HRERA GurugramTemp Project Id : RERA-GRG-PROJ-941-2021
Submission Date : 30-12-2021 10:35:34 AM
Applicant Type : Company
Project Type: NEW




DLF LIMITED
DLF SHOPPING MALL, 3RD FLOOR, ARJUN MARG, DLF CITY, PHASE I, GURUGRAM 122002, HARYANA (INDIA)
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in/
XXXX494N
L70101HR1963PLC002484
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







THE GROVE
DLF 5, SECTOR 54
WAZIRABAD ST
GURUGRAM
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
SUNIL KUMAR
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152005703-12-20211873600ICICI BANKHRERA Gurugram







5.3073 (Acre)
2.49
2.49
5.3073 (Acre)
Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF 5 (earlier known as DLF City Phase V), in which the plots fall.
Yes







69650.50 Lakhs
22304.33 Lakhs
38532.09 Lakhs
0 Lakhs
8814.08 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS5.3073
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total5.3073




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCOMPLETEDYes
WATER SUPPLYCOMPLETEDYes
ELECTRICITYCOMPLETEDYes
SEWAGE DISPOSALCOMPLETEDYes
STORM WATER DRAINAGECOMPLETEDYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM0AS PER PROJECT REPORT
3STORM WATER DRAINAGE0AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0AS PER PROJECT REPORT
6STREET LIGHTING0AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT


20-11-2020 (date)
29-11-2021 (date)
01-03-2022
31-12-2025
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings126.10141
Apartment/Shops/Other Buildings138.46741
Apartment/Shops/Other Buildings128.246123
Apartment/Shops/Other Buildings128.286205
Apartment/Shops/Other Buildings128.29582
Apartment/Shops/Other Buildings128.34082
Apartment/Shops/Other Buildings128.37541
Apartment/Shops/Other Buildings128.4638421
Apartment/Shops/Other Buildings139.71941
Apartment/Shops/Other Buildings141.80441
Apartment/Shops/Other Buildings143.09741
Apartment/Shops/Other Buildings146.34541
Apartment/Shops/Other Buildings148.02441
Apartment/Shops/Other Buildings148.19441
Apartment/Shops/Other Buildings149.93441
Apartment/Shops/Other Buildings150.01841
Apartment/Shops/Other Buildings150.306287
Apartment/Shops/Other Buildings150.43741
Apartment/Shops/Other Buildings154.18041
Apartment/Shops/Other Buildings184.67541
Apartment/Shops/Other Buildings201.39441
Apartment/Shops/Other Buildings216.09482
Apartment/Shops/Other Buildings216.637369
Apartment/Shops/Other Buildings216.81341
Apartment/Shops/Other Buildings217.06141
Apartment/Shops/Other Buildings217.09741
Apartment/Shops/Other Buildings217.99241
Apartment/Shops/Other Buildings219.09841
Apartment/Shops/Other Buildings234.72241
Apartment/Shops/Other Buildings287.36341





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments5391.46
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments18709.153414.614574.744542.82
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4452.253394.883535.423782.95
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3495.173317.812614.802544.53
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1352.511299.021476.381752.01
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2026)
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
ICICI BANK LIMITED, GROUND FLOOR, GOPAL DAS BHAWAN, CONNAUGHT PLACE, NEW DELHI -110001
135205000815
ICIC0001352
110229137
1352
01. Mr. Vivek Anand (E1001, Palm Springs, Golf Course Road, opposite IBIS Hotel,Sector 54, Gurgaon, Haryana 122002) 02. Mr. Puneet Rakheja (H.No. 386, Sector 31,Faridabad, Haryana 121003) 03. Mr. Pankaj Jain (C701, Apex Acacia Valley, Sector 3,Ghaziabad, Uttar Pradesh 201010) 04. Mr. Saurabh Kumar Gupta (1116, Vikas Kunj,Vikaspuri, Delhi 110018) 05. Mr. Gaurav Arora (A-33, Near Mehfil Banquet Hall,Mahendru Enclave, GT Karnal Road, Delhi 110009) 06. Ms. Sandhya Singla (NeelanchalApartments, Plot No. 3, Sector 4, Swarka, Delhi 110075) 07. Mr. Ashok Nanda (A255,Surya Nagar, Chander Nagar, Ghaziabad, Uttar Pradesh 201011) 08. Mr. Rajeev Singhal(Flat No. 14, Tower No. 4, Raj Nagar Extension, Signature Homes, Ghaziabad, UttarPradesh 201001) 09. Mr. Sujeet Kumar Sinha (C-061, DLF New Town Heights, IMTManesar, Sector 91, Gurgaon, Haryana 122505) 10. Mr. Pankaj Kumar (A3, Rajcottage1/18, Rajendra Nagar, Ghaziabad, Uttar Pradesh 201005)
No Default











