HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1700-2024
Submission Date : 01-08-2024 04:10:39 PM
Applicant Type : Company
Project Type: NEW




JHS ESTATE PRIVATE LIMITED
SPAZE BUSINESS PARK,TOWER B, 3RD & 4TH FLOOR, SECTOR-66,GURUGRAM-122018,HARYANA
01246920555
9811566292 (Number Shared by Promoter in Public)
hello@trevocgroup.com
https://www.jhsestate.com/
XXXX527R
U68100DL2023PTC412322
 
 


 
 


 
 







TREVOC ROYAL RESIDENCES
SECTOR 56, URBAN ESTATE, GURGAON II, HARYANA
GURGAON
GURUGRAM
9911911138 (Number Shared by Promoter in Public)
royal.residences@trevocgroup.com
PRAHLAD DALAL
9911911138 (Number Shared by Promoter in Public)
prahlad.dalal@trevocgroup.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15202407260061892826-07-20241242931ICICI BANK HRERA Gurugram
25202407260060773926-07-2024343373ICICI BANK HRERA Gurugram
35202408220084175022-08-2024204415ICICI BANK HRERA Gurugram







2.059 (Acre)
4.12
4.12
2.059 (Acre)
Land allotted by HSVP through LOIEndst No.ZO002/EO018/UE029/LALOT/0000000385
Yes







58977.57 Lakhs
14919.23 Lakhs
25739.4 Lakhs
5490.67 Lakhs
12828.27 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3415.462
3CONSTRUCTION OF ROADS2338.29
4PAVEMENTS0
5PARKS AND PLAYGROUNDS808.959
6GREEN BELTS499.151
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION47.062
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER100.7673
13GUARDROOMANDBASEMENTANDSTAIRCASEMUMTY30.968
14COMMERCIAL1057.639
15RAINWATERHARVESTING36.00
Total8334.2983




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCONNECTED ROADTHROUGH HUDA (APPROVAL NOT REQUIRED)No
WATER SUPPLYHSVP (ASSURANCE GRANTED)Yes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVP (ASSURANCE GRANTED)Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS566.34AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM39.06AS PER PROJECT REPORT
3STORM WATER DRAINAGE31.25AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM1041.31AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0YET TO BE PREPARED
6STREET LIGHTING15AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING386.16AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS286.62AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM31.5AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER65.72AS PER PROJECT REPORT
15SEWERAGE SYSTEM23.43YET TO BE PREPARED
16STP55.50YET TO BE PREPARED
17UNDERGROUND WATER TANK141.39YET TO BE PREPARED
18RAIN WATER HARVESTING23.43YET TO BE PREPARED
19ELECTRICAL SUB STATION90YET TO BE PREPARED


29-07-2024 (date)
29-07-2024 (date)
08-08-2024
06-02-2030
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings128.6822
Apartment/Shops/Other Buildings171.11382
Apartment/Shops/Other Buildings146.5222
Apartment/Shops/Other Buildings338.6822
Apartment/Shops/Other Buildings128.68422





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
EDC734.86
Land cost14919.23
Other Cost1970.16

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0853.00
Shops00
Plots00
Other Cost440.14440.14

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1137.331421.671563.831706.00
Shops0000
Plots0000
Other Cost440.14440.14440.14440.14

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1848.171990.342274.672345.75
Shops0000
Plots0000
Other Cost440.14440.14440.14440.14

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2416.842559.001990.341563.83
Shops0000
Plots0000
IDW139.84223.74279.67335.61
Other Cost440.14440.14440.14440.14

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1305.58924.08853.00710.83
Shops0000
Plots0000
IDW419.51335.61279.67279.67
Other Cost440.14440.14440.14440.14

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments497.58142.17142.1771.08
Shops0000
Plots0000
Other Cost440.14440.14440.14440.14
IDW279.67223.74

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments71.08
Shops0
Plots0
Other Cost440.14




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2030)
Apr-JuneJuly-SepOct-DecJan-Mar












No
No
KOTAK MAHINDRA BANK, BADSHAPUR BRANCH, GURUGRAM
5849394150
KKBK0000298
110485057
000298
Mr Gurpal Chawla and Mr Sehaj Chawla(both R/o: K S Farm, Khasra No. 482/ 483,Opp Air Force Station, Rajokri, AF Rajokri, Vasant Vihar, Delhi - 110038











