HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1813-2024
Submission Date : 01-12-2024 04:53:03 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM-122001
01244421155
9876888338 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 


 
 







URBAN ASCENT
SECTOR 112, GURUGRAM, HARYANA
GURGAON
GURUGRAM
01244421155
9876888338 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
MANOJ SHARMA
01244421155
9717776439 (Number Shared by Promoter in Public)
coordination.in@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
182448530-11-20246686500HSBC BANKHRERA Gurugram
286427518-12-20247552500HSBC BANKHRERA Gurugram







9.164 (Acre)
3.579
3.579
10.744 (Acre)
04 of 2013
No
Address     ADDRESS 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Address     S 306-308, SQUARE-ONE, C2,DISTRICTCENTRE,SAKET, NEWDELHI-110017
Annexure-B- ANNEXURE-B- COLLABORATOR
BY VIRTUE OF COLLABORATION AGREEMENT
No
THE DEVELOPER SHALL BE RESPONSIBLE FORCOMPLIANCE OF ALL TERMS & CONDITIONS OFLICENCE/CLU / PROVISIONS OF THE HARYANADEVELOPMENT AND REGULATIONS OF URBANAREAS ACT,1975 & RULESTHEREOF OR THEPUNJAB SCHEDULED ROAD &CONTROLLED; AREARESTRICTION OF UNREGULATED DEVELOPMENTACT,1963 & RULES THEREOF AS THE CASE MAY BE,TILL THE GRANT OF FINAL COMPLETIONCERTIFICATE TO THE COLONY OR RELIEVED OFTHE RESPONSIBILITY BY THE DTCP, HARYANA ORANY OTHER COMPETENT AUTHORITY, WHICHEVERIS EARLIER
No
Yes
Yes







238000 Lakhs
67260.13 Lakhs
127125.15 Lakhs
5176.98 Lakhs
38437.74 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.38
3CONSTRUCTION OF ROADS 2.13
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 3.79
6GREEN BELTS 0
7VEHICLE PARKINGS 0.67
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0.16
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.01
13CONSTRUCTION 0.63
14AREA UNDER COMMERCIAL UNIT 0.04
15AREA UNDER GATE HOUSE OR GUARD ROOM 0.004
16AREA UNDER TOWER DROP OFFS 0.250
17AREA UNDER BOUNDARY WALL 0.10
Total9.164




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYGMDAYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS611.22AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM637.83AS PER PROJECT REPORT
3STORM WATER DRAINAGE73.04AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM140.82AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL117.77AS PER PROJECT REPORT
6STREET LIGHTING131.42AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING110.08AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS142.93AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15RAIN WATER HARVESTING93.53AS PER PROJECT REPORT
16ELECTRICAL SUBSTATION570.46AS PER PROJECT REPORT
17ELECTRIFICATION COST 326.66AS PER PROJECT REPORT
18GST LC ESCALATION CONTINGENCY1332.88AS PER PROJECT REPORT
19PARKING440.72AS PER PROJECT REPORT
20STP293.84AS PER PROJECT REPORT
21UNDERGROUND WATER TANK153.78AS PER PROJECT REPORT


29-11-2024 (date)
29-11-2024 (date)
01-01-2025
30-11-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings93.0360
Apartment/Shops/Other Buildings131.3840
Apartment/Shops/Other Buildings144.3720
Apartment/Shops/Other Buildings144.151020
Apartment/Shops/Other Buildings114.503000
Apartment/Shops/Other Buildings153.44400
Apartment/Shops/Other Buildings153.442280
Apartment/Shops/Other Buildings172.881340
Apartment/Shops/Other Buildings17.69120
Apartment/Shops/Other Buildings17.53600
Apartment/Shops/Other Buildings17.4370
Apartment/Shops/Other Buildings17.56750
Apartment/Shops/Other Buildings16.9760
Apartment/Shops/Other Buildings11.03120
Apartment/Shops/Other Buildings11.15610
Apartment/Shops/Other Buildings7.09710
Apartment/Shops/Other Buildings9.21010
Apartment/Shops/Other Buildings13.72510
Apartment/Shops/Other Buildings14.12530
Apartment/Shops/Other Buildings13.68610
Apartment/Shops/Other Buildings13.55410
Apartment/Shops/Other Buildings13.35410





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2665.995331.981599.59
Shops000
Plots000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3732.398653.389308.794903.91
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments7806.109579.636578.086551.82
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments10621.844756.666356.265289.86
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments10070.912763.824468.363584.84
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2700.083399.90817.521481.80
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1481.802175.52197.40246.92
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Underground water tank7.6915.384.61
Electrification Cost16.3332.679.80
Electrical sub station28.5257.0517.11
Street Lighting0
Security and fire fighting0
Parking0
STP MEP PART14.6929.388.82
Rain water harvesting4.689.352.81

