HRERA GurugramTemp Project Id : RERA-GRG-PROJ-531-2019
Submission Date : 30-12-2019 10:36:56 AM
Applicant Type : Company
Project Type: ONGOING




SELENE CONSTRUCTIONS LIMITED
INDIABULLS HOUSE, 448-451, UDYOG VIHAR, PHASE-V, GURUGRAM, HARYANA
01246682892
9910005489 (Number Shared by Promoter in Public)
selene_cl_ghc@indiabulls.com
https://www.indiabullsrealestate.com/residential-projects/centrum-park
XXXX587K
U70109DL2006PLC151147
 
 


 
 


 
 


 
 


 
 







CENTRUM PARK
SECTOR-103, VILLAGE DAULTABAD, DISTRICT GURUGRAM, HARYANA
GURGAON
GURUGRAM
01246682892
9910005489 (Number Shared by Promoter in Public)
Selene_cl_ghc@indiabulls.com
NAVEEN YADAV
01246682892
9910575058 (Number Shared by Promoter in Public)
NAVEEN.YADAV@INDIABULLS.COM








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
127346631-07-20171173270HDFCHRERA Gurugram







89282.758 (Sqr/mtrs)
1.75
1.747
89282.758 (Sqr/mtrs)
252 of 2007 dated 2.11.2007 50 of 2011 dated 5.06.2011 63 of 2012 dated 19.06.2012
Yes







18856 Lakhs
2252 Lakhs
10252 Lakhs
3386 Lakhs
2966 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.54
3CONSTRUCTION OF ROADS1.74
4PAVEMENTS0.219
5PARKS AND PLAYGROUNDS2.82
6GREEN BELTS0.09
7VEHICLE PARKINGS0.686
8ELECTRICITY SUB-STATION0.64
9CLUB HOUSE0.4
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.131
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13SCHOOL0.2
Total7.466




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS194.66AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM179.86AS PER PROJECT REPORT
3STORM WATER DRAINAGE119.90AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM759.95AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL229.82AS PER PROJECT REPORT
6STREET LIGHTING19.48AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING249.80AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS2.52AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE954.85AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM9.74AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER290.89AS PER PROJECT REPORT
15STP89.93AS PER PROJECT REPORT
16UNDERGROUND WATER TANK59.95AS PER PROJECT REPORT
17RAIN WATER39.97AS PER PROJECT REPORT
18ELECTRIC SUB STATION185.03AS PER PROJECT REPORT


23-08-2013 (date)
23-08-2013 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type K1-3BED 11503635351
2APARTMENT/SHOPS/OTHER BUILDINGS Type K1-3 BED+S-12203737371
3APARTMENT/SHOPS/OTHER BUILDINGS Type K2-3BED 11503635351
4APARTMENT/SHOPS/OTHER BUILDINGS Type K2-3 BED+S-12203737371
5APARTMENT/SHOPS/OTHER BUILDINGS Type K3-3BED 11503736361
6APARTMENT/SHOPS/OTHER BUILDINGS Type K3-3 BED+S-12203636361
7APARTMENT/SHOPS/OTHER BUILDINGS Type L-2 BED+S-81.8802222221
8APARTMENT/SHOPS/OTHER BUILDINGS Type L-2 BED-77.8002221211
9APARTMENT/SHOPS/OTHER BUILDINGS Type L-2 BED-7801111
10APARTMENT/SHOPS/OTHER BUILDINGS Type L-2 BED+S-8201111






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
K1-3BED 11535100% COMPLETE
K1-3 BED+S-12237100% COMPLETE
K2-3BED 11535100% COMPLETE
K2-3 BED+S-12237100% COMPLETE
K3-3BED 11536100% COMPLETE
K3-3 BED+S-12236100% COMPLETE
L-2 BED+S-81.8822100% COMPLETE
L-2 BED-77.8021100% COMPLETE
L-2 BED-781100% COMPLETE
L-2 BED+S-821100% COMPLETE


