HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2093-2025
Submission Date : 27-10-2025 07:47:49 PM
Applicant Type : Company
Project Type: NEW




MAX ESTATES GURGAON TWO LIMITED
MAX HOUSE, KH NO 335/2, 355/18,337, AND 1511/339, OKHLA INDUSTRIAL ESTATE, NEW DELHI, DELHI, INDIA, 110020
01204743222
9810411360 (Number Shared by Promoter in Public)
rera@maxestates.in
https://maxestates.in/
XXXX441M
U68100DL2024PLC424818
 
 


 
 


 
 


 
 


 
 







ESTATE 361
VILLAGE-HARSARU, SECTOR 36
HARSARU ST
GURUGRAM
1204743222
9810411360 (Number Shared by Promoter in Public)
rera@maxestates.in
ASHISH TICKU
1204743222
9810411360 (Number Shared by Promoter in Public)
rera@maxestates.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
159039816-10-20255730000ICICI BANKHRERA Gurugram
259046611-11-20253074979ICICI BANKHRERA Gurugram







14.2944 (Acre)
3.03
3.03
18.2375 (Acre)
50 of 2025 valid up to 08.04.2030
No
Address     461-462, UDYOG VIHAR, PHASE-III, GURUGRAM, HARYANA, PIN-122016
Annexure-B- ANNEXURE-B-LEAD DEVELOPER AS PER LICENCE
BEFORE GRANT OF LICENCE
Yes
ANNEX IN FOLDER B
No
Yes
Yes







586185 Lakhs
258118 Lakhs
177820 Lakhs
46607 Lakhs
103640 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 22258.24
3CONSTRUCTION OF ROADS 2723.68
4PAVEMENTS 8171.03
5PARKS AND PLAYGROUNDS 7683.11
6GREEN BELTS 5261.97
7VEHICLE PARKINGS 500
8ELECTRICITY SUB-STATION 943.08
9CLUB HOUSE 6826.85
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 1730.73
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 809.60
13UNDERGROUND 939.09
Total57847.38




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS2733AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM341AS PER PROJECT REPORT
3STORM WATER DRAINAGE113AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM2520AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL84AS PER PROJECT REPORT
6STREET LIGHTING56AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING2520AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS850AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM144AS PER PROJECT REPORT
12SCHOOL1404AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15COVERED PARKING20222AS PER PROJECT REPORT
16STP335AS PER PROJECT REPORT
17UNDERGROUND TANK328AS PER PROJECT REPORT
18RAIN WATER HARVESTING141AS PER PROJECT REPORT
19ELECTRIC SUBSTATION422AS PER PROJECT REPORT
20ELECTRIFICATION COST TO PROJECT1762AS PER PROJECT REPORT


16-10-2025 (date)
16-10-2025 (date)
05-03-2026
30-09-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings81.48171
Apartment/Shops/Other Buildings75.621341
Apartment/Shops/Other Buildings74.141051
Apartment/Shops/Other Buildings55.281241
Apartment/Shops/Other Buildings173.081242
Apartment/Shops/Other Buildings136.011322
Apartment/Shops/Other Buildings140.6582
Apartment/Shops/Other Buildings116.13882
Apartment/Shops/Other Buildings314.8542
Apartment/Shops/Other Buildings297.1921
Apartment/Shops/Other Buildings264.2121
Apartment/Shops/Other Buildings204.01882
Apartment/Shops/Other Buildings161.842562
Apartment/Shops/Other Buildings134.6282
Apartment/Shops/Other Buildings303.722
Apartment/Shops/Other Buildings376.6322
Apartment/Shops/Other Buildings18.582361
Apartment/Shops/Other Buildings1125.2711
Apartment/Shops/Other Buildings487.6811
Apartment/Shops/Other Buildings7668.0211
Apartment/Shops/Other Buildings2255.3411
Apartment/Shops/Other Buildings24.2411
Apartment/Shops/Other Buildings48.5311
Apartment/Shops/Other Buildings20.6011
Apartment/Shops/Other Buildings33.2011
Apartment/Shops/Other Buildings42.4411
Apartment/Shops/Other Buildings18.0811
Apartment/Shops/Other Buildings52.8611
Apartment/Shops/Other Buildings50.5211
Apartment/Shops/Other Buildings38.7711
Apartment/Shops/Other Buildings38.8411
Apartment/Shops/Other Buildings51.2011
Apartment/Shops/Other Buildings41.3211
Apartment/Shops/Other Buildings31.4311
Apartment/Shops/Other Buildings16.3911
Apartment/Shops/Other Buildings55.1811
Apartment/Shops/Other Buildings627.3211