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30.5661.1218.3442.79
Water Supply System095.6719.1344.65
Sewerage treatment & garbage disposal017.663.538.24
Electricity Supply System00035.21
Storm Water Drainage010.962.195.11
Parks and Playgrounds00035.73
Clubhouse/community centres0000
Shopping area0000
Other0000
STP MEP PART20.5729.3814.6914.69
Electrification Cost16.3316.3316.3316.33
Electrical sub station28.5228.5228.5228.52
Rain water harvesting6.559.354.684.68
Underground water tank10.7615.387.697.69
Parking110.18
Security and fire fighting27.52
Street Lighting32.85

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements61.1230.5630.5630.56
Water Supply System63.7831.8931.8931.89
Sewerage treatment & garbage disposal11.785.895.895.89
Electricity Supply System14.087.047.047.04
Storm Water Drainage7.303.653.653.65
Parks and Playgrounds14.297.157.157.15
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking44.0722.0422.0422.04
Street Lighting13.146.576.576.57
Security and fire fighting11.015.505.505.50
STP MEP PART14.6914.6914.6914.69
Underground water tank7.697.697.697.69
Rain water harvesting4.684.684.684.68
Electrical sub station28.5228.5228.5228.52
Electrification Cost16.3316.3316.3316.33

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements30.5630.5630.5679.46
Water Supply System31.8931.8931.8982.92
Sewerage treatment & garbage disposal5.895.895.8915.31
Electricity Supply System7.047.047.0418.31
Storm Water Drainage3.653.653.659.50
Parks and Playgrounds7.157.157.1518.58
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground water tank19.9915.386.154.61
STP MEP PART38.2029.3811.758.82
Parking22.0422.0422.0457.29
Security and fire fighting5.505.505.5014.31
Street Lighting6.576.576.5717.08
Electrical sub station28.5228.5228.5228.52
Rain water harvesting12.169.353.742.81
Electrification Cost16.3316.3316.3316.33

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements61.1224.4518.3430.56
Water Supply System63.7825.5119.1331.89
Sewerage treatment & garbage disposal11.784.713.535.89
Electricity Supply System14.085.634.227.04
Storm Water Drainage7.302.922.193.65
Parks and Playgrounds14.295.724.297.15
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground water tank7.69000
Street Lighting13.145.263.946.57
Security and fire fighting11.014.403.305.50
Parking44.0717.6313.2222.04
STP MEP PART14.69000
Rain water harvesting4.68000
Electrical sub station28.5228.5228.5239.93
Electrification Cost16.3316.3316.3322.87












Yes
No
HSBC JMD REGENT SQUARE, DLF PHASE IL, GURGAON MEHRAULI ROAD, GURGAON
057122129905
HSBC0110005
110039005
4761
Rahul Bindle, Ashish Kumar bagri, Sanjeev Sharma, Madhuri Mehta, Rajeev Choudhary, Sujeet kumar, Himanshu Jain, Cheena Bhardwaj, Tanush Khandelwal, Mohit gupta, Riaz bari, Swapnil Gupta, Rahul Agarwal, Ankush Mittal, kalyan Chakrabarti, Sumil mathur, Jamal Majed Bin Theniyah, Haroon, Saeed Siddiqui, Emaar Business Park, Sector 28, Gurugram, Haryana











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCE NO. 04 OF 2013ALREADY BEEN OBTAINED18-02-2013
II. APPROVAL OF BUILDING PLAN BR-IIIALREADY BEEN OBTAINED29-11-2024
III. FOREST NOCALREADY BEEN OBTAINED23-07-2021
IV. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED24-12-2013
V. AAI NOCALREADY BEEN OBTAINED02-08-2023








Yes


Yes


As per Draft







MARBELLA PHASE 2, SECTOR 65&66; GURUGRAM
66.059
0
501
0
137
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
43432042880
Cost of the apartments000
Cost of the infrastructure000
Others costs653265326244


16462 Lakhs
858 Lakhs
0 Lakhs
42880 Lakhs
No
31-12-2027
31-12-2027




EMAAR BUSINESS DISTRICT (EBD) 99, SECTOR-99, GURUGRAM
3.26875
0
35
0
9
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
946394637177
Cost of the apartments000
Cost of the infrastructure18311831773
Others costs287628761671


