HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2307-2026
Submission Date : 26-08-2026 12:10:34 PM
Applicant Type : Company
Project Type: NEW




PARDOS CRAFT HOMES PVT. LTD.
RASHTRIYA SEVA SAMITHI, FIRST FLOOR, 1, DEEN DAYAL UPADHYAY MARG, MINTO ROAD
01140347658
9560014487 (Number Shared by Promoter in Public)
info@ctcgeo.in
https://pardosgroup.com
XXXX450A
U45208DL2022PTC399224
 
 


 
 


 
 


 
 


 
 


 
 


 
 







SAKURA
VILLAGE - HAYATPUR, SECTOR - 90, GURUGRAM
HARSARU ST
GURUGRAM
9871866912 (Number Shared by Promoter in Public)
info@ctcgeo.in
OM PRAKASH DABAR
9871866912 (Number Shared by Promoter in Public)
info@ctcgeo.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
199437713-07-2026880480.82KOTAK MAHINDRA BANKHRERA Gurugram







13.0786 (Acre)
under TOD 250%
3.63
14.53125 (Acre)
100 of 2023 dated 08-05-2023
Yes







180541.33 Lakhs
17364.67 Lakhs
95128.38 Lakhs
12610.48 Lakhs
55437.79 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 7324.88
3CONSTRUCTION OF ROADS 9474.94
4PAVEMENTS 6532.00
5PARKS AND PLAYGROUNDS 804.92
6GREEN BELTS 9238.14
7VEHICLE PARKINGS 1231.86
8ELECTRICITY SUB-STATION 1054.21
9CLUB HOUSE 2929.92
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 844.98
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 10656.54
13SCHOOLS 2832.80
Total52925.19




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA, HARYANAYes
WATER SUPPLYGMDA, HARYANAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDA, HARYANAYes
STORM WATER DRAINAGEGMDA, HARYANAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS2086.59AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM282.02AS PER PROJECT REPORT
3STORM WATER DRAINAGE24.77AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM587.46AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL892.63AS PER PROJECT REPORT
6STREET LIGHTING439.88AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS690.77AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE3875.88AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL2664.54AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER197.40AS PER PROJECT REPORT


14-05-2025 (date)
14-05-2025 (date)
01-07-2026
13-05-2034
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings102105.807619
Apartment/Shops/Other Buildings26759.41361





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments7955
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments01631.822107.07
Shops00.000.00
Plots00.000.00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1781.612034.632354.502643.56
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3441.213156.033236.273710.91
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4294.634272.173935.773921.87
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3999.023729.793398.133094.01
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2900.583444.033869.254120.41
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4170.183631.992828.661946.21
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1459.411074.35716.19268.97
Shops0.000.000.000.00
Plots0.000.000.000.00

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0.000.000.000.00
Shops0.000.000.000.00
Plots0.000.000.000.00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.000.00
Water Supply System0.000.00
Sewerage treatment & garbage disposal0.000.00
Electricity Supply System0.000.00
Storm Water Drainage0.000.00
Parks and Playgrounds0.000.00
Clubhouse/community centres0.000.00
Shopping area0.000.00
Other0.000.00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.000.000.000.00
Water Supply System0.000.000.000.00
Sewerage treatment & garbage disposal0.000.000.000.00
Electricity Supply System0.000.000.000.00
Storm Water Drainage0.000.000.000.00
Parks and Playgrounds0.000.000.000.00
Clubhouse/community centres0.000.000.000.00
Shopping area0.000.000.000.00
Other0.000.000.000.00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.000.000.000.00
Water Supply System0.000.000.000.00
Sewerage treatment & garbage disposal0.000.000.000.00
Electricity Supply System0.000.000.000.00
Storm Water Drainage0.000.000.000.00
Parks and Playgrounds0.000.000.000.00
Clubhouse/community centres0.000.000.000.00
Shopping area0.000.000.000.00
Other0.000.000.000.00

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.000.000.000.00
Water Supply System0.000.0022.5622.56
Sewerage treatment & garbage disposal0.00104.14106.1288.77
Electricity Supply System0.000.0047.0047.00
Storm Water Drainage0.000.001.981.98
Parks and Playgrounds0.000.0055.2655.26
Clubhouse/community centres0.000.000.00387.59
Shopping area0.000.000.000.00
Other0.0023.6923.6919.74
Street Lighting35.1935.19

