HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1689-2024
Submission Date : 11-07-2024 07:36:11 PM
Applicant Type : Company
Project Type: NEW




SILVERGLADES HOMES LLP
506, 5TH FLOOR TIME SQUARE BUILDING, B BLOCK, SUSHANT LOK PHASE 1, GURGAON -122002
9811937212 (Number Shared by Promoter in Public)
cs@silverglades.com
http://www.silverglades.com
XXXX079C
ABZ9999
 
 


 
 


 
 


 
 







THE LEGACY PHASE-I
VILLAGE BEHRAMPUR, SECTOR 63A, GURGAON
WAZIRABAD ST
GURUGRAM
9899987678 (Number Shared by Promoter in Public)
cs@silverglades.com
HARSH KUMAR GUPTA
9899987678 (Number Shared by Promoter in Public)
cs@silverglades.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
162951011-07-20241858000INDUSIND BANKHRERA Gurugram
262951111-07-2024876000INDUSIND BANKHRERA Gurugram







9.950 (Acre)
2.21
2.08
10.4625 (Acre)
215 of 2023
Yes







82310.3 Lakhs
5384.07 Lakhs
53067.96 Lakhs
8120.68 Lakhs
15737.59 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS5410.24
3CONSTRUCTION OF ROADS15329.49
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS5394.46
8ELECTRICITY SUB-STATION975.29
9CLUB HOUSE2634.51
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER1003.63
Total30747.62




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA, ALREADY EXISTING 60M ROAD ABERTING THE SITEYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS805.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM258.75AS PER PROJECT REPORT
3STORM WATER DRAINAGE230AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM373.75AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL287.50AS PER PROJECT REPORT
6STREET LIGHTING195.50AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING230.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS161.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE2570.34AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM460.00AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER172.50AS PER PROJECT REPORT
15STP373.75AS PER PROJECT REPORT
16PARKING287.50AS PER PROJECT REPORT
17UNDERGROUND WATER TANK287.50AS PER PROJECT REPORT
18RAIN WATER HARVESTING92.00AS PER PROJECT REPORT
19ELECTRICAL SUB STATION460.00AS PER PROJECT REPORT


NA (date)
NA (date)
01-09-2024
31-05-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings149.9801321
Apartment/Shops/Other Buildings220.50941
Apartment/Shops/Other Buildings205.4331322
Apartment/Shops/Other Buildings309.38542
Apartment/Shops/Other Buildings261.091671
Apartment/Shops/Other Buildings386.83421





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments33451503
Shops00
Plots00

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1820217218192512
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2273251225872199
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2166260919031927
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1669226724422442
Shops001426
Plots0000
Community Building1132

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2442176618781614
Shops2525108153
Plots0000
Community Building3131138318

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments593307
Shops199199
Plots00
Community Building827827




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2030)
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
ICICI BANK LTD., 005 A, UNITECH TRADE CENTRE, SECTOR ROAD, SUSHANT LOK, PHASE I, GURGOAN - 122002,
777705031491
ICIC0000314
110229042
000314
Mr. Pradeep Jain, Mr. Paras Kumar Jain, Mrs. Abha Jain, Mr. Sandeep Handa
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED23-10-2023
II. BUILDING PLAN APPROVAL (BR-III)ALREADY BEEN OBTAINED05-07-2024
III. ELECTRICAL LOAD AVAILABILITY CONNECTIONALREADY BEEN OBTAINED03-01-2024
IV. HUDA CONSTRUCTION WATER NOCALREADY BEEN OBTAINED05-12-2023
V. DRINKING WATER SUPPLYALREADY BEEN OBTAINED04-12-2023
VI. SEWAGE DISPOSALALREADY BEEN OBTAINED04-12-2023
VII. STORM WATER DRAINAGEALREADY BEEN OBTAINED04-12-2023
VIII. NOC ARAVALIALREADY BEEN OBTAINED06-07-2022
IX. ZONING PLANALREADY BEEN OBTAINED18-12-2023
X. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED26-02-2024
XI. FOREST NOCALREADY BEEN OBTAINED15-02-2022
XII. ENVIRONMENT CLEARANCEAPPLIED FOR BUT YET TO RECEIVE18-12-2023
XIII. SERVICE PLANS AND ESTIMATESYET TO FILE FOR APPROVALNA
XIV. FIRE SCHEME APPROVALYET TO FILE FOR APPROVALNA
XV. MINING PERMISSIONYET TO FILE FOR APPROVALNA








