HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1778-2024
Submission Date : 29-10-2024 04:19:18 PM
Applicant Type : Company
Project Type: NEW




1000 TREES HOUSING PRIVATE LIMITED
ATS TOWER, PLOT NO. 16, SECTOR-135, NOIDA, GAUTAM BUDH NAGAR UP. 201305
01207111500
9643007884 (Number Shared by Promoter in Public)
1000trees.customercare@atsgreens.com
http://www.atsgreens.com
XXXX179R
U70100DL2010PTC210404
 
 


 
 


 
 


 
 


 
 


 
 


 
 







SANCTUARY 105 PHASE-2
SECTOR 105, NEAR DAULATABAD FLYOVER, DWARKA EXPRESSWAY
GURGAON
GURUGRAM
01207111500
9810403257 (Number Shared by Promoter in Public)
1000trees.customercare@atsgreens.com
MR RAJEEV GUPTA
01207111500
9810403257 (Number Shared by Promoter in Public)
Rajeev.gupta@homekraft.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
158779425-10-2024407665ICICI BANK HRERA Gurugram
258816318-12-202491239ICICI BANK HRERA Gurugram
358779325-10-2024839791ICICI BANK HRERA Gurugram







4.894 (Acre)
40566.53
2.06
13.078 (Acre)
127 of 2012 (27.12.2012)
No
Address     SECTOR105, NEARDAULATABADFLYOVER,DWARKAEXPRESSWAY,GURGAON,HARYANA, 122001,
Annexure-B- COLLABORATIONAGREEMENT, POWER OF ATTORNEY
INITIAL COLLABORATION AGREEMENTARE DATED 13-SEP-2011 & 10-OCT-2011AND GRANT OF LICENSE IS DATED 28-DEC-2012
Yes
ATTACHED
No
No
No







63788.02 Lakhs
17090.15 Lakhs
20285.87 Lakhs
0 Lakhs
26412.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1ANY OTHER 0
2SWIMMINGPOOLANDFACILITYAREA 528.481
3AREAUNDERBOUNDARY 204.11
4PRIVATEGARDENWITHGROUNDFLOORUNITS 557.41
5COMMUNIYBLOCK 621.62
6PLOTS TO BE SOLD 0
7LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1574.7
8CONSTRUCTION OF ROADS 5455.77
9PAVEMENTS 349.27
10PARKS AND PLAYGROUNDS 9678.18
11GREEN BELTS 0
12VEHICLE PARKINGS 835.00
13ELECTRICITY SUB-STATION 0
14CLUB HOUSE 0
15SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
16AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
Total19804.541




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS64.67SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM978.24SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE33.05SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM1096.01SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL0YET TO BE PREPARED
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING657.97SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS124.26SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE1700.00SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER171.27SUBMITTED TO TOWN & COUNTRY PLANNING
15OVER HEADS AND EQUIPMENTS1064.78SUBMITTED TO TOWN & COUNTRY PLANNING
16EXTRA COST555.25SUBMITTED TO TOWN & COUNTRY PLANNING
17STAFF1260.27SUBMITTED TO TOWN & COUNTRY PLANNING
18SOLAR PANEL100.17SUBMITTED TO TOWN & COUNTRY PLANNING
19BOUNDARY WALL58.50SUBMITTED TO TOWN & COUNTRY PLANNING


22-05-2024 (date)
22-05-2024 (date)
01-01-2025
31-12-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings96.151262
Apartment/Shops/Other Buildings145.391362





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
EDC and IDC2887.15
Land Cost662.63
Other Cost856.68

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0
Land Cost0
Other Cost0
EDC and IDC143.99

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments204.00371.16382.16384.16
Shops0000
Plots0000
EDC and IDC067.24064.21
Land Cost94.86853.74365.49430.59
Other Cost1873.25977.591138.21832.70

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments443.16445.16464.16404.16
Shops0000
Plots0000
Land Cost712.56870.76731.661275.2
Other Cost1270.661406.771586.102320.87
EDC and IDC061.04057.98

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments544.16746.16573.16524.16
Shops0000
Plots0000
EDC and IDC054.8512.290
Other Cost1380.692407.011554.27150.39
Land Cost557.861181.141385.54564.72

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments469.16543.16289.12555.16
Shops0000
Plots0000
Land Cost1122.441638.40982.08892.8
Other Cost1150.491878.74255.33240.68
EDC and IDC0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments597.16475.16468.16575.16
Shops0000
Plots0000
EDC and IDC0000
Land Cost892.889.2800
Other Cost261.15137.83128.68129.07

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments442.16309.16205.16348.79
Shops0000
Plots0000
Other Cost109.19105.4193.6196.24
EDC and IDC0000
Land Cost0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments257.20235.34196.60341.93
Shops0000
Plots0000
EDC and IDC0000
Other Cost89.6585.27189.21357.50
Land Cost00803.52982.08




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Staff44.0044.0044.0044.00
Boundary Wall4.256.25

