Comprehensive Project Details
Project Location Details
Project Name Project Location Project District Project Tehsil Promoter Name
Centra One Sector 61 Gurugram Haryana GURUGRAM Gurgaon COUNTRYWIDE PROMOTERS PRIVATE LIMITED
Project Detail
Project Registration Number Project Id Receiving Date Online Submission Date Current Status Next Date of Hearing Notice Dispatched Notice Dispatched On Notice Tracking Id Notice Dispatched Remarks View Notice Initially Scrutinized Remarks Details of Project(Form A-H)
GGM/684/416/2023/28 DATED 30.01.2023 RERA-GRG-845-2021 07-Apr-2021 05-Apr-2021 APPROVED AND CERTIFICATE UPLOADED NOT REQUIRED Yes 09-Apr-2021 BY HAND BY HAND
Hearing is fixed for 19.04.2021. View Form(A-H)
Project Approval Status
Project Registration Number Uploading Date Remarks View Certificate
GGM/684/416/2023/28 DATED 30.01.2023 28-Apr-2023 RC Uploaded
Project Listing Details
Date of Hearing Proceedings of the day Status Order
30-Jan-2023 Sh. Sumeet, Engineer Executive and Ms. Asha Chartered Accountant briefed about the facts of the case. Sh. Rahul Sharma (AR) is present on behalf of the promoter. The OC of the project after completion of the construction already stands obtained way back in 2018(on 09.10.2018) and the requisite application for renewal of license alongwith requisite fee and undertaking stands submitted to DTCP and renewal of license is under consideration. The AR submits that a security amount of Rs 25 Lakhs is being submitted on account of submission of renewed license no. 277 of 2007 by 28.02.2023 and Rs 25 lakhs on account of submission of approved service plan and estimates within 3 months. In case of failure, the security amount shall be forfeited. Therefore, RC be issued subject to above conditions and further sale in the project shall be made as per the terms and conditions of RC. APPROVED AND READY FOR CERTIFICATE ISSUING PROCESS View Order
16-Jan-2023 The matter is adjourned to 30.01.2023. ADJOURNMENT View Order
02-Jan-2023 Sh. Sumeet, Engineer Executive and Ms. Asha Chartered Accountant briefed about the facts of the case. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The ARs of the promoter is directed to remove the deficiencies and submit the deficit documents as detailed above. The matter is adjourned to 16.01.2023. ADJOURNMENT View Order
19-Dec-2022 The AR of the promoter is directed to remove the deficiencies. The matter to come up on 02.01.2023 ADJOURNMENT View Order
28-Nov-2022 Sh. Sumeet, Engineer Executive and Ms. Asha Chartered Accountant briefed about the facts of the case. Sh. Rahul Sharma (GM) is present on behalf of the promoter. The AR of the promoter requests for three weeks’ time for submission of renewal of license and approved service plan and estimates. Further, the AR of the promoter requests to return the two cheques having no. 547736 and 577737 dated 17.10.2022 amounting to Rs 25 lakhs each submitted as a guarantee for submission of above approvals. The Authority accepts the request. The matter to come up on 19.12.2022.               (Sanjeev Kumar Arora) Member, HARERA Gurugram   (Vijay Kumar Goyal) Member, HARERA Gurugram   (Ashok Sangwan) Member, HARERA, Gurugram   (Dr. K.K. Khandelwal) Chairman, HARERA, Gurugram         ADJOURNMENT ---
17-Oct-2022 Proceedings dated: 17.10.2022 Sh. Sumeet, Engineer Executive and Ms. Asha Chartered Accountant briefed about the facts of the case. Sh. Rahul Sharma (Manager Compliance) is present on behalf of the promoter. License is still not renewed. The matter to come up on 28.11.2022.   (Sanjeev Kumar Arora) Member, HARERA Gurugram   (Vijay Kumar Goyal) Member, HARERA Gurugram   (Ashok Sangwan) Member, HARERA, Gurugram   (Dr. K.K. Khandelwal) Chairman, HARERA, Gurugram         OBJECTION View Order
12-Sep-2022 Sh. Sumeet, Engineer Executive briefed about the facts of the case. None is present on behalf of the promoter. License of the promoter company stands expired on 16.12.2019. Directions of the Authority dated 06.06.2022 with regard to deposit of DD of Rs. 25 lakh as BG for submission of renewal of license and approved service plan estimates has not been complied. As the promoter failed to rectify the deficiencies and comply with the directions despite various opportunities (more than 25 opportunities) a public notice be issued on behalf of the Authority that no sales in this project be effected further by the promoter and public be cautioned not to indulge in any kind of purchase and sale in the project. The Authority hereby exercising the powers under section 5(1) (b) of the Act, 2016 read with rule 5(2) of the  Haryana  Rules, 2017  give show cause notice as why the application for grant of registration should not be rejected and also grant an opportunity to the promoter to rectify the defects  as pointed above within a period of 30 days from the  date of issuance of communication of such defects i.e. today 12.09.2022 and also an opportunity of hearing on 17.10.2022 at 2.00 PM in the office of the Authority.  The matter to come up on 17.10.2022.Member (Sanjeev Kumar Arora)Member (Ashok Sangwan)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT View Order
