HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1458-2023
Submission Date : 07-11-2023 01:35:02 PM
Applicant Type : Company
Project Type: NEW




DLF HOME DEVELEOPERS LIMITED
1ST FLOOR, R BLOCK, GATEWAY TOWER, GURUGRAM 122002
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in
XXXX037H
U74899HR1995PLC082458
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







CENTRAL 67
SECTOR 67
BADSHAHPUR ST
GURUGRAM
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
SUNIL KUMAR ARORA
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152267326-10-20231590000ICICI BANK HRERA Gurugram
252272415-11-2023525000ICICI BANK HRERA Gurugram







8.6987 (Acre)
1.5
1.486
8.6987 (Acre)
234 of 2023
Yes







33506 Lakhs
16508 Lakhs
0 Lakhs
4349 Lakhs
12649 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD2.9552
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS2.6083
4PAVEMENTS1.2747
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0.4817
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.1483
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER1.2305
Total8.6987




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNHAINo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1744AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM226AS PER PROJECT REPORT
3STORM WATER DRAINAGE220AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM795AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL436AS PER PROJECT REPORT
6STREET LIGHTING95AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER603AS PER PROJECT REPORT
15EARTH WORKS230AS PER PROJECT REPORT


11-12-2023 (date)
11-12-2023 (date)
01-03-2024
31-12-2027
Plot Area(In Square Meter)Number of plots in the project
118.588
124.68
140.0016
133.710
134.399
168.757
218.755
140.94
228.881
210.11
280.001
293.631
352.502
402.571
268.781


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Earth Works0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System00022.64
Sewerage treatment & garbage disposal043.6143.6143.61
Electricity Supply System0000
Storm Water Drainage002222
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other00026.07
Earth Works11.511.511.511.5

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0174.43174.43261.64
Water Supply System22.6422.6433.9533.95
Sewerage treatment & garbage disposal43.6143.6143.6143.61
Electricity Supply System79.4679.4679.4679.46
Storm Water Drainage33222233
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other34.3656.2299.94121.80
Earth Works23.0134.5123.0123.01

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements261.64174.43174.43174.43
Water Supply System33.9522.6422.6411.32
Sewerage treatment & garbage disposal43.6143.6121.821.8
Electricity Supply System79.46119.19119.1979.46
Storm Water Drainage22221111
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other99.9480.1573.0153.23
Earth Works23.0123.0123.0111.50

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements174.43174.4300
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System79.46000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other53.23000
Earth Works0000












Yes
No
ICICI BANK LIMITED, QUTAB PLAZA, DLF PHASE-1, GURGAON-122002
017705014300
ICIC0000177
110229030
0177
01. Mr. Vivek Anand (E1001, Palm Springs, Golf Course Road,opposite IBIS Hotel, Sector 54, Gurgaon, Haryana 122002) 02. Mr. Puneet Rakheja (H.No. 386, Sector 31, Faridabad, Haryana 121003) 03. Mr. Pankaj Jain (C701, Apex Acacia Valley, Sector 3,Vaishali, Ghaziabad, Uttar Pradesh 201010) 04. Mr. Saurabh Kumar Gupta (1116, Vikas Kunj, Vikaspuri, Delhi 110018) 05. Mr.Gaurav Arora (A-33, Near Mehfil Banquet Hall, Mahendru Enclave, GT Karnal Road, Delhi 110009) 06. Ms. Sandhya Singla(Neelanchal Apartments, Plot No. 3, Sector 4, Dwarka, Delhi110075) 07. Mr. Ashok Nanda (A255, Surya Nagar, ChanderNagar, Ghaziabad, Uttar Pradesh 201011) 08. Mr. Rajeev Singhal (Flat No. 14, Tower No. 4, Signature Homes, Ghaziabad,Uttar Pradesh 201001) 09. Mr. Amit Bansal ( 472, Sector 10, Panchkula, Haryana-134113 ) 10. Mr. Pankaj Kumar (A3, Raj cottage 1/18, Rajendra Nagar, Ghaziabad, Uttar Pradesh-201005)
Certificate to be Annexured











Yes
Yes
No
Yes
Yes
Yes
No
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LAYOUT AT THE TIME OF STANDARD DESIGN APPROVALALREADY BEEN OBTAINED11-12-2023
II. LICENCEALREADY BEEN OBTAINED03-11-2023
III. LOIALREADY BEEN OBTAINED11-09-2023
IV. STANDARD DESIGNALREADY BEEN OBTAINED11-12-2023








