HRERA GurugramTemp Project Id : RERA-GRG-PROJ-393-2019
Submission Date : 07-12-2019 03:05:14 AM
Applicant Type : Company
Project Type: ONGOING




SUNCITY PROJECTS PVT. LTD.
SUNCITY BUSINESS TOWER 2ND FLR GOLF COURSE ROAD SECTOR 54, GURUGRAM
01244691000
9651313894 (Number Shared by Promoter in Public)
info@suncityprojects.com
https://www.suncityprojects.com
XXXX757R
U45201DL1996PTC083915
 
 


 
 


 
 







SUNCITY AVENUE 102
SECTOR 102
GURGAON
GURUGRAM
01244691000
9999870418 (Number Shared by Promoter in Public)
info@suncityprojects.com
S SAXENA
01244691000
9999870418 (Number Shared by Promoter in Public)
info@suncityprojects.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
153180131-07-2017455288ICICI BANKHRERA Gurugram
251027103-02-202010117ICICI BANKHRERA Gurugram







5 (Acre)
225
224.802
5 (Acre)
3 of 2015
No
Address     1809, SECTOR 17, GURUGRAM, HARYANA
Address     DD1, DHAWAN DEEP BUILDING, 6 JANTAR MANTAR ROAD, NEW DELHI
Annexure-B- ANNEXURE-B-COLLABORATION AGREEMENT
COLLABORATION AGREEMENT
Yes
ATTACHED
No
Yes
Yes







12023.07 Lakhs
1986 Lakhs
5492.90 Lakhs
670.38 Lakhs
3873.79 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3857.2
3CONSTRUCTION OF ROADS3595
4PAVEMENTS1282
5PARKS AND PLAYGROUNDS2878.874
6GREEN BELTS670.878
7VEHICLE PARKINGS5703.15
8ELECTRICITY SUB-STATION926.845
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13COMMUNITY187.054
14CRECHE187.054
15COMMERCIAL946.187
Total20234.242




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCPYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS122.31SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM19SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE29SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM90SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL45SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING3SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING35SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS7SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE23.20SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM4SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL19.08SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER273.79SUBMITTED TO TOWN & COUNTRY PLANNING


NA (date)
09-11-2015 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type A4682.26969601
2APARTMENT/SHOPS/OTHER BUILDINGS Type 5024.3210310301
3APARTMENT/SHOPS/OTHER BUILDINGS Type 5024.3210310301
4APARTMENT/SHOPS/OTHER BUILDINGS Type 4634.13959501
5APARTMENT/SHOPS/OTHER BUILDINGS Type 3463.57717101
6APARTMENT/SHOPS/OTHER BUILDINGS Type 4634.13959501
7APARTMENT/SHOPS/OTHER BUILDINGS Type 4634.13959501
8APARTMENT/SHOPS/OTHER BUILDINGS Type 1185.708515101
9APARTMENT/SHOPS/OTHER BUILDINGS Type 5024.3210310301






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
BLOCK A96OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK B103OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK C103OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK D103OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK E95OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK F71OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK G95OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
BLOCK H95OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019
SHOPS51OCCUPATION CERTIFICATE OBTAINED ON 08.08.2019


01-08-2016
08-08-2019
08-08-2019
01-08-2016
100
08-08-2019
ATTACHED- OC OBTAINED ON 08.08.2019
ATTACHED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-08-2016
100
08-08-2019
ATTACHED- OC OBTAINED ON 08.08.2019
ATTACHED


0
29
0
460
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments5002.8
Shops106.33
Plots0
EDC Submitted579.79
Other Building383.77

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements122.31
Water Supply System19
Sewerage treatment & garbage disposal45
Electricity Supply System90
Storm Water Drainage29
Parks and Playgrounds7
Clubhouse/community centres23.20
Shopping area0
Other273.79
School19.08

