HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2322-2026
Submission Date : 10-10-2026 04:29:32 PM
Applicant Type : Company
Project Type: NEW




BASE BUILDWELL PRIVATE LIMITED
MAX HOUSE 1, DR. JHA MARG, OKHLA PHASE 3, OKHLA INDUSTRIAL ESTATE, OPPOSITE OKHLA RAILWAY STATION, NEW DELHI - 110020, INDIA
01204743222
9810411360 (Number Shared by Promoter in Public)
rera@maxestates.in
https://maxestates.in/
XXXX291C
U70100DL2012PTC236737
 
 


 
 


 
 


 
 


 
 







THE BUNGALOWS
VILLAGE BEHRAMPUR, SECTOR 59, GURGAON - 122098, HARYANA
WAZIRABAD ST
GURUGRAM
01204743222
9810411360 (Number Shared by Promoter in Public)
rera@maxestates.in
ROHIT MEHTA
01204743222
9810411360 (Number Shared by Promoter in Public)
rera@maxestates.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
159387008-10-20262000000ICICI BANK LIMITEDHRERA Gurugram







7.2563 (Acre)
2.99
2.99
7.2563 (Acre)
16 of 2008 Valid up to 30.01.2030 28 of 2008 Valid up to 16.02.2030
No
Address     305,3RD FLOOR,KANCHAN HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Address     305,3RD FLOOR,KANCHAN HOUSE, KARAMPURA COMMERCIAL COMPLEX, NEW DELHI-110015
Annexure-B- THE APPLICANT, BASE BUILDWELL PRIVATE LIMITED, IS APPLYING FOR REGISTRATION IN ITS CAPACITY AS THE BENEFICIARY INTEREST PERMISSION HOLDER AND TRANSFEREE LICENCE HOLDER FOR THE RELEVANT PORTIONS OF LICENCE NOS. 16 OF 2008 AND 28 OF 2008, AND PROMOTER OF THE PROJECT.
AFTER GRANT OF LICENCE. THE COLLABORATION CUM CONVEYANCE DEEDS WERE EXECUTED AND REGISTERED ON 04.09.2025, AFTER THE ORIGINAL LICENCES GRANTED IN 2008. SUBSEQUENTLY, PART OF THE LICENSED AREA MEASURING 6.025 ACRES UNDER LICENCE NO. 28 OF 2008 AND 1.23125 ACRES UNDER LICENCE NO. 16 OF 2008 WAS TRANSFERRED IN FAVOUR OF BASE BUILDWELL PRIVATE LIMITED ON 30.01.2026.
Yes
THE COLLABORATION CUM CONVEYANCE DEEDS BEARING REGISTRATION NOS. 11782 AND 11783 DATED 04.09.2025 PROVIDE FOR TRANSFER OF DEVELOPMENT RIGHTS IN FAVOUR OF BASE BUILDWELL PRIVATE LIMITED, AGAINST CONSIDERATION INCLUDING REVENUE SHARING, AS PER THE TERMS OF THE DEEDS.
No
Yes
Yes







177618.26 Lakhs
22018.00 Lakhs
64499.46 Lakhs
45440.42 Lakhs
45660.38 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0.0000
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.6776
3CONSTRUCTION OF ROADS 1.6299
4PAVEMENTS 0.0000
5PARKS AND PLAYGROUNDS 1.2748
6GREEN BELTS 0.0000
7VEHICLE PARKINGS 0.1303
8ELECTRICITY SUB-STATION 0.2024
9CLUB HOUSE 1.7999
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.0834
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0.0000
12ANY OTHER 1.2318
13UNDERGROUND 0.2262
Total7.2563




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNNo
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS3623.13AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM225.14AS PER PROJECT REPORT
3STORM WATER DRAINAGE106.32AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM1188.26AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL62.54AS PER PROJECT REPORT
6STREET LIGHTING62.54AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1188.26AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS716.77AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE15118.18AS PER PROJECT REPORT
10SHOPPING AREA0.00AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM62.54AS PER PROJECT REPORT
12SCHOOL0.00AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0.00AS PER PROJECT REPORT
14ANY OTHER0.00AS PER PROJECT REPORT
15COVERED PARKING20676.33YET TO BE PREPARED
16STP102.57YET TO BE PREPARED
17UNDERGROUND TANK187.62YET TO BE PREPARED
18RAINWATER HARVESTING125.08YET TO BE PREPARED
19ELECTRIC SUB STATION225.14YET TO BE PREPARED
20ELECTRIFICATION COST UPTO PROJECT SITE1770.00YET TO BE PREPARED


