HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1641-2024
Submission Date : 06-05-2024 03:30:05 PM
Applicant Type : Company
Project Type: NEW




SIGNATUREGLOBAL (INDIA) LIMITED
13TH FLOOR, DR. GOPAL DAS BHAWAN, 28 BARAKHAMBA ROAD, CONNAUGHT PLACE, CENTRAL DELHI ,NEW DELHI 110001
01244908200
9810899381 (Number Shared by Promoter in Public)
compliance@signatureglobal.in
Https://www.signatureglobal.in
XXXX807M
L70100DL2000PLC104787
 
 


 
 


 
 


 
 


 
 







SIGNATUREGLOBAL TITANIUM SPR
VILLAGE- FAZILPUR JHARSA, SECTOR-71, GURUGRAM, HARYANA
BADSHAHPUR ST
GURUGRAM
01244908200
9520785681 (Number Shared by Promoter in Public)
compliance@sigantureglobal.in
RAVI AGGARWAL
01244908200
9520785681 (Number Shared by Promoter in Public)
compliance@signatureglobal.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
11202405060000761606-05-20241622729YES BANKHRERA Gurugram
21202405060000761506-05-20243037665YES BANKHRERA Gurugram
31202405300000997030-05-202418259369YES BANKHRERA Gurugram







14.3825 (Acre)
1.87
1.79
22.50 (Acre)
License No. 09 of 2010 Dated 23.01.2010
Yes







204540.01 Lakhs
29139.78 Lakhs
132000 Lakhs
2137.44 Lakhs
41262.79 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.4725
3CONSTRUCTION OF ROADS0
4PAVEMENTS3.4660
5PARKS AND PLAYGROUNDS5.2062
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0.465
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER2.6877
13COMMERCIAL0.0485
14COMMUNITYBUILDINGSCHOOL0.200
15OPENPARKING0.4139
16ANYOTHERUTILITYFACILITY0.4227
Total14.3825




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA (CONNECTED)Yes
WATER SUPPLYGMDA (ASSURANCE GRANTED)Yes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDA (ASSURANCE GRANTED)Yes
STORM WATER DRAINAGEGMDA (OWN ARRANGEMENT)Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS418.53SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM662.50SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE222.25SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL274.43SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING55.19SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS48.06SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15CONSTRUCTION OF CIRCULATION ROAD456.48SUBMITTED TO TOWN & COUNTRY PLANNING


NA (date)
20-05-2024 (date)
01-06-2024
31-05-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings183.1893705
Apartment/Shops/Other Buildings293.256105
Apartment/Shops/Other Buildings133.92222
Apartment/Shops/Other Buildings233.91462
Apartment/Shops/Other Buildings158.64451





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments03500.003500.003500.00
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3500.004000.004000.004500.00
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3500.004000.004000.004000.00
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4000.004000.004000.005500.00
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5000.005000.005000.005000.00
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5000.004500.005000.004500.00
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5500.005500.005500.005500.00
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments5500.006000.00
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements44.274
Water Supply System167.267
Sewerage treatment & garbage disposal69.288
Electricity Supply System0
Storm Water Drainage56.113
Parks and Playgrounds8.089
Clubhouse/community centres0
Shopping area0
Other0
Street Light9.29

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements81.87381.873140.89344.274
Water Supply System199.681199.68175.81320.058
Sewerage treatment & garbage disposal82.71582.71531.4048.309
Electricity Supply System0000
Storm Water Drainage66.98766.98725.4336.729
Parks and Playgrounds14.48614.4868.0891.455
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light10.79610.79612.6315.838

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements25.343
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds1.455
Clubhouse/community centres0
Shopping area0
Other0
Street Light5.838
MS Charges456.48












Yes
No
STANDARD CHARTERED BANK LIMITED, DLF GURGAON BUILDING NO. 7A, GROUND FLOOR, DLF CYBER CITY, PHASE-3, SECTOR 24/25/25A, GURUGRAM, HARYANA-122002
53105134583
SCBL0036025
110036006
036025
Pradeep Kumar Aggarwal and Lalit Kumar Aggarwal R/o Aashirwad Palam Farm 6 Salahpur Bijwasn South West Delhi-110061
Attached











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
No
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. AAI NOCALREADY BEEN OBTAINED19-03-2024
II. WATER ASSURANCEALREADY BEEN OBTAINED26-04-2024
III. SEWERAGE ASSURANCEALREADY BEEN OBTAINED26-04-2024
IV. STP ASSURANCEALREADY BEEN OBTAINED26-04-2024
V. BR-IIIALREADY BEEN OBTAINED20-05-2024
VI. POWER ASSURANCEALREADY BEEN OBTAINED23-05-2024
VII. FIRE APPROVALALREADY BEEN OBTAINED31-05-2024








