HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2140-2025
Submission Date : 20-01-2026 07:27:06 PM
Applicant Type : Firm
Project Type: NEW


ADANI M2K REALTORS LLP
MIRACLE MILES, 3RD FLOOR, GOLF COURSE EXTENSION ROAD, NEAR PARAS TRINITY TOWER, SECTOR 60, GURUGRAM, HARYANA 122011
1242555000
9289934504 (Number Shared by Promoter in Public)
SatyendraNath.Tiwari@adani.com
ACE0133
ACDFA8954A













THE MARQ
SECTOR 102 & 102A
GURGAON
GURUGRAM
1242555000
1242555000 (Number Shared by Promoter in Public)
satyendranath.tiwari@adani.com
SHAILESH MATHUR
1242555000
9311438981 (Number Shared by Promoter in Public)
Shailesh.mathur@adani.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150079308-01-20262620500ICICI BANKHRERA Gurugram







5.1625 (Acre)
3.12
3.1136
5.1625 (Acre)
131 of 2025 Dated 29.07.2025 and 24 of 2012 Dated 27.03.2012
No
Address     SHOP NO. 25, M2K MALL 16, MANGALAM PLACE DISTRICT CENTRE, SECTOR-3, NORTH WEST, ROHINI, DELHI 110085
Annexure-B- ANNEXURE-B- AS A COLLABORATOR
JDA WAS EXECUTED BEFORE GRANT OF LICENCE
Yes
AS THE COLLABORATION AGREEMENT
No
Yes
Yes







119767.16 Lakhs
25200.00 Lakhs
65850.30 Lakhs
3135.45 Lakhs
25581.41 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 1.007
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 0.6512
4PAVEMENTS 0.9768
5PARKS AND PLAYGROUNDS 1.2302
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 1.2973
Total5.1625




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS171.20AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM149.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE18.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM2400.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL4.40AS PER PROJECT REPORT
6STREET LIGHTING10.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING15.50AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS2.35AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM100.00AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15UNDERGROUND WATER TANK30.00AS PER PROJECT REPORT
16RAIN WATER HARVESTING15.00AS PER PROJECT REPORT
17STP70.00AS PER PROJECT REPORT
18ELECTRICAL SUB STATION150.00AS PER PROJECT REPORT


NA (date)
20-01-2026 (date)
01-04-2026
31-12-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings100.4081
Apartment/Shops/Other Buildings104.5781
Apartment/Shops/Other Buildings119.6222
Apartment/Shops/Other Buildings119.62822
Apartment/Shops/Other Buildings119.7522
Apartment/Shops/Other Buildings119.75902
Apartment/Shops/Other Buildings123.85462
Apartment/Shops/Other Buildings123.8511
Apartment/Shops/Other Buildings128.81361
Apartment/Shops/Other Buildings165.9022
Apartment/Shops/Other Buildings165.90902
Apartment/Shops/Other Buildings128.8111
Apartment/Shops/Other Buildings10.6321
Apartment/Shops/Other Buildings10.6621
Apartment/Shops/Other Buildings10.6221
Apartment/Shops/Other Buildings10.9821
Apartment/Shops/Other Buildings19.0911
Apartment/Shops/Other Buildings19.1641
Apartment/Shops/Other Buildings19.0931
Apartment/Shops/Other Buildings19.1041
Apartment/Shops/Other Buildings19.0931
Apartment/Shops/Other Buildings19.16271
Apartment/Shops/Other Buildings19.21121
Apartment/Shops/Other Buildings19.09121





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments20.8720.87375.74
Shops000
Plots000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments417.49417.49521.87591.34
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments556.441483.481575.862132.30
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3244.113244.114055.325041.17
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments7418.109564.438173.349396.51
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments7599.45
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3.4220.5447.94
Water Supply System7.4529.8044.70
Sewerage treatment & garbage disposal0.220.881.32
Electricity Supply System120.00480.00720.00
Storm Water Drainage0.903.605.40
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Underground water tank1.506.009.00
Renewable energy system5.0020.0030.00
Rain water harvesting0.753.004.50
Security and fire fighting7.75

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements99.300
Water Supply System67.050
Sewerage treatment & garbage disposal1.980
Electricity Supply System1080.000
Storm Water Drainage8.100
Parks and Playgrounds2.350
Clubhouse/community centres00
Shopping area00
Other00
STP35.0035.00
Electrical sub station75.0075.00
Rain water harvesting6.75
Street Lighting10.00
Security and fire fighting7.75
Renewable energy system45.00
Underground water tank13.50












Yes
Yes
ICICI BANK BRANCH ADDRESS SHOP NO. 2 & 3, BESTECH BUSINESS TOWERS, SECTOR 48, SHONA ROAD, GURUGRAM,
777705012129
ICIC0004184
110229286
4184
Mr. Naveen Kumar Mittal- 1825 First Floor, Gate No. 4 of Neelkanth Society, Near Water Overhead Tank, Sector 4, Gurgaon, Haryana 122001
YES