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
EDC and IDC3930
Land Cost2945
Misc Cost5464

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2556103114691108
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1291126024054716
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3689515590327836
Shops632632758758
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments78528157977010531
Shops632758758758
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments103681036899739717
Shops632632758758
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9855863871536265
Shops632632758758
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5219521944413583
Shops6326321260
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments344430602661
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Covered Parking0
Electrical Sub Station0
ELECTRIFICATION COST0
Rainwater Harvesting0
Renewable Energy System0
School0
Security and fire fighting0
STP0
Street Light0
Underground Water Tank0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
School0000
Underground Water Tank0000
Electrification Cost up to Project Site0000
Street Light0000
Electric Substation0000
Rain Water Harvesting0000
STP0000
Covered Parking0000
Renewable Energy System0000
Security and Firefighting Services0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Firefighting Services0000
School0000
Electric Substation0000
Rain Water Harvesting0000
STP0000
Covered Parking0000
Renewable Energy System0000
Street Light0000
Electrification Cost up to Project Site0000
Underground Water Tank000
Underground Tank0

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification Cost up to Project Site0000
Underground Water Tank0000
STP0000
Security and Firefighting Services0000
Renewable Energy System0000
Rain Water Harvesting0000
Street Light0000
Covered Parking004042022
Electric Substation0000
School0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Renewable Energy System0000
Electrification Cost up to Project Site0000
Street Light0000
School0000
Security and Firefighting Services0000
Electric Substation0000
Rain Water Harvesting0000
STP0000
Covered Parking2022202222242224
Underground Water Tank0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00082
Water Supply System00109167
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres56989898
Shopping area0000
Other0000
Renewable Energy System0000
Security and Firefighting Services0000
Electric Substation0000
School0000
Street Light0000
Electrification Cost up to Project Site0000
Covered Parking2022202222242224
Underground Water Tank00105161
STP0000
Rain Water Harvesting0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements191191219191
Water Supply System65000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres84989898
Shopping area0000
Other0000
Covered Parking809000
School0000
Rain Water Harvesting0000
Electric Substation0213838
Underground Water Tank62000
Electrification Cost up to Project Site0000
Street Light0000
Security and Firefighting Services0000
Renewable Energy System0000
STP0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements191191219191
Water Supply System0000
Sewerage treatment & garbage disposal001313
Electricity Supply System0302328328
Storm Water Drainage001717
Parks and Playgrounds0000
Clubhouse/community centres84989898
Shopping area0000
Other0000
Rain Water Harvesting0000
School0000
Renewable Energy System0000
Security and Firefighting Services0302328328
Street Light0000
Electrification Cost up to Project Site0000
Underground Water Tank0000
STP0000
Covered Parking0000
Electric Substation34343838

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements191191191219
Water Supply System0000
Sewerage treatment & garbage disposal13131313
Electricity Supply System302302328328
Storm Water Drainage17171717
Parks and Playgrounds00178212
Clubhouse/community centres98849814
Shopping area0000
Other0000
Electrification Cost up to Project Site00440458
Covered Parking0000
STP0277780
Renewable Energy System002742
Security and Firefighting Services302302328328
School0000
Street Light001214
Electric Substation34383838
Rain Water Harvesting4548480
Underground Water Tank0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1918200
Water Supply System0000
Sewerage treatment & garbage disposal8000
Electricity Supply System302000
Storm Water Drainage11000
Parks and Playgrounds212212340
Clubhouse/community centres0000
Shopping area0000
Other0000
Electrification Cost up to Project Site44042300
School0000
Electric Substation34000
Rain Water Harvesting0000
STP777400
Covered Parking0000
Renewable Energy System403500
Security and Firefighting Services302000
Street Light141420
Underground Water Tank0000












Yes
No
IDFC FIRST BANK LTD & BARAKHAMBA ROAD BRANCH, LOWER GROUND FLOOR,BIRLA TOWERS, 25 BARAKHAMBA ROAD, NEW DELHI.
10244466605
IDFB0020101
110751001
20101
Nitin Kumar, Sector-5, Rajendra Nagar, Sahibabad, Ghaziabad, Uttar Pradesh, PIN-201005
UPLOADED











