304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
01142654265
8826464161 (Number Shared by Promoter in Public)
Jatin.kumar@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
ASHIANA AMARAH PHASE 4
REVENUE ESTATE OF VILLAGE- WAZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA
HARSARU ST
GURUGRAM
01142654265
0114265426 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
JATIN KUMAR
01142654265
8826464161 (Number Shared by Promoter in Public)
jatin.kumar@ashianahousing.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
516757
05-03-2024
1026814
ICICI BANK
HRERA Gurugram
2
179849
07-06-2024
3991560
ICICI BANK
HRERA Gurugram
4.395 (Acre)
184
182.976
22.344 (Acre)
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Yes
30703.00 Lakhs
1675.00 Lakhs
9627.00 Lakhs
1477 Lakhs
17924.00 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
3228.58
3
CONSTRUCTION OF ROADS
3774.91
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
5850.00
6
GREEN BELTS
650.06
7
VEHICLE PARKINGS
4112.82
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
13
STREETLIGHTING
4.05
14
STROMWATERDRAINAGE
163.90
Total
17784.32
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
Yes
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
63
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
41
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
28
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
45
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
53
AS PER PROJECT REPORT
6
STREET LIGHTING
8
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
104
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
20
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
23
AS PER PROJECT REPORT
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
15
ELECTRIC SUB STATION
339
AS PER PROJECT REPORT
16
RAIN WATER HARVESTING
24
AS PER PROJECT REPORT
17
UNDER GROUND WATER TANK
50
AS PER PROJECT REPORT
18
CONSTRUCTION OF CIRCULATION OF ROAD
100
AS PER PROJECT REPORT
19
STP
100
AS PER PROJECT REPORT
20
PARKING
479
AS PER PROJECT REPORT
09-02-2024 (date)
09-02-2024 (date)
15-09-2024
30-04-2029
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
314440
280
5
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
32
272
Shops
0
0
0
0
Plots
0
0
0
0
Others
0
978
978
978
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
542
685
631
652
Shops
0
0
0
0
Plots
0
0
0
0
Others
978
978
978
978
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
817
1024
1281
1109
Shops
0
0
0
0
Plots
0
0
0
0
Others
978
978
978
978
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
771
734
704
352
Shops
0
0
0
0
Plots
0
0
0
0
Others
978
978
978
978
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
20
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Others
978
837
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
STP
20
30
50
0
Under Ground Water Tank
0
0
0
20
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
48
Water Supply System
0
0
41
0
Sewerage treatment & garbage disposal
26
27
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
14
14
0
Parks and Playgrounds
0
0
0
2
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Parking
0
0
479
0
Construction of circulation of Road
10
20
20
Under Ground Water Tank
20
10
0
0
Rain Water Harvesting
0
8
7
9
Street Light
8
0
0
0
Electrical Sub Station
0
37
113
112
Security and Fire fighting System
10
10
20
20
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
15
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
13
10
22
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
8
7
3
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Security and Fire Fighting System
20
12
12
0
Electrical Sub Station
77
0
0
0
Construction of circulation of Road
20
30
0
0
Renewable Energy System
10
10
3
0
Yes
No
ICICI BANK LIMITED AND PREET VIHAR, DELHI
777705227098
ICIC0000037
110229006
000037
Varun Gupta (Whole Time Director) N-5, Second Floor, Panchsheel Park, New Delhi.
