HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1826-2024
Submission Date : 08-01-2025 11:21:26 PM
Applicant Type : Company
Project Type: NEW




NAVRAJ TOWNSHIP PVT. LTD.
SHOP NO. - 38, VATIKA CITY MARKET, SECTOR - 49, GURGAON, HARYANA, INDIA, 122018
0124518099
8826592326 (Number Shared by Promoter in Public)
legal@navrajindia.com
https://navrajindia.com/
XXXX651D
U68200HR2023PTC110200
 
 


 
 


 
 


 
 


 
 







THE KINGSTOWN HEIGHTS
SECTOR 37D
KADIPUR ST
GURUGRAM
0124518099
7861911919 (Number Shared by Promoter in Public)
legal@navrajindia.com
AMIT TYAGI
0124518099
7861911919 (Number Shared by Promoter in Public)
amit.tyagi@navrajindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150130002-01-2025500000ICICI BANK HRERA Gurugram
250131129-01-20252962810ICICI BANK HRERA Gurugram







3.497 (Acre)
3.5
3.0355
3.497 (Acre)
120 of 2024
No
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Address     PLOT NO. 114, SECTOR-44, GURUGRAM, HARYANA
Annexure-B- COLLABORATOR
BEFORE
Yes
ATTACHED
No
Yes
Yes







120804.64 Lakhs
21498.31 Lakhs
60705.87 Lakhs
11321.76 Lakhs
27278.7 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2.364
3CONSTRUCTION OF ROADS0.30
4PAVEMENTS0.041
5PARKS AND PLAYGROUNDS0.540
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0.070
9CLUB HOUSE0.102
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.080
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total3.497




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP - ALREADY CONNECTEDNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS250AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM325AS PER PROJECT REPORT
3STORM WATER DRAINAGE425AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM1800AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL425AS PER PROJECT REPORT
6STREET LIGHTING150AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1500AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS350AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE2232.53AS PER PROJECT REPORT
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM350AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15STP250AS PER PROJECT REPORT
16UNDERGROUND WATER TANK180AS PER PROJECT REPORT
17RAIN WATER HARVESTING70AS PER PROJECT REPORT
18ELECTRICAL SUB STATION2764.94AS PER PROJECT REPORT
19CONSTRUCTION OF CIRCULATION ROAD 250AS PER PROJECT REPORT


07-01-2025 (date)
07-01-2025 (date)
01-08-2025
01-03-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings140.5753723
Apartment/Shops/Other Buildings289.37733
Apartment/Shops/Other Buildings23.1461201





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments01408.791878.38
Shops000
Plots000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2347.981408.796131.874481.50
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4926.383779.265477.895071.28
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5281.715045.744790.103259.52
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2395.052188.29833.420
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements50
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Construction of circulation road50
Security and Fire Fighting210

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres0223.25223.35
Shopping area000
Other000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres223.35223.35223.35223.35
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres111.63111.63111.630
Shopping area0000
Other0000
Security and fire fighting0150150150

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00075
Water Supply System097.597.5130
Sewerage treatment & garbage disposal127.5127.5127.542.5
Electricity Supply System540360540360
Storm Water Drainage127.5127.5127.542.5
Parks and Playgrounds0000
Clubhouse/community centres00111.63111.63
Shopping area0000
Other0000
Construction of circulation road5037.5037.50
Security and fire fighting30030015075
Electrical sub station552.99414.74414.74
Underground water tank5472
Street Lighting4560
STP75100
Rain water harvesting2128

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements100750
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds1751750
Clubhouse/community centres111.63111.63111.63
Shopping area000
Other000
Construction of circulation road505025
Electrical sub station552.99552.99276.49
Security and fire fighting15075
Renewable energy system350
Underground water tank54
Rain water harvesting21
Street lighting45
STP75












