HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1725-2024
Submission Date : 24-09-2024 12:50:02 PM
Applicant Type : Company
Project Type: NEW




WONDER CITY BUILDCON LTD.
GODREJ ONE, 5TH FLOOR, PIROJSHANAGAR EASTERN EXPRESS HIGHWAY, VIKHROLI (EAST) MUMBAI, MAHARASHTRA - 400079
01244842300
9871202007 (Number Shared by Promoter in Public)
godrej54.ggn@godrejproperties.com
https://www.godrejproperties.com
XXXX346B
U70100MH2013PLC247696
 
 


 
 


 
 


 
 


 
 







GODREJ ASTRA
SECTOR 54, URBAN ESTATE, GURUGRAM II
GURGAON
GURUGRAM
1244842300
1244842300 (Number Shared by Promoter in Public)
godrej54.ggn@godrejproperties.com
TARUN CHADHA
1244842300
1244842300 (Number Shared by Promoter in Public)
godrej54.ggn@godrejproperties.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1278328-08-20241915500HDFC BANKHRERA Gurugram
2281316-10-2024417500HDFC BANKHRERA Gurugram







2.759 (Acre)
3.65
3.637233
2.759 (Acre)
HSVP land - e-auction, GH100 at Sector 54, Urban Estate Gurugram II on free hold basis Allotment letter vide memo no. ZO002/EO018/UE029/GALOT/0000001408 dated 20.12.2023
Yes







88364.00 Lakhs
41735.06 Lakhs
31791.76 Lakhs
7769.46 Lakhs
7068.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2153.33
3CONSTRUCTION OF ROADS2723.94
4PAVEMENTS1406.61
5PARKS AND PLAYGROUNDS2436.61
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION423
9CLUB HOUSE184.459
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13WATER0
14STROM0
15STREET64
16ELECTRICAL259
17SECURITY349
18RENEWABLE0
19STP0
20WTP0
21RWH0
22COMMERCIAL1169.14
Total11169.089




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS244.72YET TO BE PREPARED
2WATER SUPPLY SYSTEM233.72YET TO BE PREPARED
3STORM WATER DRAINAGE64.16YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM870.91YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL20.52YET TO BE PREPARED
6STREET LIGHTING48.85YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING465.43YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15SOFTSCAPE121.14YET TO BE PREPARED
16HARDSCAPE169.48YET TO BE PREPARED
17ELECTRICAL SUB STATION153.18YET TO BE PREPARED
18SIGNAGES17.7YET TO BE PREPARED