17-Aug-2022 Ms Geeta Rathee Singh, Sr. legal officer and Sh. Sumeet, Engineer Executive briefed about the facts of the case. Sh. Rahul Sharma (Manager Compliance) is present on behalf of the promoter. The AR seeks two week time for submission of DD required as per directions of the authority. the request is allowed. This will be last opportunity and if the promoter fails to deposit the requisite DD, the case shall be rejected and returned. The matter to come up on 12.09.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
27-Jul-2022 Proceedings dated: 27.07.2022 Sh. Sumeet, Engineer Executive briefed about the facts of the case. Sh. Rahul Sharma (Manager Compliance) is present on behalf of the promoter. The AR requests for one week for submission of DD with a further request to allow three months’ time for submission of deficit documents as per above. The matter to come up on 17.08.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
25-Jul-2022 Proceedings dated: 25.07.2022 Sh. Sumeet, Engineer Executive briefed about the facts of the case. Due to administrative work of the Authority, the matter is adjourned to 27.07.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
06-Jun-2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the case. Sh. Rahul Sharma (Manager Compliance) is present on behalf of the promoter. The authority allowed promoter to submit Demand Draft of Rs 25 Lakhs each as a bank guarantee for submission of renewal of license and approved service plan estimates within 2 months from the date of issuance of registration. In case of failure of submission of license renewal and service plan estimates within specified time, the Demand Draft will be encashed by the authority. The matter to come up on 25.07.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
02-May-2022 Proceedings dated: 02.05.2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the case.No one is present on behalf of the promoter. The promoter sent an email dated 02.05.2022, requesting for 3 weeks’ time for the compliance of the deficit documents. The authority decided to seek clarification from DTCP regarding the approval of service plans and estimates that the occupation certificate was granted without the approved service plan and estimates. The approval of service plans and estimates shall be granted with the license or approval of building plans. On 18.04.2022, the authority directed the promoter to submit corrected Online DPI as per the marking made on the hard copy. Bind copies of DPI to be submitted. The promoter was also directed to submit a bank certificate creating a lien of HARERA to the extent of cheque amount till clearance by Authority. The promoter fails to comply with the directions of the Authority within the given time. The Authority decided to issue a show cause notice as why the application for grant of registration shall not be rejected on account of deficiencies as mentioned above as per provisions of section 5(2)(b) of the Act, 2016 read with rule 5(2) of Haryana Rules, 2017. If promoter has to say anything in the matter, he may represent before the authority on 06.06.2022 at 3.00 PM in the office of the authority or rectify deficiencies before that date.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
18-Apr-2022 Proceedings dated: 18.04.2022 Sh. Ashish Kush, Planning Executive briefed about the facts of the case. Sh. Rahul Sharma (AR) is present on behalf of the promoter. The AR submitted that all the above deficiencies have been attended which needs to be checked by the office. Online DPI also need to be corrected as per the marking made on the hard copy. Binded copies of DPI to be submitted. The promoter applicant is submitting two number of cheques of Rs. 25 lakhs each as security for submission of license renewal and service plan estimates within 3 months. The promoter is also directed to submit a bank certificate creating a lien of HARERA to the extent of cheque amount till clearance by Authority. The Authority is considering the registration in view of the fact that the building has been constructed and has also obtained requisite occupation certificate from DTCP on 09.10.2018 itself and registration is being sought as CC of the project is not obtained and OC was also obtained after coming into force of the Act. The matter to come up on 02.05.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