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System5.5311.014.0114.01
Sewerage treatment & garbage disposal0000
Electricity Supply System10.2215.708.7018.70
Storm Water Drainage00010.87
Parks and Playgrounds0000
Clubhouse/community centres65.0076.0087.0040.00
Shopping area0000
Other013.0013.0013.00
Staff44.0044.0044.0044.00
Boundary Wall10.25
Over Heads and Equipments15.40

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System2.02017.0160.01
Sewerage treatment & garbage disposal0000
Electricity Supply System7.703.7021.7064.70
Storm Water Drainage0017.680
Parks and Playgrounds0000
Clubhouse/community centres55.0055.50140.00120.00
Shopping area0000
Other13.0013.0013.0013.00
Staff44.0044.0044.0044.00
Boundary Wall21.25
Over Heads and Equipments33.4076.4081.4079.40
Security and fire fighting26.49

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0009.26
Water Supply System18.010.8811.8813.35
Sewerage treatment & garbage disposal0000
Electricity Supply System22.7007.4510.70
Storm Water Drainage04.1000
Parks and Playgrounds0025.1128.31
Clubhouse/community centres150.000110.00113.00
Shopping area0000
Other13.0013.0013.0013.00
Lift37.4652.2353.70
Community Building190.00
Staff44.0044.0044.0044.00
Extra Cost43.5451.5446.54
Over Heads and Equipments90.4091.8780.8756.78
Security and fire fighting16.98
Boundary Wall16.50

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements015.1012.9312.93
Water Supply System121.88109.88130.8866.88
Sewerage treatment & garbage disposal0000
Electricity Supply System119.23107.23128.2364.23
Storm Water Drainage0000.40
Parks and Playgrounds22.8923.1024.850
Clubhouse/community centres199.00110.0051.0091.00
Shopping area0000
Other13.0013.002.270
Security and fire fighting65.5856.5872.8724.99
Over Heads and Equipments132.4068.4084.3340.87
Extra Cost71.5458.54226.54
Staff44.0044.0044.0044.00
Solar Panel29.0037.80
Lift162.23150.23

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0014.430
Water Supply System82.9262.0154.0172.01
Sewerage treatment & garbage disposal0000
Electricity Supply System153.1366.7558.7576.75
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres47.50000
Shopping area0000
Other0000
Staff44.0044.0044.0044.00
Solar Panel33.37
Lift171.23
Security and fire fighting40.4069.2061.2079.20
Over Heads and Equipments33.8947.0051.97
Extra Cost57.03

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System74.0144.0102.02
Sewerage treatment & garbage disposal0000
Electricity Supply System78.7551.0400
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and fire fighting81.2051.205.206.95
Staff44.0044.0044.0072.27












Yes
Yes
'ICICI BANK LTD,K1, SENIOR MALL, SEC18, NOIDA, UTTAR PRADESH - 201301
777705231024
ICIC0000031
110229005
0031 
Mr Udaivir Anand,C 226 Sector 44 Noida Gautam Budh Nagar UP 201301
-











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
No
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. AAIALREADY BEEN OBTAINED13-06-2022
II. LICENSE-127 OF 2012ALREADY BEEN OBTAINED27-12-2012
III. REVISED ZONINGALREADY BEEN OBTAINED24-11-2024
IV. PHASING PLANALREADY BEEN OBTAINED12-07-2024
V. REVISED BUILDING PLANALREADY BEEN OBTAINED22-05-2024








Yes


Yes


Attached







SANCTUARY 105, SECTOR 105, NEAR DAULATABAD FLYOVER, DWARKA EXPRESSWAY, GURUGRAM, HARYANA
4.336
472
0
221
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
60452604529575
Cost of the apartments38913389133162
Cost of the infrastructure000
Others costs21540215406414