30-08-2024 (date)
30-08-2024 (date)
16-10-2024
16-10-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings185.96291
Apartment/Shops/Other Buildings150.27261
Apartment/Shops/Other Buildings152.7221
Apartment/Shops/Other Buildings159.6731
Apartment/Shops/Other Buildings151.45201
Apartment/Shops/Other Buildings150.32221
Apartment/Shops/Other Buildings159.9231
Apartment/Shops/Other Buildings000
Apartment/Shops/Other Buildings188.62181
Apartment/Shops/Other Buildings120.6021
Apartment/Shops/Other Buildings5.7711
Apartment/Shops/Other Buildings5.9611
Apartment/Shops/Other Buildings9.3511
Apartment/Shops/Other Buildings9.4211
Apartment/Shops/Other Buildings9.5011
Apartment/Shops/Other Buildings11.5811
Apartment/Shops/Other Buildings11.6211
Apartment/Shops/Other Buildings11.9211
Apartment/Shops/Other Buildings12.1011
Apartment/Shops/Other Buildings12.1711
Apartment/Shops/Other Buildings12.1811
Apartment/Shops/Other Buildings12.2511
Apartment/Shops/Other Buildings12.4211
Apartment/Shops/Other Buildings12.8611
Apartment/Shops/Other Buildings13.0911
Apartment/Shops/Other Buildings13.1111
Apartment/Shops/Other Buildings13.9511
Apartment/Shops/Other Buildings14.2711
Apartment/Shops/Other Buildings14.4811
Apartment/Shops/Other Buildings14.7511
Apartment/Shops/Other Buildings14.7711
Apartment/Shops/Other Buildings14.8211
Apartment/Shops/Other Buildings16.4511
Apartment/Shops/Other Buildings16.7911
Apartment/Shops/Other Buildings16.8811
Apartment/Shops/Other Buildings16.8911
Apartment/Shops/Other Buildings16.9311
Apartment/Shops/Other Buildings16.9411
Apartment/Shops/Other Buildings16.9811
Apartment/Shops/Other Buildings17.0011
Apartment/Shops/Other Buildings17.0811
Apartment/Shops/Other Buildings17.1221
Apartment/Shops/Other Buildings17.4711
Apartment/Shops/Other Buildings17.4911
Apartment/Shops/Other Buildings17.5411
Apartment/Shops/Other Buildings17.5511
Apartment/Shops/Other Buildings17.6111
Apartment/Shops/Other Buildings17.6511
Apartment/Shops/Other Buildings17.6811
Apartment/Shops/Other Buildings17.9911
Apartment/Shops/Other Buildings18.0911
Apartment/Shops/Other Buildings18.1511
Apartment/Shops/Other Buildings18.7111
Apartment/Shops/Other Buildings18.9411
Apartment/Shops/Other Buildings18.9511
Apartment/Shops/Other Buildings19.3311
Apartment/Shops/Other Buildings19.3611
Apartment/Shops/Other Buildings19.4211
Apartment/Shops/Other Buildings19.4411
Apartment/Shops/Other Buildings19.4711
Apartment/Shops/Other Buildings19.4821
Apartment/Shops/Other Buildings19.6811
Apartment/Shops/Other Buildings19.8711
Apartment/Shops/Other Buildings20.3111
Apartment/Shops/Other Buildings20.3811
Apartment/Shops/Other Buildings20.4011
Apartment/Shops/Other Buildings20.4411
Apartment/Shops/Other Buildings21.0211
Apartment/Shops/Other Buildings21.4411
Apartment/Shops/Other Buildings22.4011
Apartment/Shops/Other Buildings23.4111
Apartment/Shops/Other Buildings23.5911
Apartment/Shops/Other Buildings24.1611
Apartment/Shops/Other Buildings24.4311
Apartment/Shops/Other Buildings24.8811
Apartment/Shops/Other Buildings25.4821
Apartment/Shops/Other Buildings25.5511
Apartment/Shops/Other Buildings26.211
Apartment/Shops/Other Buildings26.7411
Apartment/Shops/Other Buildings26.7611
Apartment/Shops/Other Buildings26.8911
Apartment/Shops/Other Buildings27.1511
Apartment/Shops/Other Buildings27.2511
Apartment/Shops/Other Buildings27.3811
Apartment/Shops/Other Buildings27.4411
Apartment/Shops/Other Buildings27.4911
Apartment/Shops/Other Buildings28.2311
Apartment/Shops/Other Buildings28.2411
Apartment/Shops/Other Buildings28.2511
Apartment/Shops/Other Buildings28.2711
Apartment/Shops/Other Buildings28.4411
Apartment/Shops/Other Buildings28.8811
Apartment/Shops/Other Buildings29.7011
Apartment/Shops/Other Buildings30.1411
Apartment/Shops/Other Buildings34.7211
Apartment/Shops/Other Buildings34.9511
Apartment/Shops/Other Buildings35.2521
Apartment/Shops/Other Buildings35.8911
Apartment/Shops/Other Buildings36.7911
Apartment/Shops/Other Buildings37.111
Apartment/Shops/Other Buildings38.4821
Apartment/Shops/Other Buildings39.9611
Apartment/Shops/Other Buildings42.2911
Apartment/Shops/Other Buildings42.3111
Apartment/Shops/Other Buildings43.2611
Apartment/Shops/Other Buildings45.6111
Apartment/Shops/Other Buildings150.27261





