HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2107-2025
Submission Date : 27-11-2025 02:57:42 PM
Applicant Type : Company
Project Type: NEW




ROF INFRATECH AND HOUSING PRIVATE LIMITED
REAL ESTATE
01244399399
9289977408 (Number Shared by Promoter in Public)
legalcompliance@rof.co.in
Http://rof.co.in
XXXX913H
U70102DL2012PTC239356
 
 


 
 


 
 







ANTARES BY ROF
VILLAGE SOHNA, SECTOR 7
SOHNA
GURUGRAM
01244399399
9717022441 (Number Shared by Promoter in Public)
Compliance@rof.co.in
MUKESH KUMAR
01244399399
9560890400 (Number Shared by Promoter in Public)
compliance@rof.co.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
143010317-11-20251302000PNBHRERA Gurugram
243010417-11-20251285500PNBHRERA Gurugram
350083113-02-20263330431ICICI BANKHRERA Gurugram







11.11875 (Acre)
3.15
2.88
11.11875 (Acre)
182 0f 2024
Yes







62468.37 Lakhs
14399.84 Lakhs
40871.57 Lakhs
2961.9 Lakhs
4235.06 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 3.614
3CONSTRUCTION OF ROADS 1.9
4PAVEMENTS 0.6332
5PARKS AND PLAYGROUNDS 0.5
6GREEN BELTS 1.02
7VEHICLE PARKINGS 1.927
8ELECTRICITY SUB-STATION 0.032
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.005
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13COMMUNITY CENTRE AND CRECHE 0.102
14COMMERCIAL 0.3368
15CONSTRUCTION OF CIRCULATION ROAD 1.02
16GUARD ROOM 0.003
17UNDERGROUND WATER TANK 0.0064
18RAIN WATER HARVESTING 0.0193
Total11.1187




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNo
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS151.88AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM151.87AS PER PROJECT REPORT
3STORM WATER DRAINAGE117.36AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM193.30AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL227.81AS PER PROJECT REPORT
6STREET LIGHTING34.51AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING48.32AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS36.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA533.47AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM21.50AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15STP275AS PER PROJECT REPORT
16UNDERGROUND WATER TANK105AS PER PROJECT REPORT
17RAIN WATER HARVESTING 33AS PER PROJECT REPORT
18CONSTRUCTION OF CIRCULATION ROAD 38.62AS PER PROJECT REPORT
19COMMUNITY CENTRE AND CRECHE204.26AS PER PROJECT REPORT


15-07-2025 (date)
15-10-2025 (date)
01-02-2026
31-01-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings113227.407189117
Apartment/Shops/Other Buildings1254.14621





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments313.16626.091643.402006.32
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1952.462080.671872.211687.73
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1871.032109.542206.392326.46
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2394.542308.322470.482241.22
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2292.002142.651526.921514.11
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments917.54859.33783.75572.56
Shops133.37133.37133.37133.37
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments152.69
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Circulation Road0
Community centres and Creche0
Electrification Cost upto project Site0
Rain Water Harvesting0
Renewable Energy System0
Security and Fire fighting0
STP0
Street Light0
Underground tank0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification cost upto project site0000
Rain Water Harvesting0000
Street light0000
Renewable Energy System0000
Security and Fire Fighting0000
STP0000
Underground Tank0000
Circulation Road0000
Community center and Creche0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System7.597.597.597.59
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification cost upto project site0000
Rain Water Harvesting0000
Street light0000
Renewable Energy System0000
Security and Fire Fighting0000
STP0000
Underground Tank0000
Circulation Road0000
Community center and Creche0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System7.597.597.597.59
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Community center and Creche0000
Circulation Road0000
Electrification cost upto project site0000
Rain Water Harvesting0000
Street light0000
Renewable Energy System0000
Security and Fire Fighting004.834.83
STP0000
Underground Tank0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements15.1815.1815.1822.78
Water Supply System7.597.597.5915.18
Sewerage treatment & garbage disposal22.7822.7822.7822.78
Electricity Supply System019.3319.3328.99
Storm Water Drainage011.7317.6017.60
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground Tank0000
Rain Water Harvesting008.258.25
Street light03.455.175.17
Renewable Energy System002.152.15
Security and Fire Fighting4.834.834.834.83
STP0000
Circulation Road0000
Community center and Creche0000
Electrification cost upto project site0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements22.7830.3715.1815.18
Water Supply System15.1815.1815.187.59
Sewerage treatment & garbage disposal45.5645.5622.7822.78
Electricity Supply System28.9938.6638.6619.33
Storm Water Drainage17.6017.6023.4711.73
Parks and Playgrounds010.8010.8014.40
Clubhouse/community centres0000
Shopping area133.37133.37133.37133.37
Other0000
Street light5.175.176.903.45
Renewable Energy System4.304.304.304.30
Security and Fire Fighting4.834.834.834.83
STP68.7568.7568.7568.75
Underground Tank26.2526.2526.2526.25
Circulation Road0019.3119.31
Electrification cost upto project site0276.50276.50237.00
Community center and Creche51.0651.0651.0651.06
Rain Water Harvesting8.258.2500

