HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1201-2022
Submission Date : 09-11-2022 06:32:06 PM
Applicant Type : Company
Project Type: NEW




WHITELAND CORPORATION PRIVATE LIMITED
10TH FLOOR,WORLDMARK TOWER, 1,MAIDAWAS, SECTOR - 65,GURUGRAM, HARYANA -122001
01246690100
9999977704 (Number Shared by Promoter in Public)
sumit@wlcorp.com
http://www.wlcorp.com
XXXX777B
U70109HR2021PTC092905
 
 


 
 


 
 







WHITELAND BLISSVILLE
SECTOR- 76
MANESAR
GURUGRAM
01246690100
9999977704 (Number Shared by Promoter in Public)
sumit@wlcorp.com
KRISHAN KUMAR
01246690100
9999977716 (Number Shared by Promoter in Public)
krishan.kumar@wlcorp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151936909-11-2022885631ICICI BANKHRERA Gurugram
251937009-11-2022335399ICICI BANKHRERA Gurugram







1.9256 (Acre)
2.64
2.64
7.3187 (Acre)
93 of 2022 Dated 12.07.2022
Yes







27798.67 Lakhs
3107.63 Lakhs
11367.64 Lakhs
626.52 Lakhs
12696.88 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD7792.705
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total7792.705




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNOT APPLICABLENo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS117.83SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM114.67SUBMITTED TO HUDA
3STORM WATER DRAINAGE103.94SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM16.85SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL98.80SUBMITTED TO HUDA
6STREET LIGHTING0SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING0SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS3.11SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER116.52SUBMITTED TO HUDA
15SEWER LINE WORK54.80SUBMITTED TO HUDA


12-07-2022 (date)
09-08-2022 (date)
01-01-2023
31-12-2026
Plot Area(In Square Meter)Number of plots in the project
147.78
121.6510
142.3371
148.0421
148.7531
145.3385


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings67.5682
Apartment/Shops/Other Buildings67.7282
Apartment/Shops/Other Buildings68.40246
Apartment/Shops/Other Buildings81.2841
Apartment/Shops/Other Buildings82.2741
Apartment/Shops/Other Buildings82.81164
Apartment/Shops/Other Buildings85.9141
Apartment/Shops/Other Buildings86.0241
Apartment/Shops/Other Buildings86.49287
Apartment/Shops/Other Buildings86.61164
Apartment/Shops/Other Buildings87.2910827





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments710.48710.48710.48710.48
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments710.48710.48710.48710.48
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments710.48710.48710.48710.48
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments710.48710.48710.48710.48
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other6.476.476.476.47
SEWER LINE WORK4.574.574.574.57

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage00017.32
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other6.476.476.476.47
SEWER LINE WORK4.574.574.574.57

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage17.3217.3217.3217.32
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other6.476.476.476.47
SEWER LINE WORK4.574.574.574.57

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements039.2839.2839.28
Water Supply System000114.67
Sewerage treatment & garbage disposal24.7024.724.724.7
Electricity Supply System00016.85
Storm Water Drainage17.32000
Parks and Playgrounds0003.11
Clubhouse/community centres0000
Shopping area0000
Other6.476.476.476.47












No
No
ICICI BANK LIMITED, UNIT NO. 2, GROUND FLOOR, SOLITAIRE, NEAR GURU- DRONACHARYA METRO STATION, MG ROAD, DLF PHASE III, GURUGRAM, HARYANA 122001
777705770501
ICIC0002451
110229222
002451
Sumit Chaudhary, Address-House No. 1965 Sector - 21 Near Alchemist Hospital, Panchkula - 134116
Yes











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. WATER SUPPLY LAYOUTALREADY BEEN OBTAINED17-10-2022
II. ZONING PLANALREADY BEEN OBTAINED05-08-2022
III. BUILDING PLANSALREADY BEEN OBTAINED09-08-2022
IV. LC-IVALREADY BEEN OBTAINED12-07-2022
V. ASSURANCE LETTER-DHBVNALREADY BEEN OBTAINED27-07-2022
VI. LICENSE NO. 93 OF 2022ALREADY BEEN OBTAINED12-07-2022
VII. STORM WATER LAYOUTALREADY BEEN OBTAINED12-10-2022
VIII. SEWERAGE LAYOUTALREADY BEEN OBTAINED13-10-2022
IX. ENVIRONMENT CLEARANCEAPPLIED FOR BUT YET TO RECEIVENA








Yes


Yes


Attached as annexure







URBAN CUBES 71, SECTOR - 71 GURGAON
2.65
0
34
0
22
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
284628461352
Cost of the apartments000
Cost of the infrastructure58158147
Others costs226522651305


