFUGE FLOOR AREA DIAGRAM AT 14TH AND 22ND FLOOR LEVEL 03-11-2026 View Document
27 TYPICAL FLOOR PLAN 2ND TO 21ST EXCEPT 14TH FLOOR 03-11-2026 View Document
28 CA CERTIFICATE FOR NETWORTH OF THE PROMOTER 03-11-2026 View Document
29 AFFIDAVIT FOR NO LOAN ON PROJECT LAND 03-11-2026 View Document
30 AFFIDAVIT FOR NO REGISTERED AGENT 03-11-2026 View Document
31 AFFIDAVIT FOR NO SALE AND 3RD PARTY RIGHTS__RPDPL 03-11-2026 View Document
32 AIRPORT HEIGHT NOC 03-11-2026 View Document
33 CLARIFICATION LETTER FOR BUILDING PLAN 03-11-2026 View Document
34 FIRE NOC 03-11-2026 View Document
35 PHASING APPROVAL LETTER 03-11-2026 View Document
36 SEWERAGE ASSURANCE 03-11-2026 View Document
37 WATER ASSURANCE 03-11-2026 View Document
38 AREA DIAGRAM FROM 23RD TO 28TH 03-11-2026 View Document
39 ELEVATION 03-11-2026 View Document
40 FIRST FLOOR AREA DIAGRAM 03-11-2026 View Document
41 FIRST FLOOR PLAN _CLUB 03-11-2026 View Document
42 GROUND COVERAGE CALCULATION 03-11-2026 View Document
43 LOWER PENTHOUSE_REFUGE LEVEL AREA DIAGRAM AT 31ST FLOOR_ 03-11-2026 View Document
44 OHT LEVEL & AREA DIAGRAM 03-11-2026 View Document
45 PENTHOUSE LOWER LEVEL AREA DIAGRAM AT 29TH FLOOR LEVEL_ 03-11-2026 View Document
46 PENTHOUSE UPPER LEVEL FLOOR PLAN AT 30TH & 32ND FLOOR 03-11-2026 View Document
47 PODIUM LEVEL_03 FLOOR PLAN_ 03-11-2026 View Document
48 PENTHOUSE UPPER LEVEL AREA DIA GRA AT 30TH & 32ND FLOOR_ 03-11-2026 View Document
49 PLOT B_BUILDING SECTION 2 03-11-2026 View Document
50 REFUGE LEVEL FLOOR PLAN AT 14TH AND 22ND FLOOR PLAN 03-11-2026 View Document
51 SUPERIMPOSSED DEMARCATION PLAN 03-11-2026 View Document
52 PLOT B_ELEVATION 1 03-11-2026 View Document
53 PLOT B_ELEVATION 2 03-11-2026 View Document
54 RE-VALIDATED MINING PERMISSION 19-11-2026 View Document
55 PODIUM LEVEL_01 FLOOR AREA CALCULATION 03-11-2026 View Document
56 PODIUM LEVEL_02 FLOOR PLAN_ 03-11-2026 View Document
57 PODIUM LEVEL_03 AREA CALCULATION 03-11-2026 View Document
58 PODIUM PLAN 03-11-2026 View Document
59 ROOF LEVEL PLAN & AREA DIAGRAM 03-11-2026 View Document
60 CA CERTIFICATE FOR NO DEFAULT 03-11-2026 View Document
61 AKS SIZRA 03-11-2026 View Document
62 PAYMENT PLAN 03-11-2026 View Document
63 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 19-11-2026 View Document
64 BR- BANK OPERATION 19-11-2026 View Document
65 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 19-11-2026 View Document
66 LC-IV 19-11-2026 View Document
67 LOI_60.5 ACRES 19-11-2026 View Document
68 BANK UNDERTAKING 19-11-2026 View Document
69 RAMPRASTHA AND SGHPL JDA 2.303 ACRES 19-11-2026 View Document
70 APPROVED PHASING PLAN 19-11-2026 View Document
71 GPA_2.303ACRES RAMPRASTHA 19-11-2026 View Document
72 JAMABANDI_2.303 ACRES 19-11-2026 View Document
73 MUTATION 19-11-2026 View Document
74 TITLE SEARCH REPORT_TSR 19-11-2026 View Document
75 PERT CHART 19-11-2026 View Document
76 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 19-11-2026 View Document
77 AFFIDAVIT REGARDING 4(2)LD 19-11-2026 View Document
78 CONSTRUCTION WATER NOC 19-11-2026 View Document
79 ZONING PLAN 19-11-2026 View Document
80 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 19-11-2026 View Document
81 PROJECT REPORT 19-11-2026 View Document
82 BR-III 19-11-2026 View Document
83 NON ENCUMBRANCE CERTIFICATE 19-11-2026 View Document