08-10-2026 (date)
08-10-2026 (date)
01-01-2027
30-05-2034
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings252.901542
Apartment/Shops/Other Buildings298.61702
Apartment/Shops/Other Buildings257.6572
Apartment/Shops/Other Buildings465.3642
Apartment/Shops/Other Buildings552.0522
Apartment/Shops/Other Buildings504.5542
Apartment/Shops/Other Buildings558.7011
Apartment/Shops/Other Buildings595.4111
Apartment/Shops/Other Buildings17.73131
Apartment/Shops/Other Buildings17.85381





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments318.53764.47764.47764.47
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments764.47764.47764.47764.47
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1019.291465.231337.821337.82
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1337.821337.821337.821337.82
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2443.064116.624533.274413.82
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4413.824270.484283.454283.79
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4232.613298.712848.452735.60
Shops0000
Plots0000

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2444.61
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rainwater Harvesting0000
Underground Tank0000
Street Lights0000
Security and Fire Fighting services0000
Renewable Energy Systems0000
Covered Parking0000
STP0000
Electrification cost upto project site0000
Electric Sub Station0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting services0000
Electrification cost upto project site0000
Street Lights0000
Electric Sub Station0000
Rainwater Harvesting0000
Underground Tank0000
STP0000
Covered Parking0000
Renewable Energy Systems0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP0000
Underground Tank0000
Rainwater Harvesting0000
Electric Sub Station0000
Electrification cost upto project site0000
Covered Parking0000
Renewable Energy Systems0000
Security and Fire Fighting services0000
Street Lights0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification cost upto project site0000
Electric Sub Station0000
Rainwater Harvesting0000
Underground Tank0000
STP0000
Covered Parking01536.301536.301536.30
Renewable Energy Systems0000
Security and Fire Fighting services0000
Street Lights0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rainwater Harvesting0000
Underground Tank0000
STP0000
Electric Sub Station0000
Electrification cost upto project site0000
Covered Parking1536.301536.301536.301536.30
Renewable Energy Systems0000
Security and Fire Fighting services0000
Street Lights0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System020.2620.2620.26
Sewerage treatment & garbage disposal05.635.635.63
Electricity Supply System0106.94106.94106.94
Storm Water Drainage09.579.579.57
Parks and Playgrounds0000
Clubhouse/community centres803.16672.11611.96611.96
Shopping area0000
Other0000
Underground Tank016.8916.8916.89
Rainwater Harvesting0000
Electric Sub Station020.2620.2620.26
Security and Fire Fighting services0106.94106.94106.94
Electrification cost upto project site0159.30159.30159.30
Street Lights05.635.635.63
Renewable Energy Systems05.635.635.63
Covered Parking1536.301604.381442.26634.72
STP0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00271.73706.51
Water Supply System20.2620.2620.2619.14
Sewerage treatment & garbage disposal5.635.635.635.32
Electricity Supply System106.94106.94106.94101.00
Storm Water Drainage9.579.579.579.04
Parks and Playgrounds0035.8435.84
Clubhouse/community centres611.96611.96756.33854.00
Shopping area0000
Other0000
Security and Fire Fighting services106.94106.94106.94101.00
Renewable Energy Systems5.635.635.635.32
Underground Tank16.8916.8916.8915.95
Rainwater Harvesting009.3824.39
Electric Sub Station20.2620.2620.2619.14
Electrification cost upto project site159.30159.30159.30150.45
Covered Parking634.72599.43589.38589.38
STP0000
Street Lights5.635.635.635.32