Yes


Yes


Attached













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOMBINATION OF LAMINATED WOODEN FLOORING , NATURAL STONE &TILES;
2WALL FINISHING DETAILSCOMBINATION OF ACRYLIC EMULSION PAINT , POP PUNNING
3KITCHEN DETAILSANTISLIP VITRIFIED TILES;ACRYLIC EMULSION PAINT, GRANITE STONE COUNTER, SINGLE LEVER CP FITTINGS & DOUBLE BOWL SS SINK WITH DRAIN BOARD,HOB AND CHIMNEY, MODULAR KITCHEN CABINETRY
4BATHROOM FITTINGSVANITIES WITH MIRROR, SINGLE LEVER CP FITTINGS WITH WASH BASIN & EUROPEAN; WC
5WOOD WORK ETCMODULAR KITCHEN CABINETRY,
6DOORS AND WINDOS FRAMESHARDWOOD DOOR FRAME FOR INTERNAL DOORS
7GLASS WORK NA
8ELECTRIC FITTINGSMODULAR SWITCHES
9CONDUCTING AND WIRING DETAILSUPVC CONDUITING WITH WIRING
10CUPBOARD DETAILSMODULAR KITCHEN
11WATER STORAGEOHT AT PROJECT LEVEL
12LIFT DETAILS12-18 PERSONS APPROX. EACH LIFT CAPACITY
13EXTERNAL GLAZINGSUPVC FRAME / ALUMINIUM FRAME WITH GLASS
13.1WINDOWS/GLAZINGSUPVC FRAME / ALUMINIUM FRAME WITH GLASS
14DOORSWOODEN PANELLED DOOR/POLISHED VENEER
14.1MAIN DOORSWOODEN PANELLED DOOR/POLISHED VENEER
14.2INTERNAL DOORSPOLISHED VENEER/ PANELLED/ FLUSH SHUTTER
15AIR CONDITIONINGRV/SPLIT AC SYSTEM
16ELECTRICAL FITTINGSMODULAR SWITCHES
17CNG PIPE LINEPROVISION
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION
19EXTERNAL FINISHING/COLOUR SCHEMEHIGH GRADE EXTERNAL PAINT AND STONE
20INTERNAL FINISHINGACRYLIC EMULSION PAINT ON POP PUNNING, ACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNATURAL STONE
1 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESPROVISION
3 . MASTER TOILET
3 . 1 FLOORCOMBINATION OF NATURAL STONE /TILES
3 . 2 WALLSCOMBINATION OF NATURAL STONE /TILES AND ACRYLIC EMULSION PAINT
3 . 3 CEILINGFALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
3 . 4 COUNTERSSTONETOP
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER CP FITTING, HEALTH FAUCET, WASH BASINS & WALL HUNG WC
3 . 6 FITTING/FIXTURESVANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESN.A
5 . TOILET
5 . 1 FLOORCOMBINATION OF NATURAL STONE /TILES
5 . 2 WALLSCOMBINATION OF TILES AND ACRYLIC EMULSION PAINT
5 . 3 CEILINGFALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
5 . 4 COUNTERSSTONETOP
5 . 5 SANITARY WARE/CP FITTINGSSTONETOP
5 . 6 FIXTURESVANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCOMBINATION OF TILES AND ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE COUNTER
6 . 5 FIXTURESCP FITTING & DOUBLE BOWL SS SINK WITH DRAIN BOARD
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN,CABINETRY, HOB & CHIMNEY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES/ANTISKID TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT ON THE WALL
7 . 3 TOILETTOILET WITH BASIC CP FITTINGS, WASH BASIN AND SPOUT
7 . 4 BALCONYUTILITY BALCONY TO HAVE THE PROVISION OF ELECTRICAL AND WATER CONNECTIVITY
8 . SIT-OUTS
8 . 1 FLOORANTI SKID TILES
8 . 2 WALLS & CEILINGPLASTER WITH ACRYLIC EMULSION
8 . 3 RAILINGSCOMBINATION OF SS, GLASS & MS
8 . 4 FIXTURESLED LIGHTS












