HRERA GurugramTemp Project Id : RERA-GRG-PROJ-382-2019
Submission Date : 21-12-2019 01:02:02 AM
Applicant Type : Company
Project Type: ONGOING




ALMOND INFRABUILD PVT LTD
ATS TOWER, PLOT NO- 16, SECTOR 135, NOIDA-201305
01207111500
9643007884 (Number Shared by Promoter in Public)
compliances@atsgreens.com
http://www.atsgreens.com
XXXX986A
U45400DL2010PTC204100
 
 


 
 


 
 


 
 


 
 







ATS TOURMALINE
SECTOR 109, VILLAGE- BABUPUR, TEHSIL & DISTRICT GURUGRAM, STATE-HARYANA
GURGAON
GURUGRAM
01207111500
9910490800 (Number Shared by Promoter in Public)
compliances@atsgreens.com
ARUN THAKUR
01207111500
9910490800 (Number Shared by Promoter in Public)
arunthakur@atsgreens.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
123717914-07-20172214533KOTAK MAHINDRA BANKHRERA Gurugram







10.4187 (Acre)
175
174.91
20.169 (Acre)
250 of 2007(01-11-2019)
No
Address     A-11, KAILASH COLONY , NEW DELHI
Annexure-B- IN VIEW OF THE DEVELOPMENT AGREEMENT ENTERED BETWEEN/AMONG THE PARTIED THE DEVELOPER, WE HAVE A RIGHT TO DEVELOPED THE PROJECT LAND, AS PER THE TERMS OF THE DEVELOPMENT AGREEMENT. IN THAT CAPACITY THE DEVELOPER HAS A RIGHT TO REGISTER THE PROJECT, AS PER RERA. THE DEVELOPER ALSO HAVE THE GPA IN ITS FAVOUR AUTHORISING THE DEVELOPER TO ACT ON BEHALF OF LAND OWNERS.
YES-THE DEVELOPER WILL OBTAIN LICENSE AND ZONING PLAN FROM THE RELEVANT GOVERNMENT AUTHORITIES AND THE NAME OF THE DEVELOPER WILL BE REPLACED IN PLACE OF THE FORMER DEVELOPER I.E. RAJKARAN PVT. LTD. AND OTHERS IN COLLABORATION WITH CHINTELS INDIA LTD.
Yes
ATTACHED
No
Yes
Yes







84377.86 Lakhs
12870.00 Lakhs
30033 Lakhs
38313.5 Lakhs
3161.36 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.00
3CONSTRUCTION OF ROADS1.62
4PAVEMENTS0.49
5PARKS AND PLAYGROUNDS0.12
6GREEN BELTS5.52
7VEHICLE PARKINGS0.97
8ELECTRICITY SUB-STATION0.01
9CLUB HOUSE0.20
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0.11
12ANY OTHER0.32
13ANY0.05
Total10.41




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDAYes
WATER SUPPLYHUDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDAYes
STORM WATER DRAINAGEHUDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS279SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM475SUBMITTED TO HUDA
3STORM WATER DRAINAGE309SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM1861SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL186SUBMITTED TO HUDA
6STREET LIGHTING428SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING307SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS363SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE419SUBMITTED TO HUDA
10SHOPPING AREA0SUBMITTED TO HUDA
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO HUDA
12SCHOOL55SUBMITTED TO HUDA
13HOSPITAL/DISPENSARY0SUBMITTED TO HUDA
14ANY OTHER0SUBMITTED TO HUDA
15PARKING55SUBMITTED TO HUDA
16STP250SUBMITTED TO HUDA
17UNDERGROUND WATERTANK AND PUMP ROOM220SUBMITTED TO HUDA
18RAINWATER HARVESTING127SUBMITTED TO HUDA
19BOUNDARY WALL AND ENTRANCE AND EXIT GATE AND GUARD ROOM120SUBMITTED TO HUDA


26-07-2013 (date)
26-07-2013 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 1*(TYPE-A TOWER-1)227.72201
2APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 2*(TYPE-A TOWER-1)207.082201
3APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 3*(TYPE-A TOWER-1)194.53424021
4APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 4* (TYPE-A TOWER-1)304.812201
5APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 5*(TYPE-B TOWER-2)144.74484531
6APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 6*(TYPE-B TOWER-2)278.522111
7APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 7*(TYPE CD TOWER 3,4,5)201.596333
8APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 8*(TYPE CD TOWER 3,4,5)98.8415014733
9APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 9*(TYPE CD TOWER 3,4,5)125.14150129213
10APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 10*(TYPE CD TOWER 3,4,5)411.093303
11APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 11*(TYPE-CD TOWER 3,4,5)332.773303
12APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 12*(ROWHOUSE-TYPE-1)394.281011
13APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 13*(ROWHOUSE TYPE-2)405.427071
14APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 14*(EWS)16.35740741