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LOIALREADY BEEN OBTAINED18-12-2024
II. LICENCE NO. 50 OF 2025ALREADY BEEN OBTAINED09-04-2025
III. ASSURANCE SEWERAGEALREADY BEEN OBTAINED19-06-2025
IV. ASSURANCE STORM WATERALREADY BEEN OBTAINED19-06-2025
V. ASSURANCE DRINKING WATERALREADY BEEN OBTAINED18-06-2025
VI. ASSURANCE ELECTRICAL LOADALREADY BEEN OBTAINED30-06-2025
VII. AAI NOCALREADY BEEN OBTAINED29-05-2025
VIII. ARAWALI NOCALREADY BEEN OBTAINED08-08-2025
IX. FOREST NOCALREADY BEEN OBTAINED01-07-2025
X. BUILDING PLAN APPROVAL (BR III)ALREADY BEEN OBTAINED16-10-2025
XI. LC-IVALREADY BEEN OBTAINED09-04-2025
XII. ROAD ACCESS PERMISSIONALREADY BEEN OBTAINED26-02-2025








Yes


Yes


AS PER RERA ACT













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBEDROOMS: LAMINATED WOODEN FLOORING- PREMIUM MARBLE/TILE OR EQUIVALENT; LIVING/DINING - PREMIUM MARBLE OR EQUIVALENT; KITCHEN - PREMIUM QUALITY ANTI-SKID TILES
2WALL FINISHING DETAILSINTERNAL WALL: ACRYLIC EMULSION PAINT/ OIL BOUND DISTEMPER PAINT; EXTERIOR WALL - EXTERIOR GRADE PAINT
3KITCHEN DETAILSFLOORING - PREMIUM QUALITY ANTI-SKID TILES; WALLS - COMBINATION OF CERAMIC/VITRIFIED TILES AND ACRYCLIC EMULSION PAINT/OBD
4BATHROOM FITTINGSWASHBASIN, CP FITTINGS, GLASS SHOWER PARTITIONS, WC OF PREMIUM QUALITY
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESALUMINIUM/UPVC FRAME
7GLASS WORKIN EXTERNAL DOORS AND WINDOWS ONLY
8ELECTRIC FITTINGSMODULAR SWITCHES & SOCKETS
9CONDUCTING AND WIRING DETAILSFRLS WIRES
10CUPBOARD DETAILSMODULAR WARDROBES WITH PREMIUM QUALITY HARDWARE
11WATER STORAGEHALF DAY STORAGE CAPACITY IN OHT
12LIFT DETAILSHIGH SPEED ELEVATORS (RESIDENT & SERVICE)
13EXTERNAL GLAZINGSALUMINIUM/UPVC FRAME WITH GLASS
13.1WINDOWS/GLAZINGSALUMINIUM/UPVC FRAME WITH GLASS
14DOORSPAINTED POLISHED FRAME WITH PAINTED / LAMINATED / VENEERED FLUSH DOOR
14.1MAIN DOORSPAINTED POLISHED FRAME WITH PAINTED / LAMINATED / VENEERED FLUSH DOOR
14.2INTERNAL DOORSPAINTED POLISHED FRAME WITH PAINTED / LAMINATED / VENEERED FLUSH DOOR
15AIR CONDITIONINGVRV/VRF AC SYSTEM. DUCTABLE UNIT IN LIVING & DINING ROOM AND HIGH WALL SPLIT AC IN BEDROOMS
16ELECTRICAL FITTINGSMODULAR SWITCHES & SOCKETS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION FOR WIFI ROUTER AND BROADBAND AT ONE LOCATION
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT
20INTERNAL FINISHINGAS PER DESIGN SPECIFICATIONS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORPREMIUM MARBLE/TILE OR EQUIVALENT
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT/ OIL BOUND DISTEMPER PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING/PREMIUM MARBLE OR EQUIVALENT
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT/ OIL BOUND DISTEMPER PAINT
2 . 4 MODULAR WARDROBESYES, MODULAR WARDROBES WITH PREMIUM QUALITY HARDWARE
3 . MASTER TOILET
3 . 1 FLOORPREMIUM QUALITY ANTI-SKID TILES
3 . 2 WALLSSTONE/ TILES AND ACRYLIC EMULSION PAINT/ OBD ABOVE IT
3 . 3 CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
3 . 4 COUNTERSMARBLE / GRANITE / ENGINEERED STONE OR EQUIVALENT
3 . 5 SANITARY WARE/CP FITTINGSWASHBASIN, CP FITTINGS, GLASS SHOWER PARTITIONS, WC OF PREMIUM QUALITY