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ZONINGALREADY BEEN OBTAINED26-10-2016
II. LAYOUT PLAN ALREADY BEEN OBTAINED20-11-2020
III. BR-IIIALREADY BEEN OBTAINED28-11-2021








Yes


Yes


As per HARERA Act &Rules;







INDEPENDENT FLOORS AT DLF CITYPHASE III, DLF CITY PHASE III, SECTOR24, GURUGRAM, HARYANA
1.243
48
0
48
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
628062801607
Cost of the apartments52445244875
Cost of the infrastructure000
Others costs610961092544


3702 Lakhs
14952 Lakhs
0 Lakhs
2287 Lakhs
No
31-12-2024
31-12-2024




THE ULTIMA (PHASE II), VILLAGE LAKHNOLA, SECTOR-81, TEHSIL MANESAR, DISTRICT GURUGRAM, HARYANA
11.343
496
0
496
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-11-2020
30-05-2021










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE/STONE/MARBLE/GRANITE
2WALL FINISHING DETAILSEMULSION PAINT/ WALL COVERING/ MARBLE LIFT JAMBS
3KITCHEN DETAILSN/A
4BATHROOM FITTINGSN/A
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESMODULAR / UPVC/ AL
7GLASS WORKINCLUDED ABOVE
8ELECTRIC FITTINGSMODULAR FITTINGS AND MODULAR TOUCH SWITCHES IN SELECT AREAS. HOME AUTOMATION WITH CONTROL DEVICE IN SELECT AREAS
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FRLS WIRING
10CUPBOARD DETAILSMODULAR WARDROBES
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSSGU/ DGU IN UPVC/AL FRAME
13.1WINDOWS/GLAZINGSSINGLE/DOUBLE GLASS UNIT WITH GLASS IN UPVC / AL / MS FRAMES & SHUTTERS
14DOORSPAINTED/LAMINATED/POLISHED FLUSH DOOR/ SKIN DOOR
14.1MAIN DOORSPAINTED/LAMINATED/POLISHED FLUSH DOOR/ SKIN DOOR
14.2INTERNAL DOORSPAINTED/LAMINATED/POLISHED FLUSH DOOR/ SKIN DOOR
15AIR CONDITIONINGVRV SYSTEM
16ELECTRICAL FITTINGSMODULAR FITTINGS AND MODULAR TOUCH PANELS IN SELECT AREAS
17CNG PIPE LINE-
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER SHIELD/ SNOWCEM PAINT, TERRACE GARDEN WITH TILE/SOFTSCAPE & SEATING IN SELECT AREAS ONLY
20INTERNAL FINISHINGN/A
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE/ ENGINEERED MARBLE/ TILE
1 . 2 WALLSEMULSION PAINT /OBD
1 . 3 CEILINGEMULSION PAINT / OBD/ LIMITED FALSE CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSEMULSION PAINT/ OBD
2 . 3 CEILINGEMULSION PAINT / OBD/ LIMITED FALSE CEILING
2 . 4 MODULAR WARDROBESMODULAR WARDROBES
3 . MASTER TOILET
3 . 1 FLOORMARBLE/ TILE
3 . 2 WALLSMARBLE/ TILE/ MIRROR
3 . 3 CEILINGEMULSION PAINT / OBD/ LIMITED FALSE CEILING
3 . 4 COUNTERSMARBLE/GRANITE WITH MODULAR VANITY
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN, WALL HUNG WC, SHOWER, HEALTH FAUCET, BASIN MIXTURE
3 . 6 FITTING/FIXTURESGLASS SHOWER-PARTITION IN TOILETS, EXHAUST FAN, GEYSER, TOILET PAPER HOLDER
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLS EMULSION PAINT/ OBD
4 . 3 CEILINGEMULSION PAINT / OBD/ LIMITED FALSE CEILING
4 . 4 WARDROBESMODULAR WARDROBES
5 . TOILET
5 . 1 FLOORMARBLE/TILE