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENT TYPE 1*(TYPE-A TOWER-1)2OC RECEIVED
APARTMENT TYPE 2*(TYPE-A TOWER-1)2OC RECEIVED
APARTMENT TYPE 3*(TYPE-A TOWER-1)40OC RECEIVED
APARTMENT TYPE 4* (TYPE-A TOWER-1)2OC RECEIVED
APARTMENT TYPE 5*(TYPE-B TOWER-2)45OC RECEIVED
APARTMENT TYPE 6*(TYPE-B TOWER-2)1OC RECEIVED
APARTMENT TYPE 7*(TYPE CD TOWER 3,4,5)3OC RECEIVED
APARTMENT TYPE 8*(TYPE CD TOWER 3,4,5)147OC RECEIVED
APARTMENT TYPE 9*(TYPE CD TOWER 3,4,5)129OC RECEIVED
APARTMENT TYPE 10*(TYPE CD TOWER 3,4,5)3OC RECEIVED
APARTMENT TYPE 11*(TYPE-CD TOWER 3,4,5)3OC RECEIVED


23-10-2013
22-10-2019
22-10-2019
20-05-2016
90
22-10-2019
OC RECEIVED
OC RECEIVED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
23-10-2013
0
22-10-2019


796
0
0
161
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments30033
Shops0
Plots0
EDC and IDC3161.36
Land Cost12870

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements279
Water Supply System475
Sewerage treatment & garbage disposal186
Electricity Supply System1861
Storm Water Drainage309
Parks and Playgrounds363
Clubhouse/community centres419
Shopping area0
Other0
Boundary Wall and Entrance and Exit Gates and Guard Room120
Finance and Marketing32860.24
Parking55
Rainwater Harvesting127
School55
Security and Fire Fighting307
STP250
Street Lighting428
Underground Water Tank and Pump Room220

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Particulars Remarks, if any
i. No. of Flats/Apartments constructed358OC Received
ii. No. of Flats/ Apartments booked377OC Received
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter59298.60 LakhsOC Received
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter49879.52 LakhsOC Received
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter9419.08 LakhsOC Received
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter9419.08 LakhsOC Received
vii. Amount invested in the project upto the date of application78957.71 LakhsOC Received
Land cost (If any)12870 LakhsOC Received
Apartments25438.84 LakhsOC Received
Infrastructure37487.51 LakhsOC Received
EDC/ Taxes Etc.3161.36 LakhsOC Received
viii. Balance cost to be incurred for completion of the project and delivery of possession5420.15 LakhsOC Received
(a) In respect of existing allottees4738.21 LakhsOC Received
(b) In respect of rest of the project681.94 LakhsOC Received
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
19000 LakhsOC Received
x. Total liabilities against the project up-to-date. (Annex details in folder C) 75154.83 LakhsOC Received



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS279274
II. WATER SUPPLY SYSTEM475451
III. STORM WATER DRAINAGE309293
IV. ELECTRICITY SUPPLY SYSTEM18611675
V. SEWAGE TREATMENT & GARBAGE DISPOSAL186171
VI. CLUB HOUSE/COMMUNITY CENTRE419364
VII. SCHOOL5550
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.363345
XIII. COVERED PARKING3231
XIV. OPEN PARKING2322
XV. GARAGES00
XVI. SECURITY SYSTEM3027
XVII. OTHER FACILITIES AS PER PROJECT REPORT14221064









Yes
Yes
HDFC BANK LTD. SECTOR 18 NOIDA
57500000104530
HDFC0000088
110240181
000088
Mr. Pritam Kumar Jha, Address: ATS Tower Plot No- 16, Sector 135, Noida, 201305
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
No
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. AAI ALREADY BEEN OBTAINED20-09-2012
II. HARYANA STATE POLLUTION BOARDALREADY BEEN OBTAINED18-02-2014
III. FIRE APPROVALALREADY BEEN OBTAINED13-12-2013
IV. ENVIRONMENT CLEARANCE ALREADY BEEN OBTAINED23-10-2013
V. FOREST DEPARTMENTALREADY BEEN OBTAINED22-02-2013
VI. BUILDING PLAN APPROVAL ALREADY BEEN OBTAINED26-07-2013
VII. APPROVAL OF SERVICE PLAN ESTIMATEALREADY BEEN OBTAINED28-02-2017
VIII. OCCUPATION CERTIFICATE (OC)ALREADY BEEN OBTAINED09-08-2019