3690 Lakhs
707 Lakhs
0 Lakhs
3685 Lakhs
No
31-12-2023
31-12-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVIRTRIFIED TILES/STONE (KAJARIA,SOMANY, NITCO OR EQUIVALENT)
2WALL FINISHING DETAILSPOP/PUTTY WITH ACRELIC EMULSION PAINT & OBD IN CELIING (ASIAN, BERGER OR EQUIVALENT)
3KITCHEN DETAILSVIRTRIFIED TILES(KAJARIA,SOMANY, NITCO OR EQUIVALENT), CERAMIC TILES/VITRIFIED TILES UPTO 2 FEET FROM COUNTER, OBD
4BATHROOM FITTINGSPREMIUM CP FITTINGS (JAQUAR, KOHLER, ROCA, HINDWARE OR EQUIVALENT)
5WOOD WORK ETCLAMINATED/FLUSH DOORS (ALPRO, NAYUR DOOR KING, JYOTI OR EQUIVALENT)
6DOORS AND WINDOS FRAMESRED MARANDI
7GLASS WORKN/A
8ELECTRIC FITTINGSHAVELLS OR ANCHOR ROMA OR EQUIVALENT, MCB (SCHNEIDER, HAVELLS OR SIEMENS OREQUIVALENT)
9CONDUCTING AND WIRING DETAILSPOLYPACK OR EQUIVALENT
10CUPBOARD DETAILSLAMINATED/VENEER FLUSH DOORS
11WATER STORAGEN/A
12LIFT DETAILSJOHNSON OR KONE OR OTTIS OR THYSSEN KRUPP EQUIVALENT
13EXTERNAL GLAZINGSUPVC ALUMINUM (FENESTA/ALUPLAST OR LOCALLY EQUIVALENT)
13.1WINDOWS/GLAZINGSUPVC ALUMINUM (FENESTA/ALUPLAST OR LOCALLY EQUIVALENT)
14DOORSLAMINATED/FLUSH DOORS (ALPRO, NAYUR DOOR KING, JYOTI OR EQUIVALENT)
14.1MAIN DOORSLAMINATED/FLUSH DOORS (ALPRO, NAYUR DOOR KING, JYOTI OR EQUIVALENT)
14.2INTERNAL DOORSLAMINATED/FLUSH DOORS (ALPRO, NAYUR DOOR KING, JYOTI OR EQUIVALENT)
15AIR CONDITIONINGVRV/VRF/SPLIT AC UNITS (DAIKIN OR LG OR SAMSUNG OR VOLTAS OR EQUIVALENT)
16ELECTRICAL FITTINGSHAVELLS OR ANCHOR ROMA OR EQUIVALENT, MCB (SCHNEIDER, HAVELLS OR SIEMENS OREQUIVALENT)
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT(ASIAN, BERGER OR EQUIVALENT)
20INTERNAL FINISHINGN/A
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVIRTRIFIED TILES/STONE (KAJARIA,SOMANY, NITCO OR EQUIVALENT)
1 . 2 WALLSCERAMIC TILES/VITRIFIED TILES(KAJARIA,SOMANY, NITCO OR EQUIVALENT)
1 . 3 CEILINGOBD PAINT /EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVIRTRIFIED TILES/STONE/ANTI SKID TILES (KAJARIA,SOMANY, NITCO OR EQUIVALENT)
2 . 2 WALLSEMULSION PAINT
2 . 3 CEILINGOBD PAINT /EMULSION PAINT
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORANTI SKID TILES (KAJARIA,SOMANY, NITCO OR EQUIVALENT)
3 . 2 WALLSCERAMIC TILES UPTO DOOR HEIGHT (KAJARIA,SOMANY, NITCO OR EQUIVALENT)
3 . 3 CEILINGOBD PAINT/EMULSION PAINT
3 . 4 COUNTERSN/A
3 . 5 SANITARY WARE/CP FITTINGSKOHLER, ROCA, HINDWARE OR EQUIVALENT, PVC & CPVC PIPE, DRAINAGE PIPE, WATER TAP PIPE LINE (SUPREME, ASTAL, FINOLEX OR EQUIVALENT)
3 . 6 FITTING/FIXTURESPREMIUM CP FITTINGS (JAQUAR, KOHLER, ROCA, HINDWARE OR EQUIVALENT), SINK (STEEL SINK-SINGLE BOWL WITH WASH BOARD)
4 . BED ROOMS
4 . 1 FLOORVIRTRIFIED TILES/STONE/ANTI SKID TILES(KAJARIA,SOMANY, NITCO OR EQUIVALENT)
4 . 2 WALLSEMULSION PAINT
4 . 3 CEILINGOBD/EMULSION PAINT
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORANTI SKID TILES (KAJARIA,SOMANY, NITCO OR EQUIVALENT)
5 . 2 WALLSGLAZED CERAMIC TILES/VITRIFIED TILES(KAJARIA,SOMANY, NITCO OR EQUIVALENT)
5 . 3 CEILINGOBD PAINT/EMULSION PAINT
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSKOHLER, ROCA, HINDWARE OR EQUIVALENT, PVC & CPVC PIPE, DRAINAGE PIPE, WATER TAP PIPE LINE (SUPREME, ASTAL, FINOLEX OR EQUIVALENT)
