HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1591-2024
Submission Date : 22-03-2024 01:20:59 PM
Applicant Type : Company
Project Type: NEW




UNION BUILDMART PRIVATE LIMITED
41ST FLOOR, TOWER-1, M3M, INTERNATIONAL FINANCIAL CENTER, SECTOR-66, BADSHAHPUR, GURGAON, HARYANA
01244732000
9711348349 (Number Shared by Promoter in Public)
unionbuildmart0207@gmail.com
http://unionbuildmart.in
XXXX843M
U70100HR2012PTC089615
 
 


 
 


 
 


 
 







M3M CAPITAL PHASE-3
SECTOR-113, VILLAGE CHAUMA, GURUGRAM, HARYANA
GURGAON
GURUGRAM
01244732000
9711348349 (Number Shared by Promoter in Public)
Unionbuildmart0207@gmail.com
VIMAL SAROHA
01244732000
9711348349 (Number Shared by Promoter in Public)
Unionbuildmart0207@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150647722-03-20242042000ICICI BANK LIMITEDHRERA Gurugram
250647822-03-2024432600ICICI BANK LIMITEDHRERA Gurugram







0.91875 (Acre)
4.456
0.712
15.0625 (Acre)
106 OF 2021 DATED 16.12.2021 214 OF 2023 DATED 20.10.2023
No
Address     CABIN-2,LGF,F-22,SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE-1,GURUGRAM-122002 HARYANA
Address     CABIN-2,LGF,F-22,SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE-1,GURUGRAM-122002 HARYANA
Address     41ST FLOOR,TOWER-1,M3M INTERNATIONAL FINANCIAL CENTER, SECTOR 66,GURUGRAM,HARYANA
Annexure-B- COLLABORATOR VIDE DEVELOPMENT RIGHTSAGREEMENT 7322 DATED 07.10.2019
BEFORE GRANT OF LICENCE
Yes
AS ATTACHED IN FOLDER A
No
Yes
Yes







51928.22 Lakhs
14082.52 Lakhs
21907.53 Lakhs
1205.18 Lakhs
14732.99 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.91875
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total0.91875




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS114.12AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM39.43AS PER PROJECT REPORT
3STORM WATER DRAINAGE17.12AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM131.24AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL28.53AS PER PROJECT REPORT
6STREET LIGHTING11.41AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING73.15AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS72.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00YET TO BE PREPARED
10SHOPPING AREA0.00YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0.00YET TO BE PREPARED
12SCHOOL0.00YET TO BE PREPARED
13HOSPITAL/DISPENSARY0.00YET TO BE PREPARED
14ANY OTHER0.00YET TO BE PREPARED
15BOUNDARY WALL21.75AS PER PROJECT REPORT
16STP36.80AS PER PROJECT REPORT
17UNDERGROUND WATER TANK43.71AS PER PROJECT REPORT
18RAIN WATER HARVESTING2.85AS PER PROJECT REPORT
19ELECTRICAL SUB STATION196.90AS PER PROJECT REPORT
20SWITCHING STATION85.59AS PER PROJECT REPORT
21CONSULTANCY154.07AS PER PROJECT REPORT
22INFRA ESTABLISHMENTS114.13AS PER PROJECT REPORT
23HARDSCAPE AND SOFTSCAPE57.06AS PER PROJECT REPORT
24PARKING5.30AS PER PROJECT REPORT


19-02-2024 (date)
19-02-2024 (date)
01-03-2024
31-03-2027
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings34690.462682





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments3375
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments506.291179.301367.96
Shops000
Plots000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1408.201837.392017.032411.83
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2181.042722.41979.50906.27
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1015.31
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0006.85
Water Supply System003.942.37
Sewerage treatment & garbage disposal002.851.71
Electricity Supply System0000
Storm Water Drainage001.711.03
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain water harvesting000.290.17
Consultancy0030.810
Infra Establishments05.7111.415.71