04-Apr-2022 Proceedings dated: 04.04.2022 Sh. Ashish Kush, briefed about the facts of the case. Sh. Rahul Sharma (Manager Compliance) is present on behalf of the promoter. The Authority directed the promoter to submit the bank guarantee of Rs 25 lakhs on account of submission of license renewal and bank guarantee of Rs 25 lakhs on account of submission of Approved service plan and estimates. The Authority also directed the promoter to submit the deficit fee- Rs 16,96,765/- alongwith the other deficiencies mentioned above. The matter to come up on 18.04.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)  ADJOURNMENT ---
28-Feb-2022 Sh. Ashish Kush, briefed about the facts of the case. None is present is present on behalf of the promoter. However, an e-mail request has been received from the promoter company requesting for an adjournment of two months’ time as the company is in process to apply for completion certificate of the project and removal of other deficiencies conveyed by the Authority. It is noticed that the promoter is trying to delay the process of registration on one pretext or other instead of trying to comply with the deficiencies. One last opportunity be given to the promoter to make compliance with the deficiency notice already conveyed including payment of deficit fees of Rs. 16,96,765/- already demanded and a show cause notice  before rejection of the application under provisions of  section 5 of the Act, 2016 be issued giving four weeks time for necessary compliance by the promoter. The matter to come up on 04.04.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)  ADJOURNMENT ---
24-Jan-2022 Sh. Ashish Kush, briefed about the facts of the case. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The AR request for four week adjournment as many of their executives are suffering from COVID-19 hence not available to fill up the requisite details in DPI. The matter to come up on 28.02.2022.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)  ADJOURNMENT ---
20-Dec-2021 Sh. Ashish Kush, briefed about the facts of the case. Sh. Rahul Sharma (AR) is present on behalf of the promoter. The promoter is hereby afforded last opportunity to complete the deficit information and submit requisite documents. It is surprising to note that in this case without approval of service plans and estimates by the competent authority. The license be immediately got renewed as per the requirement of the Act, 2016. A show cause notice be issued to the promoter as why the application for grant of registration shall not be rejected on account of deficiencies as mentioned above as per provisions of section 5(2)(b) of the Act, 2016 read with rule 5(2) of Haryana Rules, 2017. If promoter has to say anything in the matter he may represent before the authority on 24.01.2022 at 3.00 PM in the office of the authority or rectify deficiencies before that date.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal)  ADJOURNMENT ---
30-Nov-2021 Proceedings dated: 30.11.2021 The hearing is adjourned and matter is fixed for 20.12.2021. ADJOURNMENT ---
09-Nov-2021 Proceedings dated: 09.11.2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. No one is present on behalf of the promoter. The AR of the promoter requests through email for 3 weeks’ time and authority considers the same. The matter to come up on 30.11.2021.Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
19-Oct-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. No one is present on behalf of the promoter. The AR of the promoter requests through email for 3 weeks’ time and authority considers the same. The matter to come up on 09.11.2021.Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
28-Sep-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. No one is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. 1.     The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.     DPI not filled properly. 3.     Deficit Fee- Rs 16,96,765/- 4.     Renewal of license no 277 of 2007 needs to be submitted. 5.     Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.     Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.     Electrical Load availability needs to be submitted. 8.     Non-encumbrance Certificate or ROC needs to be submitted. 9.     Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted.   On 15.07.2021, the promoter requested for the time for compliance of the deficiencies and filing of online DPI same was granted by the authority and matter is fixed for 03.08.2021. No reply was submitted by the promoter till now. On 03.08.2021, the matter was adjourned and fixed for 10.08.2021. On 10.08.2021, the matter was adjourned for 12.08.2021. On 12.08.2021, the hearing was adjourned for 17.08.2021. On 17.08.2021, the AR requested for three weeks’ time and same was granted by the promoter and matter to come up on 07.09.2021. The AR of the promoter requests for 3 weeks’ time and authority considers the same. The matter to come up on 28.09.2021. The promoter requested for the adjournment through the email. The authority considers the request of the adjournment. The matter to come up on 19.10.2021.Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) OBJECTION ---
