HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1121-2022
Submission Date : 01-09-2022 02:14:22 PM
Applicant Type : Company
Project Type: ONGOING




SUPOSHAA REALCON PRIVATE LIMITED
12A FLOOR, TOWER 2 M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66 GURUGRAM, HARYANA
0124660000
9958552424 (Number Shared by Promoter in Public)
secretarial@smartworlddevelopers.com
http://suposhaarealcon.com
XXXX101L
U70105HR2016PTC092957
 
 


 
 


 
 


 
 


 
 







SMARTWORLD ORCHARD
SECTOR-61
WAZIRABAD ST
GURUGRAM
0124660000
9958552424 (Number Shared by Promoter in Public)
secretarial@smartworlddevelopers.com
AJAY BANSAL
0124660000
9958552424 (Number Shared by Promoter in Public)
secretarial@smartworlddevelopers.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151309128-10-20213046300ICICI BANK LTD.HRERA Gurugram
251309028-10-20211154000ICICI BANK LTD.HRERA Gurugram
35374029-08-2022277600KOTAK MAHINDRA BANK LTD.HRERA Gurugram
45374129-08-2022630400KOTAK MAHINDRA BANK LTD.HRERA Gurugram
55378315-09-2022171600KOTAK MAHINDRA BANK LTD.HRERA Gurugram
65378415-09-202249100KOTAK MAHINDRA BANK LTD.HRERA Gurugram
75202209190065119419-09-2022594522KOTAK MAHINDRA BANK (RTGS)HRERA Gurugram







23.29999 (Acre)
2.64
2.629
23.29999 (Acre)
68 of 2021 dated 16.09.2021 , 62 of 2022 dated 25.05.2022
No
Address     C-4, 1ST FLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     C-4, 1ST FLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     C-4, 1ST FLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     C-4, 1ST FLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     304, 3RD FLOOR, KANCHAN HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Address     12A FLOOR, TOWER 2 M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66 GURUGRAM GURGAON HR 122002 IN
Address     C-4, 1STFLOOR, MALVIYANAGAR, NEW DELHI-110017
Address     C-4, 1STFLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     305, 3RD FLOOR, KANCHAN HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Address     C-4, 1ST FLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     C-4, 1ST FLOOR, MALVIYA NAGAR, NEW DELHI-110017
Address     305, 3RD FLOOR, KANCHAN HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Annexure-B- ANNEXURE-B- BY THE TERMSAND CONDITIONS OFTHECOLLABORATION AGREEMET NO. 3346DATED 26-19-2020AND ADDENDUM TO THECOLLABORATION AGREEMENT4978 DATED27.07.2021
COLLABORATION AGREEMENT & GPAEXECUTED BEFORE GRANT OF LICENCEBY DTCP
Yes
ANNEXED IN FOLDER-A
No
Yes
Yes







98625.7 Lakhs
28712.83 Lakhs
3754.85 Lakhs
54701.9 Lakhs
11456.2 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS13.39126
3CONSTRUCTION OF ROADS4.73222
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.74752
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES2.33005
12ANY OTHER0
13AREA UNDER COMMERCIAL UNITS 0.93094
14VEGETABLE BOOTH0.007
15STP0.111
16TRANSFORMER0.001
17UNDER GROUND WATER TANK0.049
Total23.29999




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA Yes
WATER SUPPLYGMDA Yes
ELECTRICITYDHBVNL Yes
SEWAGE DISPOSALGMDA Yes
STORM WATER DRAINAGEGMDA Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1145.15AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM520.05AS PER PROJECT REPORT
3STORM WATER DRAINAGE235.67AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM420.58AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL392.67AS PER PROJECT REPORT
6STREET LIGHTING89.40AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS38.94AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15SECURITY5.65AS PER PROJECT REPORT
16STP OTHER THAN STRUCTURAL WORKS160.81AS PER PROJECT REPORT
17UNDERGROUND TANK OTHER THAN STRUCTURAL WORKS176.90AS PER PROJECT REPORT
18RAIN WATER HARVESTING112.83AS PER PROJECT REPORT
19ELECTRICAL SUB STATION OTHER THAN STRUCTURAL WORKS331.83AS PER PROJECT REPORT
20BOUNDARY WALL124.36AS PER PROJECT REPORT


