HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2142-2025
Submission Date : 16-01-2026 02:42:25 PM
Applicant Type : Company
Project Type: NEW




BIRLA ESTATES PRIVATE LIMITED
BIRLA AURORA, LEVEL 8, UNIT A, DR ANNIE BESANT ROAD, WORLI MUMBAI - 400030 MAHARASHTRA
01244227720
8828809059 (Number Shared by Promoter in Public)
be.ncr.legal@adityabirla.com
https://www.birlaestates.com/
XXXX831G
U70100MH2017PTC303291
 
 


 
 


 
 


 
 







BIRLA ARIKA PHASE 2
SECTOR 31-32A, GURUGRAM
WAZIRABAD ST
GURUGRAM
01244227720
8828809059 (Number Shared by Promoter in Public)
be.ncr.legal@adityabirla.com
AMAN SHARMA
01244227720
8828809059 (Number Shared by Promoter in Public)
be.ncr.legal@adityabirla.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150943914-01-20261530000ICICI BANK, GURGAON BRANCH HRERA Gurugram
251146707-02-20261208000ICICI BANKHRERA Gurugram







1.53 (Acre)
1.25
1.25
13.275 (Acre)
License No. 116 of 2011 Dated 23.12.2011 granted by DTCP, Haryana
No
Address     VILLAGE JHARSA SECTOR 31 GURUGRAM HARYANA 122001
Address     VILLAGE JHARSA SECTOR 31 GURUGRAM HARYANA 122001
Address     VILLAGE JHARSA SECTOR 31 GURUGRAM HARYANA 122001
Annexure-B- CHANGE OF DEVELOPER, COLLABORATION AGREEMENT, POWER OF ATTORNEY
YES, REGISTERED COLLABORATION AGREEMENT WAS EXECUTED AFTER GRANT OF LICENSE
Yes
AS PER ANNEXURE
No
Yes
Yes







228782.75 Lakhs
115985.43 Lakhs
87166.52 Lakhs
3277.42 Lakhs
22353.42 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.5959
3CONSTRUCTION OF ROADS 0.383
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.270
6GREEN BELTS 0
7VEHICLE PARKINGS 0.136
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0.0723
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.003
13NURSERY SCHOOL 0.0691
Total1.5293




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS130.06AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM124.20AS PER PROJECT REPORT
3STORM WATER DRAINAGE34.11AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM463.73AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL10.66AS PER PROJECT REPORT
6STREET LIGHTING25.59AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING247.85AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS66.09AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE1554.42AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15NURSERY SCHOOL390AS PER PROJECT REPORT
16ELECTRIFICATION COST50AS PER PROJECT REPORT
17SIGNAGE8AS PER PROJECT REPORT
18PARKING21.32AS PER PROJECT REPORT
19ELECTRICAL SUB STATION81.56AS PER PROJECT REPORT
20HARDSCAPE69.83AS PER PROJECT REPORT


16-01-2026 (date)
16-01-2026 (date)
10-03-2026
09-10-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings218.26772
Apartment/Shops/Other Buildings215.45772
Apartment/Shops/Other Buildings218.89401
Apartment/Shops/Other Buildings218.06401





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments2729.39
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments222.591527.602995.803389.97
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4117.103077.923034.893639.97
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3639.973992.414351.955014.82
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments6115.916289.914775.534712.09
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4163.152461.632030.192319.74
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2975.262619.112469.262180.94
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1685.19672.39451.81
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Nursery School5.858.788.788.78

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Nursery School8.788.7815.6020.48

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0006.51
Water Supply System0006.21
Sewerage treatment & garbage disposal0000.53
Electricity Supply System0000
Storm Water Drainage0001.7
Parks and Playgrounds0000
Clubhouse/community centres0046.63101.04
Shopping area0000
Other0000
Nursery School20.4820.4820.4820.48
Street Lighting1.28

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.516.5113.0113.01
Water Supply System6.216.2112.4212.42
Sewerage treatment & garbage disposal0.530.531.071.07
Electricity Supply System0000
Storm Water Drainage1.71.73.413.41
Parks and Playgrounds0000
Clubhouse/community centres100.04128.24120.47118.73
Shopping area0000
Other0000
Street Lighting1.281.282.562.56
Nursery School17.755.4618.7219.5

