HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1369-2023
Submission Date : 12-07-2023 02:24:53 PM
Applicant Type : Company
Project Type: NEW




GODREJ PROPERTIES LIMITED
3RD FLOOR, UM HOUSE, TOWER A, PLOT NO.35, SECTOR 44, GURUGRAM, HARYANA 122002
012449561500
8448991901 (Number Shared by Promoter in Public)
secretarial@godrejproperties.com
http://www.godrejproperties.com
XXXX995M
L74120MH1985PLC035308
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







GODREJ ARIA & 101 (VOL. III)
NAURANGPUR
GURGAON
GURUGRAM
012449561500
8448991901 (Number Shared by Promoter in Public)
godrej101crm@godrejproperties.com
NITISH DUBEY
012449561500
8448991901 (Number Shared by Promoter in Public)
nitish.dubey@godrejproperties.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1225404-07-2023229040HDFC BANKHRERA Gurugram
2233006-09-20231936957HDFC BANKHRERA Gurugram







2.8375 (Acre)
175
4.9
17.43 (Acre)
47 of 2013 dated 06/06/13 valid upto 05/06/25 - 14.59 109 of 2014 dated 14/08/2014 valid upto 13/08/2024 - 2.83
No
Address     7TH FLOOR, PLOT NO. 15, SECTOR-44, GURGAON-122022
Address     7TH FLOOR, PLOT NO. 15, SECTOR-44, GURGAON-122022
Annexure-B- APPLICANT HAS DEVELOPMENT RIGHTS OVER THE LICENSED LAND BY VIRTUE OF DEVELOPMENT AGREEMENT EXECUTED BETWEEN THE LANDOWNERS I.E. LICENSEE AND THE DEVELOPER
BEFORE THE GRANT OF LICENSE NUMBER 109 OF 2014
Yes
REVENUE WILL BE SHARED BETWEEN THE LANDOWNERS AND THE PROMOTER SUBJECT TO THE TERMS OF THE DEVELOPMENT AGREEMENT
No
Yes
Yes







24508.68 Lakhs
8373.90 Lakhs
8098.35 Lakhs
610.30 Lakhs
7426.13 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.34
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0.48
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER2.01
Total2.83




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS67.20AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM85.10AS PER PROJECT REPORT
3STORM WATER DRAINAGE33.30AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM43.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL38.70AS PER PROJECT REPORT
6STREET LIGHTING10.90AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING18.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15SOFT SCAPE28YET TO BE PREPARED
16HAND SCAPE18YET TO BE PREPARED
17ELECTRICAL SUB STATION94.40YET TO BE PREPARED
18SIGNAGES21.0YET TO BE PREPARED
19LANDSCAPE3.2YET TO BE PREPARED
20HIGH SIDE60.0YET TO BE PREPARED
21COMPOUND WALL AND ENTRANCE GATE89.7YET TO BE PREPARED


10-02-2020 (date)
10-02-2020 (date)
01-10-2023
31-08-2028
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings135.43281
Apartment/Shops/Other Buildings114.18301
Apartment/Shops/Other Buildings92.20131
Apartment/Shops/Other Buildings78.30601
Apartment/Shops/Other Buildings95.23151





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments1028.00
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments161.97
Shops0
Plots0

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments323.93404.92566.88242.95
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments323.93647.87647.87161.97
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments404.92566.88566.88161.97
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments323.93404.92404.92323.93
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments242.9580.98105.77
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Hardscape0
Landscape0
Compound Wall and Entrance Gate0
Electrical Sub Station0
Street Lighting0
Security and Firefighting0
Softscape0
High Side0
Signages0

