HRERA GurugramTemp Project Id : RERA-GRG-PROJ-151-2019
Submission Date : 10-01-2019 05:24:39 AM
Applicant Type : Company
Project Type: ONGOING




INTERNATIONAL LAND DEVELOPERS PVT. LTD.
ILD TRADE CENTRE, 9TH FLOOR,SECTOR-47, SOHNA ROAD, GURUGRAM
01244935100
7042195640 (Number Shared by Promoter in Public)
ild@ild.co.in
http://www.ild.co.in
XXXX684P
U70109DL2006PTC151365
 
 


 
 


 
 







ARETE, PHASE I
SECTOR- 33, SOHNA, GURUGRAM
SOHNA
GURUGRAM
01244935100
7042195640 (Number Shared by Promoter in Public)
ild@ild.co.in
DEVENDRA DABAS
01244935100
8860281307 (Number Shared by Promoter in Public)
devender.singh@ild.co.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15695129-07-2017622545HDFC BANK LIMITEDHRERA Gurugram







11.6125 (Acre)
18.9343
18.9310
11.6125 (Acre)
44 OF 2013
Yes







35479 Lakhs
1881 Lakhs
16613 Lakhs
3544 Lakhs
13441 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3272.01
3CONSTRUCTION OF ROADS10189.76
4PAVEMENTS0
5PARKS AND PLAYGROUNDS23075.71
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION902.41
9CLUB HOUSE214.29
10SEWAGE AND SOLID WASTE TREATMENT FACILITY658.34
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13COMMERCIAL218.72
14SCHOOL1620
Total40151.24




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSPWD/NHIYes
WATER SUPPLYHUDAYes
ELECTRICITYDHBVNLYes
SEWAGE DISPOSALHUDAYes
STORM WATER DRAINAGEHUDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS965.00SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM741.00SUBMITTED TO HUDA
3STORM WATER DRAINAGE0YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM550.00YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL0YET TO BE PREPARED
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE3544.00YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM40.00SUBMITTED TO HUDA
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER807.00SUBMITTED TO HUDA


14-05-2014 (date)
25-05-2015 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK (UNIT-1 & 3)96.699866322
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK (UNIT 2)113.514625212
3APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK (UNIT 4)101.285010402
4APARTMENT/SHOPS/OTHER BUILDINGS Type PENT HOUSE (UNIT 2) T 1,2174.602112
5APARTMENT/SHOPS/OTHER BUILDINGS Type PENT HOUSE (UNIT 3) T 1,2185.522022
6APARTMENT/SHOPS/OTHER BUILDINGS Type PENT HOUSE (UNIT 4) T 1,2165.122022
7APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK (UNIT 1 & 3)62.0017488844
8APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK (UNIT 2,464.917083874
9APARTMENT/SHOPS/OTHER BUILDINGS Type PENT HOUSE (UNIT 2) T 3,4,5,6123.584134
10APARTMENT/SHOPS/OTHER BUILDINGS Type PENT HOUSE (UNIT 3) T 3,4,5,6115.804044
11APARTMENT/SHOPS/OTHER BUILDINGS Type PENT HOUSE (UNIT 4) T 3,4,5,6124.034044






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2BHK173AS PER BAR CHART ATTACHED
3BHK101AS PER BAR CHART ATTACHED
PENT HOUSE2AS PER BAR CHART ATTACHED


30-03-2015
31-03-2021
31-03-2023
30-09-2021
14
31-03-2023
NIL


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
30-03-2021
0
31-03-2023
NIL
NIL


500
58
500
289
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments7042
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments350350500
Shops000
Plots000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments500500500598
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments700700700699
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments699687714587
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments487
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements500
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other342

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2023)
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed8496
ii. No. of Flats/ Apartments booked273
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter21495 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter10185 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter11310 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1169 Lakhs
vii. Amount invested in the project upto the date of application18051 Lakhs
Land cost (If any)1881 Lakhs
Apartments7042 Lakhs
Infrastructure842 Lakhs
EDC/ Taxes Etc.8286 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession17428 Lakhs
(a) In respect of existing allottees10065 Lakhs
(b) In respect of rest of the project7363 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
8410 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 11988 LakhsInclude Loan & Capital.



