HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2365-2026
Submission Date : 19-10-2026 12:19:43 PM
Applicant Type : Company
Project Type: NEW




INTERNATIONAL GREEN SCAPES LTD
FIRST FLOOR, WORLD TRADE TOWER,BARAKHAMBA LANE(CP), NEW DELHI
7715086860 (Number Shared by Promoter in Public)
ltr.aravista@larsentoubro.com
https://www.lntrealty.com/
XXXX600F
U74899DL1993PLC056170
 
 


 
 


 
 


 
 







L & T REALTY ARAVISTA PHASE 1
SECTOR-86 AND 81 ,NAWADA FATEHPUR AND NAHARPUR KASAN , GURUGRAM, HARYANA
MANESAR
GURUGRAM
8879662086 (Number Shared by Promoter in Public)
LTR.ARAVISTA@larsentoubro.com
APURV SRIVASTAVA
8879662086 (Number Shared by Promoter in Public)
apurv.srivastava@larsentoubro.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques/Online Banking:-

Drafts/ Banker’s Cheques

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
15202610177367850817-10-20262418200HDFC BANKHRERA Gurugram
26438007-11-202616937299HDFC BANKHRERA Gurugram

Online Banking








7.1969 (Acre)
1.75
1.75
19.9750 (Acre)
47 of 2009 dated 21.08.2009, 104 of 2012 dated 06.10.2012, 24 of 2026 dated 09.02.2026
Yes







173129.91 Lakhs
19324.13 Lakhs
126082.21 Lakhs
7267.48 Lakhs
20456.09 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.0213
3CONSTRUCTION OF ROADS 1.4349
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 1.6974
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0.0831
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13SECTOR 2.9602
Total7.1969




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHUVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS367.02YET TO BE PREPARED
2WATER SUPPLY SYSTEM447.22YET TO BE PREPARED
3STORM WATER DRAINAGE129.02YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM1000.00YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL229.71YET TO BE PREPARED
6STREET LIGHTING28.47YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING500.00YET TO BE PREPARED
8PLAYGROUNDS AND PARKS10.52YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM250.00YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15RWH300.00YET TO BE PREPARED
16ELECTRIC SUB STATION500.00YET TO BE PREPARED
17MTC350.15YET TO BE PREPARED
18SECTOR ROAD AND SERVICE ROAD AND BOUNDARY WALL AND GATE1455.37YET TO BE PREPARED
19ELECTRIFICATION COST600YET TO BE PREPARED
20PARKING500.00YET TO BE PREPARED
21STP300.00YET TO BE PREPARED
22UWT300.00YET TO BE PREPARED


NA (date)
15-10-2026 (date)
01-01-2027
31-12-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings132.23662
Apartment/Shops/Other Buildings132.42762
Apartment/Shops/Other Buildings143.27682
Apartment/Shops/Other Buildings143.64802
Apartment/Shops/Other Buildings103.5022
Apartment/Shops/Other Buildings103.8442
Apartment/Shops/Other Buildings186.42173
Apartment/Shops/Other Buildings190.50203
Apartment/Shops/Other Buildings189.10163
Apartment/Shops/Other Buildings190.31183
Apartment/Shops/Other Buildings213.01373
Apartment/Shops/Other Buildings215.72173
Apartment/Shops/Other Buildings217.04203
Apartment/Shops/Other Buildings151.2613
Apartment/Shops/Other Buildings152.6223





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5731.015731.015731.015731.01
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5731.015731.015731.015731.01
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5731.015731.015731.015731.01
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5731.015731.015731.015731.01
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5731.015731.015731.015731.01
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5731.015731.01
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements61.1761.1761.1761.17
Water Supply System74.5474.5474.5474.54
Sewerage treatment & garbage disposal38.2838.2838.2838.28
Electricity Supply System0000
Storm Water Drainage32.2532.2532.2532.25
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Renewable energy system125.00125.00
Parking250.00250.00
Electrification cost300300
Electrical sub station250.00250.00
Sector road and service road and boundary wall and gate363.84363.84363.84363.84
Security and fire fighting125.00125.00
STP7575.00

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements61.1761.170
Water Supply System74.5474.540
Sewerage treatment & garbage disposal38.2838.280
Electricity Supply System500.00500.000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Play grounds and Parks5.265.26
Security and fire fighting125.00125.00
STP75.0075.00
Street light14.2414.23
UWT150.00150.00
RWH300.00








Cash Flow in each quarter (In Lakhs)