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements923.90923.90797.090
Water Supply System16.8916.8916.8916.89
Sewerage treatment & garbage disposal4.694.694.694.69
Electricity Supply System89.1289.1289.1289.12
Storm Water Drainage7.977.977.977.97
Parks and Playgrounds00215.03215.03
Clubhouse/community centres1443.222200.802176.741948.15
Shopping area0000
Other0000
Rainwater Harvesting31.9031.9027.520
Electrification cost upto project site132.75132.75132.75132.75
Street Lights4.694.694.694.69
Security and Fire Fighting services89.1289.1289.1289.12
Renewable Energy Systems4.694.694.694.69
Covered Parking589.38589.38589.38458.23
STP027.6925.6424.62
Underground Tank14.0714.0714.0714.07
Electric Sub Station16.8916.8916.8916.89

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System16.89
Sewerage treatment & garbage disposal4.69
Electricity Supply System89.12
Storm Water Drainage7.97
Parks and Playgrounds215.03
Clubhouse/community centres1815.85
Shopping area0
Other0
STP24.62
Street Lights4.69
Security and Fire Fighting services89.12
Renewable Energy Systems4.69
Electrification cost upto project site132.75
Electric Sub Station16.89
Rainwater Harvesting0
Underground Tank14.07
Covered Parking65.31












Yes
No
HDFC BANK LIMITED, S/N 4-8 D BLOCK COMMERCIAL SHOPPING COMPLEX, SOUTH CITY 2, GURGAON, HR - 122018
99959595959591
HDFC0001721
110240222
1721
Nitin Kumar, House No. 266 Near Mother Dairy Sector-5 Rajender Nagar Sahibabad Ghaziabad Uttar Pradesh PIN- 201005
Yes











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 16 OF 2008ALREADY BEEN OBTAINED17-02-2008
II. BUILDING PLAN APPROVAL (BR-III) ALREADY BEEN OBTAINED08-10-2026
III. WILDLIFE / ARAVALI CLEARANCE ALREADY BEEN OBTAINED10-06-2026
IV. TREATED WATER CONSENT ALREADY BEEN OBTAINED05-03-2026
V. CONSTRUCTION WATER NOC ALREADY BEEN OBTAINED18-08-2026
VI. LICENCE NO. 28 OF 2008ALREADY BEEN OBTAINED31-01-2008
VII. AIRPORT HEIGHT CLEARANCE ALREADY BEEN OBTAINED06-04-2026
VIII. EXTERNAL ROAD / ACCESS PERMISSION ALREADY BEEN OBTAINED31-08-2026
IX. WATER SUPPLY ASSURANCE ALREADY BEEN OBTAINED18-02-2026
X. SEWERAGE ASSURANCE ALREADY BEEN OBTAINED17-02-2026
XI. STORM WATER ASSURANCE ALREADY BEEN OBTAINED18-02-2026
XII. FOREST NOC ALREADY BEEN OBTAINED17-04-2026
XIII. ENVIRONMENT CLEARANCE APPLIED FOR BUT YET TO RECEIVE04-06-2026
XIV. ELECTRICAL LOAD ASSURANCE / CONNECTION APPLIED FOR BUT YET TO RECEIVE05-06-2026
XV. FIRE SCHEME APPROVAL YET TO FILE FOR APPROVALNA
XVI. SERVICE PLAN ESTIMATES APPROVAL YET TO FILE FOR APPROVALNA








