HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1942-2025
Submission Date : 07-05-2025 03:04:17 PM
Applicant Type : Company
Project Type: NEW




SIGNATUREGLOBAL (INDIA) LIMITED
UNIT NO.101,GROUND FLOOR, TOWER-A, SIGNATURE TOWER SOUTH CITY-1, GURUGRAM, HARAYNA-122001
911244908200
9810899381 (Number Shared by Promoter in Public)
compliance@signatureglobal.in
Https://www.signatureglobal.in
XXXX807M
L70100DL2000PLC104787
 
 


 
 


 
 


 
 


 
 


 
 







CITY OF COLOURS NH-8 EXTN.-1
VILLAGE- SIDHRAWALI, GURUGRAM, HARYANA
MANESAR
GURUGRAM
911244908200
9810899381 (Number Shared by Promoter in Public)
compliance@sigantureglobal.in
RAVI AGGARWAL
911244908200
9520785681 (Number Shared by Promoter in Public)
compliance@signatureglobal.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
132020385807-05-2025245600ICICI BANKHRERA Gurugram
21202504020080589602-04-2025245600STANDARD CHARTERED BANK (RTGS NO.-SCBLR12025040200805896)HRERA Gurugram
31202504020080589702-04-2025245600STANDARD CHARTERED BANK (RTGS NO.-SCBLR12025040200805897)HRERA Gurugram







6.06875 (Acre)
1
1
135.725 (Acre)
38 of 2025 Dated25.03.2025 (InAddition toLicense No. 104 of2024 Dated01.08.2024)
No
Address     320,3RD FLOOR, EBLOCK,INTERNATIONALTRADE TOWER,NEHRU PLACE,NEW DELHI-110019
Annexure-B- COLLABORATOR
AS PER THE COLLABORATION AGREEMENT
Yes
AS PER THE COLLABORATION AGREEMENT
No
Yes
Yes







10934.57 Lakhs
7869.40 Lakhs
0 Lakhs
622.01 Lakhs
2443.16 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 1.17797
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0.03478
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13AREA IN INDUSTRIAL PLOTS 3.117
14AREA IN RESIDENTIAL PLOTS 1.739
Total6.06875




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNHAIYes
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVP (OWN ARRANGEMENT)No




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS172.64SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM69.19SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE50.65SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL68.65SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING23.30SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS3.90SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15MS CHARGES233.68SUBMITTED TO TOWN & COUNTRY PLANNING


25-03-2025 (date)
NA (date)
01-05-2025
31-12-2028
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 103.50 47
2 108 6
3 125.10 5
4 149.85 6
5 1149.254 1
6 1225.776 7
7 1442.48 2
Total74


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0005.18
Water Supply System00.692.083.46
Sewerage treatment & garbage disposal00.692.063.43
Electricity Supply System0000
Storm Water Drainage00.511.522.53
Parks and Playgrounds0000.12
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light0000.70

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements8.6317.2617.2617.26
Water Supply System3.466.926.926.92
Sewerage treatment & garbage disposal3.436.876.876.87
Electricity Supply System0000
Storm Water Drainage2.535.065.065.06
Parks and Playgrounds0.190.390.390.39
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light1.162.332.332.33

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17.2617.2617.2617.26
Water Supply System8.308.306.926.92
Sewerage treatment & garbage disposal8.248.246.876.87
Electricity Supply System0000
Storm Water Drainage6.086.085.065.06
Parks and Playgrounds0.390.390.390.39
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Light2.332.332.332.33

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17.2612.088.630
Water Supply System4.843.4600
Sewerage treatment & garbage disposal4.813.4300
Electricity Supply System0000
Storm Water Drainage3.552.5300
Parks and Playgrounds0.390.270.190
Clubhouse/community centres0000
Shopping area0000
Other0000
Ms Charges000233.68
Street Light2.331.631.16












Yes
No
STANDARD CHARTERED BANK LIMITED, DLF GURGAON BUILDING NO. 7A, GROUND FLOOR, DLF CYBER CITY, PHASE-3, SECTOR 24/25/25A, GURUGRAM, HARYANA-122002
53105138449
SCBL0036025
110036006
036025
Master collection account namely" SIGNATUREGLOBAL INDIA LTD CITY OF COLOURS NH8 EXTN.-1 COLLECTION A/C " will be operated by Mr. Pradeep Kumar Aggarwal and Lalit Aggarwal R/o Aashirwad, Palam Farm 6, Salahapur, Bijwasan, South West Delhi-110061
Attached











Yes
Yes
Yes
No
No
No
No
No
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED25-03-2025
II. LOIALREADY BEEN OBTAINED06-12-2024
III. LC-IVALREADY BEEN OBTAINED25-03-2025
IV. NHAI NOCALREADY BEEN OBTAINED25-04-2024
V. FOREST NOCALREADY BEEN OBTAINED29-02-2024
VI. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED19-02-2025
VII. WATER ASSURANCEALREADY BEEN OBTAINED26-11-2024
VIII. LAYOUT PLANALREADY BEEN OBTAINED25-03-2025
IX. ZONING PLAN ALREADY BEEN OBTAINED30-04-2025








Yes


Yes


Attached







SIGNATURE GLOBAL IMPERIAL,SECTOR 88A, GURUGRAM
8.93125
1141
0
1141
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23392.40012500.67
Cost of the apartments17929.1008770.09
Cost of the infrastructure20000
Others costs5263.3003730.58