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Circulation Road0
Rain Water Harvesting0
Street light0
Renewable Energy System0
Security and Fire Fighting0
STP0
Underground Tank0
Electrification cost upto project site0
Community center and Creche0












Yes
No
ICICI BANK, UNIT NO. 004A, GROUND FLOOR, TOWER-A UNITECH WORLD CYBER PARK, SECTOR-39, GURGAON, 122003
777705732797
ICIC0007327
110229335
7327
RAHUL MITTAL and ABHISHEK MITTAL, B-62 South Ex part-1, Andrewsganj, South Delhi, Delhi-110049
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED19-07-2024
II. FOREST NOCALREADY BEEN OBTAINED16-08-2024
III. ASSURANCE DRINKING WATERALREADY BEEN OBTAINED26-10-2024
IV. ASSURANCE STORM WATER ALREADY BEEN OBTAINED04-11-2024
V. ASSURANCE SEWARAGE ALREADY BEEN OBTAINED04-11-2024
VI. LAYOUT PLANALREADY BEEN OBTAINED15-07-2025
VII. ZONING PLANALREADY BEEN OBTAINED26-07-2024
VIII. SERVICE ESTIMATEALREADY BEEN OBTAINED13-02-2026








Yes


Yes









ROF NORMANTON PARK, VILLAGE DHUNELA, SEC-36, SOHNA, GURUGRAM
14.775
0
233
0
192
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3888.943888.945013.05
Cost of the apartments000
Cost of the infrastructure1658.11658.11935.95
Others costs2230.832230.833077.10