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED26-12-2024
II. FOREST NOCALREADY BEEN OBTAINED04-03-2024
III. HUDA CONSTRUCTIONALREADY BEEN OBTAINED23-12-2024
IV. ECALREADY BEEN OBTAINED21-01-2026
V. BR-IIIALREADY BEEN OBTAINED20-01-2026
VI. ASSURANCE FOR STORM WATERALREADY BEEN OBTAINED23-12-2024
VII. ELECTRICAL LOADALREADY BEEN OBTAINED20-01-2025
VIII. LICENSEALREADY BEEN OBTAINED29-07-2025
IX. ASSURANCE FOR WATER SUPPLYALREADY BEEN OBTAINED24-12-2024
X. ASSURANCE FOR SEWAGE CONNECTIONALREADY BEEN OBTAINED24-12-2024
XI. SERVICE PLANS AND ESTIMATES APPROVALAPPLIED FOR BUT YET TO RECEIVE02-02-2026
XII. FIRE SCHEME APPROVALAPPLIED FOR BUT YET TO RECEIVE02-02-2026








Yes


Yes


As per Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELARGE FORMAT/LUXURY VITRIFIED TILES
2WALL FINISHING DETAILSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & WASH BASIN MIRROR
3KITCHEN DETAILSVITRIFIED TILE UPTO 2' ABOVE COUNTER & ACRYLIC EMULSION PAINT IN BALANCE AREA
4BATHROOM FITTINGSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & WASH BASIN MIRROR
5WOOD WORK ETCNO
6DOORS AND WINDOS FRAMESLAMINATED DOOR, WOODEN DOOR FRAME RED MERANDI OR EQUIVALENT & UPVC/ALUMINUM
7GLASS WORKGLASS ALUMINIUM
8ELECTRIC FITTINGSAS PER DETAIL SHARED IN THE MEP DRAWING BY THE CONSULTANT
9CONDUCTING AND WIRING DETAILSPVC CONDUIT & COPPER WIRING
10CUPBOARD DETAILSNA
11WATER STORAGEYES
12LIFT DETAILS4 LIFTS PER FLOOR AND 1 SERVICE LIFT IN FIRE TOWER
13EXTERNAL GLAZINGSUPVC/ALUMINUM
13.1WINDOWS/GLAZINGSUPVC/ALUMINUM
14DOORSLAMINATED DOOR, WOODEN DOOR FRAME RED MERANDI OR EQUIVALENT
14.1MAIN DOORSLAMINATED DOOR
14.2INTERNAL DOORSWOODEN DOOR FRAME RED MERANDI OR EQUIVALENT
15AIR CONDITIONINGAS PER DETAIL SHARED IN THE MEP DRAWING BY THE CONSULTANT
16ELECTRICAL FITTINGSAS PER DETAIL SHARED IN THE MEP DRAWING BY THE CONSULTANT
17CNG PIPE LINEYES
18PROVISION OF WIFI AND BROADBAND FACILITY3000-4000/ UNIT
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT
20INTERNAL FINISHINGACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORLARGE FORMAT/LUXURY VITRIFIED TILES
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGOIL BASED DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGOIL BASED DISTEMPER
2 . 4 MODULAR WARDROBESNO
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES
3 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & WASH BASIN MIRROR
3 . 3 CEILINGFALSE CEILING WITH OBD
3 . 4 COUNTERSISI STANDARD
3 . 5 SANITARY WARE/CP FITTINGSISI STANDARD
3 . 6 FITTING/FIXTURESISI STANDARD
4 . BED ROOMS
4 . 1 FLOORLAMINATED FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGOIL BASED DISTEMPER
4 . 4 WARDROBESNO
5 . TOILET
5 . 1 FLOORVITRIFIED TILES
5 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & WASH BASIN MIRROR
5 . 3 CEILINGFALSE CEILING WITH OBD
5 . 4 COUNTERSISI STANDARD
5 . 5 SANITARY WARE/CP FITTINGSISI STANDARD
5 . 6 FIXTURESISI STANDARD
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSVITRIFIED TILE UPTO 2' ABOVE COUNTER & ACRYLIC EMULSION PAINT IN BALANCE AREA
6 . 3 CEILINGOIL BASED DISTEMPER
6 . 4 COUNTERSISI STANDARD
6 . 5 FIXTURESISI STANDARD
6 . 6 KITCHEN APPLIANCESISI STANDARD
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGOIL BASED DISTEMPER
7 . 3 TOILETVITRIFIED TILES, COMBINATION OF TILES, ACRYLIC EMULSION PAINT & WASH BASIN MIRROR
7 . 4 BALCONYVITRIFIED TILES
8 . SIT-OUTS
8 . 1 FLOORCERAMIC TILE/VITRIFIED
8 . 2 WALLS & CEILINGOIL BASED DISTEMPER
8 . 3 RAILINGSNA
8 . 4 FIXTURESISI STANDARD












