HRERA GurugramTemp Project Id : RERA-GRG-PROJ-266-2019
Submission Date : 03-07-2019 06:01:29 AM
Applicant Type : Company
Project Type: ONGOING




PAREENA INFRASTRUCTURES PVT. LTD.
C7A IIND FLOOR, OMAXE CITY CENTRE MALL, SOHNA ROAD, SECTOR 49, GURUGRAM, HARYANA
01242219440
8800693505 (Number Shared by Promoter in Public)
pareenabuilders@gmail.com
https://www.pareena.in/
XXXX883J
U45400DL2012PTC244739
 
 


 
 


 
 







THE ELITE RESIDENCES /EXPRESS HEIGHTS
VILLAGE DHANKOT, SECTOR 99
HARSARU ST
GURUGRAM
01242219440
9818146886 (Number Shared by Promoter in Public)
info@pareena.in
MUKESH GUPTA
01242219440
9818146886 (Number Shared by Promoter in Public)
mgengineers9@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
145874327-07-2017323700INDUSIND BANK HRERA Gurugram
2758703-07-2019283300IDBI BANKHRERA Gurugram
3766006-08-2019330700IDBI BANKHRERA Gurugram
4758503-07-20191200IDBI BANKHRERA Gurugram
5765905-08-2019524681IDBI BANKHRERA Gurugram







4.741 (Acre)
33575.70274
1.75
13.32 (Acre)
license no. 70 of 2011 dt. 22.07.2011 and 82 of 2012 dt. 27.08.2012
No
Address     4 BATTERY LANE RAJPUR ROAD CIVIL LINES DELHI 110054
Annexure-B- ATTACHED IN FOLDER B
REGISTERED AGREEMENT WITH M/S SHIVNANDAN BUILDTECH PVT. LTD.
Yes
THE RIGHTS OF DEVELOPMENT AND MARKETING TO THE EXTENT OF 35.63% THE AFORESAID DEVELOPMENT RIGHTS, MARKETING AND SALE RIGHTS I.E. FOR AN AREA OF 349060 SQ. FT. I.E. SANCTIONED AREA AVAILABLE FOR ABOUT 4.57 ACRES (AS PER THE ZONING AREA OF THE PROJECT) OR 4.741 ACRES LAND OUT OF TOTAL 13.32 ACRES (I.E. TOTAL AREA FOR WHICH LICENSES WERE APPLIED FOR, BUT DUE TO ACQUISITION OF SOME PORTION FOR CONSTRUCTION OF A ROAD THE ZONING AREA WAS SLIGHTLY REDUCED) ALONG WITH PROPORTIONATE (35.63%) RIGHTS AND TITLE IN THE TOTAL PROJECT LAND AND ALONG WITH ALL RIGHTS APPURTENANT THERETO (HEREINAFTER REFERRED TO AS THE PART PROJECT") TO THE ASSIGNEE. THIS PART PROJECT IS MORE CLEARLY DEFINED LATER IN AGREEMENT
No
No
Yes







17378.73 Lakhs
1390.00 Lakhs
9314.75 Lakhs
1042.73 Lakhs
5631.25 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.157
3CONSTRUCTION OF ROADS0.521
4PAVEMENTS0.388
5PARKS AND PLAYGROUNDS0.547
6GREEN BELTS0.165
7VEHICLE PARKINGS0.402
8ELECTRICITY SUB-STATION0.037
9CLUB HOUSE0.058
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.029
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0.5884
12ANY OTHER0.7936
13COMMERCIAL0.023
14RAIN0.008
15SCHOOL0.024
Total4.741




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHARYANA SHAHARI VIKAS PRADHIKARANNo
WATER SUPPLYGMDANo
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS37.80SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM87.07SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE31.50SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM213.78YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL47.49SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING7.28SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING185.99YET TO BE PREPARED
8PLAYGROUNDS AND PARKS38.14SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE50.36YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL20.48YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15PARKING5.57YET TO BE PREPARED
16STP8.91YET TO BE PREPARED
17UNDERGROUND WATER TANK46.14YET TO BE PREPARED
18RAIN WATER HARVESTING12.50YET TO BE PREPARED


12-07-2010 (date)
07-07-2017 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+3T+SQ+UTILITY100.26446180
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+3T+UTILITY89.00201460
3APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+4T+SQ+UTILITY120.59201370
4APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+5T+SQ+UTILITY139.172110
5APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+3T+UTILITY91.60242130
6APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+5T+UTILITY129.882110
7APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+3T+SQ+UTILITY107.774831170
8APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+5T+SQ+UTILITY149.954040
9APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+3T+UTILITY94.95242040
10APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+5T+UTILITY136.472020
11APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+4T+SQ+UTILITY122.82244200
12APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+5T+SQ+UTILITY162.392110