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.0113.0113.0113.01
Water Supply System12.4212.4212.4212.42
Sewerage treatment & garbage disposal1.071.071.071.07
Electricity Supply System23.1969.5669.5669.56
Storm Water Drainage3.413.413.413.41
Parks and Playgrounds003.309.91
Clubhouse/community centres120.47151.56151.56116.58
Shopping area0000
Other0000
Security Fire Fighting12.3937.1837.1837.18
Street Lighting2.562.562.562.56
Electrical Sub Station4.0812.2312.2312.23
Parking1.073.193.193.19
Nursery School24.3824.3814.6314.63
Electrification Cost16.6716.67
Hardscape10.4710.47
Signage0.41.2

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.016.516.516.49
Water Supply System12.426.216.216.22
Sewerage treatment & garbage disposal1.070.530.530.52
Electricity Supply System69.5669.5646.3746.36
Storm Water Drainage3.411.71.71.7
Parks and Playgrounds13.2213.2213.2213.22
Clubhouse/community centres116.5897.1597.1538.86
Shopping area0000
Other0000
Hardscape13.9613.9710.4710.47
Security Fire Fighting37.1837.1824.7924.8
Street Lighting2.561.281.281.28
Electrical Sub Station12.2312.238.158.16
Parking3.193.192.132.15
Signange1.61.6
Nursery School29.2529.2524.38
Signage1.61.6
Electrification Cost16.67

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres40.86
Shopping area0
Other0












Yes
Yes
ICICI BANK LIMITED, TIME TOWER MG ROAD GURGAON
777705156580
ICIC0001143
110229199
1143
K.T. Jithendran, Keyur Shah, Narender Joshi, Harish Jhanwer, Gaurau Jain, Ami Mistry,Rakesh kumar, Sachin Siuuarkar, Shirin Saucheti
ATTACHED hibaui shirodkar, Sanideep Patwa, Nisha Oza, Tarendra Singh, Nitin Sharma











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. LAYOUT PLAN/SITE PLANALREADY BEEN OBTAINED24-12-2024
II. ENVIRONMENT CLAREARANCEALREADY BEEN OBTAINED13-11-2024
III. BUILDING PLANALREADY BEEN OBTAINED16-01-2026
IV. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED27-12-2018
V. FOREST NOCALREADY BEEN OBTAINED30-07-2024
VI. ASSURANCE ELECTRICAL LOADALREADY BEEN OBTAINED19-07-2024
VII. TREE CUTTING PERMISSIONALREADY BEEN OBTAINED29-10-2024
VIII. HUDA SEWAGE TREATED WATER FOR CONSTRUCTIONALREADY BEEN OBTAINED24-07-2024
IX. ASSURANCE FOR TREATED WATER FOR CONSTRUCTIONALREADY BEEN OBTAINED11-07-2024
X. ASSURANCE FOR FRESH WATER FOR DRINKINGALREADY BEEN OBTAINED08-07-2024
XI. ARAVALI NOCALREADY BEEN OBTAINED19-09-2024
XII. ASSURANCE FOR STORM WATER CONNECTIONALREADY BEEN OBTAINED11-07-2024
XIII. ASSURANCE FOR SEWERAGE CONNECTIONALREADY BEEN OBTAINED11-07-2025








Yes


Yes


Attached







BIRLA ARIKA, SECTOR-31 32A GURUGRAM
11.745
322
0
386
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
119199.1141126.2534033.95
Cost of the apartments84300.1484300.1412646.81
Cost of the infrastructure8743.128743.120
Others costs26155.8426155.8421387.14


57172 Lakhs
267981 Lakhs
0 Lakhs
0 Lakhs
No
10-03-2025
09-12-2031




BIRLA PRAVAAH, SECTOR 71 GURUGRAM
5.075
492
0
583
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
107956.41107956.4116608.90
Cost of the apartments83636.6183636.6111312.07
Cost of the infrastructure6950.866950.860
Others costs17368.9417368.945296.83