Yes
No
100% Account Details70% Account Details30% Account Details
AXIS BANK LIMITED AND DLF STAR TOWER, SHOP NO. 25 AND 45, SECTOR 30, GURUGRAM, HARYANAAXIS BANK LIMITED AND DLF STAR TOWER, SHOP NO. 25 AND 45, SECTOR 30, GURUGRAM, HARYANAAXIS BANK LIMITED AND DLF STAR TOWER, SHOP NO. 25 AND 45, SECTOR 30, GURUGRAM, HARYANA
925020029390821925020029390818925020029390805
UTIB0003622UTIB0003622UTIB0003622
110211230110211230110211230
362236223622
IGSL L&T Realty Aravista Phase 1 Master A/C
Yes











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLANALREADY BEEN OBTAINED15-10-2026
II. ELECTRICALALREADY BEEN OBTAINED07-07-2026
III. ROADALREADY BEEN OBTAINED06-11-2026
IV. WATER SUPPLYALREADY BEEN OBTAINED27-04-2026
V. SEWERALREADY BEEN OBTAINED28-04-2026
VI. STORMALREADY BEEN OBTAINED28-04-2026
VII. ZONINGALREADY BEEN OBTAINED10-04-2026
VIII. AHCALREADY BEEN OBTAINED30-06-2026
IX. FORESTALREADY BEEN OBTAINED18-05-2026








Yes


Yes


As per Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLES OR EQUIVALENT
2WALL FINISHING DETAILSOBD/ ACRYLIC EMULSION OR EQUIVALENT
3KITCHEN DETAILSVITRIFIED FLOORING
4BATHROOM FITTINGSVITRIFIED FLOORING/ CHROME PLATES
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESENGINEERED DOORS/ ALUMINIUM/ TOUGHENED GLASS
7GLASS WORKALUMINIUM WINDOW OR EQUIVALENT
8ELECTRIC FITTINGSCRABTREE,
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSAL WINDOW OR EQUIVALENT
14DOORSENGINEERED DOOR
14.1MAIN DOORS1 HOUR FIRE RATED ENGINEERED DOOR
14.2INTERNAL DOORSENGINEERED DOOR
15AIR CONDITIONINGDAIKIN/TOSHIBA/LG/HITACHI OR EQUIVALENT
16ELECTRICAL FITTINGSPOLYCAB/ KEI/ RR KABLES OR EQUIVALENT
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEASIAN/ BERGER OR EQUIVALENT
20INTERNAL FINISHINGASIAN/ BERGER OR EQUIVALENT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE FLOORING OR EQUIVALENT
1 . 2 WALLSASIAN / BERGER OR EQUIVALENT
1 . 3 CEILINGASIAN / BERGER OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORSAME AS ABOVE
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES
3 . 2 WALLSVITRIFIED TILES
3 . 3 CEILINGASIAN/ BERGER OR EQUIVALENT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESHANSGROBE/ GU REVIT OR EQUIVALENT/ PVC
4 . BED ROOMS
4 . 1 FLOORSAME AS ABOVE ROOMS
4 . 2 WALLSNIL
4 . 3 CEILINGNIL
4 . 4 WARDROBESNIL
5 . TOILET
5 . 1 FLOORNIL
5 . 2 WALLSSAME AS ABOVE ROOMS
5 . 3 CEILINGNIL
5 . 4 COUNTERSNIL
5 . 5 SANITARY WARE/CP FITTINGSNIL
5 . 6 FIXTURESNIL
6 . KITCHEN
6 . 1 FLOORNIL
6 . 2 WALLSNIL
6 . 3 CEILINGNIL
6 . 4 COUNTERSNIL
6 . 5 FIXTURESNIL
6 . 6 KITCHEN APPLIANCESNIL
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORMATT
7 . 2 WALLS & CEILINGVITRIFIED
7 . 3 TOILETSAME AS BEDROOM
7 . 4 BALCONYNIL
8 . SIT-OUTS
8 . 1 FLOORNIL
8 . 2 WALLS & CEILINGNIL
8 . 3 RAILINGSNIL
8 . 4 FIXTURESNIL