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements5.716.8513.6917.12
Water Supply System2.763.152.372.76
Sewerage treatment & garbage disposal2.002.281.712.00
Electricity Supply System0000
Storm Water Drainage1.201.371.031.20
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Consultancy030.81030.81
Security0004.56
Firefighting Services0002.75
Electrical sub station019.69039.38
Infra Establishments11.415.7111.415.71
STP1.842.213.683.68
Underground Tank2.192.624.374.37
Rain water harvesting0.200.230.170.20

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements22.8218.269.137.99
Water Supply System3.943.945.913.94
Sewerage treatment & garbage disposal2.852.854.282.85
Electricity Supply System0000
Storm Water Drainage1.711.712.571.71
Parks and Playgrounds018.0018.0018.00
Clubhouse/community centres0000
Shopping area0000
Other0000
STP5.525.527.363.68
Infra Establishments11.415.7117.1211.41
Electrification032.8132.8132.81
Security6.859.1313.694.56
Hardscape and Softscape014.2714.2714.27
Boundary Wall05.445.445.44
Parking Marking01.331.331.33
Street Light02.852.852.85
Firefighting Services4.135.508.252.75
Switching Station021.4021.4021.40
Electrical sub station19.6919.6929.5339.38
Rain water harvesting0.290.290.430.29
Underground Tank6.566.568.744.37
Consultancy015.4115.4115.41

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements5.71
Water Supply System4.34
Sewerage treatment & garbage disposal3.14
Electricity Supply System0
Storm Water Drainage1.88
Parks and Playgrounds18.00
Clubhouse/community centres0
Shopping area0
Other0
Hardscape and Softscape14.27
Consultancy15.41
Switching Station21.40
Electrical sub station29.53
Rain water harvesting0.31
Underground Tank3.93
Infra Establishments11.41
STP3.31
Firefighting services4.13
Security6.85
Street Light2.85
Electrification32.81
Parking Marking1.33
Boundary Wall5.44












Yes
No
ICICI BANK LIMITED AND EMAAR EMERALD PLAZA
777705004541
ICIC0005885
5885
5885
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 Arera Colony Bhopal M.P. 462016 2) Ms. Amarjot Kaur Sahni-3/66 Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi- House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon, Haryana- 122002 4) Ms. Surbhi- Flat No-3-905, 9th floor, Sector-103, grandiva, Daultabad, Gurgaon, Haryana-122006 5) Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad, Haryana- 121001 6) Mr. Pratap Singh-10A Pocket 2 Mayur Vihar East Delhi 110096 7) Mr. Pradeep Kumar Katiyar- 357, Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, Uttar Pradesh
UPLOADED











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE APPROVALALREADY BEEN OBTAINED16-12-2021
II. LICENSE APPROVALALREADY BEEN OBTAINED20-12-2023
III. ASSURANCE- SEWERAGEALREADY BEEN OBTAINED04-03-2024
IV. ASSURANCE- STORM WATERALREADY BEEN OBTAINED28-02-2024
V. ASSURANCE- DRINKING WATERALREADY BEEN OBTAINED29-02-2024
VI. CONSTRUCTION WATER NOCALREADY BEEN OBTAINED04-03-2024
VII. BR-IIIALREADY BEEN OBTAINED19-02-2024
VIII. AAI NOCALREADY BEEN OBTAINED13-12-2023
IX. ASSURANCE- ELECTRICAL LOADALREADY BEEN OBTAINED17-11-2021
X. FOREST NOCALREADY BEEN OBTAINED30-09-2016








Yes


Yes


AS PER THE RULES AND REGULATIONS OF HARERA







M3M CAPITAL
5.004
750
0
706
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
47692.3447193.320
Cost of the apartments24779.9330624.50
Cost of the infrastructure2266.193531.730
Others costs20646.2113037.090