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Softscape0000
Landscape0000
Electrical Sub Station0000
Street Lighting0000
Security and Firefighting0000
Hardscape0000.36
Compound Wall and Entrance Gate003.5913.45
High Side001.804.80
Signages0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements02.015.379.40
Water Supply System1.702.5510.2110.21
Sewerage treatment & garbage disposal01.555.818.52
Electricity Supply System0.861.293.446.02
Storm Water Drainage0.671.002.664.66
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Compound Wall and Entrance Gate16.1417.9313.458.97
Landscape00.130.480.70
High Side1.201.201.201.20
Signages00.631.682.94
Electrical Sub Station03.7714.1616.99
Hardscape0.542.162.162.16
Softscape1.124.206.165.60
Security and Firefighting00.722.703.24
Street Lighting0.220.331.311.31

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements12.095.376.726.72
Water Supply System10.2113.6117.0212.76
Sewerage treatment & garbage disposal7.755.814.653.10
Electricity Supply System7.743.444.304.30
Storm Water Drainage5.992.664.325.99
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Compound Wall and Entrance Gate7.173.592.692.69
Street Lighting1.311.742.181.63
Security and Firefighting3.602.701.801.44
Softscape4.203.362.240.56
Hardscape2.883.602.701.44
Electrical Sub Station18.8714.169.447.55
Signages3.781.682.733.78
High Side Work4.801.204.804.20
Landscape0.630.480.380.25

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.726.726.040
Water Supply System6.81000
Sewerage treatment & garbage disposal0.770.7700
Electricity Supply System4.304.303.010
Storm Water Drainage2.66000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Compound Wall and Entrance Gate0000
Hardscape0000
Electrical Sub Station3.771.891.891.89
Signages1.681.680.420
High Side Work1.201.4024.007.00
Landscape0.060.0600
Street Lighting0.87000
Security and Firefighting0.720.540.540
Softscape0.56000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000












Yes
No
HDFC BANK LTD GROUND FLOOR JEHANGIR BUILDING M G ROAD FORT MUMBAI MAHARASHTRA 400001
50200039830829
HDFC0003676
110240366
003676
Sagar Teotia, Plot 35, Sector 44, Gurugram-201303
uploaded in documents tab











No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
Yes
No
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCE NO. 47 OF 2013ALREADY BEEN OBTAINED06-06-2013
II. RENEWAL OF LICENCE NO. 47 OF 2013ALREADY BEEN OBTAINED02-08-2021
III. LICENCE NO. 109 OF 2014ALREADY BEEN OBTAINED14-08-2014
IV. RENEWAL OF LICENCE NO. 109 OF 2014ALREADY BEEN OBTAINED30-09-2019
V. ZONING PLANALREADY BEEN OBTAINED14-08-2014
VI. NOC FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED23-07-2014
VII. REVALIDATION OF NOC FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED23-05-2019
VIII. NOC FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED18-05-2015
IX. REVALIDATION OF NOC FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED25-06-2020
X. APPROVAL OF BUILDING PLANALREADY BEEN OBTAINED20-08-2014
XI. APPROVAL OF REVISED BUILDING PLANALREADY BEEN OBTAINED07-08-2015
XII. HUDA NOC FOR CONSTRUCTION PURPOSEALREADY BEEN OBTAINED24-07-2014
XIII. HUDA NOC FOR CONSTRUCTION PURPOSEALREADY BEEN OBTAINED05-05-2015
XIV. APPROVAL OF SERVICE PLAN ESTIMATESALREADY BEEN OBTAINED08-03-2018
XV. APPROVAL OF FIRE SCHEMEALREADY BEEN OBTAINED12-12-2017
XVI. MINING APPROVALALREADY BEEN OBTAINED12-01-2016
XVII. APPROVAL OF ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED01-05-2017
XVIII. FOREST NOCALREADY BEEN OBTAINED11-08-2014
XIX. FOREST NOCALREADY BEEN OBTAINED11-06-2015
XX. ASSURANCE OF ELECTRICAL LOADALREADY BEEN OBTAINED16-08-2016
XXI. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED02-08-2016
XXII. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED29-07-2016
XXIII. CTEALREADY BEEN OBTAINED21-06-2017
XXIV. REAVLIDATION OF BUILDING PLANALREADY BEEN OBTAINED10-02-2020
XXV. REAVLIDATION OF BUILDING PLANALREADY BEEN OBTAINED01-12-2020
XXVI. ARAVALI NOCALREADY BEEN OBTAINED01-12-2014
XXVII. ARAVALI NOCALREADY BEEN OBTAINED02-07-2015
XXVIII. NOC FOR HEIGHT CLEARANCE (14.59 ACS)ALREADY BEEN OBTAINED05-08-2022
XXIX. NOC FOR HEIGHT CLEARANCE (2.83 ACS)ALREADY BEEN OBTAINED05-06-2023