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments233.06
Shops0
Plots0

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments272.40275.43421.15825.43
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments807.49816.46825.431177.95
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1224.951238.561304.251958.87
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1956.371956.371977.871977.87
Shops021.2621.5030.21
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1934.881956.371704.531462.02
Shops217.05219.47221.88304.59
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1128.68815.30777.95725.70
Shops250.74188.56228.54230.72
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments709.93717.82608.64
Shops225.70197.060
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System0012.39
Sewerage treatment & garbage disposal001.09
Electricity Supply System000
Storm Water Drainage003.40
Parks and Playgrounds000
Clubhouse/community centres143.97143.97143.97
Shopping area000
Other000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00016.64
Water Supply System12.1512.3912.3912.39
Sewerage treatment & garbage disposal1.071.091.091.09
Electricity Supply System00059.22
Storm Water Drainage3.343.403.403.40
Parks and Playgrounds0000
Clubhouse/community centres140.97143.97143.97143.97
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.4016.6416.6416.64
Water Supply System12.3912.3912.3912.39
Sewerage treatment & garbage disposal1.091.091.091.09
Electricity Supply System58.3558.3559.2259.22
Storm Water Drainage3.403.403.403.40
Parks and Playgrounds0000
Clubhouse/community centres143.97143.97143.97143.97
Shopping area0000
Other0000
Hardscape12.2012.2012.3712.37
Security and Fire fighting33.5133.51
Security and fire fighting33.9833.98
Electrical sub station13.02
Electrical substation13.02

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.1516.4016.6416.64
Water Supply System12.1512.3912.3912.39
Sewerage treatment & garbage disposal1.071.091.091.09
Electricity Supply System57.4858.3559.2259.22
Storm Water Drainage3.343.403.403.40
Parks and Playgrounds0000
Clubhouse/community centres140.97143.97143.97143.97
Shopping area0000
Other0000
Electrical sub station12.7112.8713.0213.02
Street lighting4.894.934.984.98
Hardscape12.0312.2012.3712.37
Security and fire fighting33.0533.5133.9833.98

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.1516.4016.6416.64
Water Supply System12.1512.3912.3912.39
Sewerage treatment & garbage disposal1.071.091.091.09
Electricity Supply System57.4858.3559.2259.22
Storm Water Drainage3.343.403.403.40
Parks and Playgrounds0000
Clubhouse/community centres140.97143.97143.97143.97
Shopping area0000
Other0000
Street lighting4.894.934.984.98
Softscape20.9821.2321.4821.48
Hardscape12.0312.2012.3712.37
Electrical sub station12.7112.8713.0213.02
Signages2.993.033.063.06
Security and fire fighting33.0533.5133.9833.98

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.1513.950
Water Supply System12.1511.690
Sewerage treatment & garbage disposal1.071.030
Electricity Supply System57.4850.510
Storm Water Drainage3.343.210
Parks and Playgrounds000
Clubhouse/community centres140.97131.970
Shopping area000
Other000
Softscape20.9818
Security and fire fighting33.0528.39
Street lighting4.894.40
Electrical sub station12.7111.18
Signages2.992.57
Hardscape12.0310.34












Yes
No
AXIS BANK LIMITED I GROUND FLOOR, SHOP NO-25 & 45.DLF STAR TOWER,SECTOR-30,GURGAON-122001
924020055420531
UTIB0003622
110211230
003622
Sushil Kumar S/O: Kali Dass, Bah (391), Mandi, Himachal Pradesh, 175049
Yes











No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LETTER OF INTENT (LOI)ALREADY BEEN OBTAINED12-07-2023
II. ALLOTMENT LETTER ALREADY BEEN OBTAINED20-12-2023
III. OFFER OF POSSESSIONALREADY BEEN OBTAINED20-12-2023
IV. POSSESSION LETTER ALREADY BEEN OBTAINED16-01-2024
V. ASSURANCE OF SEWERAGE CONNECTION ALREADY BEEN OBTAINED29-03-2024
VI. ASSURANCE OF STORM WATER CONNECTIONALREADY BEEN OBTAINED29-03-2024
VII. ASSURANCE OF STP TREATED WATER CONNECTION FOR CONSTRUCTION PURPOSEALREADY BEEN OBTAINED29-03-2024
VIII. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED03-09-2024
IX. SANCTION OF ULTIMATE LOAD ASSURANCEALREADY BEEN OBTAINED07-05-2024
X. BUILDING PLAN APPROVALALREADY BEEN OBTAINED30-08-2024
XI. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED14-09-2024