Sr. No.Document DescriptionDate of Document UploadView Document
1DEMARCATION PLAN08-07-2024 View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.08-07-2024 View Document
3 DRINKING WATER SUPPLY11-07-2024 ------
4SLD APPROVAL11-07-2024 ------
5COPY OF LICENSE ALONG WITH SCHEDULE OF LAND08-07-2024 View Document
6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT08-07-2024 View Document
7IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN11-07-2024 View Document
8NOC SEWAGE DISPOSAL11-07-2024 ------
9ZONING PLAN08-07-2024 View Document
10IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN11-07-2024 View Document
11NOC ARAVALI11-07-2024 ------
12NOC STORM WATER DRAINAGE11-07-2024 ------
13NOC FOR CONSTRUCTION WATER 11-07-2024 ------
14ELECTRICAL LOAD11-07-2024 ------
15NOC FOREST11-07-2024 ------
16ZONING PLAN22-08-2024 ------
17CA CERTIFICATE_INVENTORY DETAILS22-08-2024 ------
18CA CERTIFICATE_NON DEFAULT PAYMENTS22-08-2024 ------
19LCI- VA-63A22-08-2024 ------
20MUTATION COPY22-08-2024 ------
21NOC DRINKING WATER -63A22-08-2024 ------
22COPY OF SUPERIMPOSED DEMARCATION PLAN ON APPROVED LAYOUT PLAN22-08-2024 ------
23DEMARCATION PLAN22-08-2024 ------
24LC-IV -63A22-08-2024 ------
25NOC ARAWALI22-08-2024 ------
26ELEVATION PLAN22-08-2024 ------
27LAYOUT PLAN22-08-2024 ------
28PARKING PLAN22-08-2024 ------
29SITE PLAN22-08-2024 ------
30LOI NEW SECTOR -63A22-08-2024 ------
31X SECTION PLAN22-08-2024 ------
32ADDITIONAL FEES DD COPY22-08-2024 ------
33AFFIDAVIT_RECIPT_EDC22-08-2024 ------
34AFFIDAVIT_ARRANGEMENT OF BANK ACCOUNTS22-08-2024 ------
35AFFIDAVIT_MINING PERMISSION22-08-2024 ------
36AFFIDAVIT_POWERLINE SHIFTING22-08-2024 ------
37AFFIDAVIT_PYRAMID22-08-2024 ------
38CA CERTIFICATE_COST INCURRED22-08-2024 ------
39AFFIDAVIT_TREE CUTTING PERMISSION22-08-2024 ------
40BANK UNDERTAKING22-08-2024 ------
41BR_RERA REG AUTH22-08-2024 ------
42BUILDER BUYER AGREEMENT_DRAFT22-08-2024 ------
43BUILDING PLAN APPROVAL_BR-III_63A22-08-2024 ------
44CA CERTIFICATE_REP-I22-08-2024 ------
45CASHFLOW SEC 63A_PHASE_1_14082422-08-2024 ------
46COLLABORATION AGREEMENT22-08-2024 ------
47CONVEYANCE DEED_DRAFT22-08-2024 ------
48COPY OF REG FEES CHEQUES22-08-2024 ------
49ELECTRICAL LOAD AVAILABILITY CONNECTION22-08-2024 ------
50FOREST NOC22-08-2024 ------
51HUDA CONSTRUCTION WATER NOC22-08-2024 ------
52PROJECT REPORT22-08-2024 ------
53JAMABANDI COPY22-08-2024 ------
54LAND COST DETAILS22-08-2024 ------
55LICENCE 63A22-08-2024 ------
56NETWORTH CERTIFICATE22-08-2024 ------
57NOC DISPOSAL OF SURPLUS TREATED WATER 63A22-08-2024 ------
58NOC FOREST22-08-2024 ------
59NOC STORM WATER CONNECTION-63A22-08-2024 ------
60NON_ENCUMBRANCE_CERTIFICATE22-08-2024 ------
61PAYMENT RECEIPT_DRAFT22-08-2024 ------
62POWER OF ATTORNEY22-08-2024 ------
63QTLY_ESTIMATED EXPENDITURE & SOURCE OF FUND22-08-2024 ------
64REP-II22-08-2024 ------
65RERA ESCROW AGREEMENT22-08-2024 ------
66SALE DEED22-08-2024 ------
67SERVICE ESTIMATES APPLICATION 63A22-08-2024 ------
68SGHLLP - BS22-08-2024 ------
69SLD APRROVAL 63A22-08-2024 ------