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2361520


31-01-2014
31-07-2018
31-07-2020
30-04-2019
20
31-07-2020


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT000
30-04-2019
20
31-07-2020


261
121
382
58
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments4688.52
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1156.561387.87
Shops00
Plots00

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1387.87462.63231.30
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements3.78
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System64.13
Storm Water Drainage7.88
Parks and Playgrounds9.54
Clubhouse/community centres0
Shopping area0
Other0
Construction of circulation road0
Electrical sub station0
Parking0
Rain water harvesting0
Security and firefighting9.3
Sewerage system14.25
STP0
Street lighting0
Underground water tank41.53

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements9.459.45
Water Supply System21.7721.77
Sewerage treatment & garbage disposal07.12
Electricity Supply System00
Storm Water Drainage7.887.88
Parks and Playgrounds9.540
Clubhouse/community centres00
Shopping area00
Other00
Sewerage system14.25
Street lighting0
Security and firefighting46.546.5
Parking0
STP0
Underground water tank0

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements9.453.781.89
Water Supply System21.7717.414.35
Sewerage treatment & garbage disposal7.1200
Electricity Supply System85.5153.4510.69
Storm Water Drainage7.8600
Parks and Playgrounds09.549.52
Clubhouse/community centres000
Shopping area000
Other000
Sewerage system4.75
Construction of circulation road10.112.632.53
Electrical sub station10.223.41
Rain water harvesting12.50
Underground water tank4.61
STP3.564.460.89
Parking4.181.39
Security and firefighting46.527.9011
Street lighting3.643.64












Particulars Remarks, if any
i. No. of Flats/Apartments constructed236
ii. No. of Flats/ Apartments booked152
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter14212.86350 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter7095.96425 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter7116 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)1390 Lakhs
Apartments9314.75 Lakhs
Infrastructure1042.73 Lakhs
EDC/ Taxes Etc.5631.25 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession8686.56 Lakhs
(a) In respect of existing allottees5559.40 Lakhs
(b) In respect of rest of the project3127.16 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
1000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 9.93 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS37.803.78
II. WATER SUPPLY SYSTEM87.070
III. STORM WATER DRAINAGE31.507.88
IV. ELECTRICITY SUPPLY SYSTEM213.7864.13
V. SEWAGE TREATMENT & GARBAGE DISPOSAL47.4914.25
VI. CLUB HOUSE/COMMUNITY CENTRE50.3620.14
VII. SCHOOL20.480
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM50
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.38.149.54
XIII. COVERED PARKING12341049.56
XIV. OPEN PARKING5.570
XV. GARAGES00
XVI. SECURITY SYSTEM185.995.57
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
ICICI BANK LTD.
777705224490
ICIC0006637
110229177
006637
Surender Kumar Verma R.o. Flat No-3, Plot No-13B, Sector-6, Dwarka, New Delhi-110075
as per attached annexure











Yes
No
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCE ALREADY BEEN OBTAINED24-12-2013
II. AIRPORT HEIGHT CLEARANCE ALREADY BEEN OBTAINED27-12-2011
III. FIRE SCHEME APPROVAL ALREADY BEEN OBTAINED16-07-2018
IV. BUILDING APPROVAL LETTER (BR-III)ALREADY BEEN OBTAINED29-12-2011
V. SERVICE PLAN AND ESTIMATES APPROVAL SANCTION LETTER ALREADY BEEN OBTAINED21-06-2019
VI. ELECTRIFICATION PLAN WITH ULTIMATE LOAD ALREADY BEEN OBTAINED11-05-2018
VII. FOREST NOCALREADY BEEN OBTAINED29-12-2011








Yes


Yes









LAXMI APARTMENT VILLAGE GOPALPUR SECTOR 99A GURUGRAM, HARYANA
5
804
0
784
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10061.00102197225
Cost of the apartments847184716142
Cost of the infrastructure800800269
Others costs790948814


13084 Lakhs
1079 Lakhs
2800 Lakhs
2800 Lakhs
No
14-09-2020
14-09-2020




MICASA VILLAGE NURPUR-JHASRA, BADSHAPUR, SECTOR 68, GURUGRAM, HARYANA
13.48275
952
0
409
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
42093017399
Cost of the apartments30467010697
Cost of the infrastructure514602203
Others costs648004499