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements187.79187.79187.79187.79
Water Supply System22.5622.560.000.00
Sewerage treatment & garbage disposal1.981.980.000.00
Electricity Supply System47.0047.000.000.00
Storm Water Drainage1.981.980.000.00
Parks and Playgrounds55.2655.260.000.00
Clubhouse/community centres775.18775.18775.18775.18
Shopping area0.000.000.000.00
Other0.000.000.000.00
Street Lighting35.1935.19

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.000.000.000.00
Water Supply System0.000.000.000.00
Sewerage treatment & garbage disposal0.000.00216.96216.96
Electricity Supply System0.000.000.000.00
Storm Water Drainage0.000.000.000.00
Parks and Playgrounds0.000.000.000.00
Clubhouse/community centres387.590.000.000.00
Shopping area0.000.000.000.00
Other0.000.0049.3549.35

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.000.00166.93166.93
Water Supply System22.5622.5645.1245.12
Sewerage treatment & garbage disposal140.841.983.963.96
Electricity Supply System47.0047.0093.9993.99
Storm Water Drainage1.981.983.963.96
Parks and Playgrounds55.2655.26110.52110.52
Clubhouse/community centres0.000.000.000.00
Shopping area0.000.000.000.00
Other31.580.000.000.00
Street Lighting35.1935.1970.3870.38
School266.45

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements187.79187.79187.79187.79
Water Supply System22.5622.5611.280.00
Sewerage treatment & garbage disposal1.981.980.990.00
Electricity Supply System47.0047.0023.500.00
Storm Water Drainage1.981.980.990.00
Parks and Playgrounds55.2655.2627.630.00
Clubhouse/community centres0.000.000.000.00
Shopping area0.000.000.000.00
Other0.000.000.000.00
School532.91532.91532.91399.68
Street Lighting35.1935.1917.60

ParticularsYear-2034
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements125.20125.200.000.00
Water Supply System0.000.000.000.00
Sewerage treatment & garbage disposal0.000.000.000.00
Electricity Supply System0.000.000.000.00
Storm Water Drainage0.000.000.000.00
Parks and Playgrounds0.000.000.000.00
Clubhouse/community centres0.000.000.000.00
Shopping area0.000.000.000.00
Other0.000.000.000.00
School266.45133.23












Yes
No
KOTAK MAHINDRA BANK, 14 GROUND FLOOR, AMBADEEP BUILDING, KG MARG, NEW DELHI-110001
2051776422
KKBK0000172
110485003
172
Jassa Singh Chawla, R/o 120 Sunder Nagar, Lodhi Road, New Delhi-110003 2. Sanjay Pandey, R/o A-306, Pearl Heights, Sec-9, Vaishali, Ghaziabad, UP-201010
Attached - Pardos Craft Homes Pvt Ltd Non-Default Certificate











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED08-05-2023
II. ZONING PLANALREADY BEEN OBTAINED09-05-2023
III. BUILDING PLAN APPROVALALREADY BEEN OBTAINED14-05-2025
IV. WATER SUPPLY ASSURANCEALREADY BEEN OBTAINED12-04-2024
V. ASSURANCE FOR SEWERAGE CONNECTIONALREADY BEEN OBTAINED12-04-2024
VI. ASSURANCE OF STORM WATERALREADY BEEN OBTAINED27-02-2026
VII. ELECTRICAL LOADALREADY BEEN OBTAINED21-03-2024








Yes


Yes


Yes - Gist of the important provisions of the Draft Agreement is attached.