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBARE SHELL APARTMENT
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESFIRE RATED DOOR FRAMES FOR MAIN DOOR. ALUMINIUM FRAMES FOR WINDOWS.
7GLASS WORKONLY EXTERNAL DOOR/WINDOW
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSAS PER STANDARD SPECIFICATION
10CUPBOARD DETAILSNA
11WATER STORAGEUNDERGROUND AND OVERHEAD WATER TANKS
12LIFT DETAILSLIFTS AS PER BUILDING PLAN
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMING
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMING
14DOORSNA
14.1MAIN DOORSWOODEN DOOR WITH FIRE RATING AS PER NORMS
14.2INTERNAL DOORSNA
15AIR CONDITIONINGPROVISION FOR VRV SYSTEM
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORRCC CONCRETE
1 . 2 WALLSCONCRETE/BLOCKWORK
1 . 3 CEILINGRCC CONCRETE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORRCC CONCRETE
4 . 2 WALLSCONCRETE/BLOCKWORK
4 . 3 CEILINGRCC CONCRETE
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORRCC CONCRETE
5 . 2 WALLSNA
5 . 3 CEILINGRCC CONCRETE
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORRCC CONCRETE
6 . 2 WALLSNA
6 . 3 CEILINGRCC CONCRETE
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORRCC CONCRETE
7 . 2 WALLS & CEILINGCONCRETE/BLOCKWORK
7 . 3 TOILETNA
7 . 4 BALCONYRCC CONCRETE
8 . SIT-OUTS
8 . 1 FLOORRCC CONCRETE
8 . 2 WALLS & CEILINGCONCRETE/BLOCKWORK
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 10-10-2026 View Document
2 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 10-10-2026 View Document
3 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 10-10-2026 View Document
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 10-10-2026 View Document
5 DEMARCATION PLAN 10-10-2026 View Document
6 ZONING PLAN 10-10-2026 View Document
7 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 10-10-2026 View Document
8 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 10-10-2026 View Document
9 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 10-10-2026 View Document
10 PHASING PLAN 10-10-2026 View Document
11 C-01A 1ST FLOOR PLAN - CLUB 10-10-2026 View Document
12 TA-01 GROUND FLOOR PLAN - TOWER A 10-10-2026 View Document
13 TB-10 30 - 32 & 34 - 40 TYPICAL FLOOR PLAN - TOWER B 10-10-2026 View Document
14 TD-01 TOILET DETAILS - TOWER A & B 10-10-2026 View Document
15 SC-02 (B) SECTION B - TOWER B 10-10-2026 View Document
16 LP-01 LAYOUT PLAN 10-10-2026 View Document
17 ST-01 (A) GREEN AREA CALCULATION 10-10-2026 View Document
18 ST-01 SITE PLAN 10-10-2026 View Document
19 TA-10 30 - 32 & 34 - 40 TYPICAL FLOOR PLAN - TOWER A 10-10-2026 View Document
20 TB-05 6TH - 10TH TYPICAL FLOOR PLAN - TOWER B 10-10-2026 View Document
21 TB-07 11 - 15 & 17 - 19 TYPICAL FLOOR PLAN - TOWER B 10-10-2026 View Document
22 EB-02 ELEVATION C&D - TOWER B 10-10-2026 View Document
23 BS-01(C) BASEMENT FLOOR PLAN - CLUB 10-10-2026 View Document
24 ST-02 SITE PLAN (SERVICES) 10-10-2026 View Document
25 C-01 GROUND FLOOR PLAN - CLUB 10-10-2026 View Document
26 C-01A GROUND FLOOR & GROUND COVERAGE - CLUB 10-10-2026 View Document
27 C-03 TERRACE FLOOR PLAN & MUMTY - CLUB 10-10-2026 View Document
28 C-04 TOILET DETAILS - CLUB 10-10-2026 View Document
29 EW-01 GROUND, 1ST, 2ND & TERRACE FLOOR PLAN - EWS 10-10-2026 View Document
30 EW-02 TOILET DETAILS - EWS 10-10-2026 View Document
31 TA-01A GROUND COVERAGE - TOWER A 10-10-2026 View Document