Yes


Yes


ATTACHED







SIGNATURE GLOBAL PRIME, VILLAGE-KADARPUR, SEC.63A, GURUGRAM
5.74375
817
0
817
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17567.69015026.81
Cost of the apartments11125010918.62
Cost of the infrastructure1237.0900
Others costs5205.604108.19


18905.31 Lakhs
4063.63 Lakhs
0 Lakhs
0 Lakhs
No
29-04-2024
29-04-2024




SIGNATURE GLOBAL SCO-36 SOHNA, VILLAGE-DUNELA, SEC.36 SOHNA, GURUGRAM
5.21875
0
84
0
84
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6590.4102886.26
Cost of the apartments000
Cost of the infrastructure10600684.11
Others costs5529.8102202.15


7458.60 Lakhs
3930.20 Lakhs
1484.13 Lakhs
1484.13 Lakhs
No
29-06-2024
29-06-2024




GOLF GREEN-79, VILLAGE-NAURANGPUR, SEC.79, GURUGRAM
5.9125
934
0
934
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16816.2016433.26
Cost of the apartments10290010290
Cost of the infrastructure14100983
Others costs5116.205160.26


19417.64 Lakhs
5122.85 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2024
31-07-2024




SIGNATURE GLOBAL IMPERIAL, VILLAGE-HARSARU, SEC.88A, GURUGRAM
8.93125
1141
0
1141
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23392.408597.44
Cost of the apartments17929.105086.73
Cost of the infrastructure1309.600
Others costs4153.703510.71


11270.07 Lakhs
2108.02 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2026
28-02-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE IMPORTED MARBLE
2WALL FINISHING DETAILS ACRYLIC EMULSION PAINT
3KITCHEN DETAILS IMPORTED MARBLE
4BATHROOM FITTINGS WASH BASIN WITH FAUCET, SHOWER DIVERTER
5WOOD WORK ETC FLUSH DOOR SHUTTERS
6DOORS AND WINDOS FRAMES HIGH LAMINATED SHUTTER, FLUSH DOOR SHUTTERS
7GLASS WORK GLASS PARTITION WITHOUT DOOR
8ELECTRIC FITTINGS AS/ SELECTION
9CONDUCTING AND WIRING DETAILS AS/ SELECTION
10CUPBOARD DETAILS NA
11WATER STORAGE NA
12LIFT DETAILSPASSENGER LIFT, SERVICE LIFT, PENTHOUSE INTERNAL LIFT, PRIVATE LIFT FOR EACH TOWER / WING
13EXTERNAL GLAZINGS GLASS PARTITION WITHOUT DOOR
13.1WINDOWS/GLAZINGS GLASS PARTITION WITHOUT DOOR
14DOORS LAMINATED SHUTTER, FLUSH DOOR SHUTTERS
14.1MAIN DOORSLAMINATED SHUTTER, FLUSH DOOR SHUTTERS
14.2INTERNAL DOORS LAMINATED SHUTTER, FLUSH DOOR SHUTTERS
15AIR CONDITIONING VRV/VRF
16ELECTRICAL FITTINGS AS/SELECTION
17CNG PIPE LINE NA
18PROVISION OF WIFI AND BROADBAND FACILITY NA
19EXTERNAL FINISHING/COLOUR SCHEME NA
20INTERNAL FINISHING NA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR IMPORTED MARBLE
1 . 2 WALLS ACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOOR IMPORTED MARBLE
2 . 2 WALLS ACRYLIC EMULSION PAINT
2 . 3 CEILING ACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBES MODULAR PRE-LAMINATED SHUTTER AND CARCASS
3 . MASTER TOILET
3 . 1 FLOOR IMPORTED MARBLE
3 . 2 WALLS STONE / VITRIFIED MATTE TILES
3 . 3 CEILING ACRYLIC EMULSION PAINT ON CEILING/MOISTURE-PROOF BOARD FALSE CEILING
3 . 4 COUNTERS IMPORTED MARBLE /ENGINEERED STONE
3 . 5 SANITARY WARE/CP FITTINGS TOILET PAPER HOLDER, TOWEL RING, TOWEL RACK, ROBE HOOK
3 . 6 FITTING/FIXTURES MEDICINE CABINET WITH MIRROR, VANITY CABINET
4 . BED ROOMS
4 . 1 FLOOR LAMINATED WOODEN FLOORING (AC4)
4 . 2 WALLS ACRYLIC EMULSION PAINT
4 . 3 CEILING ACRYLIC EMULSION PAINT
4 . 4 WARDROBES CALCIUM SILICATE BOARD WITH MS FRAMEWORK
5 . TOILET
5 . 1 FLOORVITRIFIED MATTE TILES
5 . 2 WALLS VITRIFIED GLOSSY TILES UPTO FALSE CEILING
5 . 3 CEILING ACRYLIC EMULSION PAINT ON CEILING/MOISTURE-PROOF BOARD FALSE CEILING
5 . 4 COUNTERS IMPORTED MARBLE/ GRANITE/ ENGINEERED STONE
5 . 5 SANITARY WARE/CP FITTINGS TOILET PAPER HOLDER, TOWEL RING, TOWEL ROD, ROBE HOOK
5 . 6 FIXTURES BRANDED
6 . KITCHEN
6 . 1 FLOOR IMPORTED MARBLE
6 . 2 WALLS VITRIFIED GLOSSY TILES & ACRYLIC EMULSION PAINT
6 . 3 CEILING ACRYLIC EMULSION PAINT
6 . 4 COUNTERS GRANITE
6 . 5 FIXTURES MODULAR CABINETARY WITH SOFT CLOSE TRAYS
6 . 6 KITCHEN APPLIANCES HOB & CHIMNEY, REFRIGERATOR, BUILT-IN MICROWAVE, BUILT-IN OVEN, DISHWASHER, DOUBLE BOWL SINK WITH DRAIN BOARD, INSTANT GEYSER, RO
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR ANTI - SKID VITRIFIED TILES
7 . 2 WALLS & CEILING ACRYLIC EMULSION PAINT
7 . 3 TOILET ANTI - SKID VITRIFIED TILES
7 . 4 BALCONY MATTE TILES
8 . SIT-OUTS
8 . 1 FLOOR NA
8 . 2 WALLS & CEILING NA
8 . 3 RAILINGS NA
8 . 4 FIXTURES NA