Yes
No
SECTOR 69, GURUGRAM
924020069949936
UTIB0004762
110211349
3480008
1) Raj Singh, S/o Kanwar Pal, Flat No. - 1102, Tower A3, Tulip Orange Tower, Sector - 70, Badshahpur, Gurugram, Haryana - 122101 2) Naveen Kumar, S/o Hemchander, F-201, Tulip Ivory, Sector - 70, Badshahpur, Gurgaon, Haryana, 122101
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED14-08-2024
II. DEMARCATION CUM ZONING PLANALREADY BEEN OBTAINED20-08-2024
III. BUILDING PLAN AND SITE PLANALREADY BEEN OBTAINED07-01-2025








Yes


Yes


Attached













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE /VITRIFIED TILES/LAMINATED WOODEN FLOORING
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT/OBD
3KITCHEN DETAILSIMPORTED MARBLE /VITRIFIED TILES / GRANITE
4BATHROOM FITTINGSALL SANITARY FIXTURES OF PREMIUM BRAND
5WOOD WORK ETCMODULAR CABINET - SOFT CLOSING BANK/SOFT CLOSE SHUTTERS UNDER COUNTER ONLY, LAMINATED PARTICLE BOARD WARDROBE & VANITY
6DOORS AND WINDOS FRAMESUPVC/ALUMINIUM DOORS / WINDOW
7GLASS WORKHIGH PERFORMANCE GLASS
8ELECTRIC FITTINGSGEYSERS & EXHAUST FAN PROVISION ONLY IN KITCHEN & TOILETS .MODULAR SWITCHES & SOCKETS, COPPER WIRING OF BRANDED MAKE.
9CONDUCTING AND WIRING DETAILSPVC CONDUITING & FRLS WIRING
10CUPBOARD DETAILSN./A
11WATER STORAGERCC TANK
12LIFT DETAILSHIGH SPEED ELEVATORS
13EXTERNAL GLAZINGSCURTAIN GLAZING WITH HIGH PERFORMANCE GLASS
13.1WINDOWS/GLAZINGSUPVC/ALUMINIUM / DOORS / WINDOW WITH HIGH PERFORMANCE GLASSES
14DOORSHARD WOOD DOOR FRAME & DESIGNER VENEER/LAMINATED FLUSH DOOR SHUTTER
14.1MAIN DOORSDESIGNER VENEER FLUSHED DOOR AS/DESIGN
14.2INTERNAL DOORSVENEERED/LAMINATED FLUSHED DOOR WITH WOODEN ARCHITRAVE & FRAME
15AIR CONDITIONINGVRV SYSTEM WITH HI-WALL UNITS OF ADEQUATE CAPACITIES DESIGNED BY MEP CONSULTANTS OF PREMIUM BRANDS.
16ELECTRICAL FITTINGSGEYSERS & EXHAUST FAN PROVISION ONLY IN KITCHEN & TOILETS .MODULAR SWITCHES & SOCKETS, COPPER WIRING OF BRANDED MAKE.
17CNG PIPE LINEPROVISION OF IGL PIPE LINE
18PROVISION OF WIFI AND BROADBAND FACILITYCONNECTIVITY PROVOSION THROUGH SERVICE PROVIDER
19EXTERNAL FINISHING/COLOUR SCHEMERUSTIC FINISH PAINT WITH WEATHER SHIELD MAX TOP COAT
20INTERNAL FINISHINGPLASTIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIMPORTED MARBLE FLOORING
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOOD/ VITRIFIED TILE
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORANTI SKID VITRIFIED TILES
3 . 2 WALLSCERAMIC/VITRIFIED TILES UPTO FALSE CEILING
3 . 3 CEILINGMOISTURE RESISTANT GYPSUM/BOARD FALSE CEILING
3 . 4 COUNTERSGRANITE STONE
3 . 5 SANITARY WARE/CP FITTINGS- WOODEN VANITY WITH GRANITE COUNTER. - WHITE SANITARY FIXTURES OF PREMIUM BRANDS - CP FITTINGS OF PREMIUM BRANDS
3 . 6 FITTING/FIXTURESALL SANITARY FIXTURES OF PREMIUM BRAND
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN/VITRIFIED TILES
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORANTI SKID VITRIFIED TILES
5 . 2 WALLSCERAMIC/VITRIFIED TILES UPTO FALSE CEILING
5 . 3 CEILINGMOISTURE RESISTANT GYPSUM/BOARD FALSE CEILING
5 . 4 COUNTERSGRANITE STONE
