HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1262-2023
Submission Date : 25-01-2023 03:56:23 PM
Applicant Type : Company
Project Type: NEW




METRO EDUCATION & WELFARE PRIVATE LIMITED
6TH FLOOR, M3M TEE POINT NORTH BLOCK, SECTOR-65, GURUGRAM
1244732000
9711348349 (Number Shared by Promoter in Public)
metroeducation1204@gmail.com
Https://www.metroeducationwelfare.com
XXXX683E
U70100HR2010PTC086524
 
 


 
 


 
 


 
 







M3M CROWN PHASE 1
SECTOR-111
GURGAON
GURUGRAM
1244732000
8929012754 (Number Shared by Promoter in Public)
metroeducation1204@gmail.com
PRAVEEN SEHGAL
1244732000
9711348349 (Number Shared by Promoter in Public)
metroeducation1204@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150087611-01-20235488800ICICI BANK LTDHRERA Gurugram
250087511-01-20231882040ICICI BANK LTDHRERA Gurugram
351421930-01-20231287730ICICI BANK LTDHRERA Gurugram







15.9938 (Acre)
3.60
2.92
11.6022 (Acre)
License No. 213 of 2022 dated 27-Dec-22 valid upto 26-Dec-27
Yes







230674.96 Lakhs
79246.62 Lakhs
98400.24 Lakhs
7145.53 Lakhs
45882.56 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 6.69
3CONSTRUCTION OF ROADS 2.84
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 2.09
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total11.62




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS338.24AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM72.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE125.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM590.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL250.00AS PER PROJECT REPORT
6STREET LIGHTING76.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING192AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER697.41AS PER PROJECT REPORT
15STP262.50AS PER PROJECT REPORT
16PARKING52.59AS PER PROJECT REPORT
17RAIN WATER HARVESTING125.00AS PER PROJECT REPORT
18ELECTRIC SUB STATION621.83AS PER PROJECT REPORT
19UNDERGROUND WATER TANK135.00AS PER PROJECT REPORT
20BOUNDARY WALL237.12AS PER PROJECT REPORT
21SWITCHING STATION703.26AS PER PROJECT REPORT
22HARDSCAPE AND SOFTSCAPE2538.57AS PER PROJECT REPORT
23MAIN ENTRANCE129.02AS PER PROJECT REPORT
24BOUNDARY WALL237.12AS PER PROJECT REPORT


25-01-2023 (date)
25-01-2023 (date)
25-01-2023
31-01-2028
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings145041.19133211





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments641192325635514
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments8577109581036710202
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments115601146380365401
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4111309419631167
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments859
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2027)
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
ICICI BANK LTD & M3M TEE POINT, SECTOR-65, GURUGRAM BRANCH
777705242010
ICIC0007242
110229338
007242
1. Amarjot Kaur Sahni -D/O Swarnjeet Singh , 3/66, SubashNagar , Tagore Garden ,West Delhi 2. Vyom Shakti Nigam-D3/103 Paras City , Bhopal, Madhya Pradesh 3.ShubhraBakshi- 10/6 DLF Phase I , Gurugram. 4. Surbhi- Flat no. 3-905 , Sec 103 , Gurugram 5. Vidhya Sagar - 3G - 208 ,Faridabad 6. Pratap Singh - 10 A Pocket 2 , Mayur ViharPhase III, Delhi. 7. Pradeep Kumar Katiyar- 357 Bakothi ,Kanpur , Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED27-12-2022
II. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED10-05-2021
III. FOREST NOCALREADY BEEN OBTAINED07-08-2018
IV. ARAVALI NOCALREADY BEEN OBTAINED27-08-2018