07-Sep-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. 1.     The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.     DPI not filled properly. 3.     Deficit Fee- Rs 16,96,765/- 4.     Renewal of license no 277 of 2007 needs to be submitted. 5.     Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.     Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.     Electrical Load availability needs to be submitted. 8.     Non-encumbrance Certificate or ROC needs to be submitted. 9.     Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted.   On 15.07.2021, the promoter requested for the time for compliance of the deficiencies and filing of online DPI same was granted by the authority and matter is fixed for 03.08.2021. No reply was submitted by the promoter till now. On 03.08.2021, the matter was adjourned and fixed for 10.08.2021. On 10.08.2021, the matter was adjourned for 12.08.2021. On 12.08.2021, the hearing was adjourned for 17.08.2021. On 17.08.2021, the AR requested for three weeks’ time and same was granted by the promoter and matter to come up on 07.09.2021. The AR of the promoter requests for 3 weeks’ time and authority considers the same. The matter to come up on 28.09.2021.Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) OBJECTION ---
17-Aug-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. 1.     The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.     DPI not filled properly. 3.     Deficit Fee- Rs 16,96,765/- 4.     Renewal of license no 277 of 2007 needs to be submitted. 5.     Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.     Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.     Electrical Load availability needs to be submitted. 8.     Non-encumbrance Certificate or ROC needs to be submitted. 9.     Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted. On 15.07.2021, the promoter requested for the time for compliance of the deficiencies and filing of online DPI same was granted by the authority and matter is fixed for 03.08.2021. No reply was submitted by the promoter till now. On 03.08.2021, the matter was adjourned and fixed for 10.08.2021. On 10.08.2021, the matter was adjourned for 12.08.2021. On 12.08.2021, the matter was adjourned and fixed for 17.08.2021. On the request of the AR of the promoter three weeks’ time is granted. The matter to come up on 07.09.2021.Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
12-Aug-2021 Matter adjourned for 17.08.2021 ADJOURNMENT ---
10-Aug-2021 Matter adjourned for 12.08.2021 ADJOURNMENT ---
03-Aug-2021 Due to Covid-19 pandemic, authority meeting could not be held. Now, the authority has decided to fix the matter on 10.08.2021.  OBJECTION ---
15-Jul-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. The deficiencies still remaining as mentioned below: 1.       The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.       DPI not filled properly. 3.       Deficit Fee- Rs 16,96,765/- 4.       Renewal of license no 277 of 2007 needs to be submitted. 5.       Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.       Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.       Electrical Load availability needs to be submitted. 8.       Non-encumbrance Certificate or ROC needs to be submitted. 9.       Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted. The promoter requested for the time for compliance of the deficiencies and filing of online DPI. On request of the promoter the authority considered the request and the matter to come up on 03.08.2021.Member (Vijay Kumar Goyal)Member (Samir Kumar)Chairman (Dr. K.K. Khandelwal) OBJECTION ---
01-Jul-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On scrutiny of reply some deficiencies are still remaining which are mentioned below: 1.       The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.       DPI not filled properly. 3.       Deficit Fee- Rs 16,96,765/- 4.       Renewal of license no 277 of 2007 needs to be submitted. 5.       Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.       Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.       Electrical Load availability needs to be submitted. 8.       Non-encumbrance Certificate or ROC needs to be submitted. 9.       Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted. The promoter is advised to complete online information on www.hrera.in/app1/sign_up.  The matter to come up on 15.07.2021.Member (Vijay Kumar Goyal)Member (Samir Kumar)Chairman (Dr. K.K. Khandelwal) ADJOURNMENT ---
