HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2020-2025
Submission Date : 10-10-2025 02:35:55 PM
Applicant Type : Company
Project Type: NEW




ASHIANA AAROHAM PHASE 1
304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







ASHIANA AAROHAM PHASE 1
REVENUE ESTATE OF VILLAGE- HSIIDC PLOT NO GH-04 SECTOR 80 IMT MANESAR GURUGRAM HARYANA
MANESAR
GURUGRAM
0114265426
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
ASHIANA HOUSING LIMITED
0114265426
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
12101826-09-2025830700HDFC BANKHRERA Gurugram
22107030-10-20257939HDFC BANKHRERA Gurugram







4.66 (Acre)
1.87
186.481
10.80 (Acre)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed
Yes







27627.71 Lakhs
7310.53 Lakhs
11047.02 Lakhs
2134.69 Lakhs
7135.20 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1302.81
3CONSTRUCTION OF ROADS 3195
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 8335.00
6GREEN BELTS 2994.81
7VEHICLE PARKINGS 137.5
8ELECTRICITY SUB-STATION 191
9CLUB HOUSE 2064.92
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13COMMERCIAL 237.296
14GUARD 6
15HT 98.3
16ELECTRICITY 287.15
Total18849.786




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSIIDCYes
WATER SUPPLYHSIIDCYes
ELECTRICITYHSIIDCYes
SEWAGE DISPOSALHSIIDCYes
STORM WATER DRAINAGEHSIIDCYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS83.18SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM9.19SUBMITTED TO HUDA
3STORM WATER DRAINAGE24.86SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL12.92SUBMITTED TO HUDA
6STREET LIGHTING35.87SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING87.55SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS156.10SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE1393.72YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15UNDERGROUND WATER TANK55.78SUBMITTED TO HUDA
16STP84.07SUBMITTED TO HUDA
17RAINWATER HARVESTING SYESTEM19.96SUBMITTED TO HUDA
18ELECTRIC SUB STATION 139.51SUBMITTED TO HUDA
19PARKING32.25SUBMITTED TO HUDA


08-10-2025 (date)
08-10-2025 (date)
01-11-2025
31-07-2030
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings116.99432
Apartment/Shops/Other Buildings141.32452
Apartment/Shops/Other Buildings242.7321
Apartment/Shops/Other Buildings219.8011
Apartment/Shops/Other Buildings98.23432
Apartment/Shops/Other Buildings113.62452
Apartment/Shops/Other Buildings195.0221
Apartment/Shops/Other Buildings178.2511
Apartment/Shops/Other Buildings21.5981





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments552.35552.35552.35552.35
Shops0006.16
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments552.35552.35552.35552.35
Shops6.1612.328.218.21
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments773.29773.29773.29773.29
Shops4.115.1312.329.03
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments773.29773.29773.29662.82
Shops7.183.2800
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres278.74
Shopping area0
Other0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres139.3769.6969.6969.69
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0008.27
Sewerage treatment & garbage disposal03.886.462.58
Electricity Supply System0000
Storm Water Drainage00022.38
Parks and Playgrounds0000
Clubhouse/community centres69.6969.6969.6969.69
Shopping area0000
Other0000
STP0021.02
Electrical Sub Station014.5343.60
Rain Water Harvesting009.98
Underground Water Tank16.7322.3116.73
Street Lighting000
Security and fire fighting021.8943.77
Parking000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements24.9533.2724.950
Water Supply System0.92000
Sewerage treatment & garbage disposal0000
Electricity Supply System0001.48
Storm Water Drainage2.49000
Parks and Playgrounds018.7357.5657.76
Clubhouse/community centres69.6969.6969.6969.69
Shopping area0000
Other0000
STP21.0242.0300
Parking32.25000
Security and fire fighting17.514.3800
Street lighting0030.495.38
Underground water tank5.58000
Rainwater harvesting9.98000
Electrical sub station43.6030.3900

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0008.32
Water Supply System0000.92
Sewerage treatment & garbage disposal0001.29
Electricity Supply System1.484.4300.74
Storm Water Drainage0002.49
Parks and Playgrounds21.850015.61
Clubhouse/community centres69.6969.6969.69139.37
Shopping area0000
Other0000
Rainwater harvesting0002
Electrical sub station00013.21
Street lighting0003.59
Security and fire fighting0008.75
Parking0003.23
STP0008.41
Underground water tank0005.58

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
Yes
SHOP NO. 75 & 76, JMS CROSSWALK, SECTOR 93, GURUGRAM, HARYANA - 122005
008305019638
ICIC0005891
122229013
5891
Varun Gupta (Whole Time Director) N-5, Second Floor, Panchsheel Park, New Delhi.
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed











No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED13-11-2024
II. FOREST NOCALREADY BEEN OBTAINED04-04-2024
III. ARAVALI NOCALREADY BEEN OBTAINED24-04-2024
IV. PORTABLE WATER ASSURANCEALREADY BEEN OBTAINED18-03-2024
V. AIRPORT AUTHORITY OF INDIA NOCALREADY BEEN OBTAINED24-04-2024
VI. CONSTRUCTION WATER NOCALREADY BEEN OBTAINED21-03-2024








Yes


Yes


hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.