3 . 6 FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING/PREMIUM MARBLE OR EQUIVALENT
4 . 2 WALLSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
4 . 4 WARDROBESYES, MODULAR WARDROBES WITH PREMIUM QUALITY HARDWARE
5 . TOILET
5 . 1 FLOORPREMIUM QUALITY ANTI-SKID TILES
5 . 2 WALLSSTONE/ TILES AND ACRYLIC EMULSION PAINT/ OBD ABOVE IT
5 . 3 CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
5 . 4 COUNTERSMARBLE / GRANITE / ENGINEERED STONE OR EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGSWASHBASIN, CP FITTINGS, GLASS SHOWER PARTITIONS, WC OF PREMIUM QUALITY
5 . 6 FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
6 . KITCHEN
6 . 1 FLOORPREMIUM QUALITY ANTI-SKID TILES
6 . 2 WALLSCOMBINATION OF CERAMIC/VITRIFIED TILES AND ACRYCLIC EMULSION PAINT/OBD
6 . 3 CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
6 . 4 COUNTERSMARBLE / GRANITE / ENGINEERED STONE OR EQUIVALENT
6 . 5 FIXTURESCP FITTINGS, STAINLESS STEEL SINK WITH DRAINBOARD OF PREMIUM QUALITY
6 . 6 KITCHEN APPLIANCESMODULAR KITCHEN WITH CHIMNEY, HOB, MICROWAVE, REFRIGERATOR, WASHING MACHINE AND HEAT PUMP
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
7 . 3 TOILETANTI-SKID TILES
7 . 4 BALCONYANTI-SKID TILES
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID TILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT
8 . 3 RAILINGSMS RAILING AS PER DESIGN OR EQUIVALENT
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 27-10-2025 View Document
2 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 27-10-2025 View Document
3 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 27-10-2025 View Document
4 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 27-10-2025 View Document
5 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 27-10-2025 View Document
6 APPROVED PHASING 20-11-2025 ------
7 ESTATE361_ALLOTMENT REVISED, APPLICATION FORM REVISED, ATS REVISED, CONVEYANCE DEED REVISED, PAYMENT RECEIPT FORMAT 20-11-2025 ------
8 DEMARCATION PLAN 20-11-2025 View Document
9 EWS BLOCK-47 20-11-2025 ------
10 GC- 02D (A1) 20-11-2025 ------
11 ESTATE361_MOA_MEGTL 20-11-2025 ------
12 JDA 1 ADDENDUM 20-11-2025 ------
13 REGISTERED GPA 1 20-11-2025 ------
14 CA CERTIFICATE_INVENTORY DETAILS 20-11-2025 ------
15 MEL SIGNATURE TOWER B2 & B4-23 20-11-2025 ------
16 LOI 20-11-2025 ------
17 MEL SIGNATURE TOWER B2 & B4-16 20-11-2025 ------
18 ASL SIGNATURE TOWER B1 & B3-19 20-11-2025 ------
19 MILLENNIAL TOWER A-04A 20-11-2025 ------
20 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 20-11-2025 View Document
21 ASL SIGNATURE TOWER B1 & B3-34 20-11-2025 ------
22 BUILDING PLAN-02B (A1) 20-11-2025 ------
23 BASEMENT PLAN-30B 20-11-2025 ------
24 BROCHURE 20-11-2025 ------
25 JDA 3 ADDENDUM 20-11-2025 ------
26 ZONING PLAN 20-11-2025 View Document
27 MEL SIGNATURE TOWER B2 & B4-39 20-11-2025 ------
28 STP WATER APPROVAL 20-11-2025 ------
29 LC-IV AND LC-IVA 20-11-2025 ------
30 ASL SIGNATURE TOWER B1 & B3-35 20-11-2025 ------
31 ESTATE 361 - PRINT AD RERA 20-11-2025 ------
32 ARAVALI NOC 20-11-2025 ------
33 CONSTRUCTION WATER NOC 20-11-2025 ------
34 GC- 02C (A1) 20-11-2025 ------
35 MEL SIGNATURE TOWER B2 & B4-15 20-11-2025 ------