4975 Lakhs
44934 Lakhs
6000 Lakhs
6000 Lakhs
Yes
02-06-2024
01-06-2031










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE"VITRIFIED TILES FLOORING IN LIVING, DINING & LOBBY, LAMINATED WOODEN/VITRIFIED TILES FLOORING IN BEDROOMS. TILES IN KITCHEN, CERAMIC TILE IN UTILITY/SERVANT ROOM AND TOILETS. BALCONIES WILL BE IN ANTI-SKID CERAMIC FLOORING"
2WALL FINISHING DETAILSCERAMIC TILES UPTO DADO HEIGHT IN TOILETS & 600MMHEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATECOLOUR & PAINT
3KITCHEN DETAILSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE, ELECTRICAL POINTS FOR CHIMNEY, HOB, MICROWAVE & FRIDGE TO BE PROVIDED
4BATHROOM FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMES"MAIN ENTRANCE DOOR FRAME –POLISHED/ENAMEL PAINTED ENGINEERED WOOD DOOR FRAME. ALL INTERNAL DOORS FRAME-LAMINATED/ENAMEL PAINTED ENGINEERED WOOD DOOR FRAME . EXTERNAL WINDOW FRAME OF UPVC SECTIONS,SIZE & SECTION AS PER THE DESIGN OF ARCHITECT"
7GLASS WORKNA
8ELECTRIC FITTINGS"PROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING AND MASTER BEDROOM. MOULDED MODULAR PLASTIC SWITCHES &PROTECTIVE; MCB'S"
9CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSLIFTS TO BE PROVIDED FOR ACCESS TO ALL HABITABLE FLOORS FROM COMMON LOBBY
13EXTERNAL GLAZINGS-
13.1WINDOWS/GLAZINGSWINDOW PANELS OF UPVC SECTIONS,SIZE AND SECTION AS PER DESIGN OF THE ARCHITECT
14DOORS-
14.1MAIN DOORSMAIN ENTRANCE DOOR –POLISHED/ENAMEL PAINTED ENGINEERED WOOD FLUSH DOOR ; STAINLESS STEEL/BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKES
14.2INTERNAL DOORSENAMEL PAINTED/LAMINATED ENGINEERED WOOD FLUSH DOOR
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGS"PROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING AND MASTER BEDROOM. MOULDED MODULAR PLASTIC SWITCHES &PROTECTIVE; MCB'S"
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEAPPROPRIATE FINISH OF TEXTURE PAINT OF EXTERIOR GRADE WATER PROOF PAINT
20INTERNAL FINISHINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS & CEILINGS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER WITH OBD
1 . 3 CEILINGPLASTER WITH OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING/VITRIFIED TILES
2 . 2 WALLSPLASTER WITH OBD
2 . 3 CEILINGPLASTER WITH OBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES
3 . 2 WALLSCERAMIC TILES UPTO DADO HEIGHT
3 . 3 CEILINGPLASTER WITH OBD
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSPLASTER WITH OBD
4 . 3 CEILINGPLASTER WITH OBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSCERAMIC TILES UPTO DADO HEIGHT
5 . 3 CEILINGPLASTER WITH OBD
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES 600MM HEIGHT ABOVE KITCHEN COUNTERSLAB IN APPROPRIATE COLOUR & PAINT
6 . 3 CEILINGPLASTER WITH OBD
6 . 4 COUNTERSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLESTONE
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES IN UTILITY/SERVANT ROOM
7 . 2 WALLS & CEILINGPLASTER WITH OBD
7 . 3 TOILETCERAMIC TILES OF REQUIRED HEIGHT IN TOILETS & CERAMIC TILES IN TOILETS FOR FLOORING
7 . 4 BALCONYBALCONIES WILL BE IN ANTI SKID CERAMIC FLOORING
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1LOI29-10-2024 View Document
2A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-429-10-2024 View Document
3A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-729-10-2024 View Document
4AAI29-10-2024 View Document
5A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-529-10-2024 View Document
6DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.29-10-2024 View Document
7COPY OF LICENSE ALONG WITH SCHEDULE OF LAND29-10-2024 View Document
8DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD29-10-2024 View Document
9DEMARCATION PLAN29-10-2024 View Document
10IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-10-2024 View Document
11A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS29-10-2024 View Document
12ZONING PLAN29-10-2024 View Document
13CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT29-10-2024 View Document
14NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT29-10-2024 View Document
15BUILDING PLAN APPROVAL BR-III29-10-2024 View Document
16A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS PART-829-10-2024 View Document
17LC-IV29-10-2024 View Document
18FOREST NOC29-10-2024 View Document
19EC29-10-2024 View Document
20 SUPRIMPOSED DEMARCATION PLAN29-10-2024 View Document
21DRAFT ALLOMENT LETTER29-10-2024 View Document
22 DRAFT AGREEMENT FOR SALE 29-10-2024 View Document
23SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN17-06-2025 View Document
24ELEVATIONS AND SECTIONS17-06-2025 View Document
25NO STATUTORY DUE- CA CERTIFICATE - SANCTUARY 105 PHASE-217-06-2025 View Document
26WASTE DISPOSAL17-06-2025 View Document
27IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN17-06-2025 View Document
28PHASING PLAN APPROVAL LETTER17-06-2025 View Document
29ROAD LAYOUT17-06-2025 View Document
30APPROVED SERVICE ESTIMATE PLAN SANCTION LETTER DT. 21.11.2417-06-2025 View Document
31STORM LAYOUT17-06-2025 View Document
32BANK UNDERTAKING SANCTUARY 105 PHASE-2-REVISED17-06-2025 View Document
33SWEAGE LAYOUT17-06-2025 View Document
34CASH FLOW STATEMENT OF THE PROPOSED PROJECT17-06-2025 View Document
35STREET LIGHTING LAYOUT17-06-2025 View Document
36SUMMARY OF VARIOUS COLLABORATION AGREEMENTS HIGHLIGHTING IMPORTANT CLAUSES OF THE AGREEMENTS17-06-2025 View Document
37SERVICE PLAN ESTIMATES CALCULATIONS17-06-2025 View Document
38PHASING PLAN17-06-2025 View Document
39WATER SUPPLY AND IRRIGATION LAYOUT17-06-2025 View Document