Sr. No.Document DescriptionDate of Document UploadView Document
1CASH FLOW STATEMENT OF THE PROPOSED PROJECT06-05-2024 View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.06-05-2024 View Document
3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND02-05-2024 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT02-05-2024 View Document
5DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD02-05-2024 View Document
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT06-05-2024 View Document
7CA CERTIFICATE FOR COST INCURRED AND TO BE INCURRED04-06-2024 ------
8SOUTH SIDE BASEMET-2 PLAN04-06-2024 ------
9IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN04-06-2024 View Document
10ZONING PLAN04-06-2024 View Document
11SERVICE PLAN ON SITE LAYOUT04-06-2024 ------
12T4_SKY GARDEN PLAN_30TH FLOOR04-06-2024 ------
13T7,T8 REFUGE FLOORS(16,24&33;)04-06-2024 ------
14TOL04-06-2024 ------
15AFFIDAVIT 4(2)(L)(D)04-06-2024 ------
16T7,T8_PH_UPPER LEVEL_41ST FLOOR04-06-2024 ------
17BANK UNDERTAKING SPR04-06-2024 ------
18BR-III04-06-2024 ------
19T2 TO T6 ELEVATION A04-06-2024 ------
20WATER ASSURANCE04-06-2024 ------
21SOUTH SIDE BASEMENT-1 PLAN04-06-2024 ------
22SOUTH SIDE BASEMENT-1 CEILING PLAN04-06-2024 ------
23T7,T8_ELEVATION AA04-06-2024 ------
24SEWERAGE ASSURANCE04-06-2024 ------
25STP ASSURANCE04-06-2024 ------
26T2 TO T6 GROUND COVERAGE04-06-2024 ------
27T7,T8_SECTION A04-06-2024 ------
28T2 TO T6 SECTION A-A04-06-2024 ------
29T2 TO T6 TERRACE,OHT AND MACHINE ROOM LEVEL04-06-2024 ------
30T2,T3_SKY GARDEN PLAN_30TH FLOORS04-06-2024 ------
31T7,T8 GROUND COVERAGE AREA CALCULATION04-06-2024 ------
32T7,T8_TERRACE,MUMTY& MACHINE ROOM04-06-2024 ------
33T-7,T-8_SKY GARDEN_30TH FLOOR04-06-2024 ------
34A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS04-06-2024 View Document
35SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN04-06-2024 View Document
36CA CERTIFICATE FOR LAND COST04-06-2024 ------
37CA CERTIFICATE FOR NET WORTH04-06-2024 ------
38GREEN AREA CALCULTION04-06-2024 ------
39POWER ASSURANCE 22.50 ACRE04-06-2024 ------
40T2 TO T6 REFUGE FLOOR04-06-2024 ------
41T2 TO T6 TYPICAL FLOOR04-06-2024 ------
42T2 TO T6_PH LOWER LEVEL PLAN_40TH FLOOR04-06-2024 ------
43T2 TO T6_PH UPER LEVEL PLAN_41ST FLOOR04-06-2024 ------
44T5,T6_SKY GARDEN PLAN_30TH FLOOR04-06-2024 ------
45T7,T8 GROUND FLOOR PLAN04-06-2024 ------
46T7,T8_PH_LOWER LEVEL_40TH FLOOR04-06-2024 ------
47DEMARCATION PLAN04-06-2024 View Document
48IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN04-06-2024 View Document