36 JDA 2 (REGISTERED) 20-11-2025 ------
37 ASL SIGNATURE TOWER B1 & B3-42 20-11-2025 ------
38 MILLENNIAL TOWER A-10 20-11-2025 ------
39 FOREST NOC 20-11-2025 ------
40 JDA 3 (REGISTERED) 20-11-2025 ------
41 MILLENNIAL TOWER A-31 20-11-2025 ------
42 STORM WATER ASSURANCE 20-11-2025 ------
43 ASL SIGNATURE TOWER B1 & B3-43 20-11-2025 ------
44 POWER ASSURANCE 20-11-2025 ------
45 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 20-11-2025 View Document
46 CA CERT_PROMOTER NET WORTH 20-11-2025 ------
47 ASL SIGNATURE TOWER B1 & B3-20 20-11-2025 ------
48 BASEMENT PLAN-30A 20-11-2025 ------
49 MEL SIGNATURE TOWER B2 & B4-37 20-11-2025 ------
50 ESTATE 361_ CA CERTIFICATE EXPENDITURE INCURRED 20-11-2025 ------
51 BASEMENT PLAN-29B 20-11-2025 ------
52 MILLENNIAL_TOWER A-03, MILLENNIAL_TOWER A-04, MILLENNIAL_TOWER A-05, MILLENNIAL_TOWER A-06 20-11-2025 ------
53 NON ENCUMBRANCE CERTIFICATE 20-11-2025 ------
54 MILLENNIAL TOWER A-07 20-11-2025 ------
55 BR-III 20-11-2025 ------
56 ASL SIGNATURE TOWER B1 & B3-13 20-11-2025 ------
57 EWS BLOCK-48 20-11-2025 ------
58 MILLENNIAL TOWER A-08 20-11-2025 ------
59 ASL SIGNATURE TOWER B1 & B3-14 20-11-2025 ------
60 BASEMENT PLAN-29 20-11-2025 ------
61 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 20-11-2025 View Document
62 EWS BLOCK-26 20-11-2025 ------
63 MEL SIGNATURE TOWER B2 & B4-21 20-11-2025 ------
64 MILLENNIAL TOWER A-32 20-11-2025 ------
65 REVISED AKS SHAJRA , REVISED MUTATION, REVISED NAKAL JAMABANDI, REVISED TSR 20-11-2025 ------
66 ASL SIGNATURE TOWER B1 & B3-18 20-11-2025 ------
67 MEL SIGNATURE TOWER B2 & B4-24 20-11-2025 ------
68 MEL SIGNATURE TOWER B2 & B4-40 20-11-2025 ------
69 ASL SIGNATURE TOWER B1 & B3-41 20-11-2025 ------
70 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 20-11-2025 View Document
71 BASEMENT PLAN-30 20-11-2025 ------
72 EWS BLOCK-49 20-11-2025 ------
73 MILLENNIAL TOWER A-11 20-11-2025 ------
74 FRESH WATER ASSURANCE 20-11-2025 ------
75 CASH FLOW SUMMARY 20-11-2025 ------
76 MEL SIGNATURE TOWER B2 & B4-44 20-11-2025 ------
77 MILLENNIAL TOWER A-33 20-11-2025 ------
78 REGISTERED GPA 2 20-11-2025 ------
79 ASL SIGNATURE TOWER B1 & B3-36 20-11-2025 ------
80 SEWERAGE CONNECTION ASSURANCE 20-11-2025 ------
81 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 20-11-2025 View Document
82 REGISTERED GPA 3 20-11-2025 ------
83 ASL SIGNATURE TOWER B1 & B3-12 20-11-2025 ------
84 SPORTS BLOCK-50 20-11-2025 ------
85 GC- 02B (A1) 20-11-2025 ------
86 SIGNATURE CLUB-28, SIGNATURE CLUB-51 20-11-2025 ------
87 AAI NOC 20-11-2025 ------
88 BASEMENT PLAN-29A 20-11-2025 ------
89 MEL SIGNATURE TOWER B2 & B4-45 20-11-2025 ------
90 ROAD ACCESS PERMISSION 20-11-2025 ------
91 JDA 2 ADDENDUM 20-11-2025 ------
92 EWS BLOCK-25 20-11-2025 ------
93 MEL SIGNATURE TOWER B2 & B4-17 20-11-2025 ------
94 MEL SIGNATURE TOWER B2 & B4-38 20-11-2025 ------
95 ESTATE361_AOA_MEGTL 20-11-2025 ------
96 JDA 1 (REGISTERED) 20-11-2025 ------
97 MILLENNIAL TOWER A-09 20-11-2025 ------
98 MEL SIGNATURE TOWER B2 & B4-22 20-11-2025 ------
99 MEL SIGNATURE TOWER B2 & B4-46 20-11-2025 ------
100 SPORTS BLOCK-27 20-11-2025 ------