08-01-2018
31-07-2018
31-07-2018
08-01-2018
100
31-07-2018


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
08-01-2018
100
31-07-2018


273
6
0
222
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements194.66
Water Supply System179.86
Sewerage treatment & garbage disposal229.82
Electricity Supply System759.95
Storm Water Drainage119.90
Parks and Playgrounds2.52
Clubhouse/community centres954.85
Shopping area0
Other410.54
Electrical sub station185.03
Rain water39.97
security249.80
Street Light19.48
Underground Water tank39.97

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Particulars Remarks, if any
i. No. of Flats/Apartments constructed265
ii. No. of Flats/ Apartments booked259
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter18841.21 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter17786.54 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter1054.66 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter283.93 Lakhs
vii. Amount invested in the project upto the date of application18854 Lakhs
Land cost (If any)2252 Lakhs
Apartments10252 Lakhs
Infrastructure3386 Lakhs
EDC/ Taxes Etc.2966 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS0194.66
II. WATER SUPPLY SYSTEM0179.86
III. STORM WATER DRAINAGE0119.90
IV. ELECTRICITY SUPPLY SYSTEM0759.95
V. SEWAGE TREATMENT & GARBAGE DISPOSAL0229.82
VI. CLUB HOUSE/COMMUNITY CENTRE0954.85
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM089.93
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.02.52
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM0249.80
XVII. OTHER FACILITIES AS PER PROJECT REPORT0605.06









Yes
Yes
AXIS BANK LTD, GROUND FLOOR & BASEMENT S.C.O NO. 29, SECTOR 31 - 32 A, URBAN ESTATE, GURGAON, HARYANA – 122001
917020056959397
UTIB0001359
110211099
001359
Mr. Vinay Dave,14th Floor, Tower 1, Indiabulls Finance Centre, Elphinstone West, Mumbai-400013
Yes











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCE APPROVALALREADY BEEN OBTAINED01-10-2013
II. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED02-08-2017
III. FIRE SCHEME APPROVALALREADY BEEN OBTAINED11-12-2013
IV. SERVICE PLAN ESTIMATES APPROVALALREADY BEEN OBTAINED01-01-2015
V. LICENSE APPROVALALREADY BEEN OBTAINED19-06-2012
VI. ZONING PLAN APPROVALALREADY BEEN OBTAINED20-06-2012
VII. BUILDING PLAN / SITE PLAN APPROVALALREADY BEEN OBTAINED23-08-2013