Yes


Yes


AS PER THE HARERA NORMS













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATEDWOODEN FLOOR/CERAMIC TILE
2WALL FINISHING DETAILSPLASTER WITH OBD
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESEXTERNAL ALUMINIUM WITH GLASSINTERNAL – WOODEN
7GLASS WORKONLY EXTERNAL DOOR/WINDOW
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSNA
11WATER STORAGEAS PER NORMS
12LIFT DETAILSLIFTS AS PER BUILDING PLANS
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
14DOORSNA
14.1MAIN DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINESERVICE PROVIDER
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEWATER PROOF PAINT
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER /OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODENFLOORING
2 . 2 WALLSPLASTER + OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER +DADO
3 . 3 CEILINGGRID FALSE CEILING/OBD
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATE WOODENFLOORING
4 . 2 WALLSPLASTER /OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER +DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER+DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSSTONE / MARBLE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCES NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER + PAINT
7 . 3 TOILETANTI SKID CERAMIC TILES
7 . 4 BALCONYANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DEMARCATION PLAN 05-01-2023 View Document
2 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 09-01-2023 View Document
3 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 09-01-2023 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 05-01-2023 View Document
5 ZONING PLAN 05-01-2023 View Document
6 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 09-01-2023 View Document
7 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 09-01-2023 View Document
8 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 31-01-2023 View Document
9 T1-2 (4TH TO 23RD FLOOR) 31-01-2023 View Document
10 TOWER TYPE-A (1, 2, 3, 4, 6)- STRUCTURAL PLAN 31-01-2023 View Document
11 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 31-01-2023 View Document
12 AAI NOC 31-01-2023 View Document
13 T1 TYPICAL FLOOR_FIRE FIGHTING LAYOUT 31-01-2023 View Document
14 WATER SUPPLY SITE PLAN 31-01-2023 View Document
15 FIRE FIGHTING SITE PLAN 31-01-2023 View Document
16 T2 (STILT, GROUND FLOOR PLAN) 31-01-2023 View Document
17 ELEVATIONS & SECTION PLAN 31-01-2023 View Document
18 T6 (TERRACE PLAN & AREA CALCULATIONS) 31-01-2023 View Document
19 ENVIRONMENT CLEARANCE 31-01-2023 View Document
20 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 31-01-2023 View Document
21 BASEMENT 1,2,3 UNDER COMMERCIAL 31-01-2023 View Document
22 FOREST NOC 31-01-2023 View Document
23 SITE PLAN STORM WATER DRAINAGE 31-01-2023 View Document
24 PERT CHART METRO 31-01-2023 View Document
25 IRRIGATION SITE PLAN 31-01-2023 View Document
26 LANDSCAPE PLAN 31-01-2023 View Document
27 TOWER TYPE-D (5, 8, 11, 13, 15) STRUCTURAL PLAN 31-01-2023 View Document
28 ELECTRICAL AND STREET LIGHTING LAYOUT 01-02-2023 View Document
29 T1 & T2 20TH_FIRE FIGHTING LAYOUT 31-01-2023 View Document
30 ASSURANCE- SEWERAGE 31-01-2023 View Document
31 ELEVATION PLAN 3 31-01-2023 View Document
32 SECTION AA 31-01-2023 View Document
33 TOWER TYPE-F (5, 8, 11, 13, 15) STRUCTURAL PLAN 31-01-2023 View Document
34 T12 & 14 (2ND TO 23RD FLOOR) 31-01-2023 View Document
35 TOWER TYPE-C (1, 2, 3, 4, 6) STRUCTUREAL PLAN 31-01-2023 View Document
36 FIRE APPLICATION 31-01-2023 View Document
37 ASSURANCE- STORM WATER 31-01-2023 View Document
38 T8-9 & 11 (1ST FLOOR) 31-01-2023 View Document
39 T8-9 & 11 (2ND TO 23RD FLOOR) 31-01-2023 View Document
40 AIRPORT HEIGHT CLEARANCE 31-01-2023 View Document
41 ELEVATION PLAN 1 31-01-2023 View Document
42 BASEMENT 2 31-01-2023 View Document
43 SECTION BB 31-01-2023 View Document
44 SEWERAGE LAYOUT SITE PLAN 31-01-2023 View Document
45 T8, T9 & T11 TYPICAL FLOOR_FIRE FIGHTING LAYOUT 31-01-2023 View Document
46 T12 & T14_TYPICAL FLOOR_FIRE FIGHTING LAYOUT 31-01-2023 View Document
47 T13 (TERRACE AREA CALCULATION) 31-01-2023 View Document
48 TOWER TYPE-B (5, 8, 11, 13, 15)- STRUCTURE 31-01-2023 View Document
49 SERVICE ESTIMATE APPLICATION 31-01-2023 View Document
50 T8-9 (TERRACE & GROUND COVERAGE) 31-01-2023 View Document
51 T13 (2ND TO 23RD FLOOR) 31-01-2023 View Document
52 ARAVALLI NOC 31-01-2023 View Document
53 ASSURANCE- DRINKING WATER 31-01-2023 View Document
54 ASSURANCE- STP TREATED WATER 31-01-2023 View Document
55 BASEMENT 1 AREA DIAGRAM 31-01-2023 View Document
56 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 31-01-2023 View Document
57 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 31-01-2023 View Document
58 T13 (5TH TO 29TH FLOOR PLAN) 31-01-2023 View Document
59 DEMARCATION SUPERIMPOSED ON SITE PLAN 31-01-2023 View Document
60 ELECTRICITY ASSURANCE 31-01-2023 View Document
61 ELEVATION PLAN 2 31-01-2023 View Document
62 METRO EDUCATION- 15.99 ACRES- LOI ISSUED FOR MLU 31-01-2023 View Document
63 NON- ENCUMBRANCE CERTIFICATE 31-01-2023 View Document
64 STORM WATER SITE PLAN 31-01-2023 View Document
65 T1 & T2 FIRST FLOOR_FIRE FIGHTING LAYOUT 31-01-2023 View Document
66 T1-2 (5TH TO TERRACE) 31-01-2023 View Document
67 T6 (STILT TO 30TH FLOOR PLAN) 31-01-2023 View Document
68 T7 & 10 (TERRACE FLOOR AREA CALCULATIONS) 31-01-2023 View Document
69 T7 (S TO 30TH FLOOR PLAN) &T10; (S TO 32ND FLOOR) 31-01-2023 View Document
70 T8-9 & 11 (AREA CALCULATIONS) 31-01-2023 View Document
71 T12 & 14 (5TH TO 29TH FLOOR) 31-01-2023 View Document
72 T12 & 14 (AREA CALCULATION OF ALL FLOORS) 31-01-2023 View Document
73 TOWER TYPE-E (1, 2, 3, 4, 6) STRUCTURE PLAN 31-01-2023 View Document
74 BR-III ISSUED- METRO EDUCATION- 15.99375 ACRES 31-01-2023 View Document
75 ROAD LAYOUT 31-01-2023 View Document