32 TA-02 1ST FLOOR PLAN - TOWER A 10-10-2026 View Document
33 TA-03 2ND FLOOR PLAN - TOWER A 10-10-2026 View Document
34 TA-06 16TH REFUGE FLOOR PLAN - TOWER A 10-10-2026 View Document
35 TB-11 33RD & 41ST REFUGE FLOOR PLAN - TOWER B 10-10-2026 View Document
36 SC-01 SECTION A - TOWER B 10-10-2026 View Document
37 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 10-10-2026 View Document
38 TA-04 TA-03 3RD - 5TH FLOOR PLAN - TOWER A 10-10-2026 View Document
39 TA-05 6TH - 10TH TYPICAL FLOOR PLAN - TOWER A 10-10-2026 View Document
40 TA-07 11 - 15 & 17 - 19 TYPICAL FLOOR PLAN - TOWER A 10-10-2026 View Document
41 TA-08 24TH REFUGE FLOOR PLAN - TOWER A 10-10-2026 View Document
42 TA-09 20 - 23 & 25 - 29 TYPICAL FLOOR PLAN - TOWER A 10-10-2026 View Document
43 TA-11 33RD REFUGE FLOOR PLAN - TOWER A 10-10-2026 View Document
44 TA-12 41ST LOWER PENTHOUSE (REFUGE) FLOOR PLAN - TOWER A 10-10-2026 View Document
45 TA-13 42ND UPPER PENTHOUSE FLOOR PLAN - TOWER A 10-10-2026 View Document
46 TA-14 TERRACE FLOOR PLAN - TOWER A 10-10-2026 View Document
47 TA-15 MRL FLOOR PLAN & ROOF PLAN - TOWER A 10-10-2026 View Document
48 TB-01A GROUND COVERAGE - TOWER B 10-10-2026 View Document
49 TB-15 MRL FLOOR PLAN & ROOF PLAN - TOWER B 10-10-2026 View Document
50 TB-01 GROUND FLOOR PLAN - TOWER B 10-10-2026 View Document
51 SE-01 SECTION A ELEVATION A, B & C - EWS 10-10-2026 View Document
52 TB-02 1ST FLOOR (LOWER TOWNHOUSE) PLAN - TOWER B 10-10-2026 View Document
53 TB-03 2ND FLOOR (UPPER TOWNHOUSE) PLAN - TOWER B 10-10-2026 View Document
54 TB-04 3RD - 5TH FLOOR PLAN - TOWER B 10-10-2026 View Document
55 TB-06 16TH REFUGE FLOOR PLAN - TOWER B 10-10-2026 View Document
56 BS-03A BASEMENT 3 FLOOR PLAN (SERVICES) 10-10-2026 View Document
57 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 10-10-2026 View Document
58 TB-08 24TH REFUGE FLOOR PLAN - TOWER B_9 10-10-2026 View Document
59 TB-09 20 - 23 & 25 - 29 TYPICAL FLOOR PLAN - TOWER B 10-10-2026 View Document
60 TB-12 42ND LOWER PENTHOUSE FLOOR PLAN - TOWER B 10-10-2026 View Document
61 SE-01(C) SECTION XX, YY & ELEVATION - CLUB 10-10-2026 View Document
62 BS-01 BASEMENT 1 FLOOR PLAN 10-10-2026 View Document
63 TB-13 42RD UPPER PENTHOUSE FLOOR PLAN - TOWER B 10-10-2026 View Document
64 TB-14 TERRACE FLOOR PLAN - TOWER B 10-10-2026 View Document
65 EA-01 ELEVATION A&B - TOWER A 10-10-2026 View Document
66 EA-02 ELEVATION C&D - TOWER A 10-10-2026 View Document
67 EB-01 ELEVATION A&B - TOWER B 10-10-2026 View Document
68 SE-02(C) ELEVATION B, C & D - CLUB 10-10-2026 View Document
69 SC-02 (A) SECTION B - TOWER A 10-10-2026 View Document
70 SLD-01 WATER SCHEMATIC DIAGRAM 10-10-2026 View Document
71 BS-01A BASEMENT 1 FLOOR PLAN - SERVICES 10-10-2026 View Document
72 BS-01A(C) BASEMENT 1 - CLUB 10-10-2026 View Document
73 BS-01B BASEMENT 1 AREA CALCULATION 10-10-2026 View Document
74 BS-02 BASEMENT 2 FLOOR PLAN 10-10-2026 View Document
75 BS-02A BASEMENT 2 FLOOR PLAN - SERVICES 10-10-2026 View Document
76 BS-02B BASEMENT 2 AREA CALCULATION 10-10-2026 View Document
77 BS-03 BASEMENT 3 FLOOR PLAN 10-10-2026 View Document
78 BS-03B BASEMENT 3 AREA CALCULATION 10-10-2026 View Document
79 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 10-10-2026 View Document
80 ENGINEER CERTIFICATE 10-10-2026 View Document
81 ARCHITECT CERTIFICATE 10-10-2026 View Document