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. NO OBJECTION CERTIFICATE FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED26-02-2024
II. ASSURANCE FOR DRINKING WATER SUPPLY, SEWERCONNECTION AND STORM WATER CONNECTIONALREADY BEEN OBTAINED07-02-2024
III. NOC FOR USE OF TREATED WASTE WATER FORCONSTRUCTION ACTIVITIESALREADY BEEN OBTAINED13-02-2024
IV. GRANT OF PERMISSION FOR TRANSFER OF TDR CERTIFICATESALREADY BEEN OBTAINED09-04-2024
V. ASSURANCE CERTIFICATE OF DHBVN FOR POWER SUPPLYALREADY BEEN OBTAINED22-02-2024
VI. GREEN RATING FOR INTEGRATED HABITAT ASSESSMENTALREADY BEEN OBTAINED22-02-2024
VII. REQUEST FOR REDUCING OF MINIMUM SETBACKSALREADY BEEN OBTAINED20-02-2024
VIII. SITE CO-ORDINATES IN WGS 84 AND SITE ELEVATIONCERTIFICATEALREADY BEEN OBTAINED13-02-2024
IX. TREE CUTTING PERMISSIONALREADY BEEN OBTAINED05-02-2024
X. APPROVAL FOR NO ENCROACHMENT ON SITE, NOLITIGATION ON SITE, NO HT LINE PASSING OVER THE SITE,NO HARYANA CITY GAS DISTRIBUTION PIPELINE PASSINGOVER OR UNDER THE SITE, NO EFFECT OF PLPA ACT ONSITE, NO EFFECT OF ARAVALI NOTIFICATION, NO FORESTLAND ON SITE, NO EFFECT OF NATURAL CONSERVATIONZONE.ALREADY BEEN OBTAINED02-02-2024
XI. SITE PLANSALREADY BEEN OBTAINED29-07-2024
XII. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED29-07-2024
XIII. FIRE FIGHTING SCHEMEALREADY BEEN OBTAINED28-08-2024
XIV. MINING PERMISSIONALREADY BEEN OBTAINED20-08-2024