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS4650
II. WATER SUPPLY SYSTEM290696
III. STORM WATER DRAINAGE170238
IV. ELECTRICITY SUPPLY SYSTEM5500
V. SEWAGE TREATMENT & GARBAGE DISPOSAL28158
VI. CLUB HOUSE/COMMUNITY CENTRE1190
VII. SCHOOL700
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.5000
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT10990









Yes
Yes
HDFC BANK LIMITED, FIRST INDIA PLACE, M G ROAD, GURGAON 122002, HARYANA
57500000254237
HDFC0000280
110240037
0280
SALM AN JALALUDDIN AKBAR B-418, NEW FRIENDS COLONY, NEW DELHI - 110025
0











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED10-06-2013
II. LICENSE RENEWALALREADY BEEN OBTAINED03-01-2019
III. FOREST NOCALREADY BEEN OBTAINED02-04-2013
IV. NATURAL CONSERVATION ZONE NOCALREADY BEEN OBTAINEDNA
V. AIRPORT HEIGHT CLEARANCE NOCALREADY BEEN OBTAINED06-02-2014
VI. HUDA CONSTRUCTION WATER NOCALREADY BEEN OBTAINED17-01-2014
VII. ELECTRICAL LOAD AVAILABILITYALREADY BEEN OBTAINED06-02-2014
VIII. TREE CUTTING PERMISSION NOC, IF REQUIREDALREADY BEEN OBTAINEDNA
IX. POWERLINE NOC IF REQUIRED ALREADY BEEN OBTAINED04-05-2017
X. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED15-04-2014
XI. CONSENT TO ESTABLISHALREADY BEEN OBTAINED06-06-2015
XII. FIRE FIGHTINGALREADY BEEN OBTAINED21-09-2016








Yes


Yes


NIL







ILD GREENS, PHASE-1 AND 2,(TOWER 2, 3,4,5,6,7), SECTOR 37C
80974.958
564
0
464
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
357.53341.39254.54
Cost of the apartments207.65207.65152.65
Cost of the infrastructure13.0013.008.00
Others costs136.88136.8893.75


218.34 Lakhs
69.57 Lakhs
70.00 Lakhs
64.00 Lakhs
Yes
31-03-2017
31-03-2017




ILD GRAND, SECTOR-37C, (TOWER A,B,C)
41223.953
334
0
262
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
209.00209.00163.00
Cost of the apartments110.00110.0090.00
Cost of the infrastructure9.009.008.00
Others costs90.0090.0065.00


134.23 Lakhs
50.36 Lakhs
50.00 Lakhs
44.00 Lakhs
No
17-09-2019
17-09-2019




GRAND CENTRA, SECTOR-37C, (TOWER-1)
25690.450
215
0
78
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
120.78120.7829.06
Cost of the apartments71.9071.909.12
Cost of the infrastructure3.003.001.00
Others costs45.8845.8818.94


16.20 Lakhs
47.12 Lakhs
30.00 Lakhs
28.00 Lakhs
No
28-02-2020
28-02-2020




ENGRACIA, SECTOR-37D, PLOTTED COLONY
15904.15
0
27
0
15
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
25.0625.063.45
Cost of the apartments4.504.500.75
Cost of the infrastructure0.500.500
Others costs20.0620.062.70


5.44 Lakhs
8.72 Lakhs
20.00 Lakhs
15.60 Lakhs
No
31-08-2019
31-08-2019




GSR DRIVE, SECTOR-36, SOHNA, GURUGRAM
17239.61
364
0
64
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
125.09125.0910.04
Cost of the apartments86.1686.161.40
Cost of the infrastructure10.0010.000
Others costs28.9328.938.64