3683 Lakhs
10319 Lakhs
0 Lakhs
7177 Lakhs
No
17-08-2026
17-08-2026




PALM HEIGHTS, SECTOR-77,GURUGRAM
5.5
297
0
297
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
200012000117408
Cost of the apartments179931799315238
Cost of the infrastructure808080
Others costs9869861149


38912 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2023
28-02-2024




EMMAR BUSINESS DISTRICT (EBD) 114, SECTOR-114, GURUGRAM
6.40625
0
86
0
80
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11286112869330
Cost of the apartments000
Cost of the infrastructure282228222538
Others costs426842682661


25103 Lakhs
719 Lakhs
0 Lakhs
9330 Lakhs
No
11-03-2026
11-03-2026




URBAN OASIS PHASE 1 & 2
6.64
424
0
424
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6988507106
Cost of the apartments5971602747
Cost of the infrastructure2680252
Others costs1044104107


53237 Lakhs
128424 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2028
30-09-2028




THE 88
1.847
88
0
66
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1067401337
Cost of the apartments84410544
Cost of the infrastructure47047
Others costs21860746


2934 Lakhs
10878 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2029
31-03-2029




EMAAR BUSINESS DISTRICT 75A
4.55625
0
55
0
55
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
827906414
Cost of the apartments326101589
Cost of the infrastructure2770277
Others costs474104558


9331 Lakhs
19757 Lakhs
0 Lakhs
0 Lakhs
No
23-08-2027
23-08-2027




EMMAR BUSINESS DISTRICT 83
9.10625
0
116
0
116
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1874209028
Cost of the apartments54380353
Cost of the infrastructure5530553
Others costs1275108122