25-05-2022 (date)
25-08-2022 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK , 3 BHK132392.35166462610380
2APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL TOWER4034.1910901091






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2 BHK , 3 BHK6260
COMMERCIAL00


01-11-2021
31-12-2024
31-12-2024
01-11-2021
10
31-12-2024


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-11-2021
0
31-12-2024


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments13673.74
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4188.975766.61
Shops00
Plots00

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5863.094666.975634.594327.64
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4147.224087.93
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements203.10
Water Supply System135.40
Sewerage treatment & garbage disposal169.25
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical Sub Station169.25

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements57.26114.52
Water Supply System78.01104.01
Sewerage treatment & garbage disposal39.2747.12
Electricity Supply System00
Storm Water Drainage35.3570.70
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Underground tank other than structural works8.85
Rain water harvesting16.92
STP32.16
Boundary Wall12.44
Underground Tank17.69
Rain Water Harvesting33.85
Electrical Sub Station99.55

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements222.09229.03171.77140.45
Water Supply System104.0178.0120.620
Sewerage treatment & garbage disposal78.5358.9000
Electricity Supply System21.0384.1242.0642.06
Storm Water Drainage35.3535.3558.920
Parks and Playgrounds9.739.739.739.73
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain Water Harvesting16.9216.9228.21
Street Light8.9444.7022.3513.41
STP032.1632.1632.16
Underground Tank35.3835.3853.0726.54
Electrical Sub Station0016.5916.59
Boundary Wall12.4449.7524.8724.87
Security2.832.83

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System126.17105.14
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Electrical Sub Station29.86
STP32.16












Particulars Remarks, if any
i. No. of Flats/Apartments constructed1773
ii. No. of Flats/ Apartments booked626
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter93143.96 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter36678.85 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter56465.11 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application37393.32 Lakhs
Land cost (If any)20482.65 Lakhs
Apartments13673.74 Lakhs
Infrastructure676.99 Lakhs
EDC/ Taxes Etc.2603.23 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession41760.87 Lakhs
(a) In respect of existing allottees41760.87 Lakhs
(b) In respect of rest of the project41760.87 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS1145.15203.10
II. WATER SUPPLY SYSTEM520.05135.40
III. STORM WATER DRAINAGE235.670
IV. ELECTRICITY SUPPLY SYSTEM841.80169.25
V. SEWAGE TREATMENT & GARBAGE DISPOSAL392.67169.25
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.38.940
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM5.650
XVII. OTHER FACILITIES AS PER PROJECT REPORT574.910









Yes
Yes
KOTAK MAHINDRA BANK, GROUND FLOOR, JMD REGENT SQUARE MG ROAD, GURGAON-122002
7745099986
KKBK0000261
110485003
000261
"1.Meenal Sood-C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015 2. Naman Gupta-704, Om Terrace, New City Light, China Gate, Surat, New Citylight, Surat, Surat City, Surat, Svr College, Gujarat, 395007 3.Gaurav Bansal-C-501, Lions Society, Opposite Tau Devi Lal Park, Sector 56, Gurgaon Sector 56, Gurgaon, Haryana - 122011 4. Rajat Jain-Villa no 44, Tulip Lvory, Gurgaon, Sector 70, Badshahpur, Gurgaon, Haryana-122101 5. Vivek Singhal-Flat No 7A, Tower 1, Fairway West, M3M Golf Estate, Sector 65, Badshahpur , Gurgaon, Haryana-122101 6. Anuj Kumar Goel- House No- C-25, Street No-1, Near Sunrise Public School, Bhajanpura, North East, Delhi- 110053"
Upload











Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENCE ALREADY BEEN OBTAINED16-09-2021
II. LICENCEALREADY BEEN OBTAINED25-05-2022
III. ZONING PLAN ALREADY BEEN OBTAINED25-05-2022
IV. ARAVALI NOCALREADY BEEN OBTAINED05-05-2022
V. FOREST NOCALREADY BEEN OBTAINED01-04-2022








Yes


Yes


AS PER HARERA NORMS













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE / LAMINATED WOODEN FLOORING / CERAMIC TILE
2WALL FINISHING DETAILSPLASTER WITH PAINT
3KITCHEN DETAILSGRANITE COUNTER WITH SS SINK
4BATHROOM FITTINGSAS PER APPROVED MAKE
5WOOD WORK ETCN.A.
6DOORS AND WINDOS FRAMESN.A. " HARDWOOD DOOR FRAME WITH LAMINATED FLUSH/WOODEN DOOR
7GLASS WORKN.A.
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSN.A.
11WATER STORAGEAS PER NORMS
12LIFT DETAILS4 TO 6 PASSENGER LIFTS AS PER NORMS
13EXTERNAL GLAZINGSALUMINUM GLAZING / UPVC GLAZING
13.1WINDOWS/GLAZINGSALUMINUM GLAZING / UPVC GLAZING
14DOORSN.A.
14.1MAIN DOORS" HARDWOOD DOOR FRAME WITH LAMINATED FLUSH DOOR"
14.2INTERNAL DOORSHARDWOOD DOOR FRAME WITH LAMINATED WOODEN DOOR
15AIR CONDITIONINGVRV HIGH WALL UNITS IN APARTMENT SPLIT UNITS IN BASEMENT
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINEAS PER APPROVED MAKE N.A.
18PROVISION OF WIFI AND BROADBAND FACILITYRIGHT OF WAY FOR INFRASTRUCTURE TO BE PROVISIONED
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL WEATHERPROOF PAINT
20INTERNAL FINISHINGN.A.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE / LAMINATED WOODEN FLOORING
1 . 2 WALLSPLASTIC PAINT / OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILE / LAMINATED WOODEN FLOORING
2 . 2 WALLSPLASTIC PAINT / OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESN.A.
3 . MASTER TOILET
3 . 1 FLOORMATT FINISH TILES
3 . 2 WALLSTILE DADO AND PAINT
3 . 3 CEILINGFALSE CEILING / OBD
3 . 4 COUNTERSWASHBASIN WITH COUNTER
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILE / LAMINATED WOODEN FLOORING " PLASTIC PAINT / OBD" OBD N.A. MATT FINISH TILES TILE DADO AND PAINT FALSE CEILING / OBD WASHBASIN WITH COUNTER AS PER APPROVED MAKE AS PER APPROVED MAKE VITRIFIED TILE
4 . 2 WALLSVITRIFIED TILE / LAMINATED WOODEN FLOORING " PLASTIC PAINT / OBD" OBD N.A. MATT FINISH TILES TILE DADO AND PAINT FALSE CEILING / OBD WASHBASIN WITH COUNTER AS PER APPROVED MAKE AS PER APPROVED MAKE VITRIFIED TILE
4 . 3 CEILINGOBD
4 . 4 WARDROBESN.A.
5 . TOILET
5 . 1 FLOORMATT FINISH TILES
5 . 2 WALLSTILE DADO AND PAINT
5 . 3 CEILINGFALSE CEILING / OBD
5 . 4 COUNTERSWASHBASIN WITH COUNTER
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE
6 . 2 WALLSCERAMIC TILE DADO ABOVE COUNTER AND PAINT
6 . 3 CEILINGFALSE CEILING / OBD
6 . 4 COUNTERSSTONE COUNTER WITH SS SINK
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A.
7 . 2 WALLS & CEILINGN.A.
7 . 3 TOILETN.A.
7 . 4 BALCONYN.A.
8 . SIT-OUTS
8 . 1 FLOORN.A.