5 . 6 FIXTURESPREMIUM CP FITTINGS (JAQUAR, KOHLER, ROCA, HINDWARE OR EQUIVALENT), SINK (STEEL SINK-SINGLE BOWL WITH WASH BOARD)
6 . KITCHEN
6 . 1 FLOORVIRTRIFIED TILES(KAJARIA,SOMANY, NITCO OR EQUIVALENT)
6 . 2 WALLSCERAMIC TILES/VITRIFIED TILES UPTO 2 FEET FROM COUNTER
6 . 3 CEILINGOBD PAINT
6 . 4 COUNTERSMODULAR KITCHEN
6 . 5 FIXTURESN/A
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES/CERAMIC TILES (KAJARIA/NITCO/SOMANY)
7 . 2 WALLS & CEILINGEXTERNAL GRADE PAINT (ASIAN/BERGER OR EQUIVALENT)
7 . 3 TOILETN/A
7 . 4 BALCONYANTI SKID TILES
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN09-11-2022 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND07-11-2022 View Document
3DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD07-11-2022 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN07-11-2022 View Document
5DEMARCATION PLAN07-11-2022 View Document
6ZONING PLAN07-11-2022 View Document
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT07-11-2022 View Document
8CASH FLOW STATEMENT OF THE PROPOSED PROJECT09-11-2022 View Document
9CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT09-11-2022 View Document
10IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN09-11-2022 View Document
11LC-IV 24-11-2022 ------
12SERVICE PLAN ESTIMATE WATER SUPPLY LAYOUT24-11-2022 ------
13BUILDING PLAN- PLOT NO 7 9 11 13 15 17 1924-11-2022 ------
14BUILDING PLAN- PLOT NO 4724-11-2022 ------
15BUILDING PLAN- PLOT NO 3024-11-2022 ------
16BUILDING PLAN- PLOT NO 46 71 9624-11-2022 ------
17BUILDING PLAN- PLOT NO 11124-11-2022 ------
18BUILDING PLAN- PLOT NO 43 45 58 60 62 64 66 68 70 74 76 78 80 85 87 89 91 93 9524-11-2022 ------
19BUILDING PLAN- PLOT NO 23 27 29 33 37 3924-11-2022 ------
20SERVICE PLAN ESTIMATE ROAD LAYOUT24-11-2022 ------
21BUILDING PLAN- PLOT NO 8324-11-2022 ------
22BUILDING PLAN- PLOT NO 8224-11-2022 ------
23SERVICE PLAN ESTIMATE SEWERAGE LAYOUT24-11-2022 ------
24BUILDING PLAN- PLOT NO 3124-11-2022 ------
25BUILDING PLAN- PLOT NO 22 24 28 32 34 3824-11-2022 ------
26BUILDING PLAN- PLOT NO 524-11-2022 ------
27BUILDING PLAN- PLOT NO 42 44 57 59 61 63 65 67 69 73 75 77 79 81 84 86 88 90 92 9424-11-2022 ------
28BUILDING PLAN- PLOT NO 6 8 10 12 14 16 1824-11-2022 ------
29AFFIDAVIT- NO REQUIREMENT OF NOC FOR FOREST LAND DIVERSION AND POWER LINE SHIFITING24-11-2022 ------
30SERVICE PLAN ESTIMATE DRAINAGE LAYOUT24-11-2022 ------
31BUILDING PLAN- PLOT NO 26 3624-11-2022 ------
32BUILDING PLAN- PLOT NO 48 50 52 5424-11-2022 ------
33BUILDING PLAN- PLOT NO 25 3524-11-2022 ------
34BUILDING PLAN- PLOT NO 41 56 72 9724-11-2022 ------
35BUILDING PLAN- PLOT NO 49 51 5324-11-2022 ------
36BUILDING PLAN- PLOT NO 98 100 102 104 106 108 11024-11-2022 ------
37BUILDING PLAN- PLOT NO 99 101 103 105 107 10924-11-2022 ------
38SERVICE PLAN APPROVAL LETTER24-11-2022 ------
39DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.24-11-2022 View Document
40AFFIDAVIT- NO REQUIREMENT OF TREE CUTTING PERMISSION24-11-2022 ------
41BRS-III24-11-2022 ------
42A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS24-11-2022 View Document