Sr. No.Document DescriptionDate of Document UploadView Document
1 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 02-01-2026 View Document
2 FOREST NOC 24-02-2026 ------
3 LOI 24-02-2026 ------
4 GROUND FLOOR PLAN (COMBINED) 24-02-2026 ------
5 EWS - SECTIONS AND ELEVATION 24-02-2026 ------
6 BASEMENT-1- FLOOR PLAN 24-02-2026 ------
7 TOWER B TERRACE & MUMTY FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
8 TYPICAL ELEVATION-2 & 4-TOWER A & B 24-02-2026 ------
9 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 24-12-2025 View Document
10 ZONING PLAN 02-01-2026 View Document
11 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 20-01-2026 View Document
12 JAMABANDI 24-02-2026 ------
13 EWS FLOOR PLAN & AREA DIAGRAM (2) 24-02-2026 ------
14 TOWER-B FIRST FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
15 BBA 24-02-2026 ------
16 UNIT RERA CARPET AREAS (2) 24-02-2026 ------
17 CLUB 2 (STANDAL ONE CLUB) GROUND & FIRST FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
18 GMDA STORM WATER CONNECTION ASSURANCE 24-02-2026 ------
19 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 02-01-2026 View Document
20 DEMARCATION PLAN 02-01-2026 View Document
21 TYPICAL SECTION-A & B-TOWER B 24-02-2026 ------
22 EWS FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
23 UNIT RERA CARPET AREAS 24-02-2026 ------
24 BASEMENT 3 AREA DIAGRAM 24-02-2026 ------
25 BASEMENT-1 AREA DIAGRAM 24-02-2026 ------
26 EWS - SECTIONS AND ELEVATION 24-02-2026 ------
27 SERVICE PLAN ESTIMATE SUBMISSION RECEIPT 24-02-2026 ------
28 TYPICAL SECTION-A & B-TOWER A 24-02-2026 ------
29 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 19-02-2026 View Document
30 FIREFIGHTING SCHEME 24-02-2026 ------
31 GMDA SEWERAGE ASSURANCE 24-02-2026 ------
32 NON ENCUBRANCE CERTIFICATE AND INFROMATION TO REVENUE 24-02-2026 ------
33 APPROVED PHASING 24-02-2026 ------
34 AAI NOC 24-02-2026 ------
35 ALLOTMENT LETTER 24-02-2026 ------
36 PROJECT PROPONENT 24-02-2026 ------
37 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 24-02-2026 View Document
38 SITE PLAN & GREEN AREA DIAGRAM 24-02-2026 ------
39 TOWER A TYPICAL FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
40 CLUB 2 (STANDALONE CLUB) BUILDING SECTIONS 24-02-2026 ------
41 ALL SALE DEED 24-02-2026 ------
42 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 24-02-2026 View Document
43 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 24-02-2026 View Document
44 BASEMENT-2 AREA DIAGRAM 24-02-2026 ------
45 CLUB 2 (STANDALONE CLUB) BUILDING ELEVATIONS 24-02-2026 ------
46 GROUND COVERAGE & F.A.R. DETAILS (GROUND FLOOR) 24-02-2026 ------
47 TOWER A REFUGE FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
48 SIZRA 24-02-2026 ------
49 AFFIDAVIT - 4(2)(L)(D) 24-02-2026 ------
50 BR-III 24-02-2026 ------
51 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 24-02-2026 View Document
52 EC LETTER 24-02-2026 ------
53 GMDA DRINKING WATER ASSURANCE 24-02-2026 ------
54 ICICI BANK UNDERTAKING 24-02-2026 ------
55 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 24-02-2026 View Document
56 LC IV 24-02-2026 ------
57 MUTATION 24-02-2026 ------
58 NCZ AFFIDAVIT 24-02-2026 ------
59 POWER ASSURANCE 24-02-2026 ------
60 SPA AND JDA 24-02-2026 ------
61 APPROVED REVISED ZONING LAYOUT 24-02-2026 ------
62 BASEMENT 3 24-02-2026 ------
63 BASEMENT-2- FLOOR PLAN 24-02-2026 ------
64 TYPICAL ELEVATION-1 & 3-TOWER A & B 24-02-2026 ------
65 EWS FLOOR PLAN & AREA DIAGRAM (3) 24-02-2026 ------
66 TOWER-A FIRST FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
67 TOWER B TYPICAL FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
68 TOWER B REFUGE FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
69 TOWER A TERRACE & MUMTY FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------
70 TOWER A SERVICE PERSONNEL FLOOR PLAN & AREA DIAGRAM 24-02-2026 ------