Yes


Yes


The draft agreement is in the prescribed format.







GODREJ RETREAT AROMA
9.7063
0
180
0
177
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3223.822885.792424.21
Cost of the apartments000
Cost of the infrastructure399.18399.18234.43
Others costs4344.524830.494830.49


5763 Lakhs
4650 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ HABITAT
7.46875
452
5
381
5
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
323003447515013
Cost of the apartments000
Cost of the infrastructure000
Others costs11500107358788


16994 Lakhs
29364 Lakhs
0 Lakhs
0 Lakhs
No
25-02-2023
24-08-2024




GODREJ RETREAT SYMPHONY
9.31875
0
166
0
159
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3022.023022.022059.38
Cost of the apartments000
Cost of the infrastructure370.79370.79159.36
Others costs4406.554485.624485.62


7172 Lakhs
6333 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ RETREAT VIBE
7.806
0
141
0
141
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3065.193065.192011.11
Cost of the apartments000
Cost of the infrastructure360.64360.6471.22
Others costs4285.984286.054286.05


7118 Lakhs
5633 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ RETREAT VISTA
6.70
0
119
0
115
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2207.912207.911523.76
Cost of the apartments000
Cost of the infrastructure272.60272.6056.26
Others costs3239.633239.633238.89


5205 Lakhs
4127 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022




GODREJ RETREAT ORCHARD
10.3375
0
187
0
184
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3403.753403.753348.83
Cost of the apartments000
Cost of the infrastructure459.76459.76139.84
Others costs5863.955863.955563.07