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN/ IMPORTED MARBLE/ VITRIFIED TILE/LAMINATE WOODEN FLOORING/ ANTISKIDVITRIFIED
2WALL FINISHING DETAILSPLASTER + DADO UP TO 7FT IN VITRIFIEDTILE(ONLY FOR TOILETS)
3KITCHEN DETAILSWALLS: PLASTER + DADO ABOVE COUNTERUP TO 2FT HIGH IN VITRIFIED TILE
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESHARDWOOD DOOR FRAME WITH FLUSHDOOR/LAMINATE OR SKIN DOOR PANELS
7GLASS WORKUPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
8ELECTRIC FITTINGSMODULAR SWITCHES AND SOCKETS
9CONDUCTING AND WIRING DETAILS1.5 SQMM - 4 SQMM FRLS COPPER WIRING
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSUPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
13.1WINDOWS/GLAZINGSUPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
14DOORSWOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
14.1MAIN DOORSWOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
14.2INTERNAL DOORSWOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
15AIR CONDITIONINGVRV / VRF
16ELECTRICAL FITTINGSPROVISION ONLY
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYTHROUGH FTTH SYSTEM
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE WEATHERSHIELD PAINT
20INTERNAL FINISHINGPUTTY WITH COMBINATION OF OBD AND ACRYLIC EMULSION, PLASTER NOT REQUIRED FOR RCC SURFACES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORITALIAN/IMPORTED MARBLE/VITRIFIED TILE
1 . 2 WALLSLOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES
1 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES AND PART FALSE CEILING AS PERDESIGN
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORITALIAN/IMPORTED MARBLE/VITRIFIED TILE
2 . 2 WALLSPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
2 . 3 CEILINGPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID VITRIFIED / CERAMIC TILES
3 . 2 WALLSPLASTER + DADO UP TO 7FT IN VITRIFIED TILE
3 . 3 CEILINGWATER RESISTANT
3 . 4 COUNTERSSTONE / ENGINEERED STONE
3 . 5 SANITARY WARE/CP FITTINGSEWC, WASH BASIN, SHOWER AND NECESSARY CP FITTINGS
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORLAMINATE WOODEN FLOORING/VITRIFIED TILES
4 . 2 WALLSPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
4 . 3 CEILINGPUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID VITRIFIED / CERAMIC TILES
5 . 2 WALLSPLASTER + DADO UP TO 7FT IN VITRIFIED TILE
5 . 3 CEILINGWATER RESISTANT
5 . 4 COUNTERSSTONE / ENGINEERED STONE
5 . 5 SANITARY WARE/CP FITTINGSEWC, WASH BASIN, SHOWER AND OTHER NECESSARY CP FITTINGS
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER + DADO ABOVE COUNTER UP TO 2FT HIGHIN VITRIFIED TILE
6 . 3 CEILINGLOW VOC ACRYLIC EMULSION PAINT/OBD
6 . 4 COUNTERSSTONE / ENGINEERED STONE
6 . 5 FIXTURESSS SINK AND CP FITTINGS
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED / CERAMIC TILES
7 . 2 WALLS & CEILINGPUTTY AND PAINT OBD
7 . 3 TOILETANTISKID CERAMIC TILE IN DADO AND FLOOR
7 . 4 BALCONYCERAMIC / VITRIFIED TILES
8 . SIT-OUTS
8 . 1 FLOORANTISKID VITRIFIED TILES
8 . 2 WALLS & CEILINGLOW VOC EXTERIOR GRADE WEATHER SHIELDPAINT
8 . 3 RAILINGSGLASS / MS / ALUMINIUM
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN01-08-2024 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN01-08-2024 View Document
3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.01-08-2024 View Document
4COPY OF LICENSE ALONG WITH SCHEDULE OF LAND01-08-2024 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN01-08-2024 View Document
6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT01-08-2024 View Document
7TOWER A AND B ELEVATION A04-09-2024 ------
8SITE PLAN WITH MEP04-09-2024 ------
9TOWER A - LOWER PENT HOUSE FLOOR PLAN AND AREA DIAGRAM04-09-2024 ------
10AFFIDAVIT FOR 4 2 L D04-09-2024 ------
11ENVIRONMENT CLEARANCE04-09-2024 ------
12BANK UNDERTAKING04-09-2024 ------
13DEMARCATION PLAN04-09-2024 View Document
14UNDERTAKING FREE FROM ENCUMBRANCE04-09-2024 ------
15CA CERTIFICATE-QUATERLY EXPENDITURE, QUATERLY CASHFLOW AND QUATERLY FUND FLOW04-09-2024 ------
164TH FLOOR COMMERCIAL AND AREA DIAGRAM04-09-2024 ------
17HSVP BUILDING PLAN APPROVAL04-09-2024 ------
18PODIUM 3 - 3RD FLOOR PLAN AND AREA DIAGRAM04-09-2024 ------
19SUPERIMPOSED PLAN04-09-2024 ------
20TOWER A AND B SECTION B04-09-2024 ------
21TERRACE AND ROOF PLAN04-09-2024 ------
22NOC FROM DEBENTURE TRUSTEE04-09-2024 ------
23LOI04-09-2024 ------
24AIRPORT HEIGHT CLEARANCE04-09-2024 ------
25MINING PERMISSION04-09-2024 ------
26NON APPLICABILITY OF POWER LINE SHIFTING04-09-2024 ------
27FOREST NOC04-09-2024 ------
28SALE DEED OF THE LAND04-09-2024 ------
29PODIUM 1 - 1ST FLOOR PLAN AND AREA DIAGRAM04-09-2024 ------
30TYPE A AND TYPE B UNIT PLAN04-09-2024 ------
31TYPE C AND TYPE D UNIT PLAN04-09-2024 ------
32TYPE E UNIT PLAN04-09-2024 ------
33TOWER A - UPPER PENT HOUSE FLOOR PLAN AND AREA DIAGRAM04-09-2024 ------
34TOWER A AND B SECTION C04-09-2024 ------
35SUPERIMPOSED PLAN04-09-2024 ------
36APPLICATION TO ISSUE CERTIFIED COPY OF REVISED ZONING PLAN04-09-2024 ------
37NON APPLICABILITY OF NCZ04-09-2024 ------
38FIRE FIGHTING04-09-2024 ------
39VARIOUS APPROVALS04-09-2024 ------
40GROUND FLOOR PLAN (LOBY AND COMMERCIAL) AND AREA DIAGRAM AND GROUND COVERAGE04-09-2024 ------
41TOWER A AND B SECTION A04-09-2024 ------
42TOWER A - SERVICE FLOOR04-09-2024 ------
43SITE PLAN WITH GREEN AREA CALCULATION04-09-2024 ------
44HSVP ALLOTMENT LETTER04-09-2024 ------
45POWER ASSURANCE LETTER04-09-2024 ------
46TOWER A - FLOOR PLAN 6TH - 14TH FLOOR04-09-2024 ------
47ASSURANCE OF DRINKING, SEWER AND STORM CONNECTION04-09-2024 ------
48TREE CUTTING PERMISSION04-09-2024 ------
495TH FLOOR PLAN04-09-2024 ------
50BASEMENT PLAN 01 - PLAN AND AREA DIAGRAM04-09-2024 ------
51BASEMENT PLAN 02 - PLAN AND AREA DIAGRAM04-09-2024 ------
52PODIUM 2 - 2ND FLOOR PLAN AND AREA DIAGRAM04-09-2024 ------
53TOWER A AND B ELEVATION B04-09-2024 ------
54TOWER A - FLOOR 15 AND 24 AND AREA DIAGRAM04-09-2024 ------