20263.31 Lakhs
800 Lakhs
0 Lakhs
12696.32 Lakhs
No
31-03-2026
31-03-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBEDROOM AND LIVING ROOM- VITRIFIED TILE FLOOR, TOILET AND BALCONY- ANTISKID CEREMIC TILE, KITCHEN VITRIFIED TILE
2WALL FINISHING DETAILSPUTTY + PRIMER+ 2 COAT OF OBD PAINT
3KITCHEN DETAILSCERAMIC TILE, PAINT, GRANITE MARBLE AND SINK
4BATHROOM FITTINGSCP FITTING AND CHINA WARE
5WOOD WORK ETCMAIN DOOR AND INTERNAL DOOR
6DOORS AND WINDOS FRAMESALUMINUM/UPVC DOOR AND WINDOWS
7GLASS WORKEXTERNAL ALUMINUM/UPVC DOOR AND WINDOW
8ELECTRIC FITTINGSSWITCH BOARDS, LIGHT POINT, FAN POINT
9CONDUCTING AND WIRING DETAILSPVC CONDUIT AND COPPER WIRES
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD WATER TANK
12LIFT DETAILSTWO NO. OF LIFT EACH TOWER
13EXTERNAL GLAZINGSALUMINUM/UPVC
13.1WINDOWS/GLAZINGSALUMINUM/UPVC
14DOORSWOODEN
14.1MAIN DOORSWOODEN
14.2INTERNAL DOORSWOODEN
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSSWITCHES AND COMMON AREA LIGHTS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYYES
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR PAINT- ASIAN PAINT OR EQUIVALENT BRAND
20INTERNAL FINISHINGPUTTY + PRIMER+ 2 COAT OF OBD PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED FLOOR
1 . 2 WALLSOBD PAINT
1 . 3 CEILINGOBD PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED
2 . 2 WALLSOBD PAINT
2 . 3 CEILINGOBD PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILE
3 . 2 WALLSCERAMIC WALL TILE
3 . 3 CEILINGOBD PAINT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSYES
3 . 6 FITTING/FIXTURESWC, WASHBASIN, SHOWER POINT
4 . BED ROOMS
4 . 1 FLOORVITRIFIED FLOOR
4 . 2 WALLSOBD PAINT
4 . 3 CEILINGOBD PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILE
5 . 2 WALLSCERAMIC WALL TILE
5 . 3 CEILINGOBD PAINT
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSYES
5 . 6 FIXTURESWC, WASHBASIN, SHOWER POINT
6 . KITCHEN
6 . 1 FLOORVITIFIED TILE
6 . 2 WALLSCERAMIC TILE UPTO 2 FT ABOVE COUNTER AND OBD PAINT
6 . 3 CEILINGOBD PAINT
6 . 4 COUNTERSGRANITE STONE OR FULL BODY TILE
6 . 5 FIXTURESSINK AND WATER TAP
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 MUTATION 16-04-2026 ------
2 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 16-04-2026 View Document
3 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 16-04-2026 View Document
4 AFFIDAVIT PROMOTER 16-04-2026 ------
5 STORM WATER LAYOUT 16-04-2026 ------
6 ARAVALI 16-04-2026 ------
7 SUPERIMPOSE SITE & DEMARCATION 16-04-2026 ------
8 UNDERTAKING DEFICIT FEES 16-04-2026 ------
9 ANTARES BY ROF PAYMENT PLAN 16-04-2026 ------
10 WATER SUPPLY LAYOUT 16-04-2026 ------
11 LOI 16-04-2026 ------
12 SALE DEED 1 16-04-2026 ------
13 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 16-04-2026 View Document
14 TREE CUTTING NOC 16-04-2026 ------
15 ZONING APPROVAL LETTER 16-04-2026 ------
16 CORDINATE LAYOUT 16-04-2026 ------
17 ASSURANCE STORM WATER 16-04-2026 ------
18 FOREST NOC 16-04-2026 ------
19 SEWARAGE ASSURANCE 16-04-2026 ------
20 LATEST CA NETWORTH CERTIFICATE ROF INFRATECH PROV BASIS 31012026 16-04-2026 ------
21 CONVEYANCE DEED DRAFT ROF ANTARES 16-04-2026 ------
22 DRINKING WATER SUPPLY NOC 16-04-2026 ------
23 SERVICE_ESTIMATE_PLAN_1_CALCULATION 16-04-2026 ------
24 AFFIDAVIT NOT APPLICABLE ITEMS 16-04-2026 ------
25 UNDERTAKING EC FIRE SCHEME AND SERVICE PLAN ESTIMATES 16-04-2026 ------