8992 Lakhs
7588 Lakhs
0 Lakhs
0 Lakhs
No
08-12-2022
08-12-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
2WALL FINISHING DETAILSACRYLIC EMULSION/OIL BOUND DISTEMPER
3KITCHEN DETAILSVITRIFIED TILES CERAMIC TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
4BATHROOM FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
5WOOD WORK ETC(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
6DOORS AND WINDOS FRAMES(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE) POWDER COATED ALUMINUM / UPVC
7GLASS WORK4MM AND ABOVE AS PER SPECIFICATION
8ELECTRIC FITTINGSAS PER BUILDING NORMS
9CONDUCTING AND WIRING DETAILSAS PER BUILDING NORMS
10CUPBOARD DETAILSNA
11WATER STORAGEUNDERGROUND WATER TANK AND OVERHEAD WATER TANK
12LIFT DETAILS2 IN EACH TOWER- 1 PASSENGER AND 1 SERVICE
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSPOWDER COATED ALUMINUM / UPVC
14DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
14.1MAIN DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
14.2INTERNAL DOORS(LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSAS PER BUILDING NORMS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMETBD
20INTERNAL FINISHINGPROVIDING AND APPLYING 10 TO 12MM THICK PLASTER TO MASONRY AND RCC WALLS, COLUMNS ETC. IN CEMENT MORTAR 1:5 (1
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSCERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER
1 . 3 CEILINGCEMENT : 5 FINE AND COARSE SAND IN EQUAL PROPORTION) INCLUDING CUP-LOCK SCAFFOLDING, HACKING, CHICKEN/FIBRE WIRE MESH, MAKING GROOVES, CORNER PROFILES ETC. WHEREVER REQUIRED COMPLETE AS PER DESIGN AND DRAWING TO THE SATISFACTION OF SITE ENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET &
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSCERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER
2 . 3 CEILINGENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER
3 . 3 CEILINGENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET
3 . 4 COUNTERS8 MM THICK STONE JET BLACK
3 . 5 SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
3 . 6 FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSNA
4 . 3 CEILINGENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI SKID CERAMIC TILES
5 . 2 WALLSCERAMIC TILES TILL 7' ON ALL SIDES & OIL BOUND DISTEMPER
5 . 3 CEILINGGRID CEILING
5 . 4 COUNTERSALL PROVIDED OF STANDARD COMPANY MAKE
5 . 5 SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
5 . 6 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSJET BLACK
6 . 5 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
6 . 6 KITCHEN APPLIANCESALL PROVIDED OF STANDARD COMPANY MAKE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION/OIL BOUND DISTEMPER
7 . 3 TOILETANTI SKID TILE
7 . 4 BALCONYANTI SKID TILE
8 . SIT-OUTS
8 . 1 FLOORANTI SKID TILE
8 . 2 WALLS & CEILINGACRYLIC EMULSION/OIL BOUND DISTEMPER
8 . 3 RAILINGSMS STEEL
8 . 4 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN28-04-2023 View Document
2APPROVAL OF ELECTRICAL ASSURANCE30-04-2023 ------
3REVISED BUILDING PLAN30-04-2023 ------
4ARAVALI NOC30-04-2023 ------
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN28-04-2023 View Document
6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-04-2023 View Document
7APPROVAL OF WATER ASSURANCE30-04-2023 ------
8A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS28-04-2023 View Document
9APPROVAL CONSENT TO ESTABLISH30-04-2023 ------
10FOREST NOC30-04-2023 ------
11APPROVAL OF SEWER ASSURANCE30-04-2023 ------
12CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT07-06-2023 View Document
13REVALIDATION OF BUILDING PLAN05-07-2023 ------
14NOC FOR HEIGHT CLEARANCE10-07-2023 ------
15BUILDING PLAN APPROVAL05-10-2023 ------
16ROAD PLAN05-10-2023 ------
17IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN05-10-2023 View Document
18TOWER-6 SECTION AA & BB05-10-2023 ------
19TOWER-6 ELEVATION 3 & 405-10-2023 ------
20TOWER-5 ELEVATION 1 & 205-10-2023 ------
21TOWER-5 SECTION AA & BB05-10-2023 ------
22BIP-JDR05-10-2023 ------
23SUPERIMPOSED DEMARCATION PLAN05-10-2023 ------
24STORM PLAN05-10-2023 ------
25AAI APPROVAL05-10-2023 ------
26CA CERTIFICATE INVENTORY05-10-2023 ------
27ENVIRONMENT CLEARANCE05-10-2023 ------
28ZONING PLAN05-10-2023 View Document
29TOWER-6 FLOOR PLAN05-10-2023 ------
30SERVICE PLAN LETTER05-10-2023 ------
31SITE AND SERVICES05-10-2023 ------
32OC DATED 01.09.201905-10-2023 ------
33SEWER PLAN05-10-2023 ------
34NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT05-10-2023 View Document
35TOWER-5 FLOOR PLAN05-10-2023 ------
36FIRE SCHEME APPROVAL05-10-2023 ------
37DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.05-10-2023 View Document
38AFFIDAVIT OF PROMOTER REGARDING ARRANGEMENT WITH THE BANK OF MASTER ACCOUNT05-10-2023 ------
39APPROVAL OF SERVICE PLAN ESTIMATE05-10-2023 ------
40ELECTRICAL LOAD AVAILABILITY05-10-2023 ------
41TOWER-5 ELEVATION 3 & 405-10-2023 ------
42TOWER-6 ELEVATION 1 & 205-10-2023 ------
43WATER SUPPLY PLAN05-10-2023 ------