30-Jun-2021 The matter is Adjourned for 01.07.2021. ADJOURNMENT ---
17-May-2021 Due to COVID-19 Pandemic, the matter is Adjourned for 30.06.2021. ADJOURNMENT ---
23-Apr-2021 Sh. Ashish Kush, Planning Executive briefed about the project.No one is present on behalf of the promoter.  An e-mail request has been received for adjournment in the matter due to lock-down situation in Delhi. Matter to come up on 17.05.2021.The promoter is advised to rectify the deficiencies and submit deficit documents. Dr. K.K.Khandelwal (Chairman)Samir Kumar (Member)Vijay Kumar Goyal (Member)          ADJOURNMENT ---
19-Apr-2021 Due to COVID-19 Pandemic, the matter is Adjourned for 23-04-2021 EXAMINATION BY AUTHORITY ---
Project Deficiency Details
Deficiency Date Deficiency Remarks Online Compliance Done Online Compliance Date Online Compliance Remarks Compliance Date Compliance Remarks
12-Oct-2022 Proceedings dated: 12.09.2022 Sh. Sumeet, Engineer Executive briefed about the facts of the case. None is present on behalf of the promoter. License of the promoter company stands expired on 16.12.2019. Directions of the Authority dated 06.06.2022 with regard to deposit of DD of Rs. 25 lakh as BG for submission of renewal of license and approved service plan estimates has not been complied. As the promoter failed to rectify the deficiencies and comply with the directions despite various opportunities (more than 25 opportunities) a public notice be issued on behalf of the Authority that no sales in this project be effected further by the promoter and public be cautioned not to indulge in any kind of purchase and sale in the project. The Authority hereby exercising the powers under section 5(1) (b) of the Act, 2016 read with rule 5(2) of the  Haryana  Rules, 2017  give show cause notice as why the application for grant of registration should not be rejected and also grant an opportunity to the promoter to rectify the defects  as pointed above within a period of 30 days from the  date of issuance of communication of such defects i.e. today 12.09.2022 and also an opportunity of hearing on 17.10.2022 at 2.00 PM in the office of the Authority.  The matter to come up on 17.10.2022.        Not Yet
16-Sep-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. 1.     The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.     DPI not filled properly. 3.     Deficit Fee- Rs 16,96,765/- 4.     Renewal of license no 277 of 2007 needs to be submitted. 5.     Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.     Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.     Electrical Load availability needs to be submitted. 8.     Non-encumbrance Certificate or ROC needs to be submitted. 9.     Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted.   On 15.07.2021, the promoter requested for the time for compliance of the deficiencies and filing of online DPI same was granted by the authority and matter is fixed for 03.08.2021. No reply was submitted by the promoter till now. On 03.08.2021, the matter was adjourned and fixed for 10.08.2021. On 10.08.2021, the matter was adjourned for 12.08.2021. On 12.08.2021, the hearing was adjourned for 17.08.2021. On 17.08.2021, the AR requested for three weeks’ time and same was granted by the promoter and matter to come up on 07.09.2021. The AR of the promoter requests for 3 weeks’ time and authority considers the same. The matter to come up on 28.09.2021.Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) Not Yet
20-Aug-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. 1.     The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.     DPI not filled properly. 3.     Deficit Fee- Rs 16,96,765/- 4.     Renewal of license no 277 of 2007 needs to be submitted. 5.     Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.     Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.     Electrical Load availability needs to be submitted. 8.     Non-encumbrance Certificate or ROC needs to be submitted. 9.     Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted. On 15.07.2021, the promoter requested for the time for compliance of the deficiencies and filing of online DPI same was granted by the authority and matter is fixed for 03.08.2021. No reply was submitted by the promoter till now. On 03.08.2021, the matter was adjourned and fixed for 10.08.2021. On 10.08.2021, the matter was adjourned for 12.08.2021. On 12.08.2021, the matter was adjourned and fixed for 17.08.2021. On the request of the AR of the promoter three weeks’ time is granted. The matter to come up on 07.09.2021.Member (Samir Kumar)Member (Vijay Kumar Goyal)Chairman (Dr. K.K. Khandelwal) Not Yet