16210 Lakhs
169290 Lakhs
0 Lakhs
0 Lakhs
No
01-05-2026
31-03-2032










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES/ANTI SKID TILES/CERAMIC TILES/ENGINEERED STONES AND EQUIVALENTS
2WALL FINISHING DETAILSTILES/ACRYLIC EMULSION/OBD/PAINT AND EQUIVALENTS
3KITCHEN DETAILSMARBLE/ANTI SKID TILES; ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER/TILE DADO; CP FITTINGS, SS SINK
4BATHROOM FITTINGSPVC, CPVC PIPES, CP & SANITARY FITTINGS
5WOOD WORK ETC INTERNAL DOORS
6DOORS AND WINDOS FRAMESWOODEN / POWDER COATED ALUMINUM / UPVC
7GLASS WORKAS PER SPECIFICATION
8ELECTRIC FITTINGSAS PER SPECIFICATION
9CONDUCTING AND WIRING DETAILSISI MARKED AND STANDARD MAKE
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSAS PER BUILDING CODE
13EXTERNAL GLAZINGSAS PER BUILDING CODE
13.1WINDOWS/GLAZINGSAS PER BUILDING CODE
14DOORSPAINTED/POLISHED FRAME WITH PAINTED/LAMINATED/VENEERED FLUSH DOORS
14.1MAIN DOORSPAINTED/ POLISHED FRAME WITH PAINTED/LAMINATED/VENEERED FLUSH DOORS
14.2INTERNAL DOORSPAINTED/ POLISHED FRAME WITH PAINTED/LAMINATED/VENEERED FLUSH DOORS
15AIR CONDITIONINGVRV/VRF
16ELECTRICAL FITTINGSAS PER SPECIFICATION
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEACRYLIC EMULSION/ OIL BOUND DISTEMPER/ EXTERNAL GRADE PAINT
20INTERNAL FINISHINGVITRIFIED TILES/LAMINATE WOODEN FLOORING/MARBLE FLOORING AND EQUIVALENT; ACRYLIC EMULSION/ OIL BOUND DISTEMPER AND EQUIVALENT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
1 . 2 WALLS ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
1 . 3 CEILINGACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOOR MARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
2 . 2 WALLSACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
2 . 3 CEILINGACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORSTONE/ VITRIFIED TILES/ANTI SKID TILES AND EQUIVALENTS
3 . 2 WALLSSTONE/TILES, ACRYLIC EMULSION PAINT/OBD AND EQUIVALENT
3 . 3 CEILINGGRID CEILING/POP
3 . 4 COUNTERSMARBLE/GRANITE/ ENGINEERED STONE/VITRONITE TILES AND EQUIVALENT
3 . 5 SANITARY WARE/CP FITTINGSSTANDARD CP FITTINGS, WASH BASIN, WC
3 . 6 FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
4 . BED ROOMS
4 . 1 FLOORMARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
4 . 2 WALLS ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
4 . 3 CEILINGACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOOR STONE/ VITRIFIED TILES/ANTI SKID TILES AND EQUIVALENTS
5 . 2 WALLSSTONE/TILES, ACRYLIC EMULSION PAINT/OBD AND EQUIVALENT
5 . 3 CEILINGGRID CEILING/POP
5 . 4 COUNTERSMARBLE/GRANITE/ ENGINEERED STONE/VITRONITE TILES AND EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGS STANDARD CP FITTINGS, WASH BASIN, WC
5 . 6 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
6 . KITCHEN
6 . 1 FLOORMARBLE/LAMINATED WOODEN FLOORING/ VITRIFIED TILES AND EQUIVALENTS
6 . 2 WALLS TILE DADO/ACRYLIC EMULSION PAINT / OBD AND EQUIVALENT
6 . 3 CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT AND EQUIVALENT
6 . 4 COUNTERS GRANITE/MARBLES/ENGINEERED STONE/VITRONITE TILES AND EQUIVALENT
6 . 5 FIXTURESCP FITTINGS, SS SINK
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES AND EQUIVALENTS
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT/OBD
7 . 3 TOILETACRYLIC EMULSION PAINT/OBD
7 . 4 BALCONY VITRIFIED/ANTI-SKID TILES AND EQUIVALENTS
8 . SIT-OUTS
8 . 1 FLOORTILES/ANTI SKID TILES AND EQUIVALENTS
8 . 2 WALLS & CEILING ACRYLIC EMULSION PAINT/OBD/EXTERNAL GRADE PAINT AND EQUIVALENT
8 . 3 RAILINGSSS/MS/ALUMINUM/GLASS AND EQUIVALENT
8 . 4 FIXTURES NA












Sr. No.Document DescriptionDate of Document UploadView Document
1 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 14-01-2026 View Document
2 DEMARCATION PLAN 06-01-2026 View Document
3 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 06-01-2026 View Document
4 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 14-01-2026 View Document
5 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 16-01-2026 View Document
6 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 16-01-2026 View Document
7 ZONING PLAN 06-01-2026 View Document
8 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 06-01-2026 View Document
9 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 06-01-2026 View Document
10 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 14-01-2026 View Document
11 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 14-01-2026 View Document