Yes


Yes


As per hrera













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE- CERAMIC/ VITRIFIED TILES - LAMINATED WOODEN FLOORING
2WALL FINISHING DETAILS- ACRYLIC EMULSION PAINT - OIL BOND DISTEMPER
3KITCHEN DETAILS- ANTISKID TILES AT FLOOR - CERAMIC TILE DADO WITH ACRYLIC EMULSION PAINT. - GRANITE COUNTER AND SS SINK WITH CP FITTINGS
4BATHROOM FITTINGS- ANTISKID TILES AT FLOOR - CERAMIC TILE DADO WITH ACRYLIC EMULSION PAINT. - CP FITTINGS CHINA WARE, MODULAR SWITCHES
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMES- UPVC DOORS AND WINDOWS - INTERNAL WOODEN FLUSH DOOR WITH VENEER
7GLASS WORK- UPVC
8ELECTRIC FITTINGS- MODULAR SWITCHES
9CONDUCTING AND WIRING DETAILS- ISI APPROVED
10CUPBOARD DETAILSNA
11WATER STORAGE- FINISHED INTERNALLY WITH TILES
12LIFT DETAILS- PASSENGER / SERVICE LIFTS PROVIDED
13EXTERNAL GLAZINGS- UPVC
13.1WINDOWS/GLAZINGS- UPVC
14DOORS- EXTERNAL UPVC - INTERNAL UPVC
14.1MAIN DOORS- WOODEN FLUSH DOOR
14.2INTERNAL DOORS- WOODEN FLUSH DOOR
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGS- MODULAR SWITCHES
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION FOR LV SERVICES PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER SHIELD PAINT.
20INTERNAL FINISHINGACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED / PREMIUM CERAMIC TILES
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGOIL BOND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGOIL BOND DISTEMPER
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI-SKID TILES
3 . 2 WALLSCOMBINATION OF CERAMIC TILES AND ACRYLIC EMULSION PAINT
3 . 3 CEILINGOIL BOND DISTEMPER
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSWALL MOUNTED WC, ABOVE COUNTER WASH BASINS,
3 . 6 FITTING/FIXTURESCP FITTING OF STANDARD MAKE.
4 . BED ROOMS
4 . 1 FLOORVITRIFIED / PREMIUM CERAMIC TILES
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGOIL BOND DISTEMPER
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI-SKID TILES
5 . 2 WALLSCOMBINATION OF CERAMIC TILES AND ACRYLIC EMULSION PAINT
5 . 3 CEILINGOIL BOND DISTEMPER
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSWALL MOUNTED WC, ABOVE COUNTER WASH BASINS
5 . 6 FIXTURESCP FITTING OF STANDARD MAKES
6 . KITCHEN
6 . 1 FLOORANTI-SKID TILES
6 . 2 WALLSCOMBINATION OF CERAMIC TILES AND ACRYLIC EMULSION PAINT
6 . 3 CEILINGOIL BOND DISTEMPER
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESWALL MOUNTED WC, ABOVE COUNTER WASH BASINS,
6 . 6 KITCHEN APPLIANCESSS SINK OF STANDARD MAKE.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI-SKID TILES
7 . 2 WALLS & CEILINGWEATHER SHIELD PAINT AND OIL BOND DISTEMPER
7 . 3 TOILET- ANTISKID TILES AT FLOOR - CERAMIC TILE DADO WITH OIL BOND DISTEMPER. - CP FITTINGS CHINA WARE
7 . 4 BALCONY- ANTISKID TILES AT FLOOR - WEATHER SHIELD PAINT ON WALLS AND OIL BOND DISTEMPER AT CEILING
8 . SIT-OUTS
8 . 1 FLOOR- ANTISKID TILES AT FLOOR
8 . 2 WALLS & CEILING- WEATHER SHIELD PAINT ON WALLS AND OIL BOND DISTEMPER AT CEILING
8 . 3 RAILINGS- MS RAILING
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1ELECTRICAL SCHEME30-12-2019 ------
2WATER SUPPLY30-12-2019 ------
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN30-12-2019 View Document
4BASEMENT PART 130-12-2019 ------
5STREET LIGHTING PLAN30-12-2019 ------
6TOWER K1 TO K3 SECTIONS30-12-2019 ------
7TOWER K1 TO K3 ELEVATION- 130-12-2019 ------
8ZONING PLAN30-12-2019 View Document
9IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN30-12-2019 View Document
10ROAD30-12-2019 ------
11SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN30-12-2019 View Document
12A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS30-12-2019 View Document
13FIRE FIGHTING30-12-2019 ------
14TOWER K1 TO K3 - TYPICAL FLOOR P[LAN 30-12-2019 ------
15DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.30-12-2019 View Document
16TOWER L ELEVATIONS30-12-2019 ------
17NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT30-12-2019 View Document
18TOWER L SECTIONS30-12-2019 ------
19STORM WATER30-12-2019 ------
20DEMARCATION PLAN30-12-2019 View Document
21BASEMENT PART 230-12-2019 ------
22COPY OF LICENSE ALONG WITH SCHEDULE OF LAND30-12-2019 View Document
23CASH FLOW STATEMENT OF THE PROPOSED PROJECT30-12-2019 View Document
24TOWER L - TYPICAL FLOOR PLAN30-12-2019 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 OC uploaded for Tower K1, K2, K3 and tower L 08-08-2023 View Document
2 OC uploaded 08-08-2023 View Document