3205 Lakhs
14016 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2028
31-12-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES/MARBLE/WOODEN FLOORING
2WALL FINISHING DETAILSTEXTURE PAINT / WHEATERSHIELD / OBD / SNOWSHEM OR EQUIVALENT
3KITCHEN DETAILSSS OR INDIAN STANDARD
4BATHROOM FITTINGSSS, INDIAN STANDARD
5WOOD WORK ETCGOOD QUALITY, STANDARD MAKE
6DOORS AND WINDOS FRAMESFLUSH DOOR, STANDARD MAKE
7GLASS WORKGOOD QUALITY, STANDARD MAKE
8ELECTRIC FITTINGS MODULAR SWITCHES
9CONDUCTING AND WIRING DETAILSPVC CONDUIT,
10CUPBOARD DETAILSMODULAR, STANDARD MAKE
11WATER STORAGENA
12LIFT DETAILS2/3/4 FLATS & LIFTS -3 NOS
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINIUM / UPVC
14DOORSFLUSH DOOR
14.1MAIN DOORSFLUSH DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGSPLIT/VRV OR EQUIVALENT SYSTEM
16ELECTRICAL FITTINGSLEGRAND / NORTHWEST/SCHNEIDER/HONEYWELL. ( MODELS WILL BE APPROVED IN CONSULTATION WITH ARCHITECT)
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYFTTH
19EXTERNAL FINISHING/COLOUR SCHEMEGOOD QUALITY, STANDARD MAKE
20INTERNAL FINISHINGGOOD QUALITY, STANDARD MAKE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILES/MARBLE/WOODEN FLOORING
1 . 2 WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
1 . 3 CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORTILES/WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
2 . 3 CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
2 . 4 MODULAR WARDROBESE
3 . MASTER TOILET
3 . 1 FLOORTILES
3 . 2 WALLSTILES/ PAINT
3 . 3 CEILINGPAINT/FALSE CEILING
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSSS INDIAN STANDARD
3 . 6 FITTING/FIXTURESINDIAN STANDARD
4 . BED ROOMS
4 . 1 FLOORTILES/WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
4 . 3 CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORTILES
5 . 2 WALLSTILES/ PAINT
5 . 3 CEILINGPAINT/FALSE CEILING
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESSS INDIAN STANDARD
6 . KITCHEN
6 . 1 FLOORTILES
6 . 2 WALLSPAINT/TILES
6 . 3 CEILINGPAINT
6 . 4 COUNTERSNA
6 . 5 FIXTURESSS / INDIAN STANDARD
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGPAINT
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORTILES
8 . 2 WALLS & CEILINGPAINT
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 30-11-2024 View Document
2 ENVIRONMENT CLEARANCE 30-11-2024 ------
3 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 30-11-2024 View Document
4 LOI 30-11-2024 ------
5 COPY OF LICENSE RENEWAL 30-11-2024 ------
6 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 30-11-2024 View Document
7 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 30-11-2024 View Document
8 ZONING PLAN 30-11-2024 View Document
9 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 30-11-2024 View Document
10 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 30-11-2024 View Document
11 DEMARCATION PLAN 30-11-2024 View Document
12 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 30-11-2024 View Document
13 SEWERAGE LAYOUT 09-01-2025 ------
14 REGISTRATION FEES DEMAND DRAFT 09-01-2025 ------
15 SITE PLAN SERVICES 09-01-2025 ------
16 ZONING PLAN 09-01-2025 ------
17 FOREST NOC 09-01-2025 ------
18 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 09-01-2025 View Document
19 BASEMENT 02 SERVICES PLAN 09-01-2025 ------
20 COMMUNITY BUILDING 2 CLUB FIRST FLOOR PLAN 09-01-2025 ------
21 ELEVATION 1,2 ,3 TOWER E AND F 4BHK TYPE 5 09-01-2025 ------
22 FIRST FLOOR PLAN AREA CALCULATION OF EWS AND SCHOOL 09-01-2025 ------
23 OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER D AND F 4 BHK TYPE 4 09-01-2025 ------
24 SECTIONS B B 09-01-2025 ------
25 GROUND COVERAGE AREA CALCULATION AND STILT FLOOR AREA CALCULATION TOWER B 3BHK TYPE 3 09-01-2025 ------
26 RAMP SECTIONS 09-01-2025 ------
27 REFUGE FLOOR PLAN AND FAR CALCULATION TOWER C 3 BHK TYPE 3 09-01-2025 ------
28 SITE PLAN ST01 09-01-2025 ------
29 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 09-01-2025 View Document
30 CA CERTIFICATE COST & EXPENSE 09-01-2025 ------
31 BASEMENT 01 PLAN 09-01-2025 ------
32 BASEMENT 02 PLAN 09-01-2025 ------
33 COMMUNITY BUILDING 2 CLUB ELEVATIONS 09-01-2025 ------
34 ELEVATION 1,2 ,3 TOWER D AND F 4BHK SMALL 09-01-2025 ------
35 GROUND COVERAGE AREA CALCULATION STILT FLOOR AREA CALCULATION TOWER F 4 BHK TYPE 4 09-01-2025 ------