19998 Lakhs
15566 Lakhs
10000 Lakhs
5250 Lakhs
No
30-06-2022
30-06-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
2WALL FINISHING DETAILSOIL BOUND DISTEMPER
3KITCHEN DETAILSGRANITE COUNTER, CERAMIC TILES UPTO 2 FT ABOVE COUNTER AND REST OBD
4BATHROOM FITTINGSCP FITTING & CHINA WARE
5WOOD WORK ETCCUP BOARDS IN MASTER BED ROOM & IN KITCHEN BELOW COUNTER
6DOORS AND WINDOS FRAMESMIRANTI WOOD PAINTED
7GLASS WORKNOT PROVIDING
8ELECTRIC FITTINGSNOT PROVIDING
9CONDUCTING AND WIRING DETAILSCOPPER WIRING IN RECESSED PVC CONDUIT
10CUPBOARD DETAILSLAMINATED BLOCK BOARD
11WATER STORAGEUNDER GROUND & OVER HEAD TANKS
12LIFT DETAILSPASSENGER & SERVICE LIFTS IN EACH TOWER
13EXTERNAL GLAZINGSMIRANTI WOOD FRAME WITH 5MM THICK PLAIN GLASS
13.1WINDOWS/GLAZINGSMIRANTI WOOD FRAME WITH 5MM THICK PLAIN GLASS
14DOORSYES
14.1MAIN DOORSDECORATIVE LAMINATED FLUSH DOORS
14.2INTERNAL DOORSPAINTED FLUSH DOORS
15AIR CONDITIONINGNOT PROVIDING
16ELECTRICAL FITTINGSNOT PROVIDING
17CNG PIPE LINENOT PROVIDING
18PROVISION OF WIFI AND BROADBAND FACILITYNOT PROVIDING
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT WITH PLEASANT SHADES
20INTERNAL FINISHINGYES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSOIL BOUND DISTEMPER
1 . 3 CEILINGOIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSOIL BOUND DISTEMPER
2 . 3 CEILINGOIL BOUND DISTEMPER
2 . 4 MODULAR WARDROBESLAMINATED BLOCK BOARD
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES
3 . 2 WALLSCERAMIC TILES
3 . 3 CEILINGOIL BOUND DISTEMPER
3 . 4 COUNTERSGRANITE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSCP FITTING & CHINA WARE
3 . 6 FITTING/FIXTURESNOT PROVIDING
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSOIL BOUND DISTEMPER
4 . 3 CEILINGOIL BOUND DISTEMPER
4 . 4 WARDROBESNOT PROVIDING
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSCERAMIC TILES
5 . 3 CEILINGOIL BOUND DISTEMPER
5 . 4 COUNTERSGRANITE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSCP FITTING & CHINA WARE
5 . 6 FIXTURESNOT PROVIDING
6 . KITCHEN
6 . 1 FLOORCERAMIC TILES
6 . 2 WALLSCERAMIC TILES, 2 FT ABOVE COUNTER REST OBD
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSGRANITE COUNTER
6 . 5 FIXTURESSTAINLESS STEEL KITCHEN SINK
6 . 6 KITCHEN APPLIANCESNOT PROVIDING
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
7 . 3 TOILETCERAMIC TILES
7 . 4 BALCONYCERAMIC TILE FLOORING, EXTERIOR EMULSION ON WALL & CEILING AND MS RAILING
8 . SIT-OUTS
8 . 1 FLOORCERAMIC TILES
8 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
8 . 3 RAILINGSPAINTED MS RAILING
8 . 4 FIXTURESNOT PROVIDING












Sr. No.Document DescriptionDate of Document UploadView Document
1STORM WATER LAYOUT PLAN 06-08-2019 ------
2FIRE LAYOUT PLAN06-08-2019 ------
3LAYOUT PLAN SUPERIMPOSED ON DEMARCATION PLAN06-08-2019 ------
4BUILDING PLAN-TOWER 306-08-2019 ------
5BR306-08-2019 ------
6ROAD LAYOUT PLAN06-08-2019 ------
7FOREST NOC06-08-2019 ------
8SEWER LAYOUT PLAN06-08-2019 ------
9FIRE NOC06-08-2019 ------
10BUILDING PLAN-TOWER 10(2)06-08-2019 ------
11IRRIGATION WATER SUPPLY LAYOUT PLAN06-08-2019 ------
12ENVIRONMENT CLEARANCE06-08-2019 ------
13BUILDING PLAN-TOWER 906-08-2019 ------
14BUILDING PLAN-TOWER 1006-08-2019 ------
15SITE PLAN06-08-2019 ------
16BUILDING PLAN-TOWER 9(2)06-08-2019 ------
17DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.22-06-2019 View Document
18NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT22-06-2019 View Document
19COPY OF LICENSE ALONG WITH SCHEDULE OF LAND20-06-2019 View Document
20IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN22-06-2019 View Document
21IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN22-06-2019 View Document
22ZONING PLAN22-06-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 OC uploaded 08-08-2023 View Document