Sr. No.Document DescriptionDate of Document UploadView Document
1 FIRE SCHEME APPLIED 19-11-2026 View Document
2 BASEMENT 1 AND 2 AREA 19-11-2026 View Document
3 PAYMENT PLAN 18-10-2026 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 18-10-2026 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 18-10-2026 View Document
6 PHASING PLAN 19-11-2026 View Document
7 T317TH REFUGE FLOOR PLAN 19-11-2026 View Document
8 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 18-10-2026 View Document
9 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 18-10-2026 View Document
10 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 19-11-2026 View Document
11 SECTION PLAN 19-11-2026 View Document
12 REGISTRY NO. 516, 5686 AND 7266 19-11-2026 View Document
13 AFFIDAVIT NO LITIGATION 19-11-2026 View Document
14 AIRPORT HEIGHT CLEARANCE 19-11-2026 View Document
15 T2 SECTION AA AND BB 19-11-2026 View Document
16 GREEN AREA CALCULATION 19-11-2026 View Document
17 T3 SECTION A AND B 19-11-2026 View Document
18 ELEVATION TOWER 3 19-11-2026 View Document
19 T1 TYPICAL 2ND TO 16 TH , 18TH TO 24TH , 26TH TO 33RD AND 35TH TO 37TH FLOOR PLAN 19-11-2026 View Document
20 AFFIDAVIT FOR NON-APPLICABILITY OF NCZ, TREE CUTTING, POWERLINE AND FOREST LAND DIVERSION 19-11-2026 View Document
21 AUTO CREDIT 10% 19-11-2026 View Document
22 ENVIRONMENT CLEARANCE APPLIED 19-11-2026 View Document
23 BASEMENT 2 PLAN SERVICES 19-11-2026 View Document
24 T2 TYPICAL FLOOR UNIT 4 TOILET 19-11-2026 View Document
25 DRAFT BBA 19-11-2026 View Document
26 CA CERTIFICATE INVENTORY 19-11-2026 View Document
27 T1 GFP PLUMBING LAYOUT 19-11-2026 View Document
28 TERRACE PLAN 19-11-2026 View Document
29 T3 GFP PLUMBING 19-11-2026 View Document
30 T2 GF PLAN 19-11-2026 View Document
31 T3 TYPICAL 2ND TO 16 TH, 18TH TO 23RD FLOOR PLAN 19-11-2026 View Document
32 T1 GF AND FF PLAN 19-11-2026 View Document
33 CA CERTIFICATE FOR NET WORTH 19-11-2026 View Document
34 REGISTRY NO. 1479, 1504 AND 1986 19-11-2026 View Document
35 JAMABANDI 19-11-2026 View Document
36 AFFIDAVIT 4(2)(L)(D) 19-11-2026 View Document
37 CONSTRUCTION WATER NOC 19-11-2026 View Document
38 LOI 19-11-2026 View Document
39 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 19-11-2026 View Document
40 BANK UNDERTAKING 19-11-2026 View Document
41 T2 TYPICAL 2ND TO 16 TH , 18TH TO 24TH , 26TH TO 33RD AND 35TH TO 37TH FLOOR PLAN 19-11-2026 View Document
42 CA CERTIFICATE FOR NON DEFLAULT 19-11-2026 View Document
43 DRAFT APPLICATION FORM 19-11-2026 View Document
44 SITE PLAN ALL SERVICES 19-11-2026 View Document
45 CA CERTIFICATE COST INCURRED AND TO BE INCURRED 19-11-2026 View Document
46 MUTATION 19-11-2026 View Document
47 ELEVATION TOWER 2 19-11-2026 View Document
48 ELEVATION TOWER 1 19-11-2026 View Document
49 PAYMENT OF REGISTRATION FEE, LATE FEE 19-11-2026 View Document
50 REGISTRY NO. 8127, 24998 AND 5697 19-11-2026 View Document
51 DRAFT ALLOTMENT LETTER 19-11-2026 View Document
52 ASSURANCE FOR WATER, SEWERAGE AND STORM WATER 19-11-2026 View Document
53 LAND TITLE SEARCH REPORT 19-11-2026 View Document
54 T1 TYPICAL FLOOR UNIT 4 19-11-2026 View Document
55 AFFIDAVIT FOR NO SALE AND NO LOAN 19-11-2026 View Document
56 BR-III OLD 19-11-2026 View Document
57 FOREST NOC 19-11-2026 View Document
58 APPROVED COMBINED ZONING L AND T 19-11-2026 View Document
59 T2 REFUGE FLOOR PLAN 19-11-2026 View Document
60 ELECTRICAL LOAD AVAILABILITY 19-11-2026 View Document
61 T3 FLOOR PLAN UNIT 4 19-11-2026 View Document
62 NON-ENCUMBRANCE CERTIFICATE 19-11-2026 View Document
63 T1 SECTION AA AND BB 19-11-2026 View Document
64 SIZRA 19-11-2026 View Document
65 T2 GFP PLUMBING 19-11-2026 View Document
66 T3 GF AND FF PLAN 19-11-2026 View Document
67 DRAFT CONVEYANCE DEED 19-11-2026 View Document
68 PHASING PLAN APPROVAL LETTER 19-11-2026 View Document
69 SITE PLAN 19-11-2026 View Document
70 REGISTRY NO. 1476, 1477 AND 1478 19-11-2026 View Document
71 GST CERTIFICATE 19-11-2026 View Document
72 BUILDING PLAN APPROVAL LETTER BR-III 19-11-2026 View Document
73 ROAD ACCESS PERMISSION 19-11-2026 View Document
74 SERVICE PLAN ESTIMATE APPLIED 19-11-2026 View Document
75 BASEMENT 3 PLAN AND SERVICE PLAN 19-11-2026 View Document
76 BASEMENT PLAN 19-11-2026 View Document