HRERA GurugramTemp Project Id : RERA-GRG-PROJ-928-2021
Submission Date : 07-09-2021 10:41:58 AM
Applicant Type : Company
Project Type: NEW




COUNTRYWIDE PROMOTERS PRIVATE LIMITED
OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABD FARIDABAD HR 121004 IN
01149572787
9717790021 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
http://bptp.com
XXXX280H
U70101HR1996PTC082720
 
 


 
 


 
 


 
 







GREEN OAKS
SECTOR 70 A GURUGRAM
GURGAON
GURUGRAM
9818458965
9818458965 (Number Shared by Promoter in Public)
Sunil.Taneja@bptp.com
SUNIL TANEJA
9818458965
9818458965 (Number Shared by Promoter in Public)
Sunil.Taneja@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1689807-09-20211259586INDUSIND BANKHRERA Gurugram
2021-09-202125500INDUSIND BANK-RTGSHRERA Gurugram







15.5625 (Acre)
NA
0
15.5625 (Acre)
License 61 of 2021
No
Address     OT-14 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-16 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-14 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-16 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-14 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-16 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-16 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Address     OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABD FARIDABAD HR 121004 IN
Address     OT-16 THIRD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA-121004
Annexure-B- AS A COLLABORATOR.
BY VIRTUE OF THE COLLABORATION AGREEMENT.
Yes
THE DEVELOPER SHALL REIMBURSE THE LAND OWNERS ALL COST AND EXPENSES INCURRED BY THE LAND OWNERS WITH RESPECT TO THE PURCHASE OF THE SAID WHICH SHALL INCLUDE COST OF LAND, REGISTRATION CHARGES, STAMP DUTY, COMMISSION TO BROKERS AND ALL THE OTHER EXPENSES INCURRED FOR ACQUIRING THE OWNERSHIP, TITLE AND POSSESSION OF THE LAND. THE DEVELOPER SHALL ADDITIONALLY PAY TO THE LAND OWNERS A CONSOLIDATED SUM OF RS 35,000/- PER ACRE FOR THE SAID LAND FOR MAINTAINING THE REVENUE RECORD.
No
Yes
Yes







9442.82 Lakhs
4668.32 Lakhs
0 Lakhs
1726.00 Lakhs
3048.5 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 8.521
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 2.9715
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 1.167
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 1.556
12ANY OTHER 1.347
Total15.5625




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA- ALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS344SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM82SUBMITTED TO HUDA
3STORM WATER DRAINAGE264SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM178SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL98SUBMITTED TO HUDA
6STREET LIGHTING18SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING0SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS46SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO HUDA
10SHOPPING AREA0SUBMITTED TO HUDA
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO HUDA
12SCHOOL0SUBMITTED TO HUDA
13HOSPITAL/DISPENSARY0SUBMITTED TO HUDA
14ANY OTHER0SUBMITTED TO HUDA
15STP CIVIL MECHANICAL360SUBMITTED TO HUDA
16UNDERGROUND WATER TANK135SUBMITTED TO HUDA
17CONSTRUCTION OF CIRCULATION ROAD 25SUBMITTED TO HUDA
18ELECTRICAL SUB STATION176SUBMITTED TO HUDA


28-08-2021 (date)
NA (date)
01-10-2021
27-08-2026
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 122.05 1
2 109.62 34
3 116.34 1
4 112.56 1
5 109.62 17
6 136.00 7
7 126.97 3
8 148.85 1
9 136.32 1
10 126.97 6
11 126.60 1
12 130.22 6
13 147.26 1
14 134.75 1
15 130.22 12
16 114.75 1
17 130.22 18
18 130.42 12
19 97.12 1
20 108.07 5
21 147.15 1
22 114.45 9
23 104.91 8
24 114.45 18
25 139.82 6
26 145.41 18
27 147.84 4
28 135.11 5
29 111.14 7
30 132.05 4
31 144.43 1
32 121.18 1
33 132.05 4
34 149.01 1
35 143.72 2
36 143.31 1
37 124.59 1
38 119.77 4
39 106.96 6
40 142.58 1
41 125.61 1
42 106.96 12
43 90.47 1
44 131.03 1
45 127.52 1
46 106.96 7
47 100.74 2
48 149.90 1
49 140.00 9
50 138.95 1
51 140.00 9
52 141.70 1
Total278


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
External Development Charges1816.59
Infrastructure Development Charges340.09
Land Cost4668.32
Other Cost891.81

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30
Water Supply System8
Sewerage treatment & garbage disposal6
Electricity Supply System20
Storm Water Drainage20
Parks and Playgrounds2
Clubhouse/community centres0
Shopping area0
Other21.87

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30303030
Water Supply System8888
Sewerage treatment & garbage disposal6666
Electricity Supply System20202020
Storm Water Drainage20202020
Parks and Playgrounds2222
Clubhouse/community centres0000
Shopping area0000
Other21.8721.8721.8721.87

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30303030
Water Supply System8888
Sewerage treatment & garbage disposal6666
Electricity Supply System20202020
Storm Water Drainage20202020
Parks and Playgrounds2222
Clubhouse/community centres0000
Shopping area0000
Other21.8721.8721.8721.87

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30303030
Water Supply System8888
Sewerage treatment & garbage disposal6666
Electricity Supply System20202020
Storm Water Drainage20202020
Parks and Playgrounds2222
Clubhouse/community centres0000
Shopping area0000
Other21.8721.8721.8721.87