ASHIANA ANMOL PHASE-1
3.800
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11823.05011285.86
Cost of the apartments7465.3606183.79
Cost of the infrastructure1926.4402422.33
Others costs2431.2502679.74


23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
03-10-2020
03-10-2020




ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
216.280216.28
Cost of the apartments137.920137.92
Cost of the infrastructure26.26026.26
Others costs52.1052.1


180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019




ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14520.6102585.93
Cost of the apartments70870423.21
Cost of the infrastructure7087022.98
Others costs571501933.83


5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027




ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10876.2604319.42
Cost of the apartments4822.6501640.86
Cost of the infrastructure634.05099.21
Others costs5419.5702579.35


6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2026
30-04-2026




ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17555.5704535.57
Cost of the apartments7371.705.02
Cost of the infrastructure1006.430156.61
Others costs9177.4504373.94


2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING/DINING/LOBBY/KITCHEN:VIRTIFIED TILES;MASTER/OTHER BEDROOM:WOODEN VITRIFIED TEXTURE TILES;MASTER BATHROOM:COMBINATION OF VITRIFIED & WOODEN TEXTURE TILES;OTHER BATHROOM:CERAMIC TILES ON FLOOR
2WALL FINISHING DETAILSLIVING/DINING/LOBBY/BALCONY:ACRYLIC EMULSION OF PLEASING SHADE OF REPUTED BRAND;KITCHEN:HIGH CERAMIC TILES DADO;BATHROOM:CERAMIC TILES UPTO CEILING
3KITCHEN DETAILSPLATFORM IN QUARTZ/GRANITE STONE/VIRTIFIED TILE;STAINLESS STEEL,HOBBWOODEN CABINET,CHIMNEY,DISH WASHER &OVEN;
4BATHROOM FITTINGSWASH BASIN OF ROCA/JAQUAR;GLASS CURTAIN;MIRROR,TOWEL RACK 7 HEALTH FAUCET
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN DOOR:FOLDED STEEL SECTION/WOODEN FINISH;OTHERS: WOODEN FINISH DOOR
7GLASS WORKNA
8ELECTRIC FITTINGSELECTRICAL SWITCHES WITH SOCKETS & FAN REGULATORS
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSCEMENT SAND PLASTER WITH SPRAY TEXTURE/PAINT FINISH
13.1WINDOWS/GLAZINGSPOWER COATED/ANODIZED ALIMINIUM/UPVC WINDOWS WITH THICK PERFORMANCE GLASS
14DOORSMAIN DOOR:FOLDED STEEL SECTION/WOODEN FINISH;OTHERS: WOODEN FINISH DOOR
14.1MAIN DOORSFOLDED STEEL SECTION/WOODEN FINISH
14.2INTERNAL DOORSWOODEN FINISH DOOR
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSELECTRICAL SWITCHES WITH SOCKETS & FAN REGULATORS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT SAND PLASTER WITH SPRAY TEXTURE/PAINT FINISH
20INTERNAL FINISHINGGRANITE/MARBLE/QUARTZ STONE/VIRTIFIED/CERAMIC TILES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVIRTIFIED TILES
1 . 2 WALLSACRYLIC EMULSION OF PLEASING SHADE OF REPUTED BRAND
1 . 3 CEILINGSAND CEMENT MORTAR & COAT OF PLASTER OF PARIS/GYPSUM
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN TEXTURE VITRIFIED TILES
2 . 2 WALLSSAND CEMENT PLASTER & COAT OF POP OF EMULSION PAINT
2 . 3 CEILINGSAND CEMENT MORTAR & COAT OF PLASTER OF PARIS/GYPSUM
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC/WOODEN TEXTURE TILES