53863 Lakhs
67686 Lakhs
600 Lakhs
600 Lakhs
No
30-06-2026
30-06-2026




M3M CAPITAL PHASE-2
7.7139
1760
0
1656
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
100838.26100838.260
Cost of the apartments71820.3871820.380
Cost of the infrastructure3897.823897.820
Others costs25120.0625120.060


100832.82 Lakhs
181254.36 Lakhs
600 Lakhs
600 Lakhs
No
31-12-2026
31-12-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSERETAIL (TYPICAL FLOOR)- RCC BASE SLAB OFFICE (LOBBY)FINISHED GRND FLOOR LOBBY & RCC BASE SLAB FOR TYPICLFLOOR LOBBIES. OFFICE (UNIT FLOOR FINISH) RCC BASE SLAB
2WALL FINISHING DETAILSRAW WALL/ PARTITIONS
3KITCHEN DETAILSN.A.
4BATHROOM FITTINGSRETAIL- FINISHED COMMON TOILETS WITH MODERN FITTING &FIXTURES; OFFICE : PROVISION OF SERVICES WILL BEPROVIDED AND TO BE FINISHED BY ALLOTTEE(S).
5WOOD WORK ETCN.A.
6DOORS AND WINDOS FRAMESALUMINIUM FRAME
7GLASS WORKGLASS THICKNESS VARIES FROM 6 TO 10 MM
8ELECTRIC FITTINGSCOMMON AREAS & TOILETS TO BE PROVIDED WITH LED LIGHTFIXTURES.
9CONDUCTING AND WIRING DETAILSISI APPROVED CONDUITS & WIRES
10CUPBOARD DETAILS N.A.
11WATER STORAGERCC TANK
12LIFT DETAILSSTANDARD MAKE ELEVATORS
13EXTERNAL GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
13.1WINDOWS/GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
14DOORSALUMINIUM / GLASS DOORS
14.1MAIN DOORSALUMINIUM / GLASS DOORS
14.2INTERNAL DOORSMS/ ALUMINIUM/ WOODEN DOORS
15AIR CONDITIONINGCHILLED WATER AC SYSTEM FOR OFFICE & PROVISION FORWATER COOLED DX SYSTEM UPTO TAP OFF INSIDE SHOP
16ELECTRICAL FITTINGSPROVISION OF CABLE UP TO DISTRIBUTION BOARD ISI /BIS APPROVED
17CNG PIPE LINEN.A.
18PROVISION OF WIFI AND BROADBAND FACILITYN.A.
19EXTERNAL FINISHING/COLOUR SCHEMEN.A.
20INTERNAL FINISHINGPAINT/GLASS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR VITRIFIED TILES
1 . 2 WALLS PLASTER OBD
1 . 3 CEILING OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
2 . 2 WALLS PLASTER & OBD
2 . 3 CEILING OBD
2 . 4 MODULAR WARDROBES N.A.
3 . MASTER TOILET
3 . 1 FLOOR ANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER & DADO
3 . 3 CEILING GRID FALSE CEILING/OBD
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGS AS PER APPROVED MAKE
3 . 6 FITTING/FIXTURES AS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOOR VITRIFIED TILES/LAMINATE WOODEN FLOORING
4 . 2 WALLS PLASTER & OBD
4 . 3 CEILING OBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER & DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERS N.A
5 . 5 SANITARY WARE/CP FITTINGS AS PER APPROVED MAKE
5 . 6 FIXTURES AS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOOR VITRIFIED TILES
6 . 2 WALLS PLASTER & DADO
6 . 3 CEILING OBD
6 . 4 COUNTERS STONE/MARBLE
6 . 5 FIXTURES AS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCES N.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR ANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILING PLASTER & PAINT