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES IN LIVING/DRAWING/DINING ROOMS & BEDROOMS; ANTI-SKID CERAMIC TILES IN TOILETS & KITCHEN; LAMINATED WOODEN FLOORING OPTION IN MASTER BEDROOM; KOTA/GRANITE/ANTI-SKID TILES AT STAIRCASE; TRIMIX/VDF CONCRETE/PAVER BLOCKS AT PARKING. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
2WALL FINISHING DETAILSINTERNAL WALLS: ACRYLIC EMULSION PAINT; EXTERNAL WALLS: WEATHER-RESISTANT ACRYLIC EMULSION; VITRIFIED/CERAMIC WALL TILES UP TO FALSE-CEILING HEIGHT IN BATHROOMS AND UP TO 2.1 M WITH 600 MM DADO ABOVE COUNTER IN KITCHEN. MAKE: ASIAN / ICI / BERGER; TILES KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
3KITCHEN DETAILSANTI-SKID CERAMIC FLOOR TILES; CERAMIC/VITRIFIED WALL TILES UP TO 2.1 M WITH 600 MM DADO ABOVE COUNTER; GRANITE/QUARTZ COUNTER WITH SS SINK; CHIMNEY & EXHAUST-FAN PROVISION. MAKE: TILES KAJARIA/SOMANY/ORIENT; SINK NEELKANT; TAPS HINDWARE/PARRYWARE/JAQUAR OR EQUIVALENT.
4BATHROOM FITTINGSCP FITTINGS & SANITARY WARE OF STANDARD APPROVED MAKE — WESTERN WC, WASH BASIN, CP TAPS, MIRROR & TOWEL ROD. MAKE: HINDWARE / PARRYWARE / DURAVIT / JAQUAR OR EQUIVALENT.
5WOOD WORK ETCSOLID-CORE DOORS OF APPROPRIATE FINISH; ENGINEERED WOOD/HARDWOOD FRAMES; PROVISION FOR WARDROBES. MAKE: ORION / MARINO OR EQUIVALENT.
6DOORS AND WINDOS FRAMESENTRANCE: 1-HR FIRE-RATED SOLID-CORE DOOR (MARINO); INTERNAL/KITCHEN/TOILET: SOLID-CORE DOORS (ORION); FRAMES OF ENGINEERED WOOD/HARDWOOD/METAL; WINDOWS & VENTILATORS UPVC/ALUMINIUM FRAME WITH CLEAR TOUGHENED / OBSCURE GLASS. MAKE: ORION/MARINO; WINDOWS INDIAN MAKE.
7GLASS WORKWINDOW SHUTTERS IN CLEAR TOUGHENED GLASS; TOILET VENTILATORS IN OBSCURE/FROSTED TOUGHENED GLASS, OF APPROPRIATE THICKNESS. MAKE: ISI MAKE.
8ELECTRIC FITTINGSMODULAR SWITCHES, SOCKETS & SWITCH BOARDS; MCB/DB; LED LIGHT FITTINGS; CEILING-FAN & EXHAUST-FAN POINTS. MAKE: SWITCHES/SOCKETS LEGRAND/SCHNEIDER/MK; MCB LEGRAND/SCHNEIDER/HAGER/HAVELLS OR EQUIVALENT.
9CONDUCTING AND WIRING DETAILSCONCEALED COPPER WIRING (FR/FRLS) IN CONCEALED PVC CONDUITS WITH MS/PVC BOXES. MAKE: CONDUITS POLYPACK/BEC/BECON/AKG/RMCON; WIRES HAVELLS/KEI/POLYCAB/RR KABEL/GRANDLAY OR EQUIVALENT.
10CUPBOARD DETAILSPROVISION FOR WARDROBES; MODULAR WARDROBES IN BEDROOMS AS APPLICABLE.
11WATER STORAGEUNDERGROUND & OVERHEAD WATER TANKS INCLUDING EMERGENCY AND RAINWATER STORAGE.
12LIFT DETAILSTRACTION LIFTS OF APPROVED MAKE, CAPACITY AS PER NBC NORMS; NUMBER OF LIFTS AS PER FLATS PER FLOOR.
13EXTERNAL GLAZINGSUPVC FRAME WITH GLASS PANEL.
13.1WINDOWS/GLAZINGSUPVC / ALUMINIUM FRAME WITH CLEAR TOUGHENED GLASS PANEL. MAKE: INDIAN MAKE.
14DOORSSOLID CORE DOOR - FIRE RATED DOORS WHERE APPLICABLE AS PER NORMS.
14.1MAIN DOORS1-HR FIRE-RATED SOLID-CORE ENTRANCE DOOR OF APPROPRIATE FINISH. MAKE: MARINO OR EQUIVALENT.
14.2INTERNAL DOORSSOLID-CORE DOORS OF APPROPRIATE FINISH. MAKE: ORION OR EQUIVALENT.
15AIR CONDITIONINGVRV/VRF AIR-CONDITIONING UNITS PROVIDED; POWER SOCKETS FOR AC AS PROVISION. MAKE: VRV/VRF — DAIKIN OR EQUIVALENT.
16ELECTRICAL FITTINGSCONCEALED COPPER WIRING IN PVC CONDUITS WITH MODULAR SWITCHES & ACCESSORIES; FIRE-PROOF FITTINGS OF APPROVED BRAND. MAKE: AS PER IS/BIS; LEGRAND/SCHNEIDER/MK OR EQUIVALENT.
17CNG PIPE LINEPNG / CNG PIPELINE PROVISION AS PER FIRE-SAFETY NORMS AND STATUTORY REQUIREMENTS.
18PROVISION OF WIFI AND BROADBAND FACILITYFIBER-OPTIC INTERNET / WIFI PROVISION AS PER SERVICE PROVIDER; TELEPHONE, INTERCOM & TELEVISION POINTS WIFI ENABLED.
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER-RESISTANT ACRYLIC EMULSION PAINT OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
20INTERNAL FINISHINGACRYLIC EMULSION PAINT OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES OF APPROVED MAKE. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