26 UNDERTAKING MINING PERMISSION 16-04-2026 ------
27 BBA DRAFT ROF ANTARES 16-04-2026 ------
28 REVISED ALLOTMENT LETTER ANTARES BY ROF 16-04-2026 ------
29 FIRE LAYOUT 16-04-2026 ------
30 AIRPORT AUTHORITY 16-04-2026 ------
31 APPROVAL OF SERVICE ESTIMATES 16-04-2026 ------
32 SALE DEED 2 16-04-2026 ------
33 AFFIDAVIT BY DIRECTOR NO LITIGATION PENDING 16-04-2026 ------
34 UNDERTAKING 10% RECEIPTS 16-04-2026 ------
35 CA CERTIFICATE COSTING 16-04-2026 ------
36 CA CERTIFICATE FOR NET WORTH ROF INFRATECH FY 2024-25 02012025 16-04-2026 ------
37 NEC 16-04-2026 ------
38 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 16-04-2026 View Document
39 JAMABANDI 16-04-2026 ------
40 AFFIDAVIT NO LOAN 16-04-2026 ------
41 AFFIDAVIT TREE CUTTING 16-04-2026 ------
42 SEWERAGE LAYOUT 16-04-2026 ------
43 SITE PLAN AND AREA CAL 16-04-2026 ------
44 ASSURANCE STP CONSTRUCTION WATER 16-04-2026 ------
45 BANK UNDERTAKING 16-04-2026 ------
46 ELECTRICAL LOAD CIRCULAR 16-04-2026 ------
47 APPROVED_BR-III 16-04-2026 ------
48 BANK GUARANTEE RS 25 LAKH_ROF INFRATECH AND HOUNSING PVT LTD (1) 16-04-2026 ------
49 SIZRA 16-04-2026 ------
50 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 06-11-2025 View Document
51 TOWER 02,03,04,09 BUILDING ELEVATION 13-11-2025 ------
52 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 08-11-2025 View Document
53 DEMARCATION PLAN 08-11-2025 View Document
54 ZONING PLAN 13-11-2025 View Document
55 TOWER 01 AREA DIAGRAM CALCULATION 13-11-2025 ------
56 TOWER 02,03,04,09&15; BUILDING ELEVATION 13-11-2025 ------
57 TOWER 02,03,04,09 AREA DIAGRAM CALCULATION 13-11-2025 ------
58 SITE PLAN GREEN 13-11-2025 ------
59 TOWER 14 AREA DIAGRAM CALCULATION 13-11-2025 ------
60 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 13-11-2025 View Document
61 TOWER 12-&12A; AREA DIAGRAM CALCULATION 13-11-2025 ------
62 SITE PLAN PARKING PART A 13-11-2025 ------
63 TOWER 15 AREA DIAGRAM CALCULATION 13-11-2025 ------
64 SITE PLAN PARKING 13-11-2025 ------
65 UNIT CATEGORY TYPE-1,2,3 DETAIL 13-11-2025 ------
66 COMMERCIAL SITE PAN & CALCULATION 13-11-2025 ------
67 TOWER 05&06;, 07&08; AREA DIAGRAM CALCULATION 13-11-2025 ------
68 COMMUNITY SITE PAN & CALCULATION 13-11-2025 ------
69 TOWER 05&06;, 07& 08,16&17; BUILDING ELEVATION 13-11-2025 ------
70 TOWER 10-&11;,12&12A;_BUILDING SECTION & ELEVATION 13-11-2025 ------
71 TOWER 01 BUILDING SECTION 13-11-2025 ------
72 TOWER 14 BUILDING SECTION 13-11-2025 ------
73 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 13-11-2025 View Document
74 SITE PLAN PARKING DIAGRAM 13-11-2025 ------
75 SITE PLAN PARKING PART B 13-11-2025 ------
76 TOWER 05&06;,07&08;,16&,17 BUILDING SECTION 13-11-2025 ------
77 TOWER 10-&11;,12&12A; BUILDING ELEVATION 1 13-11-2025 ------
78 TOWER 01 BUILDING ELEVATION 13-11-2025 ------
79 TOWER 02,03,04,09 BUILDING SECTION 13-11-2025 ------
80 TOWER 16&17; AREA DIAGRAM CALCULATION 13-11-2025 ------
81 TOWER 05&06;, 07& 08,16&17; BUILDING SECTION 13-11-2025 ------
82 TOWER 10-&11;,12&12A;_BUILDING SECTION & ELEVATION 13-11-2025 ------
83 TOWER 10-&11; AREA DIAGRAM CALCULATION 13-11-2025 ------
84 TOWER 14 BUILDING ELEVATION 13-11-2025 ------
85 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 17-11-2025 View Document
86 PERT CHART 26-11-2025 ------