HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2173-2026
Submission Date : 27-02-2026 02:50:56 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDARPUR, SECTOR -28, GURUGRAM-122001
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
http://in.emaar.com/en
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 


 
 







EMAAR BUSINESS DISTRICT NEXT 114
VILLAGE BAGHERA, SECTOR 114 GURUGRAM
BADSHAHPUR ST
GURUGRAM
8448295834
8448295834 (Number Shared by Promoter in Public)
Coordination.in@emaar.ae
MANOJ SHARMA
8448295834
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
196101810-02-2026163000.00THE HONGKONG AND SHANGHAI BANKING CORPORATION LIMITEDHRERA Gurugram







0.68875 (Acre)
1.50
1.50
0.68875 (Acre)
175 of 2025 dated 18.09.2025 valid upto 17.09.2030
No
Address     EMAAR BUSINESS PARK, MG ROAD, SIKANDARPUR, SECTOR -28, GURUGRAM-122001
Address     EMAAR BUSINESS PARK, MG ROAD, SIKANDARPUR, SECTOR -28, GURUGRAM-122001
Annexure-B- COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT
Yes
LANDOWNERS AND THE DEVELOPER SHALL COMPLY WITH ALL THE REQUIREMENTS/CONDITIONS STIPULATED UNDER THE PROJECT APPROVAL, APPLICABLE DOCUMENTS AND APPLICABLE LAWS.
No
Yes
Yes







2816.90 Lakhs
1695.50 Lakhs
0 Lakhs
225.10 Lakhs
896.3 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0.23402
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 0.30018
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.04073
6GREEN BELTS 0
7VEHICLE PARKINGS 0.09381
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total0.66874




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS73.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM6.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE11.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM16.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL6.00AS PER PROJECT REPORT
6STREET LIGHTING6.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING6.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS26.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0AS PER PROJECT REPORT
15GST LC ESCALATION AND CONTINGENCY47.0AS PER PROJECT REPORT
16STP7.0AS PER PROJECT REPORT
17ELECTRIFICATION COST16.0AS PER PROJECT REPORT
18BOUNDARY WALL AND DEMARCATION AND SIGNAGE21.10AS PER PROJECT REPORT


19-09-2025 (date)
10-02-2026 (date)
01-04-2026
31-12-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 83.95 1
2 96.54 1
3 129.56 1
4 146.06 2
5 131.51 1
6 102.43 1
7 110.96 1
Total8


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots1864.52000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00.60.7
Water Supply System00.10.1
Sewerage treatment & garbage disposal0.10.10.1
Electricity Supply System000
Storm Water Drainage0.20.10.1
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
ELECTRIFICATION COST0.1

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.50.60.90.9
Water Supply System000.10.1
Sewerage treatment & garbage disposal000.10.1
Electricity Supply System0000
Storm Water Drainage0.10.10.10.1
Parks and Playgrounds0.30.40.30.3
Clubhouse/community centres0000
Shopping area0000
Other0000
STREET LIGHTING0.10.10.10.1
ELECTRIFICATION COST0.20.10.20.2
STP0.10.10.10.1
SECURITY AND FIRE FIGHTING0.10.10.10.1
BOUNDARY WALL DEMARCATION SIGNAGE0.20.30.30.2

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.80.70.40.4
Water Supply System00.100
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0.10.10.10
Parks and Playgrounds0.30.30.20.2
Clubhouse/community centres0000.1
Shopping area0000
Other0000
STREET LIGHTING0.10.100
STP00.100
SECURITY AND FIRE FIGHTING0.10.10.1
BOUNDARY WALL DEMARCATION SIGNAGE0.30.20.20.1
ELECTRIFICATION COST0.20.20.20.1

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.40.30
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds0.20.10.1
Clubhouse/community centres000
Shopping area000
Other000
STREET LIGHTING0.100
ELECTRIFICATION COST0.100
BOUNDARY WALL DEMARCATION SIGNAGE0.100.1












Yes
Yes
BARCLAYS BANK PLC, LEVEL 33, ALTIMUS, DR. G.M. BHOSLE MARG, WORLI, MUMBAI, 400018
041233668662
BARC0INBBMUM
400658002
BARC0INBBMUM
Mr. Kalyan Chakrabarti Yanmendra, Mr. Ashish Kumar Bagri, Mr. Rahul Bindle, Mr. Sanjeev Sharma, Mr. Rajeev Chaudhry, Mr. Mayank Sharma, Ms. Kavita Agarwal, Ms. Kiran Pandey, Mr. Mohit Gupta, Mr. Ankush Mittal, Mr. Nikhil Agarwal, Ms. Priyanka Goenka, Mr. Ashish Gehlot, Ms. Chinky Kindra, Mr. Swapnil Gupta
Attached