Yes


Yes


As per HRERA Act & Rules







THE ARBOUR AT SECTOR 63
25.087
1137
0
1137
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
47684352004733273
Cost of the apartments33734835244715278
Cost of the infrastructure000
Others costs13949516759917995


197065 Lakhs
604987 Lakhs
0 Lakhs
26036 Lakhs
No
31-03-2030
31-03-2030




ARCADE 68 AT SECTOR 68
2
0
16
0
16
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
250234581745
Cost of the apartments000
Cost of the infrastructure626158017
Others costs187618781728


4797 Lakhs
6802 Lakhs
0 Lakhs
0 Lakhs
No
10-11-2027
10-11-2027




ALAMEDA CENTRAL AT SECTOR 73
2.98125
0
40
0
40
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
442148131958
Cost of the apartments1192196158
Cost of the infrastructure1501500
Others costs307927021900


3673 Lakhs
4694 Lakhs
0 Lakhs
1750 Lakhs
No
08-09-2027
08-09-2027




CENTRAL AVENUE HYDE PARK ESTATE, NEW CHANDIGARH
6.6521
0
60
0
60
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
20502050306
Cost of the apartments166016607
Cost of the infrastructure000
Others costs390390299


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2025
30-09-2025




THE GRAND ENCLAVE PANIPAT
10.77
0
76
0
76
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
851385130
Cost of the apartments000
Cost of the infrastructure570057000
Others costs281328132420


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-08-2026
31-08-2026




GARDENCITY CENTRAL AT SECTOR 84
8.0396
0
122
0
122
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2223117139506
Cost of the apartments160839222101
Cost of the infrastructure2703500
Others costs34574417405


10931 Lakhs
20733 Lakhs
0 Lakhs
1384 Lakhs
No
24-08-2024
24-08-2024




INDEPENDENT FLOORS AT DLF CITY PHASE-IV
0.8314
44
0
44
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
747285543149
Cost of the apartments477156942918
Cost of the infrastructure000
Others costs27012860231


7711 Lakhs
8503 Lakhs
0 Lakhs
3834 Lakhs
No
14-11-2024
14-11-2024




INDEPENDENT FLOORS AT ALAMEDA IN SECTOR 73
2.78
116
0
116
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
176601941111289
Cost of the apartments13506162478190
Cost of the infrastructure000
Others costs381131643099


25727 Lakhs
22590 Lakhs
0 Lakhs
10367 Lakhs
No
24-11-2024
24-11-2024




INDEPENDENT FLOOR AT DLF CITY PHASE- I AND II
0.9726
52
0
52
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
619567512442
Cost of the apartments592164662181
Cost of the infrastructure000
Others costs274285262


1284 Lakhs
13638 Lakhs
0 Lakhs
14 Lakhs
No
15-12-2024
15-12-2024




CENTRAL HYDE PARK ESTATE, NEW CHANDIGARH
3.3625
0
43
0
43
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14721472986
Cost of the apartments000
Cost of the infrastructure10821082830
Others costs390390156


16247 Lakhs
734 Lakhs
0 Lakhs
4372 Lakhs
No
31-12-2021
31-12-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEN.A
2WALL FINISHING DETAILSN.A
3KITCHEN DETAILSN.A
4BATHROOM FITTINGSN.A
5WOOD WORK ETCN.A
6DOORS AND WINDOS FRAMESN.A
7GLASS WORKN.A
8ELECTRIC FITTINGSN.A
9CONDUCTING AND WIRING DETAILSN.A
10CUPBOARD DETAILSN.A
11WATER STORAGEN.A
12LIFT DETAILSN.A
13EXTERNAL GLAZINGSN.A
13.1WINDOWS/GLAZINGSN.A
14DOORSN.A
14.1MAIN DOORSN.A
14.2INTERNAL DOORSN.A
15AIR CONDITIONINGN.A
16ELECTRICAL FITTINGSN.A
17CNG PIPE LINEN.A
18PROVISION OF WIFI AND BROADBAND FACILITYN.A
19EXTERNAL FINISHING/COLOUR SCHEMEN.A
20INTERNAL FINISHINGN.A
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN.A
1 . 2 WALLSN.A
1 . 3 CEILINGN.A
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORN.A
2 . 2 WALLSN.A
2 . 3 CEILINGN.A
2 . 4 MODULAR WARDROBESN.A
3 . MASTER TOILET
3 . 1 FLOORN.A
3 . 2 WALLSN.A
3 . 3 CEILINGN.A
3 . 4 COUNTERSN.A
3 . 5 SANITARY WARE/CP FITTINGSN.A
3 . 6 FITTING/FIXTURESN.A
4 . BED ROOMS
4 . 1 FLOORN.A
4 . 2 WALLSN.A
4 . 3 CEILINGN.A
4 . 4 WARDROBESN.A
5 . TOILET
5 . 1 FLOORN.A
5 . 2 WALLSN.A
5 . 3 CEILINGN.A
5 . 4 COUNTERSN.A
5 . 5 SANITARY WARE/CP FITTINGSN.A
5 . 6 FIXTURESN.A
6 . KITCHEN
6 . 1 FLOORN.A
6 . 2 WALLSN.A
6 . 3 CEILINGN.A
6 . 4 COUNTERSN.A
6 . 5 FIXTURESN.A
6 . 6 KITCHEN APPLIANCESN.A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A
7 . 2 WALLS & CEILINGN.A
7 . 3 TOILETN.A
7 . 4 BALCONYN.A
8 . SIT-OUTS
8 . 1 FLOORN.A
8 . 2 WALLS & CEILINGN.A
8 . 3 RAILINGSN.A
8 . 4 FIXTURESN.A