5 . 5 SANITARY WARE/CP FITTINGS- WOODEN VANITY WITH GRANITE COUNTER. - WHITE SANITARY FIXTURES OF PREMIUM BRANDS - CP FITTINGS OF PREMIUM BRANDS
5 . 6 FIXTURESALL SANITARY FIXTURES OF PREMIUM BRAND
6 . KITCHEN
6 . 1 FLOORIMPORTED MARBLE /VITRIFIED TILES
6 . 2 WALLSCERAMIC TILES UPTO 1500MM LEVEL FROM FFL
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE COUNTER TOP
6 . 5 FIXTURESALL SANITARY FIXTURES OF PREMIUM BRAND
6 . 6 KITCHEN APPLIANCESSTAINLESS STEEL SINK OF PREMIUM BRAND
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGOBD/CERAIMIC TILES DADO 1500 MM HIGH
7 . 3 TOILETCERAMIC TILES UPTO FALSE CEILING
7 . 4 BALCONYWEATHER PROOF PAINT
8 . SIT-OUTS
8 . 1 FLOORANTI SKID VITRIFIED TILES
8 . 2 WALLS & CEILINGWEATHER PROOF PAINT
8 . 3 RAILINGSMS/ SS RAILING WITH GLASS
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1DEMARCATION PLAN19-12-2024 View Document
2ZONING PLAN19-12-2024 View Document
3DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD19-12-2024 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN08-01-2025 View Document
5CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT08-01-2025 View Document
6DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.08-01-2025 View Document
7A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS08-01-2025 View Document
8SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN08-01-2025 View Document
9COPY OF LICENSE ALONG WITH SCHEDULE OF LAND18-02-2025 View Document
10ASSURANCE DRINKING WATER 18-02-2025 ------
11AFFIDAVITB BANK GURANTEE FOR FIRE SERVICE EC18-02-2025 ------
12BBA18-02-2025 ------
13SITE PLAN SUPERIMPOSED ON DEMARCATION PLAN18-02-2025 ------
14NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT18-02-2025 View Document
15IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN18-02-2025 View Document
16BR III18-02-2025 ------
17CA NET WORTH18-02-2025 ------
18FIRE SCHEME ONLINE RECEIPT18-02-2025 ------
19APPLICATION FORM18-02-2025 ------
20LC IV A18-02-2025 ------
21ASSURANCE POWER 18-02-2025 ------
22ASSURANCE SEWERAGE CONNECTION 18-02-2025 ------
23ASSURANCE STORM WATER 18-02-2025 ------
24CA INVENTORY18-02-2025 ------
25FOREST NOC18-02-2025 ------
26LC IV18-02-2025 ------
27AFFIDAVIT AREA SHARING18-02-2025 ------
28ASSURANCE CONSTRUCTION WATER18-02-2025 ------
29AFFIDAVIT 42LD18-02-2025 ------
30MINING PERMISSION18-02-2025 ------
31BR BANK ACC18-02-2025 ------
32JDA18-02-2025 ------
33PROJECT REPORT NEW18-02-2025 ------
34CASH FLOW STATEMENT OF THE PROPOSED PROJECT18-02-2025 View Document
35CA PROJECT COST & INCURRED18-02-2025 ------
36CA COSTING CERTIFICATE18-02-2025 ------
37BR- AUTHORISED SIGNATORY18-02-2025 ------
38PHASING DWG APPROVED18-02-2025 ------
39GST CERTIFICATE18-02-2025 ------
40LOI18-02-2025 ------
41JDA_TOWNSHIP18-02-2025 ------
42ALLOTMENT LETTER18-02-2025 ------
43AFFIDAVIT (POWER LINE, NATURAL CONSERVATION ZONE, HIGH TENSION)18-02-2025 ------
44CA LAND COST18-02-2025 ------
45ENVIRONMENT CLEARANCE RECOMMENDATION18-02-2025 ------
46GPA18-02-2025 ------
47PHASING PLAN APPROVAL LETTER18-02-2025 ------
48TREE CUTTING - NOC18-02-2025 ------