8 . 2 WALLS & CEILINGN.A.
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND25-08-2022 View Document
2DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD25-08-2022 View Document
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN25-08-2022 View Document
4DEMARCATION PLAN25-08-2022 View Document
5ZONING PLAN25-08-2022 View Document
6IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN25-08-2022 View Document
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT25-08-2022 View Document
8DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.01-09-2022 View Document
9DOMESTIC WATER SUPPLY19-09-2022 ------
10ELECTRICAL LAYOUT19-09-2022 ------
11IRRIGATION WATER SUPPLY19-09-2022 ------
12LANDSCAPE PLAN19-09-2022 ------
13ROAD LAYOUT19-09-2022 ------
14SEWERAGE LAYOUT19-09-2022 ------
15STORM WATER LAYOUT19-09-2022 ------
16BUILDING PLAN-TYPE-A; 0119-09-2022 ------
17BUILDING PLAN-TYPE-A; 0219-09-2022 ------
18BUILDING PLAN-TYPE-A; 0319-09-2022 ------
19BUILDING PLAN-TYPE-A; 0419-09-2022 ------
20BUILDING PLAN-TYPE-A; 0519-09-2022 ------
21BUILDING PLAN-TYPE-A; 0619-09-2022 ------
22BUILDING PLAN-TYPE-A; 0719-09-2022 ------
23BUILDING PLAN-TYPE-A; 0819-09-2022 ------
24BUILDING PLAN-TYPE-B; 0119-09-2022 ------
25BUILDING PLAN-TYPE-B; 0219-09-2022 ------
26BUILDING PLAN-TYPE-B; 0319-09-2022 ------
27BUILDING PLAN-TYPE-B; 0419-09-2022 ------
28BUILDING PLAN-TYPE-C; 0119-09-2022 ------
29BUILDING PLAN-TYPE-C; 0219-09-2022 ------
30BUILDING PLAN-TYPE-D; 0119-09-2022 ------
31BUILDING PLAN-TYPE-D; 0219-09-2022 ------
32BUILDING PLAN-TYPE-D; 0319-09-2022 ------
33BUILDING PLAN-TYPE-D; 0419-09-2022 ------
34BUILDING PLAN-TYPE-D; 0519-09-2022 ------
35BUILDING PLAN-TYPE-D; 0619-09-2022 ------
36BUILDING PLAN-TYPE-D; 0719-09-2022 ------
37BUILDING PLAN-TYPE-D; 0819-09-2022 ------
38BUILDING PLAN-TYPE-E; 0119-09-2022 ------
39BUILDING PLAN-TYPE-E; 0219-09-2022 ------
40BUILDING PLAN-TYPE-E; 0319-09-2022 ------
41BUILDING PLAN-TYPE-E; 0419-09-2022 ------
42BUILDING PLAN-TYPE-F; 0119-09-2022 ------
43BUILDING PLAN-TYPE-F; 0219-09-2022 ------
44BUILDING PLAN-TYPE-F; 0419-09-2022 ------
45BUILDING PLAN-TYPE-F; 0319-09-2022 ------
46BUILDING PLAN-TYPE-P1; 0119-09-2022 ------
47BUILDING PLAN-TYPE-P2; 0119-09-2022 ------
48BUILDING PLAN-TYPE-P4; 0119-09-2022 ------
49BUILDING PLAN-TYPE-P5; 0119-09-2022 ------
50BUILDING PLAN-TYPE-P6; 0119-09-2022 ------
51BUILDING PLAN-TYPE-P7; 0119-09-2022 ------
52BUILDING PLAN-TYPE-P8; 0119-09-2022 ------
53BUILDING PLAN-TYPE-P9; 0119-09-2022 ------
541ST BASEMENT & GROUND FLOOR PLAN06-10-2022 ------
55BR-III SUPOSHAA REALCON COMMERCIAL-206-10-2022 ------
56FIRST FLOOR & SECOND FLOOR PLAN 06-10-2022 ------
57SECTION & ELEVATION 06-10-2022 ------
58SITE PLAN & AREA CALCULATION06-10-2022 ------
59THIRD FLOOR & TERRACE FLOOR PLAN06-10-2022 ------