1 . 2 WALLSACRYLIC EMULSION PAINT OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
1 . 3 CEILINGOIL-BOUND DISTEMPER / ACRYLIC EMULSION OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES / LAMINATED WOODEN FLOORING OF APPROVED MAKE. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
2 . 2 WALLSACRYLIC EMULSION PAINT OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
2 . 3 CEILINGMOISTURE-RESISTANT PAINT / FALSE CEILING. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
2 . 4 MODULAR WARDROBESPROVISION FOR MODULAR WARDROBES.
3 . MASTER TOILET
3 . 1 FLOORANTI-SKID CERAMIC TILES. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
3 . 2 WALLSVITRIFIED / CERAMIC TILES UP TO FALSE-CEILING HEIGHT. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
3 . 3 CEILINGMOISTURE-RESISTANT PAINT / FALSE CEILING. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
3 . 4 COUNTERSGRANITE / STONE COUNTER WITH CHINAWARE WASH BASIN (AS APPLICABLE).
3 . 5 SANITARY WARE/CP FITTINGSCP & SANITARY FITTINGS OF STANDARD APPROVED MAKE; CP TAPS; CHINAWARE WASH BASIN. MAKE: HINDWARE / PARRYWARE / DURAVIT / JAQUAR OR EQUIVALENT.
3 . 6 FITTING/FIXTURESMIRROR & TOWEL ROD OF STANDARD APPROVED MAKE.
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES OF APPROVED MAKE. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
4 . 2 WALLSACRYLIC EMULSION PAINT OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
4 . 3 CEILINGOIL-BOUND DISTEMPER / ACRYLIC EMULSION OVER SUITABLE BASE. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
4 . 4 WARDROBESPROVISION FOR WARDROBES.
5 . TOILET
5 . 1 FLOORANTI-SKID CERAMIC TILES. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
5 . 2 WALLSVITRIFIED / CERAMIC TILES UP TO FALSE-CEILING HEIGHT. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
5 . 3 CEILINGMOISTURE-RESISTANT PAINT / FALSE CEILING. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
5 . 4 COUNTERSCOUNTER WITH WASH BASIN OF STANDARD APPROVED MAKE.
5 . 5 SANITARY WARE/CP FITTINGSCP & SANITARY FITTINGS OF STANDARD APPROVED MAKE; WASH BASIN; CP TAPS. MAKE: HINDWARE / PARRYWARE / JAQUAR OR EQUIVALENT.
5 . 6 FIXTURESMIRROR & TOWEL ROD OF STANDARD APPROVED MAKE.
6 . KITCHEN
6 . 1 FLOORANTI-SKID CERAMIC TILES. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
6 . 2 WALLSVITRIFIED / CERAMIC TILES UP TO 2.1 M HT WITH 600 MM DADO ABOVE COUNTER. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
6 . 3 CEILINGMOISTURE-RESISTANT PAINT / FALSE CEILING.
6 . 4 COUNTERSGRANITE / QUARTZ COUNTER WITH SS SINK. SINK: NEELKANT OR EQUIVALENT.
6 . 5 FIXTURESCHIMNEY & EXHAUST-FAN PROVISION; CP TAPS. TAPS: HINDWARE / PARRYWARE / JAQUAR OR EQUIVALENT.
6 . 6 KITCHEN APPLIANCESPROVISION (POWER SOCKETS) FOR CHIMNEY, REFRIGERATOR & EXHAUST FAN.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI-SKID CERAMIC / VITRIFIED TILES OF APPROVED MAKE. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
7 . 2 WALLS & CEILINGWEATHER-RESISTANT / MOISTURE-RESISTANT PAINT OF APPROVED FINISH. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
7 . 3 TOILETCP & SANITARY FITTINGS; WASH BASIN; SS SINK; WASHING-MACHINE PROVISION. MAKE: HINDWARE / PARRYWARE / NEELKANT OR EQUIVALENT.
7 . 4 BALCONYANTI-SKID TILES WITH APPROPRIATE SLOPE; MS/SS/GLASS RAILING. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID TILES WITH APPROPRIATE SLOPE. MAKE: KAJARIA / SOMANY / ORIENT OR EQUIVALENT.
8 . 2 WALLS & CEILINGEXTERIOR-GRADE WEATHERPROOF PAINT. MAKE: ASIAN / ICI / BERGER OR EQUIVALENT.
8 . 3 RAILINGSMS / SS / GLASS RAILING WITH UPVC / ALUMINIUM DOOR & GLASS. MAKE: INDIAN MAKE.
8 . 4 FIXTURESLIGHT-POINT & POWER-SOCKET PROVISION.