17-Jul-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The Promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On 01.07.2021, the authority advised the promoter to remove the deficiencies and complete the online information on www.hrera.in/app1/sign_up and matter is fixed for 15.07.2021. The promoter did not submit any reply after 01.07.2021. The deficiencies still remaining as mentioned below: 1.       The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.       DPI not filled properly. 3.       Deficit Fee- Rs 16,96,765/- 4.       Renewal of license no 277 of 2007 needs to be submitted. 5.       Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.       Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.       Electrical Load availability needs to be submitted. 8.       Non-encumbrance Certificate or ROC needs to be submitted. 9.       Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted. The promoter requested for the time for compliance of the deficiencies and filing of online DPI. On request of the promoter the authority considered the request and the matter to come up on 03.08.2021.Member (Vijay Kumar Goyal)Member (Samir Kumar)Chairman (Dr. K.K. Khandelwal) Not Yet
02-Jul-2021 Sh. Ashish Kush, Planning Executive briefed the facts about the project. Sh. Rahul Sharma (Manager) is present on behalf of the promoter. The promoter M/s Countrywide Promoters Pvt. Ltd. who is a collaborator applied for the registration of real estate project namely “Centra One” located at Sector-61, Gurugram under section 4 of the Real Estate (Regulations and Development) Act, 2016 vide central receipt no. 10458/18778 dated 07.04.2021 and RPIN-323. The Temp I.D. of REP – I (Part A-H) is RERA -GRG-PROJ-845-2021. The project area for registration is same as that of the licensed area i.e. 3.675 acres vide License no – 277 of 2007 dated 17.12.2007 and the Occupation Certificate has been obtained dated 09.10.2018 for the 18641.67sqm which includes commercial building (Ground Floor to 14th Floor). The application for registration was scrutinized and 1st deficiency notice vide notice no. HARERA/GGM/RPIN/323 dated 09.04.2021 was issued to the promoter with an opportunity of being heard on 19.04.2021, but the hearing is adjourned due to COVID-19 Pandemic and the matter is adjourned for 23.04.2021. On 23.04.2021 the promoter requested for the adjournment. The authority accepts the request and fixed the matter for 17.05.2021. On 17.05.2021 the hearing is adjourned due to COVID Pandemic and the matter is fixed for 30.06.2021. The promoter submitted the reply on 30.06.2021. On 30.06.2021 the hearing is adjourned and fixed for 01.07.2021. On scrutiny of reply some deficiencies are still remaining which are mentioned below: 1.       The annexures in the online application are not uploaded as well as the correction needs to be done in the online application (A-H). 2.       DPI not filled properly. 3.       Deficit Fee- Rs 16,96,765/- 4.       Renewal of license no 277 of 2007 needs to be submitted. 5.       Approved Service Plans and Estimates needs to be submitted if applied than copy of applied service plans and estimates needs to be submitted. 6.       Approvals / NOC’s from various agencies for connecting external services like sewerage disposal, storm water drainage needs to be submitted. 7.       Electrical Load availability needs to be submitted. 8.       Non-encumbrance Certificate or ROC needs to be submitted. 9.       Copy of brochure of the project. 10.   Project Report and PERT Chart needs to be submitted. 11.   REP-II needs to be submitted. 12.   Draft Allotment letter is not as per the prescribed format needs to be revised. 13.   Draft Builder Buyer Agreement is not as per the prescribed format needs to be revised. 14.   Details of all three bank accounts needs to be provided in DPI. 15.   Bank undertaking duly acknowledged by bank for operation of bank account specifying same to be 70% collection account as per RERA rules needs to be provided. 16.   Affidavit by the promoter, Keeping in view the provisions of section 4 (2) (l) (D) of the Real Estate (Regulation & Development) Act, 2016 needs to be submitted. The promoter is advised to complete online information on www.hrera.in/app1/sign_up.  The matter to come up on 15.07.2021.Member (Vijay Kumar Goyal)Member (Samir Kumar)Chairman (Dr. K.K. Khandelwal) Not Yet