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. ENVIRONMENTAL CLEARANCE
ALREADY BEEN OBTAINED
26-11-2021
II. FOREST NOC
ALREADY BEEN OBTAINED
12-12-2021
III. PORTABLE WATER ASSURANCE
ALREADY BEEN OBTAINED
04-08-2021
IV. AIRPORT AUTHORITY OF INDIA NOC
ALREADY BEEN OBTAINED
06-08-2021
V. CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
23-07-2021
VI. LICENSE OF 41 OF 2010
ALREADY BEEN OBTAINED
07-06-2010
VII. ELECTRIFICATION PLAN
ALREADY BEEN OBTAINED
11-12-2023
VIII. BUILDING PLAN APPROVAL LETTER (BR-III)
ALREADY BEEN OBTAINED
09-02-2024
Yes
Yes
hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
ASHIANA ANMOL PHASE-1
3.800
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
11823.05
0
11285.86
Cost of the apartments
7465.36
0
6183.79
Cost of the infrastructure
1926.44
0
2422.33
Others costs
2431.25
0
2679.74
23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
03-10-2020
03-10-2020
ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
216.28
0
216.28
Cost of the apartments
137.92
0
137.92
Cost of the infrastructure
26.26
0
26.26
Others costs
52.1
0
52.1
180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019
ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
14520.61
0
2585.93
Cost of the apartments
7087
0
423.21
Cost of the infrastructure
7087
0
22.98
Others costs
5715
0
1933.83
5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027
ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
10876.26
0
4319.42
Cost of the apartments
4822.65
0
1640.86
Cost of the infrastructure
634.05
0
99.21
Others costs
5419.57
0
2579.35
6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2026
30-04-2026
ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
17555.57
0
4535.57
Cost of the apartments
7371.7
0
5.02
Cost of the infrastructure
1006.43
0
156.61
Others costs
9177.45
0
4373.94
2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
NA
2
WALL FINISHING DETAILS
NA
3
KITCHEN DETAILS
NA
4
BATHROOM FITTINGS
NA
5
WOOD WORK ETC
NA
6
DOORS AND WINDOS FRAMES
NA
7
GLASS WORK
PLAIN/CLEAR/FROSTED/TEMPERED/TOUGHENED, IS WIDELY USED IN RESIDENTIAL DEVELOPMENTS AND MAY BREAK/ SHATTER DUE TO ACCIDENTAL KNOCKS OR OTHER CAUSES. IN ADDITION, GLASS IS MANUFACTURED MATERIAL AND THE PURCHASER MAY WISH TO NOTE THAT IT MAY NOT BE 100% FREE FROM IMPURITIES. THESE IMPURITIES ARE NOT AVOIDABLE WITH QUALITY CHECKS AND BALANCES.
8
ELECTRIC FITTINGS
NA
9
CONDUCTING AND WIRING DETAILS
NA
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
NA
12
LIFT DETAILS
NA
13
EXTERNAL GLAZINGS
NA
13.1
WINDOWS/GLAZINGS
2 TO 3 TRACK ALUMINUM/UPVC FRAMED WINDOW, WITH 2 TO 3 SLIDING PANELS DEPENDING UPON SIZE WITH 5/6MM TOUGHENED GLASS AND PROVISION FOR FLY MESH SHUTTER.TOP HUNG/LOUVERED WITH FROSTED GLASS/PIN HEAD NO FLY MESH SHUTTER IS BEING PROVIDED.
14
DOORS
NA
14.1
MAIN DOORS
1 HOUR FIRE RATED MS/ WOODEN / MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM
14.2
INTERNAL DOORS
PAINTED FLUSH DOOR OR FLUSH DOOR WITH LAMINATE OR MOULDED SKIN DOORS.
15
AIR CONDITIONING
PROVISION FOR FIXING OF WINDOW/SPLIT AIR CONDITIONER IN DRAWING DINING AREA & BEDROOMS ARE BEING PROVIDED. FOR SPLIT A/C ASSIGNED SPACES ARE EARMARKED ON THE ELEVATION OF THE BUILDING FOR EASE OF ACCESS AND TO CREATE UNIFORMITY FOR AESTHETIC PURPOSE.(E) COPPER PIPING INSTALLATION FOR SPLIT AC’S OF SUITABLE LENGTH ALONG WITH MS BRACKETT OR STAND FOR OUTDOOR UNITS
16
ELECTRICAL FITTINGS
(A) ALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN.(B) MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT
17
CNG PIPE LINE
NA
18
PROVISION OF WIFI AND BROADBAND FACILITY
PROVISION FOR INTERNET ROUTER WILL BE DONE AT SUITABLE LOCATION INSIDE APARTMENTS & FACILITY FOR VIDEO DOOR PHONE WILL BE DONE AT SUITABLE LOCATION INSIDE APARTMENTS
19
EXTERNAL FINISHING/COLOUR SCHEME
NA
20
INTERNAL FINISHING
NA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800X1600).