5 . 2 WALLSTILE/ MIRROR
5 . 3 CEILINGEMULSION PAINT / OBD/ LIMITED FALSE CEILING
5 . 4 COUNTERSMARBLE/ GRANITE WITH MODULAR VANITY
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN, WALL HUNG WC, SHOWER, HEALTH FAUCET, BASIN MIXTURE
5 . 6 FIXTURESGLASS SHOWER-PARTITION IN TOILETS, EXHAUST FAN, GEYSER, TOILET PAPER HOLDER
6 . KITCHEN
6 . 1 FLOORTILE/STONE
6 . 2 WALLSTILES UP-TO 2’ ABOVE COUNTER & EMULSION PAINT/ OBD IN BALANCE AREA
6 . 3 CEILINGEMULSION PAINT / OBD/ LIMITED FALSE CEILING
6 . 4 COUNTERSMARBLE / GRANITE /SYNTHETIC STONE/ ENGINEERED STONE
6 . 5 FIXTURESCP FITTINGS, SS SINK, EXHAUST FAN, GEYSER
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN WITH HOB, CHIMNEY, OVEN, MICROWAVE, DISHWASHER, REFRIGERATOR, WASHING MACHINE (AT BALCONY)
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILE/ IPS FLOORING
7 . 2 WALLS & CEILINGOBD
7 . 3 TOILETTILE FLOORING & CLADDING, CONVENTIONAL CP FITTINGS, CHINAWARE
7 . 4 BALCONYTILE
8 . SIT-OUTS
8 . 1 FLOORTILE
8 . 2 WALLS & CEILINGOBD/ EMULSION PAINT
8 . 3 RAILINGSMS / GLASS
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN16-12-2021 View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.16-12-2021 View Document
3SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN16-12-2021 View Document
4DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD16-12-2021 View Document
5DEMARCATION PLAN16-12-2021 View Document
6ZONING PLAN16-12-2021 View Document
7IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN16-12-2021 View Document
8A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS16-12-2021 View Document
9COPY OF LICENSE ALONG WITH SCHEDULE OF LAND17-12-2021 View Document
10FLOOR PLANS, ELEVATION, SECTION DRAWING 619-02-2022 ------
11SALE DEED 219-02-2022 ------
12CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT18-02-2022 View Document
13CASH FLOW STATEMENT OF THE PROPOSED PROJECT18-02-2022 View Document
14NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT18-02-2022 View Document
15FLOOR PLANS, ELEVATION, SECTION DRAWING 119-02-2022 ------
16FLOOR PLANS, ELEVATION, SECTION DRAWING 219-02-2022 ------
17FLOOR PLANS, ELEVATION, SECTION DRAWING 319-02-2022 ------
18FLOOR PLANS, ELEVATION, SECTION DRAWING 419-02-2022 ------
19FLOOR PLANS, ELEVATION, SECTION DRAWING 519-02-2022 ------
20FLOOR PLANS, ELEVATION, SECTION DRAWING 719-02-2022 ------
21FLOOR PLANS, ELEVATION, SECTION DRAWING 819-02-2022 ------
22FLOOR PLANS, ELEVATION, SECTION DRAWING 919-02-2022 ------
23FLOOR PLANS, ELEVATION, SECTION DRAWING 1019-02-2022 ------
24FLOOR PLANS, ELEVATION, SECTION DRAWING 1119-02-2022 ------
25FLOOR PLANS, ELEVATION, SECTION DRAWING 1219-02-2022 ------
26FLOOR PLANS, ELEVATION, SECTION DRAWING 1319-02-2022 ------
27SALE DEED 119-02-2022 ------
28BRS III -119-02-2022 ------
29BRS III -219-02-2022 ------
30BRS III -319-02-2022 ------