3 . 2 WALLSSAND CEMENT PLASTER & COAT OF POP OF EMULSION PAINT
3 . 3 CEILINGSAND CEMENT MORTAR & COAT OF PLASTER OF PARIS/GYPSUM
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESGLASS CURTAIN;COUNTER TOP WASHBASIN WITH VANITY;WALL & BASIN MIXER OF JAUAR/GROHE;MIRRIOE;TOWEL RACK
4 . BED ROOMS
4 . 1 FLOORVITRIFIED/WOODEN TILES
4 . 2 WALLSSAND CEMENT PLASTER & COAT OF POP OF EMULSION PAINT
4 . 3 CEILINGSAND CEMENT MORTAR & COAT OF PLASTER OF PARIS/GYPSUM
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES ON FLOOR/DADO
5 . 2 WALLSSAND CEMENT PLASTER & COAT OF POP OF EMULSION PAINT
5 . 3 CEILINGSAND CEMENT MORTAR & COAT OF PLASTER OF PARIS/GYPSUM
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESGLASS CURTAIN;MIRROR;TOWEL RACK; HEALTH FAUCET
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES WITH EPOXY GROUT
6 . 2 WALLSCERAMIC TILES DADO & ACRYLIC EMULSION OF A PLEASING SHADE OF A REPUTED BRAND
6 . 3 CEILINGSAND CEMENT MORTAR & COAT OF PLASTER OF PARIS/GYPSUM
6 . 4 COUNTERSNA
6 . 5 FIXTURESPLATFORM IN QUARTZ/GRANITE STONE/VITRIFIED TILE;STAINLESS STEEL SINK WITH DRAIN BOARD
6 . 6 KITCHEN APPLIANCESHOBB,CHIMNEY,DISH WASHER,OVEN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 09-09-2025 View Document
2 DEMARCATION PLAN 09-09-2025 View Document
3 HSIIDC RLA 07-10-2025 ------
4 SITE PLAN (SERVICE) 09-10-2025 ------
5 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 07-10-2025 View Document
6 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 07-10-2025 View Document
7 LAND SEARCH REPORT 07-10-2025 ------
8 CONVENIENT SHOPPING (PLANS, ELEVATIONS, SECTIONS & AREA CALCULATIONS) 09-10-2025 ------
9 SITE PLAN 09-10-2025 ------
10 BANK UNDERTAKING 07-10-2025 ------
11 20TH FLOOR PLAN & AREA DETAILS (REFUGE FLOOR) (TOWER-2,4 &5) 09-10-2025 ------
12 DD 07-10-2025 ------
13 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 07-10-2025 View Document
14 POSSESSION CERTIFICATE HSIIDC 07-10-2025 ------
15 CONVEYANCE DEED FROM HSIIDC 07-10-2025 ------
16 GROUND COVERAGE AREA DETAILS ( COMMUNITY BUILDING) 09-10-2025 ------
17 SECATION-A (TOWER-1&3) 09-10-2025 ------
18 HSIIDC LETTER FOR SEP 07-10-2025 ------
19 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 07-10-2025 View Document
20 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 07-10-2025 View Document
21 GROUND FLOOR AREA DETAILS (COMMUNITY BUILDING) 09-10-2025 ------
22 TERRACE PLAN (COMMUNITY BUILDING) 09-10-2025 ------
23 PLANS,SLEVATION,SECTION & AREA CALCULATIONS (NURSERY SCHOOL LEARNING CENTER 09-10-2025 ------
24 SECTION-1&2 (COMMUNITY BUILDING) 09-10-2025 ------
25 1ST FLOOR PLAN & AREA DETAILS (TOWER-2,4&5) 09-10-2025 ------
26 ELEVATION-1&2 TOWER-6) 09-10-2025 ------
27 20TH FLOOR PLAN& AREA DETAILS ( REFUGE FLOOR) (TOWER-1,3&6) 09-10-2025 ------
28 GROUND COVERAGE AREA DETAILS (TOWER-1,3&6) 09-10-2025 ------
29 TYP FLOOR PLAN& AREA DETAILS (TOWER-2,4&5) 09-10-2025 ------
30 ELEVATION 1&2 (TOWER-&3) 09-10-2025 ------
31 TERRACE PLAN & AREA DETAILS (TOWER-1,3&6) 09-10-2025 ------
32 TYPICAL FLOOR PLAN & AREA DETAILS (TOWER-1,3&6) 09-10-2025 ------
33 SITE & PODIUM SECTIONS 09-10-2025 ------