Yes


Yes


OC Received and Ready to Move- GIST Attached













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES FLOORING IN LIVING, DINING & LOBBY; WOODEN/ VITRIFIED TILES FLOORING IN BEDROOMS; VITRIFIED TILES IN KITCHEN, UTILITY & SERVANT ROOM AND CERAMIC TILES IN TOILETS. BALCONIES WILL BE IN ANTI-SKID CERAMIC FLOORING
2WALL FINISHING DETAILSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS
3KITCHEN DETAILSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE, ELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, WASHING MACHINE & FRIDGE TO BE PROVIDED. KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
4BATHROOM FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN ENTRANCE DOORS – PLYWOOD FRAMES WITH POLISHED VENEER ON TOP. ALL INTERNAL DOORS-LAMINATED PLYWOOD FRAMES . WINDOW FRAMES AND WINDOW PANELS OF ALUMINIUM/ UPVC SECTIONS
7GLASS WORKNA
8ELECTRIC FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
9CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS
10CUPBOARD DETAILSMODULAR WARDROBES IN ALL BED ROOMS
11WATER STORAGEUNDERGROUND WATER TANK WITH PUMP HOUSE FOR SUPPLY OF WATER. DUAL PLUMBING PROVISION FOR ALL TOILETS
12LIFT DETAILSLIFTS TO BE PROVIDED FOR ACCESS TO ALL FLOORS FROM COMMON LOBBY
13EXTERNAL GLAZINGSREFER SR. NO. 13.1
13.1WINDOWS/GLAZINGSUPVC AND ALUMINIUM FIXED AND OPENABLE WINDOWS
14DOORSREFER SR. NO. 14.1 AND 14.2
14.1MAIN DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED; STAINLESS STEEL/ BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKES
14.2INTERNAL DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED
15AIR CONDITIONINGSPLIT UNITS IN LIVING ROOM, DINING, FAMILY ROOM & ALL BED ROOMS
16ELECTRICAL FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION FOR OPTICAL FIBRE NETWORK
19EXTERNAL FINISHING/COLOUR SCHEMEAPPROPRIATE FINISH OF TEXTURE PAINT OF EXTERIOR GRADE WATER PROOF PAINT
20INTERNAL FINISHINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS AND ON CEILINGS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES FLOORING
1 . 2 WALLSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
1 . 3 CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FLOORING
2 . 2 WALLSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
2 . 3 CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
2 . 4 MODULAR WARDROBESMODULAR WARDROBES
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES
3 . 2 WALLSGLAZED TILES AND OIL BOUND DISTEMPER OF APPROPRIATE COLOUR ABOVE IT UPTO CEILING
3 . 3 CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON CEILINGS
3 . 4 COUNTERSCOUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
3 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
3 . 6 FITTING/FIXTURESPREMIUM CHROME PLATED FITTINGS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES FLOORING
4 . 2 WALLSOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS
4 . 3 CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON CEILINGS
4 . 4 WARDROBESMODULAR WARDROBES
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSGLAZED TILES AND OIL BOUND DISTEMPER OF APPROPRIATE COLOUR ABOVE IT UPTO CEILING
5 . 3 CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
5 . 4 COUNTERSCOUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
5 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5 . 6 FIXTURESPREMIUM CHROME PLATED FITTINGS
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES IN KITCHEN
6 . 2 WALLS600MM HEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATE COLOUR & PAINT
6 . 3 CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON CEILINGS
6 . 4 COUNTERSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
6 . 5 FIXTURESELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
7 . 3 TOILETGLAZED TILES AND OIL BOUND DISTEMPER OF APPROPRIATE COLOUR ABOVE IT UPTO CEILING CERAMIC TILES FLOORING
7 . 4 BALCONYANTI-SKID CERAMIC FLOORING
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID CERAMIC FLOORING
8 . 2 WALLS & CEILINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR
8 . 3 RAILINGSM S RAILING
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT17-02-2020 View Document
2REGISTRATION FEE DEMAND DRAFT 17-02-2020 ------
3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND16-12-2019 View Document
4SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN16-12-2019 View Document
5DEMARCATION PLAN16-12-2019 View Document
6DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.16-12-2019 View Document
7IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN16-12-2019 View Document
8DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD16-12-2019 View Document
9A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS16-12-2019 View Document
10CASH FLOW STATEMENT OF THE PROPOSED PROJECT16-12-2019 View Document
11GIST OF THE IMPORTANT PROVISIONS OF THE AGREEMENT28-01-2021 ------
12IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN16-12-2019 View Document
13LOI 07-02-2020 ------
14FOREST NOC07-02-2020 ------
15ENCUMBRANCES DETAILS-ATS TOURMALINE_ALMOND INFRABUILD07-02-2020 ------
16FIRE SCHEME APPROVAL07-02-2020 ------
17LAYOUT PLAN, SITE PLAN07-02-2020 ------
18BOARD RESOLUTION07-02-2020 ------
19SERVICE PLAN ESTIMATE07-02-2020 ------
20ENVIRONMENT CLEARANCE APPROVAL07-02-2020 ------
21AIRPORT HEIGHT CLEARANCE07-02-2020 ------
22ZONING PLAN07-02-2020 View Document
23SERVICE PLAN APPROVAL LETTER07-02-2020 ------
24BUILDING PLAN APPROVAL LETTER (BR-III)07-02-2020 ------
25LC-IV07-02-2020 ------
26NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT07-02-2020 View Document