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements303030
Water Supply System888
Sewerage treatment & garbage disposal666
Electricity Supply System202020
Storm Water Drainage202020
Parks and Playgrounds222
Clubhouse/community centres000
Shopping area000
Other21.8721.8721.87












Yes
No
BARAKHAMBA ROAD GOPAL DAS BHAWAN BRANCH
252109202101
INDB0000005
110234002
000005
1. Manik Malik,CFO, Address: D-2/2406, Vasant Kunj, Delhi-110070(Email:Manik.malik@bptp.com) 2. Sanjeev Loknath Agrawal, DGM (Finance and Accounts), Address: Flat No-32,Sudershan Apartments, IP Extension, New Delhi-110092 (Email: Sanjeev.agrawal@bptp.com) 3. Rakesh Agrawal, SGM(Finance and Accounts), Address: D-308,Narwama Apartment, 89, IP Extension, Patparganj, New Delhi-110092 (Email: rakesh.agrawal@bptp.com) 4. Amit Kumar Singhal, AGM(Finance and Accounts), Address: E3/28 Nand Nagri, Mandoli,North East, Delhi-110093 (Email: amit1.singhal@bptp.com) 5. Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details) As Attached
As Attached.











Yes
Yes
No
No
No
No
No
No
No
No


Yes
Yes
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE 61 OF 2021ALREADY BEEN OBTAINED28-08-2021
II. LAYOUT APPROVALALREADY BEEN OBTAINED28-08-2021
III. FOREST NOCALREADY BEEN OBTAINED06-10-2021
IV. DEMARCATION PLANAPPLIED FOR BUT YET TO RECEIVE03-09-2021
V. SERVICE PLAN ESTIMATEAPPLIED FOR BUT YET TO RECEIVE09-09-2021








Yes


Yes


RERA Certificate







PHASE-I, PLOTS, SECTOR-81 EDEN ESTATE
15.12
0
168
0
163
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3183.003471.303830.49
Cost of the apartments000
Cost of the infrastructure1001.003000.00847.46
Others costs440.00471.302983.03


12910 Lakhs
4577 Lakhs
2000 Lakhs
1720 Lakhs
No
08-10-2018
30-06-2022




BPTP DISTRICT 1 BLOCK B
10.056
0
189
0
60
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
365701234.27
Cost of the apartments000
Cost of the infrastructure1453.000109.36
Others costs2204.6001124.91


1938.70 Lakhs
2704.48 Lakhs
1430.00 Lakhs
1230.00 Lakhs
No
06-08-2019
01-08-2024




BPTP DISTRICT 1 BLOCK A
12.373
0
220
0
110
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4504.3901644.65
Cost of the apartments000
Cost of the infrastructure1786.00088.43
Others costs2718.3901556.22


2527.04 Lakhs
4760.71 Lakhs
1757 Lakhs
1511 Lakhs
No
01-08-2019
29-07-2024




BPTP DISTRICT 1 BLOCK C
12.72
0
244
0
68
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
464001929.53
Cost of the apartments000
Cost of the infrastructure1838.000498.88
Others costs2802.1101430.65


1385 Lakhs
4391 Lakhs
1809 Lakhs
1506 Lakhs
No
20-08-2019
18-08-2024




102 EDEN ESTATE
28.67
45
235
36
48
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
21082.43019000.65
Cost of the apartments000
Cost of the infrastructure4278.502587
Others costs16803.93016413.65


91674.41 Lakhs
17173.38 Lakhs
11500 Lakhs
11500 Lakhs
Yes
01-10-2020
30-04-2024










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 07-09-2021 View Document
2 ASSURANCE- WATER SUPPLY 16-10-2021 ------
3 ASSURANCE- STORM WATER 16-10-2021 ------
4 ASSURANCE- SEWEAREGE 16-10-2021 ------
5 FOREST NOC 16-10-2021 ------
6 DEMARCATION PLAN 16-10-2021 View Document
7 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 16-10-2021 View Document
8 FORM LC-IV 16-10-2021 ------
9 FORM LC-IV-B 16-10-2021 ------
10 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 16-10-2021 View Document
11 LICENSE 16-10-2021 ------
12 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 16-10-2021 View Document
13 DOMESTIC WATER LAYOUT-MODEL 16-10-2021 ------
14 FLUSHING WATER LAYOUT-MODEL 16-10-2021 ------
15 ROAD LAYOUT-MODEL 16-10-2021 ------
16 SEWERAGE LAYOUT-MODEL 16-10-2021 ------
17 STORM WATER LAYOUT-MODEL 16-10-2021 ------
18 AUTO DEBIT UNDERTAKING 21-10-2021 ------
19 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 21-10-2021 View Document
20 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 21-10-2021 View Document
21 LOI 15.5625ACS 21-10-2021 ------
22 MASTER AFFIDAVIT 21-10-2021 ------
23 MUTATAION AND JAMABANDI 21-10-2021 ------
24 NCZ UNDERTAKING 21-10-2021 ------
25 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 21-10-2021 View Document
26 UNDERTAKING FOREST LAND 21-10-2021 ------
27 UNDERTAKING TREE CUTTING 21-10-2021 ------
28 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 21-10-2021 View Document
29 ENTRY IN REVENUE RECORD AND AKSH SIZRA 21-10-2021 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 CC Uploaded 17-04-2025 View Document