34 ELEVATION -3&4 (TOWER-2,4&5) 09-10-2025 ------
35 GROUND FLOOR PLAN & AREA DETAILS (TOWER-2,4&5) 09-10-2025 ------
36 PODIUM TERRACE PLAN 09-10-2025 ------
37 CLUBE ELEVATIONS (COMMUNITY BUILDING) 09-10-2025 ------
38 FIRST FLOOR PLAN & AREA DETAILS (COMMUNITY BUILDING) 09-10-2025 ------
39 GROUND FLOOR ( COMMUNITY BUILDING ) 09-10-2025 ------
40 LOWER GROUND FLOOR AND AREA DETAILS ( COMMUNITY BUILDING) 09-10-2025 ------
41 SECTION-A (TOWER-2,4 &5) 09-10-2025 ------
42 ELEVATION-1&2 (TOWER-2,4&5) 09-10-2025 ------
43 TERRACE,MUMTY MACHINE ROOM PLAN& AREA DETAILS (TOWER-2,4&5) 09-10-2025 ------
44 SECTION -A (TOWER-6) 09-10-2025 ------
45 ELEVATION-3&4 (TOWER-6) 09-10-2025 ------
46 ELEVATION-3&4 (TOWER-1&3) 09-10-2025 ------
47 1ST FLOOR PLAN & AREA DETAILS (TOWER-1,3&6) 09-10-2025 ------
48 GROUND FLOOR PLAN& AREA DETAILS (TOWER-3) 09-10-2025 ------
49 GROUND FLOOR PLAN & AREA DETAILS (TOWER-1&6) 09-10-2025 ------
50 PODIUM PLAN & AREA DETAILS 09-10-2025 ------
51 BASEMENT PLAN & AREA DETAILS 09-10-2025 ------
52 GREEN AREA DETAILS 09-10-2025 ------
53 ALLOTMENT LETTER 03-12-2025 ------
54 JAMABANDI COPY 03-12-2025 ------
55 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 03-12-2025 View Document
56 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 03-12-2025 View Document
57 BBA 03-12-2025 ------
58 LAND COST 03-12-2025 ------
59 REVISED ZONNING PLAN 03-12-2025 ------
60 BROCHURE DOCUMENT 03-12-2025 ------
61 AKS-SHAJRA 03-12-2025 ------
62 NON-ENCUMBRANCE CERTIFICATE 03-12-2025 ------
63 MUTATION COPY 03-12-2025 ------
64 SOURCE OF FUND 03-12-2025 ------
65 CA CERTIFICATE 05.11.2025 03-12-2025 ------
66 IFC ASHIANA DEBENTURE TRUST DEED NCD 03-12-2025 ------
67 FOREST NOC 03-12-2025 ------
68 APPLICATION FORM 03-12-2025 ------
69 APPLICATION FFS ASHIANA 80 03-12-2025 ------
70 PERT CHART 03-12-2025 ------
71 ZONING PLAN 03-12-2025 View Document
72 BALANCE SHEET- AHL STANDALONE SIGNED FINANCIALS FY 22-23 03-12-2025 ------
73 BALANCE SHEET- AHL STANDALONE 23-24 SIGNED 03-12-2025 ------
74 LAND COST & OTHER COST 03-12-2025 ------
75 APPROVAL-TEMPORARY SITE OFFICE 03-12-2025 ------
76 PROJECT REPORT 03-12-2025 ------
77 PAYMENT RECEIPT 03-12-2025 ------
78 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 03-12-2025 View Document
79 POWER LINE SHIFTING 03-12-2025 ------
80 ENVIRONMENT CLEARANCE 03-12-2025 ------
81 ROUTE & PROFILE SHIFTING HSIIDC SEC-80 66KV B.PUR-OLD MANESAR-MODEL 03-12-2025 ------
82 BIDDOCGHSITE-912 ACRE FINAL_0 (1) 03-12-2025 ------
83 BR-III 03-12-2025 ------
84 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 03-12-2025 View Document
85 NATURAL CONSERVATION ZONE NOC 03-12-2025 ------
86 NOC BY IFC FOR PHAS 1 OF ASHIANA AAROHAM_SIGNED 03-12-2025 ------
87 DD 1 03-12-2025 ------
88 CONVEYANCE DEED 03-12-2025 ------
89 EWS APPROVAL 03-12-2025 ------
90 ALLOTMENT LETTER AND ZONING LETTER 03-12-2025 ------
91 AGREEMENT BETWEEN AHL VS HSIIDC 03-12-2025 ------
92 CA CERTIFICATE FOR FINANCIAL INVENTORY DETAILS 07.11.2025 03-12-2025 ------
93 AAI NOC 03-12-2025 ------
94 MINING PERMISSION 03-12-2025 ------
95 TREE CUTTING PERMISSION AFFIDAVIT 03-12-2025 ------