Sr. No.Document DescriptionDate of Document UploadView Document
1ZONING PLAN30-10-2023 View Document
2A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS30-10-2023 View Document
3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.30-10-2023 View Document
4SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN31-10-2023 View Document
5CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT31-10-2023 View Document
6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND06-11-2023 View Document
7STANDARD DESIGN DRAWING- SCO TYPE A23-01-2024 ------
8STANDARD DESIGN DRAWING- SCO SP423-01-2024 ------
9STANDARD DESIGN DRAWING- SCO SP523-01-2024 ------
10STANDARD DESIGN DRAWING- SCO TYPE SP623-01-2024 ------
11DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD23-01-2024 View Document
12NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT23-01-2024 View Document
13IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN23-01-2024 View Document
14AKSHAJRA23-01-2024 ------
15CASH FLOW STATEMENT OF THE PROPOSED PROJECT23-01-2024 View Document
16JAMABANDI23-01-2024 ------
17STANDARD DESIGN DRAWING- SCO SP623-01-2024 ------
18LAND TITLE SEARCH REPORT (FINAL)23-01-2024 ------
19NON ENCUMBRANCE CERTIFICATE23-01-2024 ------
20DEMARCATION PLAN23-01-2024 View Document
21IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN23-01-2024 View Document
22STANDARD DESIGN DRAWING- SCO SP123-01-2024 ------
23STANDARD DESIGN DRAWING- SCO SP223-01-2024 ------
24STANDARD DESIGN DRAWING- SCO SP323-01-2024 ------
25STANDARD DESIGN DRAWING- SCO SP723-01-2024 ------
26STANDARD DESIGN DRAWING- SCO SP823-01-2024 ------
27STANDARD DESIGN DRAWING- SCO TYPE B23-01-2024 ------
28STANDARD DESIGN DRAWING- SCO TYPE C23-01-2024 ------
29STANDARD DESIGN DRAWING- SCO TYPE D23-01-2024 ------
30STANDARD DESIGN DRAWING- SCO TYPE E23-01-2024 ------
31STANDARD DESIGN DRAWING- SCO TYPE F23-01-2024 ------
32STANDARD DESIGN DRAWING- SCO TYPE G23-01-2024 ------
33STANDARD DESIGN DRAWING- SCO TYPE SP723-01-2024 ------
34STANDARD DESIGN DRAWING- SCO TYPE SP823-01-2024 ------
35STANDARD DESIGN DRAWING- SCO- PUBLIC TOILET23-01-2024 ------
36APPROVAL LETTER STANDARD DESIGN & DEMARCATION05-02-2024 ------
37SITE FOR ROAD LAYOUT-MODEL05-02-2024 ------
38SITE LAYOUT FOR FLUSHING & GARDEN HYDRANT SYSTEM-MODEL05-02-2024 ------
39SITE LAYOUT FOR SEWERAGE SYSTEM-MODEL05-02-2024 ------
40SITE LAYOUT FOR STORM WATER-MODEL05-02-2024 ------
41SITE LAYOUT FOR WATER SUPPLY-MODEL05-02-2024 ------
42SPE LETTER05-02-2024 ------