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 31-07-2026 View Document
2 DEMARCATION PLAN 31-07-2026 View Document
3 ZONING PLAN 31-07-2026 View Document
4 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 31-07-2026 View Document
5 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 31-07-2026 View Document
6 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 31-07-2026 View Document
7 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 31-07-2026 View Document
8 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 31-07-2026 View Document
9 POWER ASSURANCE 25-08-2026 View Document
10 SEWERAGE CONNECTION ASSURANCE 25-08-2026 View Document
11 STORM WATER CONNECTION ASSURANCE 25-08-2026 View Document
12 WATER SUPPLY ASSURANCE 25-08-2026 View Document
13 NOC FROM FOREST DEPARTMENT 25-08-2026 View Document
14 ENVIRONMENT CLEARANCE 25-08-2026 View Document
15 NOC FROM AIRPORTS AUTHORITY OF INDIA 25-08-2026 View Document
16 MINIG APPROVAL 25-08-2026 View Document
17 JAMABANDI 25-08-2026 View Document
18 CONTRUCTION SCHEDULE - GANTT CHART 25-08-2026 View Document
19 CONSENT TO ESTABLISH 25-08-2026 View Document
20 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 25-08-2026 View Document
21 NON ENCUMBRANCE CERTIFICATE 25-08-2026 View Document
22 TITLE SEARCH REPORT 25-08-2026 View Document
23 MUTATION 26-08-2026 View Document
24 SECTION-XX (TOWER-5) 26-08-2026 View Document
25 ELEVATION-01 & 02 (EWS) 26-08-2026 View Document
26 ELEVATION-01 & 02 (TOWER-4) 26-08-2026 View Document
27 ELEVATION-01 & 02 NARSURY SCHOOL 26-08-2026 View Document
28 SECTION-XX (TOWER-8) 26-08-2026 View Document
29 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-7) 26-08-2026 View Document
30 ELEVATION-03 & 04 (TOWER-6) 26-08-2026 View Document
31 ELEVATION-03 & 04 (TOWER-7) 26-08-2026 View Document
32 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-6) 26-08-2026 View Document
33 TYPICAL (1ST TO 17TH & 19TH TO 22ND) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 22ND) FLOOR AREA CALCULATION (TOWER-1) 26-08-2026 View Document
34 TYPICAL (1ST TO 17TH & 19TH TO 23RD) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 23RD) AREA CALCULATION (TOWER-7) 26-08-2026 View Document
35 SECTION-YY (TOWER-2) 26-08-2026 View Document
36 ELEVATION-01 & 02 (TOWER-2) 26-08-2026 View Document
37 UNIT CARPET AREA CALCULATION (TOWER-9) 26-08-2026 View Document
38 TYPICAL (1ST TO 17TH & 19TH TO 22ND) FLOOR PLAN & TYPICAL UNIT CARPET AREA CALCULATION (TOWER-2) 26-08-2026 View Document
39 SECTION-AA & BB (CLUB) 26-08-2026 View Document
40 BASEMENT-1 26-08-2026 View Document
41 2ND & TERRACE FLOOR PLAN CLUB 26-08-2026 View Document
42 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-5) 26-08-2026 View Document
43 MUTATION 26-08-2026 View Document
44 BASEMENT-2 (BS-03) 26-08-2026 View Document
45 BASEMENT-2 (BS-04) 26-08-2026 View Document
46 GREEN AREA CALCULATION 26-08-2026 View Document
47 SITE PLAN (GREEN DIMENSION) 26-08-2026 View Document
48 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-1) 26-08-2026 View Document