7.00 Lakhs
26.93 Lakhs
0 Lakhs
0 Lakhs
No
07-12-2021
07-12-2021










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED/ANTI SKID CERAMIC TILE
2WALL FINISHING DETAILSACRYLIC PAINT
3KITCHEN DETAILSGRANITE STONE COUNTER/2' DADO CERAMIC TILES
4BATHROOM FITTINGSHIGH QUALITY CP FITTINGS
5WOOD WORK ETCMIRANDI/EQUIVALENT DOOR FRAME
6DOORS AND WINDOS FRAMESENAMEL PAINT/POWDER COATED MIRANDI/UPVC/ALUMINIUM FRAMES
7GLASS WORK5/6MM PLAIN GLASS
8ELECTRIC FITTINGSANCHOR ROMA/EQUIVALENT MODULER SWITCH/POWER POINT
9CONDUCTING AND WIRING DETAILSCOPPER WIRING/CONCEALED CONDUIT
10CUPBOARD DETAILSNA
11WATER STORAGEUGT/OST
12LIFT DETAILSJOHNSONS/EQUIVALENT
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGS5/6MM PLAIN GLASS
14DOORSNA
14.1MAIN DOORSLAMINATED FLUSH DOOR
14.2INTERNAL DOORSENAMEL PAINTED SKIN/FLUSH DOOR
15AIR CONDITIONINGBRANDED SPLIT AC
16ELECTRICAL FITTINGSANCHOR ROMA/EQUIVALENT
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEALL WEATHER PROOF EXTERNAL PAINT WHITE/BEIGE/BROWN
20INTERNAL FINISHINGACRYLIC/OBD
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVERTIFIED TILES
1 . 2 WALLSACRYLIC EMULSION PAINT FINISH
1 . 3 CEILINGPLASTIC EMULSION/OBD PAINT FINISH
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODED FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT FINISH
2 . 3 CEILINGPLASTIC EMULSION/OBD PAINT FINISH
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORMATTE FINISH VITRIFIED/CERAMIC TILES
3 . 2 WALLSMATTE FINISH CERAMIC TILES
3 . 3 CEILINGPLASTIC EMULSION/OBD PAINT FINISH
3 . 4 COUNTERSGRANITE STONE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSHIGH QUALITY CP/SANITARY FITTINGS
3 . 6 FITTING/FIXTURESHIGH QUALITY FITTINGS/FIXTURES
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODED FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT FINISH
4 . 3 CEILINGPLASTIC EMULSION/OBD PAINT FINISH
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORMATTE FINISH VITRIFIED/CERAMIC TILES
5 . 2 WALLSMATTE FINISH CERAMIC TILES
5 . 3 CEILINGPLASTIC EMULSION/OBD PAINT FINISH
5 . 4 COUNTERSGRANITE STONE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSHIGH QUALITY CP/SANITARY FITTINGS
5 . 6 FIXTURESHIGH QUALITY FITTINGS/FIXTURES
6 . KITCHEN
6 . 1 FLOORMATTE FINISH VITRIFIED/ CERAMIC TILES
6 . 2 WALLS2' DADO CERAMIC TILES/ REST ACRYLIC EMULSION PAINT FINISH
6 . 3 CEILINGPLASTIC EMULSION/OBD PANT FINISH
6 . 4 COUNTERSGRANITE STONE COUNTERS
6 . 5 FIXTURESSTAINLESS STEEL SINK/ CP FITTINGS
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORLAMINATED WOODEN FLOORINGS
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT FINISH & PLASTIC EMULSION/ OBD PAINT FINISH
7 . 3 TOILETMATTE FINISH VITRIFIED/ CERAMIC TILES
7 . 4 BALCONYMATTE FINISH VITRIFIED/ CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORMATTE FINISH VITRIFIED/ CERAMIC TILES
8 . 2 WALLS & CEILINGOBD
8 . 3 RAILINGSMS RAILING WITH ENAMEL PAINT
8 . 4 FIXTURESLIGHT FIXTURES POINT












Sr. No.Document DescriptionDate of Document UploadView Document
1ZONING PLAN08-01-2019 View Document
2ENVIRONMENTAL CLEARANCE08-01-2019 ------
3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND08-01-2019 View Document
4SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN08-01-2019 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN08-01-2019 View Document
6A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS08-01-2019 View Document
7DEMARCATION PLAN08-01-2019 View Document
8DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.08-01-2019 View Document
9DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD08-01-2019 View Document
10CASH FLOW STATEMENT OF THE PROPOSED PROJECT09-01-2019 View Document
11NOT DEFAULT CERTIFICATE10-01-2019 ------
12DRAFT ALLOTMENT LETTER09-01-2019 ------
13CA CERTIFICATE ON BALANCE SHEET CONFIRMATION10-01-2019 ------
14DRAFT AGREEMENT 09-01-2019 ------
15NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT09-01-2019 View Document
16FIRE FIGHTING CHEME08-01-2019 ------
17IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN09-01-2019 View Document
18CONSENT TO ESTABLISH08-01-2019 ------
19BALANCE SHEET AY 171809-01-2019 ------
20ELECTRICAL LOAD AVAILABILITY08-01-2019 ------
21BALANCE SHEET AY 161709-01-2019 ------
22NON EXTRACT GROUND WATER08-01-2019 ------
23BALANCE SHEET AY151609-01-2019 ------
24AIR PORT APPROVAL08-01-2019 ------
25FOREST NOC08-01-2019 ------
26LICENCE 44 OF 201308-01-2019 ------
27LICENCE 44 OF 201308-01-2019 ------