7 . 3 TOILET ANTISKID CERAMIC TILES
7 . 4 BALCONY ANTISKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD22-03-2024 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN22-03-2024 View Document
3IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN22-03-2024 View Document
4CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT22-03-2024 View Document
5ZONING PLAN22-03-2024 View Document
6DEMARCATION PLAN22-03-2024 View Document
7CASH FLOW STATEMENT OF THE PROPOSED PROJECT24-05-2024 View Document
8WATER SUPPLY LAYOUT24-05-2024 ------
9T-6B- SECTIONS BB24-05-2024 ------
10T-6C- ELEVATIONS 3 & 424-05-2024 ------
11T-6B- 2ND TO 5TH LEVEL LAYOUT & AREA DETAILS24-05-2024 ------
12T-6B- 20TH & 30TH FLOOR PLAN & AREA DETAILS24-05-2024 ------
13T-6B- ELEVATIONS 3 & 424-05-2024 ------
14COMMERCIAL- ELEVATION PLAN24-05-2024 ------
15LOWER BASEMENT AREA DIAGRAM24-05-2024 ------
16T-6B- 1ST LEVEL LAYOUT & AREA DETAILS24-05-2024 ------
17T-6C- TYPICAL LEVEL LAYOUT & AREA DETAILS24-05-2024 ------
18TOWER-6B&C ZP24-05-2024 ------
19ROAD LAYOUT24-05-2024 ------
20T-6C- 1ST LEVEL LAYOUT & AREA DETAILS24-05-2024 ------
21T-6C- 2ND TO 5TH LEVEL LAYOUT & AREA DETAILS24-05-2024 ------
22PARKING PLAN-124-05-2024 ------
23STRUCTURAL PLAN-124-05-2024 ------
24T-6C- TERRACE, MUMTY LAYOUT & AREA DETAILS24-05-2024 ------
25T-6C- ELEVATIONS 3&424-05-2024 ------
26STORM WATER DRAINAGE LAYOUT24-05-2024 ------
27T-6C- 20TH & 30TH FLOOR PLAN & AREA DETAILS24-05-2024 ------
28PARKING PLAN-224-05-2024 ------
29ELECTRICITY LAYOUT24-05-2024 ------
30T-6B- SECTIONS AA24-05-2024 ------
31T-6C- STILT LEVEL LAYOUT AND AREA DETAILS24-05-2024 ------
32SECTION AA & BB24-05-2024 ------
33COMMERCIAL- SECTION PLAN24-05-2024 ------
34COMMERCIAL- TERRACE FLOOR PLAN24-05-2024 ------
35SEWERAGE LAYOUT24-05-2024 ------
36T-6C- SECTIONS AA24-05-2024 ------
37STRUCTURAL PLAN-224-05-2024 ------
38T-6B- ELEVATIONS 3&424-05-2024 ------
39T-6B- STILT LEVEL LAYOUT AND AREA DETAILS24-05-2024 ------
40T-6B&6C;- SITE-TOWER 6C & 6B24-05-2024 ------
41UPPER BASEMENT AREA DIAGRAM24-05-2024 ------
42SHAJRA11-06-2024 ------
43CA CERTIFICATE INVENTORY11-06-2024 ------
44STP TREATED WATER FOR CONSTRUCTION11-06-2024 ------
45LOI11-06-2024 ------
46MUTATIONS11-06-2024 ------
47BR-III11-06-2024 ------
48COPY OF LICENSE ALONG WITH SCHEDULE OF LAND11-06-2024 View Document
49STORM WATER DRAINAGE ASSURANCE11-06-2024 ------
50JAMABANDI11-06-2024 ------
51SEWERAGE ASSURANCE11-06-2024 ------
52CA CERTIFICATE- NET WORTH11-06-2024 ------
53AAI NOC11-06-2024 ------
54NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT11-06-2024 View Document
55LC-IV & IV-A11-06-2024 ------
56CA CERTIFICATE INCURRED11-06-2024 ------
57DRINKING WATER ASSURANCE11-06-2024 ------
58ENVIRONMENT CLEARANCE11-06-2024 ------
59DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.11-06-2024 View Document