49 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-2) 26-08-2026 View Document
50 AREA CALCULATION OF BASEMENT-2 26-08-2026 View Document
51 ELEVATION-01 & 02 (TOWER-5) 26-08-2026 View Document
52 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-1) 26-08-2026 View Document
53 TYPICAL (1ST TO 17TH & 19TH TO 23RD) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 23RD) AREA CALCULATION (TOWER-9) 26-08-2026 View Document
54 SECTION-3 & 4 (EWS) 26-08-2026 View Document
55 SECTION-AA & BB NARSURY SCHOOL 26-08-2026 View Document
56 SECTION-YY (TOWER-6) 26-08-2026 View Document
57 NURSURY SCHOOL WATER SUPPLY SCHEMATIC DIAGRAM 26-08-2026 View Document
58 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-3) 26-08-2026 View Document
59 1ST & 2ND AREA CALCULATION 26-08-2026 View Document
60 3RD & 4TH AREA CALCULATION 26-08-2026 View Document
61 5TH & 6TH AREA CALCULATION 26-08-2026 View Document
62 7TH & 8TH AREA CALCULATION 26-08-2026 View Document
63 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-5) 26-08-2026 View Document
64 AREA CALCULATION OF GROUND FLOOR TO 4TH FLOOR & MUMTY-MACHINE ROOM (PRIMARY SCHOOL) 26-08-2026 View Document
65 TYPICAL (1ST TO 17TH & 19TH TO 22ND) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 22ND) AREA CALCULATION & UNIT CARPET AREA (TOWER-3) 26-08-2026 View Document
66 SECTION-AA & BB (EWS) 26-08-2026 View Document
67 CLUB WATER SUPPLY SCHEMATIC DIAGRAM 26-08-2026 View Document
68 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-6) 26-08-2026 View Document
69 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-8) 26-08-2026 View Document
70 18TH FLOOR REFUGE, TERRACE & WATER TANK LEVEL FLOOR PLAN & 18TH REFUGE & MUMTY AREA (TOWER-9) 26-08-2026 View Document
71 AREA CALCULATION OF 1ST FLOOR & 2ND FLOOR, MUMTY AREA 26-08-2026 View Document
72 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-9) 26-08-2026 View Document
73 SECTION-YY (TOWER-5) 26-08-2026 View Document
74 WATER SUPPLY SCHEMATIC DIAGRAM TOWER-2 & 5 26-08-2026 View Document
75 AREA CALCULATION OF BASEMENT-1 26-08-2026 View Document
76 AREA CALCULATION OF GROUND & GROUND COVERAGE CLUB 26-08-2026 View Document
77 UNIT CARPET AREA CALCULATION (TOWER-4) 26-08-2026 View Document
78 ELEVATION-01 & 02 (TOWER-1) 26-08-2026 View Document
79 ELEVATION-01 & 02 (TOWER-3) 26-08-2026 View Document
80 ELEVATION-01 & 02 (TOWER-6) 26-08-2026 View Document
81 ELEVATION-01 & 02 (TOWER-8) 26-08-2026 View Document
82 ELEVATION-03 & 04 (TOWER-5) 26-08-2026 View Document
83 SECTION-XX (TOWER-6) 26-08-2026 View Document
84 SECTION-YY (TOWER-1) 26-08-2026 View Document
85 ELEVATION-01 & 02 (TOWER-7) 26-08-2026 View Document
86 ELEVATION-01 & 02 (TOWER-9) 26-08-2026 View Document
87 ELEVATION-1, 2, 3 & 4 (CLUB) 26-08-2026 View Document
88 ELEVATION-03 & 04 (TOWER-1) 26-08-2026 View Document
89 ELEVATION-03 & 04 (TOWER-2) 26-08-2026 View Document
90 ELEVATION-03 & 04 (TOWER-3) 26-08-2026 View Document
91 ELEVATION-03 & 04 (TOWER-4) 26-08-2026 View Document
92 ELEVATION-03 & 04 (TOWER-8) 26-08-2026 View Document