Yes


Yes


As per the HARERA format







GODREJ ARIA & 101 (VOL. II)
0.98
56
0
51
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7094.127094.124670.57
Cost of the apartments3785.843785.841823.18
Cost of the infrastructure260.00260.0016.63
Others costs3048.283048.282177.09


4156.16 Lakhs
10332 Lakhs
0 Lakhs
0 Lakhs
No
30-08-2028
30-08-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/CERAMIC TILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER
3KITCHEN DETAILSFLOOR: VITRIFIED TILES, WALL: CERAMIC TILES2FT ABOVE COUNTER AND OBD PAINT ONREMAINING AREA, CEILING: OBD PAINT
4BATHROOM FITTINGSALL PROVIDED WITH STANDARD COMPANY MAKE
5WOOD WORK ETCLAMINATED/PAINTED FLUSH DOORS/MOULDEDSHUTTER WITH WOODEN FRAME (PRE-HUNGLEVEL WITH LAMINATE)
6DOORS AND WINDOS FRAMESLAMINATED/PAINTED/POWER COATED FRAMESOF WOODEN/ALUMINIUM/UPVC MATERIAL
7GLASS WORK4MM AND ABOVE AS PER SPECIFICATIONS
8ELECTRIC FITTINGSAS PER BUILDING NORMS
9CONDUCTING AND WIRING DETAILSAS PER BUILDING NORMS
10CUPBOARD DETAILSNA
11WATER STORAGEUNDER GROUND WATER TANK & OVERHEADWATER TANK
12LIFT DETAILSTOWER 1 & 2: 3 PASSENGER LIFT & 1 SERVICELIFT (EACH)
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSPOWDER COATED/PAINTED ALUMINUM/UPVCWINDOWS WITH 4MM OR ABOVE THICK GLAZINGAS PER SPECIFICATIONS
14DOORSLAMINATED/PAINTED FLUSH DOORS/MOULDEDSHUTTER WITH WOODEN FRAME (PRE-HUNGLEVEL WITH LAMINATE)
14.1MAIN DOORSVENEER/LAMINATED/PAINTED FLUSH/FIRE DOORWITH WOODEN FRAME
14.2INTERNAL DOORSLAMINATED/PAINTED FLUSH DOORS/MOULDEDSHUTTER WITH WOODEN FRAME (PRE-HUNGLEVEL WITH LAMINATE)
15AIR CONDITIONINGAS PER SPECIFICATION. OF STANDARD MAKE
16ELECTRICAL FITTINGSAS PER SPECIFICATION. OF STANDARD MAKE
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINTS
20INTERNAL FINISHING10 TO 12MM THICK PLASTER ON BLOCKWORKSAND RCC WALLS AND COLUMNS WITH CEMENTMORTAR OF 1:5
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE
1 . 2 WALLSACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
1 . 3 CEILINGOIL BOUND DISTEMPER PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
2 . 3 CEILINGOIL BOUND DISTEMPER PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI-SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES UPTO 7FT HEIGHT. OIL BOUNDDISTEMPER PAINT ON THE REMAINING AREA.
3 . 3 CEILINGFALSE CEILING/GRID CEILING
3 . 4 COUNTERSGRANITE/STONE
3 . 5 SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
3 . 6 FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
4 . 3 CEILINGOIL BOUND DISTEMPER PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI-SKID CERAMIC TILES
5 . 2 WALLSACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
5 . 3 CEILINGOIL BOUND DISTEMPER PAINT
5 . 4 COUNTERSGRANITE/STONE
5 . 5 SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
5 . 6 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES 2FT ABOVE COUNTER AND OBDPAINT ON REMAINING AREA
6 . 3 CEILINGOIL BOUND DISTEMPER PAINT
6 . 4 COUNTERSGRANITE/STONE
6 . 5 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER PAINT
7 . 3 TOILETANTI-SKID CERAMIC TILES
7 . 4 BALCONYANTI-SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID CERAMIC TILES
8 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
8 . 3 RAILINGSMS RAILINGS
8 . 4 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE