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed761
ii. No. of Flats/ Apartments booked761
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter16104.05 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter15994.26 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter77.33 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter32.46 Lakhs
vii. Amount invested in the project upto the date of application12023.07 Lakhs
Land cost (If any)1986 Lakhs
Apartments5492.90 Lakhs
Infrastructure670.38 Lakhs
EDC/ Taxes Etc.579.79 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS122.31122.31
II. WATER SUPPLY SYSTEM1919
III. STORM WATER DRAINAGE2929
IV. ELECTRICITY SUPPLY SYSTEM9090
V. SEWAGE TREATMENT & GARBAGE DISPOSAL4545
VI. CLUB HOUSE/COMMUNITY CENTRE23.2023.20
VII. SCHOOL21.0821.08
VIII. ANY OTHER273.79273.79
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.77
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM3535
XVII. OTHER FACILITIES AS PER PROJECT REPORT77









Yes
Yes
YES BANK
010481400000073
YESB0000104
110532023
000104
Ankit Goel, Suncity Business Tower, 2nd Floor, Sector - 54, Golf Course Road,Gurgaon-122002, Haryana, India
Attached











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. OCCUPATION CERTIFICATE OF WHOLE LICENSEALREADY BEEN OBTAINED08-08-2019
II. LOIALREADY BEEN OBTAINED11-12-2013
III. LICENSEALREADY BEEN OBTAINED19-06-2015
IV. FOREST NOCALREADY BEEN OBTAINED11-08-2015
V. DC NOCALREADY BEEN OBTAINED01-10-2015
VI. BUILDING PLAN APPROVALALREADY BEEN OBTAINED09-11-2015
VII. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED01-07-2016
VIII. CONSENT TO ESTABLISHALREADY BEEN OBTAINED01-08-2016
IX. FIRE SCHEME APPROVALALREADY BEEN OBTAINED01-09-2016
X. SERVICE ESTIMATESALREADY BEEN OBTAINED26-04-2017
XI. WATER CONNECTIONALREADY BEEN OBTAINED27-02-2019
XII. ELECTRICAL PLAN APPROVALALREADY BEEN OBTAINED15-04-2019
XIII. STORM WATER CONNECTIONALREADY BEEN OBTAINED18-10-2019
XIV. SEWER CONNECTIONALREADY BEEN OBTAINED19-11-2019








Yes


Yes


attached -occupation certificate granted on 08.08.2019







SUNCITY AVENUE 76, SECTOR 76, GURUGRAM (REGISTRATION NO. 78 OF 2019 DATED 23.12.2019)
10
1464
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
18434.1100
Cost of the apartments10593.11077
Cost of the infrastructure3051.2900
Others costs4789.7100