93 ELEVATION-03 & 04 (TOWER-9) 26-08-2026 View Document
94 ELEVATION-03 & 04 NARSURY SCHOOL 26-08-2026 View Document
95 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-7) 26-08-2026 View Document
96 TYPICAL (1ST TO 17TH & 19TH TO 23RD) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 23RD) AREA CALCULATION (TOWER-4) 26-08-2026 View Document
97 SECTION-XX (TOWER-7) 26-08-2026 View Document
98 GROUND & 1ST FLOOR PLAN CLUB 26-08-2026 View Document
99 GROUND TO 4TH FLOOR PLAN & TERRACE PLAN (PRIMARY SCHOOL) 26-08-2026 View Document
100 TYPICAL (1ST TO 17TH & 19TH TO 23RD) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 23RD) AREA CALCULATION & UNIT CARPET AREA (TOWER-6) 26-08-2026 View Document
101 GROUND TO 4TH FLOOR PLAN, TERRACE PLAN & AREA CALCULATION OF ALL FLOOR NARSURY SCHOOL 26-08-2026 View Document
102 PARKING, GUARD ROOM, HT PANEL ROOM & METER ROOM, SURFACE STAIRCASE, ELECTRICAL ROOM AREA CALCULATION 26-08-2026 View Document
103 STILT FLOOR PLAN TO OHT TERRACE PLAN (EWS) 26-08-2026 View Document
104 WATER SUPPLY SCHEMATIC DIAGRAM TOWER-1, 4 & 7 26-08-2026 View Document
105 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-2) 26-08-2026 View Document
106 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-3) 26-08-2026 View Document
107 STILT-GROUND FLOOR PLAN & GROUND-STILT, GROUND COVERAGE AREA (TOWER-4) 26-08-2026 View Document
108 UNIT CARPET AREA CALCULATION (TOWER-1) 26-08-2026 View Document
109 UNIT CARPET AREA CALCULATION (TOWER-7) 26-08-2026 View Document
110 SECTION-XX (TOWER-4) 26-08-2026 View Document
111 STILT, GROUND COVERAGE, 1ST TO 13TH FLOOR & MUMTY FLOOR AREA CALCULATION (EWS) 26-08-2026 View Document
112 TYPICAL (1ST TO 17TH & 19TH TO 23RD) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 23RD) AREA CALCULATION & UNIT CARPET AREA (TOWER-8) 26-08-2026 View Document
113 TYPICAL (1ST TO 17TH & 19TH TO 23RD) FLOOR PLAN & TYPICAL (1ST TO 17TH & 19TH TO 23RD) AREA CALCULATION & UNIT CARPET AREA (TOWER-5) 26-08-2026 View Document
114 FAN ROOM SECTION 26-08-2026 View Document
115 SECTION-AA & BB, ELEVATION-1, 2, 3 & 4 (PRIMARY SCHOOL) 26-08-2026 View Document
116 SECTION-XX (TOWER-1) 26-08-2026 View Document
117 SECTION-YY (TOWER-8) 26-08-2026 View Document
118 SECTION-XX (TOWER-2) 26-08-2026 View Document
119 SECTION-XX (TOWER-3) 26-08-2026 View Document
120 SECTION-XX (TOWER-9) 26-08-2026 View Document
121 SECTION-YY (TOWER-3) 26-08-2026 View Document
122 SECTION-YY (TOWER-4) 26-08-2026 View Document
123 SECTION-YY (TOWER-7) 26-08-2026 View Document
124 SECTION-YY (TOWER-9) 26-08-2026 View Document
125 EWS, PRIMARY SCHOOL, NURSERY SCHOOL & CLUBHOUSE (TOWER-1, 2, 3, 4, 5, 6, 7, 8 & 9) 26-08-2026 View Document
126 EWS WATER SUPPLY SCHEMATIC DIAGRAM 26-08-2026 View Document
127 PRIMARY SCHOOL WATER SUPPLY SCHEMATIC DIAGRAM 26-08-2026 View Document
128 WATER SUPPLY SCHEMATIC DIAGRAM TOWER-3 & 9 26-08-2026 View Document
129 WATER SUPPLY SCHEMATIC DIAGRAM TOWER-6 26-08-2026 View Document
130 WATER SUPPLY SCHEMATIC DIAGRAM TOWER-8 26-08-2026 View Document