Sr. No.Document DescriptionDate of Document UploadView Document
1ZONING PLAN08-09-2024 View Document
2ASSURANCE CERTIFICATE FOR WATER SUPPLY08-09-2024 ------
3DEMARCATION PLAN08-09-2024 View Document
4ASSURANCE CERTIFICATE FROM DHBVN08-09-2024 ------
5OFFER OF POSSESION08-09-2024 ------
6ASSURANCE CERTIFICATE FOR STORM08-09-2024 ------
7IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN08-09-2024 View Document
8IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN08-09-2024 View Document
9ASSURANCE CERTIFICATE FOR SEWERAGE CONNECTION08-09-2024 ------
10A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS08-09-2024 View Document
11LETTER OF INTENT (LOI)08-09-2024 ------
12COPY OF LICENSE ALONG WITH SCHEDULE OF LAND08-09-2024 View Document
13DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD08-09-2024 View Document
14POSSESSION LETTER08-09-2024 ------
15ASSURANCE CERTIFICATE OF STP TREATED WATER CONNECTION FOR CONSTRUCTION PURPOSE08-09-2024 ------
16BUILDING PLAN APPROVAL08-09-2024 ------
17NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT15-09-2024 View Document
18BASEMENT 01 FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
19BASEMENT 02 FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
20BASEMENT 3 FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
21CARPET AREA OF 2ND FLOOR PLAN & TYPICAL FLOOR15-09-2024 ------
22CARPET AREA OF FIRST FLOOR PLAN15-09-2024 ------
23CARPET AREA OF GROUND FLOOR PLAN15-09-2024 ------
24GROUND COVERAGE AREA DIAGRAM15-09-2024 ------
25SITE PLAN SERVICE PLAN15-09-2024 ------
26TOWER 1 & 2 5TH TO 15TH & 17TH TO 22ND FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
27TOWER 1 & 2 16TH FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
28TOWER 1 & 2 23 & 24 FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
29TOWER 1 & 2 25TH FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
30TOWER 1 & 2 26TH TO 28TH FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
31TOWER 1 & 2 29TH FLOOR PLAN, TERRACE PLAN, MUMTY MACHINE & AREA DIAGRAM15-09-2024 ------
32TOWER 1 & 2 ELEVATION A15-09-2024 ------
33TOWER 1 & 2 ELEVATION B & D15-09-2024 ------
34TOWER 1 & 2 ELEVATION C & E15-09-2024 ------
35TOWER 1 & 2 FIRST FLOOR PLAN AREA DIAGRAM15-09-2024 ------
36TOWER 1 & 2 FIRST FLOOR PLAN COMMERCIAL15-09-2024 ------
37TOWER 1 & 2 FOURTH FLOOR PLAN AREA DIAGRAM15-09-2024 ------
38TOWER 1 & 2 GROUND FLOOR PLAN AREA DIAGRAM15-09-2024 ------
39TOWER 1 & 2 GROUND FLOOR PLAN COMMERCIAL15-09-2024 ------
40TOWER 1 & 2 SECOND FLOOR PLAN AREA DIAGRAM15-09-2024 ------
41TOWER 1 & 2 SECOND FLOOR PLAN COMMERCIAL15-09-2024 ------
42TOWER 1 & 2 SECTION XX15-09-2024 ------
43TOWER 1 & 2 SECTION YY & ZZ15-09-2024 ------
44TOWER 1 & 2 THIRD FLOOR PLAN AREA DIAGRAM PODIUM15-09-2024 ------
45TOWER 1 30TH & 33RD FLOOR PLAN & AREA DIAGRAM15-09-2024 ------
46TOWER 1 34TH TO 35TH FLOOR PLAN & TERRACE FLOOR PLAN AND AREA DIAGRAM15-09-2024 ------
47CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT17-09-2024 View Document
48ENVIRONMENT CLERANCE20-09-2024 ------
49DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.09-01-2025 View Document