Yes
No
No
No
No
No
No
No
No
No


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 175 OF 2025ALREADY BEEN OBTAINED18-09-2025
II. LOIALREADY BEEN OBTAINED06-06-2025
III. APPROVAL OF STANDARD DESIGNALREADY BEEN OBTAINED10-02-2026








Yes


Yes


As per Draft







EMAAR BUSINESS DISTRICT 65 NXT
1.148
0
12
0
8
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
265501922
Cost of the apartments000
Cost of the infrastructure5310237
Others costs212401685


3205 Lakhs
14016 Lakhs
0 Lakhs
0 Lakhs
No
10-08-2027
10-08-2027




URBAN OASIS PHASE 1&2
6.64
424
0
424
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
69885698857106
Cost of the apartments59176591762747
Cost of the infrastructure000
Others costs1044104107


53237 Lakhs
128424 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2028
30-09-2029




EMAAR BUSINESS PARK 83
9.10625
0
116
0
59
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1874209028
Cost of the apartments54380353
Cost of the infrastructure5530553
Others costs1275108122


3205 Lakhs
14016 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2028
31-12-2028




EMAAR BUSINESS DISTRICT 75 A
4.55625
0
55
0
55
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
827906414
Cost of the apartments326101589
Cost of the infrastructure2770277
Others costs474104548


9331 Lakhs
19757 Lakhs
0 Lakhs
0 Lakhs
No
23-08-2027
23-08-2027




MARBELLA PHASE 2 SECTOR 65 & 66
66.059
0
501
0
137
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
434324343242880
Cost of the apartments000
Cost of the infrastructure000
Others costs653265326244


16462 Lakhs
858 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2027
31-12-2027




EMMAR BUSINESS DISTRICT 114 SECTOR 114 GURUGRAM
6.40625
0
86
0
80
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11286112869330
Cost of the apartments000
Cost of the infrastructure282228222538
Others costs426842682661


25103 Lakhs
719 Lakhs
0 Lakhs
0 Lakhs
No
11-03-2026
11-03-2026




EMAAR BUSINESS DISTRICT 99 SECTOR 99 GURUGRAM
3.26875
0
35
0
9
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
946394637177
Cost of the apartments000
Cost of the infrastructure18311831773
Others costs287628761671


3683 Lakhs
10319 Lakhs
0 Lakhs
7177 Lakhs
No
17-08-2026
17-08-2026




THE 88 SECTOR 112 GURUGRAM HARYANA
1.847
88
0
66
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1067401337
Cost of the apartments84410544
Cost of the infrastructure47047
Others costs2186546746


2934 Lakhs
10878 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2029
31-03-2029




EMAAR BUSINESS DISTRICT 114 NXT
11.40
0
139
0
138
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
20470013662
Cost of the apartments000
Cost of the infrastructure576502130
Others costs14705011532


33192 Lakhs
23689 Lakhs
0 Lakhs
0 Lakhs
No
23-08-2027
23-08-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 27-02-2026 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 27-02-2026 View Document
3 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 27-02-2026 View Document
4 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 27-02-2026 View Document
5 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 13-04-2026 View Document
6 STANDARD DESIGN 7 13-04-2026 ------
7 STANDARD DESIGN 6 13-04-2026 ------
8 RE-APPROVAL OF EP WITH UL FOR EBD114 13-04-2026 ------
9 LC-IV & LC-IVD_APPROVED BILATERIAL AGGREMENT_LC 4263B_ADDITIONAL LICENSE 0.65 ACRES 13-04-2026 ------
10 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 15-04-2026 View Document
11 STANDARD DESIGN 5 13-04-2026 ------
12 STANDARD DESIGN 4 13-04-2026 ------
13 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 13-04-2026 View Document
14 FOREST NOC 13-04-2026 ------
15 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 13-04-2026 View Document
16 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 13-04-2026 View Document
17 PERT CHART 13-04-2026 ------
18 STANDARD DESIGN 1 13-04-2026 ------
19 STANDARD DESIGN 2 13-04-2026 ------
20 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 13-04-2026 View Document
21 COLLABORATION AGREEMENT 13-04-2026 ------
22 REGISTRATION FEES DEMAND DRAFT 13-04-2026 ------
23 LOI EBD NEXT 114 13-04-2026 ------
24 AKS-SHAJRA 13-04-2026 ------
25 APPROVED LETTER FOR STANDARD DESIGN EBD NXT 114 13-04-2026 ------
26 BANK ACCOUNT 4(2)(L)(D) AFFIDAVIT 13-04-2026 ------
27 BANK UNDERTAKING 13-04-2026 ------
28 CA CERTIFICATE COST & EXPENDITURE 13-04-2026 ------
29 TREE CUTTING PERMISSION 13-04-2026 ------
30 NO LOAN AFFIDAVIT 13-04-2026 ------
31 JAMABANDI 13-04-2026 ------
32 STANDARD DESIGN 3 13-04-2026 ------