16870.88 Lakhs
305644 Lakhs
0 Lakhs
0 Lakhs
No
28-02-2026
28-02-2026




SIGNATURE GLOBAL PRIME, SECTOR63A, GURUGRAM
5.74375
817
0
817
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17567.70017280.41
Cost of the apartments11825.26012334.90
Cost of the infrastructure599.25028.13
Others costs5143.1904917.38


21158.91 Lakhs
556430 Lakhs
0 Lakhs
0 Lakhs
No
28-04-2025
28-04-2025




GOLF GREEN 79, SECTOR 79,GURUGRAM
5.9125
934
0
934
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16816.27017131.02
Cost of the apartments10290010537.50
Cost of the infrastructure5000500
Others costs6026.2706093.52


20293.87 Lakhs
5689.66 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2024
31-07-2024




SIGNATURE GLOBAL SCO-36 SOHNA,SECTOR 36, SOHNA, GURUGRAM
5.21875
0
84
0
84
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6590.4105398.68
Cost of the apartments000
Cost of the infrastructure8230823.02
Others costs5767.4104575.66


9971.02 Lakhs
3953.13 Lakhs
0 Lakhs
0 Lakhs
No
28-06-2025
28-06-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 05-05-2025 View Document
2 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 05-05-2025 View Document
3 ASSURANCE SEWERAGE SIDHRAWALI 27-06-2025 ------
4 WATER PLAN 27-06-2025 ------
5 DTCP RECEIVING FOR SUBMISSION OF BG 27-06-2025 ------
6 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 05-05-2025 View Document
7 STP ASSURANCES 27-06-2025 ------
8 COPY OF BG_SEP 27-06-2025 ------
9 DEMARCATION PLAN 05-05-2025 View Document
10 ZONING PLAN 05-05-2025 View Document
11 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 05-05-2025 View Document
12 DEMARCATION CUM ZONING APPROVAL LETTER 27-06-2025 ------
13 DRAFT BBA_RESIDENTIAL 27-06-2025 ------
14 FOREST NOC 27-06-2025 ------
15 IRRIGATION PLAN 27-06-2025 ------
16 BR FOR BANK OPERATIONS 27-06-2025 ------
17 SEP BOOKLET 27-06-2025 ------
18 DRAFT_CONVEYANCE DEED_INDUSTRIAL 27-06-2025 ------
19 COLLABORATION 141 ACRES SIDRAWALI 27-06-2025 ------
20 RAPAT ROJNAMCHA 27-06-2025 ------
21 DRAFT ALLOTMENT LETTER_INDUSTRIAL 27-06-2025 ------
22 ADDENDUM TO GPA 7.2833_SIDHRAWALI 27-06-2025 ------
23 DRINKING WATER ASSURANCE 27-06-2025 ------
24 BANK UNDERTAKING 27-06-2025 ------
25 GPA 3.66 ACRES_SIDHRAWALI 27-06-2025 ------
26 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 27-06-2025 View Document
27 CA CERTIFICATE FOR LAND COST AND COST INCURRED 27-06-2025 ------
28 COLLABORATION AGREEMENT-SIDHRAWALI-8.4821ACRES 27-06-2025 ------
29 NON ENCUMBRAINCE CERTIFICATE 27-06-2025 ------
30 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 27-06-2025 View Document
31 STROM WATER PLAN 27-06-2025 ------
32 JAMABANDI 27-06-2025 ------
33 DRAFT ALLOTMENT LETTER_RESIDENTIAL 27-06-2025 ------
34 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 27-06-2025 View Document
35 ELECTRICAL PLAN APPROVAL 27-06-2025 ------
36 DEMARCTAION CUM ZONING PLAN 27-06-2025 ------
37 RECYCLE FLUSHING WATER PLAN 27-06-2025 ------
38 SEWERAGE PLAN 27-06-2025 ------
39 LC-IV C 27-06-2025 ------
40 ADDENDUM TO CA 139.95 ACRES_SIDHRAWALI 27-06-2025 ------
41 SPA 141 ACRES SIDHRAWALI 27-06-2025 ------
42 NHAI NOC 27-06-2025 ------
43 ADDENDUM TO SPA 139.95 ACRES_SIDHRAWALI 27-06-2025 ------
44 ENVIRONMENTAL CLEARANCE 27-06-2025 ------
45 AKS SIJRA 27-06-2025 ------
46 ROAD AND PAVMENT PLAN 27-06-2025 ------
47 LOI 27-06-2025 ------
48 ADDENDUM TO CA 7.2833_SIDHRAWALI 27-06-2025 ------
49 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 27-06-2025 View Document
50 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 27-06-2025 View Document
51 MUTATION 3996,4002,4031,4033,4040,4041,4050 27-06-2025 ------
52 COLLABORATION AGREEMENT 3.6680ACRES_SIDHRAWALI 27-06-2025 ------
53 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 27-06-2025 View Document
54 LATEST TSR 27-06-2025 ------
55 AFFIDAVIT FOR NOC_S 27-06-2025 ------
56 AFFIDAVIT REGARDING POWERLINE SHIFTING 27-06-2025 ------
57 LC-IV 27-06-2025 ------
58 DRAFT APPLICATION FORM_INDUSTRIAL 27-06-2025 ------
59 DRAFT APPLICATION FORM_RESIDENTIAL 27-06-2025 ------
60 DRAFT BBA_INDUSTRIAL 27-06-2025 ------
61 DRAFT_CONVEYANCE DEED_RESIDENTIAL 27-06-2025 ------
62 GPA-8.4821ACRES-SIDHRAWALI 27-06-2025 ------