0 Lakhs
0 Lakhs
10000 Lakhs
0 Lakhs
No
30-06-2024
30-06-2024










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
2WALL FINISHING DETAILSPAINT / CERAMIC TILES ABOVE COUNTER IN WASH ROOM
3KITCHEN DETAILSPAINT / CERAMIC TILES ABOVE COUNTER
4BATHROOM FITTINGSBROCHURE ATTACHED CROME PLATED FITTING, SANITARY WARES OF STANDARD MAKE
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESCOMPOSITE (ALUMINIUM & STEEL) WITH GLASS AND WOODEN
7GLASS WORKNA
8ELECTRIC FITTINGSCOPPER WIRING IN CONCEALED CONDUIT, MODULAR SWITCHES,OUTLETS & JUNCTIONS BOXES
9CONDUCTING AND WIRING DETAILSCOPPER WIRING IN CONCEALED CONDUIT
10CUPBOARD DETAILSNA
11WATER STORAGEUGT & OHT IN THE TOWER
12LIFT DETAILS2 NOS. IN EACH TOWER PROVIDED
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSCOMPOSITE (ALUMINIUM & STEEL) WITH GLASS
14DOORSHARD WOOD DOOR FRAME WITH FLUSH SHUTTER
14.1MAIN DOORSHARD WOOD DOOR FRAME WITH FLUSH SHUTTER
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITH FLUSH SHUTTER
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSCOPPER WIRING IN CONCEALED CONDUIT, MODULAR SWITCHES,OUTLETS & JUNCTIONS BOXES
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEPERMANENT EXTERNAL FINISH/TEXTURE PAINT (BROCHURE ATTACHED)
20INTERNAL FINISHINGPLASTER WITH OBD PAINT (BROCHURE ATTACHED)
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER WITH OBD PAINT
1 . 3 CEILINGPLASTER WITH OBD PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES
2 . 2 WALLSPLASTER WITH OBD PAINT
2 . 3 CEILINGPLASTER WITH OBD PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES
3 . 2 WALLSCERAMIC TILES UPTO 7 FEET
3 . 3 CEILINGPLASTER WITH OBD PAINT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSCROME PLATED FITTINGS, SANITARY WARE
3 . 6 FITTING/FIXTURESCROME PLATED FITTINGS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSPLASTER WITH OBD PAINT
4 . 3 CEILINGPLASTER WITH OBD PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORVITRIFIED TILES
5 . 2 WALLSCERAMIC TILES UPTO 7 FEET
5 . 3 CEILINGPLASTER WITH OBD PAINT
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSCROME PLATED FITTINGS, SANITARY WARE
5 . 6 FIXTURESCROME PLATED FITTINGS
6 . KITCHEN
6 . 1 FLOORCERAMIC /VITRIFIED TILES
6 . 2 WALLSPAINT / DADO 2 FEET ABOVE COUNTER
6 . 3 CEILINGPAINT / OBD
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESSTAINLESS STEEL SINK
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1CASH FLOW STATEMENT OF THE PROPOSED PROJECT26-11-2019 View Document
2A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS26-11-2019 View Document
3DEMARCATION PLAN26-11-2019 View Document
4COPY OF LICENSE ALONG WITH SCHEDULE OF LAND26-11-2019 View Document
5ZONING PLAN26-11-2019 View Document
6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT26-11-2019 View Document
7DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.26-11-2019 View Document
8SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN26-11-2019 View Document
9OCCUPATION CERTIFICATE26-11-2019 ------
10IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN26-11-2019 View Document
11DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD26-11-2019 View Document
12CONSENT TO ESTABLISH26-11-2019 ------
13IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN26-11-2019 View Document
14LETTER TO RERA FOR OCCUPATION CERTIFICATE SUBMISSION07-12-2019 ------
15AAI NOC04-02-2020 ------
16ENVIRONMENTAL CLEARANCE04-02-2020 ------
17LOI 5.00 ACRES04-02-2020 ------
18ELEVATION SECTION BLOCK E,G,H04-02-2020 ------
19SERVICE ESTIMATE APPROVAL LETTER04-02-2020 ------
20DRAINAGE & WATER SUPPLY04-02-2020 ------
21GROUND FLOOR BLOCK A04-02-2020 ------
22SEWER04-02-2020 ------
23DEMAND DRAFT DEFICIT AMOUNT04-02-2020 ------
24ELEVATION SECTION BLOCK B C D04-02-2020 ------
25LC-IV & IVA04-02-2020 ------
26BR - IIII04-02-2020 ------
27TYPICAL, TARRECE & AREA BLOCK B TO E & G, H04-02-2020 ------
28FIRE FIGHTING SCHEME APPROVAL04-02-2020 ------
29FOREST NOC04-02-2020 ------
30COMMERCIAL BLOCK04-02-2020 ------
31ELEVATION , SECTIONS CRECHE & COMMUNITY04-02-2020 ------
32GROUND FLOOR BLOCK F04-02-2020 ------
33LAYOUT 04-02-2020 ------
34LAYOUT PLAN & GREEN AREA04-02-2020 ------
35NO- ENCUMBRANCE CERTIFICATE04-02-2020 ------
36GROUND FLOOR BLOCK B TO E & G, H04-02-2020 ------
37CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT04-02-2020 View Document
38BOARD RESOLUTION FOR BANK04-02-2020 ------
39CASH FLOW STATEMENT04-02-2020 ------
40SERVICE ESTIMATE04-02-2020 ------
41ELEVATION SECTION BLOCK A04-02-2020 ------
42TYPICAL , TARRECE & AREA BLOCK F04-02-2020 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 OC uploaded 06-09-2023 View Document
2 Completion Certificate 05-08-2024 View Document