36 REFUGE FLOOR PLAN AND FAR CALCULATION TOWER B 3 BHK TYPE 3 09-01-2025 ------
37 SITE PLAN ST06 09-01-2025 ------
38 STILT FLOOR PLAN TOWER A 3BHK TYPE 3 09-01-2025 ------
39 TYPICAL FLOOR PLAN AND FAR CALCULATION TOWER F 4 BHK TYPE 4 09-01-2025 ------
40 APPROVED BUILDING PLAN BR III 09-01-2025 ------
41 ASSURANCE FOR DOMESTIC WATER SUPPLY 09-01-2025 ------
42 BANK UNDERTAKING 09-01-2025 ------
43 CASH FLOWS STATEMENT 09-01-2025 ------
44 ENVIRONMENT CLEARANCE 09-01-2025 ------
45 LICENSE RENEWAL 09-01-2025 ------
46 MINING PERMISSION 09-01-2025 ------
47 PERMISSIONTREECUTTING 09-01-2025 ------
48 BUILDING SECTION TOWER D AND F 4BHK TYPE 4 09-01-2025 ------
49 TERRACE FLOOR PLAN AREA CALCULATION 09-01-2025 ------
50 TYPICAL FLOOR PLAN 2ND FLOOR TO 7TH FLOOR AND AREA CALCULATION OF UNIT TYPE 1 AND 2 09-01-2025 ------
51 GROUND COVERAGE AREA CALCULATION AND STILT FLOOR AREA CALCULATION TOWER D 4BHK TYPE 4 09-01-2025 ------
52 GROUND COVERAGE AREA CALCULATION STILT FLOOR FAR CALCULATION TOWER A 3BHK TYPE 3 09-01-2025 ------
53 OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER C 3BHK TYPE 3 09-01-2025 ------
54 SITE SECTION 09-01-2025 ------
55 POWER ASSURANCE THE 88 DT 09-01-2025 ------
56 SUPERIMPOSED SITE PLAN WITH SHIZRA 09-01-2025 ------
57 URBAN ASCENT LICENSE 09-01-2025 ------
58 AFFIDAVIT BANK ACCOUNT 42LD 09-01-2025 ------
59 FIRE LAYOUT 09-01-2025 ------
60 IRRGIATION LAYOUT 09-01-2025 ------
61 STORM WATER LAYOUT 09-01-2025 ------
62 WATER SUPPLY LAYOUT 09-01-2025 ------
63 AKS SIZRA 09-01-2025 ------
64 JAMABANDI 09-01-2025 ------
65 MUTATION 09-01-2025 ------
66 BASEMENT 01 AREA LINE DIAGRAM 09-01-2025 ------
67 BASEMENT 01 SERVICES PLAN 09-01-2025 ------
68 BASEMENT 02 AREA LINE DIAGRAM 09-01-2025 ------
69 BUILDING SECTION TOWER E 4BHK TYPE 5 09-01-2025 ------
70 COMMUNITY BUILDING 2 CLUB GROUND FLOOR PLAN 09-01-2025 ------
71 COMMUNITY BUILDING 2 CLUB PODIUM GROUND FLOOR PLAN 09-01-2025 ------
72 COMMUNITY BUILDING 2 CLUB PODIUM PLAN 09-01-2025 ------
73 COMMUNITY BUILDING 2 CLUB SECOND FLOOR PLAN 09-01-2025 ------
74 COMMUNITY BUILDING 2 CLUB SECTION 09-01-2025 ------
75 COMMUNITY BUILDING 2 CLUB TERRACE FLOOR PLAN 09-01-2025 ------
76 EWS ELEVATION A AND B 09-01-2025 ------
77 EWS ELEVATION C AND D 09-01-2025 ------
78 OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER E 4 BHK TYPE 5 09-01-2025 ------
79 GROUND COVERAGE AREA CALCULATION AND STILT FLOOR FAR CALCULATION TOWER C 3BHK TYPE 3 09-01-2025 ------
80 OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER B 3BHK TYPE 3 09-01-2025 ------
81 STILT FLOOR PLAN TOWER F 4BHK TYPE 4 09-01-2025 ------
82 EWS SECTIONS A A 09-01-2025 ------
83 GROUND COVERAGE CALCULATION AND STILT FLOOR AREA CALCULATION TOWER E 4BHK TYPE 5 09-01-2025 ------
84 GROUND FLOOR PLAN AND AREA CALCULATION OF SCHOOL AND EWS 09-01-2025 ------
85 GROUND FLOOR PLAN AND GROUND COVERAGE AREA CALCULATION 09-01-2025 ------
86 REFUGE FLOOR PLAN AND FAR CALCULATION TOWER E 4BHK TYPE 5 09-01-2025 ------
87 STILT FLOOR PLAN TOWER E 4BHK TYPE 5 09-01-2025 ------
88 TERRACE FLOOR PLAN TOWER E 4BHK TYPE 5 09-01-2025 ------
89 TYP FLOOR PLAN AND FAR CALCULATION TOWER E 4BHK TYPE 5 09-01-2025 ------
90 BUILDING SECTION TOWER A B C 3 BHK TYPE 3 09-01-2025 ------
91 ELEVATION 1 2 AND 3 TOWER A B C 3BHK TYPE 3 09-01-2025 ------
92 OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER A 3BHK TYPE 3 09-01-2025 ------
93 PHASING PLAN 09-01-2025 ------
94 REFUGE FLOOR PLAN AND FAR CALCULATION TOWER A 3 BHK TYPE 3 09-01-2025 ------
95 REFUGE FLOOR PLAN AND FAR CALCULATION TOWER D 4 BHK TYPE 4 09-01-2025 ------
96 REFUGE FLOOR PLAN AND FAR CALCULATION TOWER F 4 BHK TYPE 4 09-01-2025 ------
97 STILT FLOOR PLAN TOWER B 3BHK TYPE 3 09-01-2025 ------
98 STILT FLOOR PLAN TOWER C 3BHK TYPE 3 09-01-2025 ------
99 STILT FLOOR PLAN TOWER D 4BHK TYPE 4 09-01-2025 ------
100 TERRACE FLOOR PLAN TOWER A 3BHK TYPE 3 09-01-2025 ------
101 TERRACE FLOOR PLAN TOWER B 3BHK TYPE 3 09-01-2025 ------
102 TYPICAL FLOOR PLAN AND FAR CALCULATION TOWER D 4 BHK TYPE 4 09-01-2025 ------
103 NON ENCUMBERANCE CERTIFICATE 10-02-2025 ------
104 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 24-01-2025 View Document
105 AAI NOC 10-02-2025 ------
106 COLLABORATION AGREEMENTS 10-02-2025 ------
107 CONSTRUCTION WATER NOC 10-02-2025 ------
108 SITE PLAN GREEN AND SITE PLAN 10-02-2025 ------