1 . 2
WALLS
SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
1 . 3
CEILING
COVA PATTA IN FALSE CELLING IN FOYER,
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
WOODEN TEXTURE VITRIFIED TILES.(196 X 1200) OR (200 X 1000
2 . 2
WALLS
SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAIN
2 . 3
CEILING
COVA PATTA IN FALSE CELLING IN FOYER,
2 . 4
MODULAR WARDROBES
NA
3 . MASTER TOILET
3 . 1
FLOOR
CERAMIC TILES (300X300) OR (300X600) OTHER SIZES UP TO 600X600) AND/OR COMBINATION, OR WOODEN TEXTURE TILE . (196 X 1200),(200 X 1000)
3 . 2
WALLS
CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.WALLS OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCKS/HOLLOW CONCRETE BLOCKS
3 . 3
CEILING
SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
3 . 4
COUNTERS
MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED
3 . 5
SANITARY WARE/CP FITTINGS
1 CP ANGLE VALVE ALONG WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET OF STANDARD MAKE,2 CP ANGLE VALVE,2 ANGLE VALVES,HINDWARE/ROCA/KOHLER/JAQUAR/AMERICAN STANDARD RAK/VITRA OR EQUIVALENT,A. BASIN MIXER, WALL MIXER AND SHOWER OF JAQUAR/ROCA/AMERICAN STANDARD/ GROHE OR EQUIVALENT
3 . 6
FITTING/FIXTURES
1 TOWEL ROD, 1 TOWEL RACK,EXHAUST FAN ,CP BASIN MIXER IN WASH BASIN,
4 . BED ROOMS
4 . 1
FLOOR
VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800X1600
SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM, LEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
CERAMIC TILES (300X300) OR (300X600) OTHER SIZES UP TO 600X600) AND/OR COMBINATION, OR WOODEN TEXTURE TILE . (196 X 1200),(200 X 1000)
5 . 2
WALLS
CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
5 . 3
CEILING
COVA PATTA IN FALSE CELLING IN FOYERA NDSAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
5 . 4
COUNTERS
MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED
5 . 5
SANITARY WARE/CP FITTINGS
1 CP ANGLE VALVE ALONG WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET OF STANDARD MAKE,2 CP ANGLE VALVE,2 ANGLE VALVES,A. BASIN MIXER, WALL MIXER AND SHOWER OF JAQUAR/ROCA/AMERICAN STANDARD/ GROHE OR EQUIVALENT,HINDWARE/ROCA/KOHLER/JAQUAR/AMERICAN STANDARD RAK/VITRA OR EQUIVALENT
5 . 6
FIXTURES
1 TOWEL ROD, 1 TOWEL RACK, EXHAUST FAN ,CP BASIN MIXER IN WASH BASIN
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800 X 1600
6 . 2
WALLS
VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800 X 1600
6 . 3
CEILING
SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM
6 . 4
COUNTERS
MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED
6 . 5
FIXTURES
2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER. 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO, PROVISION FOR PIPED LPG GAS WITH LPG METER WILL BE PROVIDED,A. SINK MIXER OF JAQUAR/ROCA/AMERICAN STANDARD/GROHE OR EQUIVALENT
6 . 6
KITCHEN APPLIANCES
1 STAINLESS STEEL SINK WITH ONE BOWL AND A DRAIN BOARD,(B) 1 SWIVEL TYPE SINK MIXER, KITCHEN CABINETS WITH HOB, CHIMNEY, DISHWASHER. GEYSER & EXHAUST FAN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
CERAMIC TILES (300X300 OR OTHER SIZES UP TO 450X450 AND/OR COMBINATION) SUITABLE QUALITY GLAZED/MATT FINISH,WOODEN TEXTURE TILE (145 X 600)
7 . 2
WALLS & CEILING
CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT
7 . 3
TOILET
NA
7 . 4
BALCONY
NA
8 . SIT-OUTS
8 . 1
FLOOR
CERAMIC TILES (300X300 OR OTHER SIZES UP TO 450X450 AND/OR COMBINATION) SUITABLE QUALITY GLAZED/MATT FINISH,WOODEN TEXTURE TILE (145 X 600)
8 . 2
WALLS & CEILING
NA
8 . 3
RAILINGS
ALCONY METAL/WALL RAILING HEIGHT IS 1050 TO 1100 MM AND STAIR METAL/WALL RAILING HEIGHT IS 1000MM
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT