HRERA GurugramTemp Project Id : RERA-GRG-PROJ-402-2019
Submission Date : 19-01-2020 11:04:22 AM
Applicant Type : Company
Project Type: ONGOING




AMBIENCE PROJECTS AND INFRASTRUCTURE PVT. LTD.
L-4, GREEN PARK EXTN., NEW DELHI-110016
01126196284
7683026401 (Number Shared by Promoter in Public)
compliance@ambienceisland.com
http://www.ambiencecreacions.com
XXXX660R
U70101DL2010PTC209128
 
 


 
 


 
 


 
 


 
 







AMBIENCE CREACIONS
JWALA MILL ROAD, SECTOR-22, GURUGRAM
GURGAON
GURUGRAM
01126196284
8130380005 (Number Shared by Promoter in Public)
compliance@ambienceisland.com
SATISH KUMAR
01126196284
8130380005 (Number Shared by Promoter in Public)
compliance@ambienceisland.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
131756903-10-20171049500VIJAYA BANKHRERA Gurugram
265524830-07-2018784039ALLAHABAD BANKHRERA Gurugram







14.819 (Acre)
1.75
1.75
14.819 (Acre)
48 of 2012(11-05-2018)
Yes







246829 Lakhs
23151 Lakhs
105807 Lakhs
6703 Lakhs
111168 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS10649.603
3CONSTRUCTION OF ROADS8980.472
4PAVEMENTS2245.118
5PARKS AND PLAYGROUNDS12596.279
6GREEN BELTS2531.13
7VEHICLE PARKINGS2323
8ELECTRICITY SUB-STATION773.879
9CLUB HOUSE1234.20
10SEWAGE AND SOLID WASTE TREATMENT FACILITY332.990
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER19410.468
Total61077.139




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA DIV IIIYes
WATER SUPPLYHUDA DIV IIIYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDA DIV IIIYes
STORM WATER DRAINAGEHUDA DIV IIIYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS535YET TO BE PREPARED
2WATER SUPPLY SYSTEM309YET TO BE PREPARED
3STORM WATER DRAINAGE347YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM2293YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL133YET TO BE PREPARED
6STREET LIGHTING30YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING1517YET TO BE PREPARED
8PLAYGROUNDS AND PARKS175YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE1020YET TO BE PREPARED
10SHOPPING AREA25YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM30YET TO BE PREPARED
12SCHOOL100YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER189YET TO BE PREPARED


NA (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE A58.7512011464
2APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE B78.2811298144
3APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE C92231471847
4APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE D88.18201261753
5APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE E103.12330331
6APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE F125.61143291145
7APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE G282.161911819
8APARTMENT/SHOPS/OTHER BUILDINGS Type EWS18.74515301531






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
TYPE A114SUPER STRUCTURE IS COMPLETE IN ALL APARTMENTS
TYPE B98SUPER STRUCTURE IS COMPLETE IN ALL APARTMENTS
TYPE C47SUPER STRUCTURE COMPLETED SERVICES/FINISHING IN ADVANCE STAGES
TYPE D26SUPER STRUCTURE COMPLETED SERVICES/FINISHING IN ADVANCE STAGES
TYPE E0SUPER STRUCTURE COMPLETED SERVICES/FINISHING IN ADVANCE STAGES
TYPE F29SUPER STRUCTURE COMPLETED SERVICES/FINISHING IN ADVANCE STAGES
TYPE G1SUPER STRUCTURE COMPLETED SERVICES/FINISHING IN ADVANCE STAGES
EWS0SUPER STRUCTURE COMPLETED SERVICES/FINISHING IN ADVANCE STAGES


04-02-2014
31-03-2022
31-03-2022
10-01-2017
46
30-09-2021


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
10-01-2017
0
30-09-2021


1000
0
0
101
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments142302
Shops25
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements535
Water Supply System215
Sewerage treatment & garbage disposal16
Electricity Supply System435
Storm Water Drainage287
Parks and Playgrounds155
Clubhouse/community centres384
Shopping area25
Other32
Security and Fire Fighting413
Street Lighting30

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed859
ii. No. of Flats/ Apartments booked315
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter59585.36 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter15794.14 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter40665.87 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter40665.87 Lakhs
vii. Amount invested in the project upto the date of application246829 Lakhs
Land cost (If any)23151 Lakhs
Apartments105807 Lakhs
Infrastructure6703 Lakhs
EDC/ Taxes Etc.111168 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession1045 Lakhs
(a) In respect of existing allottees319.90 Lakhs
(b) In respect of rest of the project725.12 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
94711 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 94711 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS535535
II. WATER SUPPLY SYSTEM309215
III. STORM WATER DRAINAGE347287
IV. ELECTRICITY SUPPLY SYSTEM2293435
V. SEWAGE TREATMENT & GARBAGE DISPOSAL13316
VI. CLUB HOUSE/COMMUNITY CENTRE1020384
VII. SCHOOL1000
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM410
X. CLUBHOUSE1020384
XI. NEIGHBOURHOOD SHOPPING2525
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.175155
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM538142
XVII. OTHER FACILITIES AS PER PROJECT REPORT18932









Yes
Yes
AMBIENCE PROJECTS & INFRASTRUCTURE PVT. LTD.
00131100914178
PSIB0000013
110023005
000013
Raj Singh Gehlot











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED16-05-2012
II. ELECTRICAL LOAD AVAILABILITYALREADY BEEN OBTAINEDNA
III. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINEDNA
IV. CONSENT TO ESTABLISHALREADY BEEN OBTAINEDNA
V. MINING PERMISSION ALREADY BEEN OBTAINEDNA
VI. FIRE SCHEME APPROVAL ALREADY BEEN OBTAINEDNA
VII. SERVICES ESTIMATES AND PLANSALREADY BEEN OBTAINEDNA
VIII. FOREST NOCALREADY BEEN OBTAINED24-10-2013
IX. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINEDNA
X. HUDA CONSTRUCTION WATER NOCALREADY BEEN OBTAINEDNA
XI. RENEWAL LICENSEAPPLIED FOR BUT YET TO RECEIVENA
XII. GMDA/ HUDA/ MCG SERVICES CONNECTION PERMISSIONYET TO FILE FOR APPROVALNA
XIII. ELECTRICAL LOAD CONNECTION/ ENERGIZATION YET TO FILE FOR APPROVALNA
XIV. HSD STORAGE NOCYET TO FILE FOR APPROVALNA
XV. CONSENT TO OPERATE NOCYET TO FILE FOR APPROVALNA
XVI. OCCUPATION PERMISSION INCLUDING FIRE NOC, HSVP INTERNAL AND EXTERNAL SERVICES NOC, LIFT NOC, CHIEF ELECTRICAL ENGINEER NOC AND ANY OTHER REQUIRED APPROVALYET TO FILE FOR APPROVALNA








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEFLOORING DONE WITH ITALIAN / SPANISH / TURKISH MARBLE OF DYNA / PERLATO SISLIA / BOTTICINO / CREMA MARFIL OR EQUIVALENT QUALITY WITH DESIGNER PATTERNS
2WALL FINISHING DETAILSPAINTING WITH PLASTIC EMULSION
3KITCHEN DETAILSMODULAR KITCHEN WITH CHIMNEY, HOB & R.O.
4BATHROOM FITTINGSSINGLE LEVER C.P. FITTING HANS GROHE/JAGUAR OR EQUIVALENT.
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESUPVC WINDOW FRAMES & FLUSH DOORS WITH VENEER.
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR RANGE SWITCH/SOCKETS/MCB
9CONDUCTING AND WIRING DETAILSFIRE PROOF CONDUITING AND WIRE
10CUPBOARD DETAILSMODULAR WARDROBES.
11WATER STORAGEUNDERGROUND & OVERHEAD TANKS
12LIFT DETAILSHIGH SPEED ELEVATORS
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSUPVS WINDOW WITH 8MM THICK GLASS
14DOORSNA
14.1MAIN DOORSELEGANTLY DESIGNED FLUSH DOORS
14.2INTERNAL DOORSFLUSH DOORS WITH VENEER
15AIR CONDITIONINGDUCTABLE SPLIT A.C.
16ELECTRICAL FITTINGSMODULAR RANGE SWITCH/SOCKETS/MCB
17CNG PIPE LINENO
18PROVISION OF WIFI AND BROADBAND FACILITYWIRELESS INTERNET FACILITIES FOR ALL UNITS
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL WALLS IN TEXTURE PAINT
20INTERNAL FINISHINGPAINTING WITH PLASTIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORFLOORING DONE WITH ITALIAN / SPANISH / TURKISH MARBLE OF DYNA / PERLATO SISLIA / BOTTICINO / CREMA MARFIL OR EQUIVALENT QUALITY WITH DESIGNER PATTERNS
1 . 2 WALLSPAINTING WITH PLASTIC EMULSION
1 . 3 CEILINGPOP CEILING WITH LIGHT FIXTURES
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
2 . 2 WALLSPAINTING WITH PLASTIC EMULSION
2 . 3 CEILINGPOP CEILING WITH LIGHT FIXTURES
2 . 4 MODULAR WARDROBESMODULAR WARDROBES
3 . MASTER TOILET
3 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
3 . 2 WALLSWALLS WITH BLEND OF HIGH QUALITY GRANITE / TILES / ITALIAN MARBLE AND TEXTURE PAINT UP TO CEILING
3 . 3 CEILINGPOP CEILING WITH LIGHT FIXTURES
3 . 4 COUNTERSCOUNTERS IN GRANITE / IMPORTED MARBLE
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER C.P. FITTING HANS GROHE/JAGUAR OR EQUIVALENT
3 . 6 FITTING/FIXTURESCHINAWARE & WASHBASIN OF DURAVIT / VB / JAGUAR OR EQUIVALENT
4 . BED ROOMS
4 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
4 . 2 WALLSPAINTING WITH PLASTIC EMULSION
4 . 3 CEILINGPOP CEILING WITH LIGHT FIXTURES
4 . 4 WARDROBESMODULAR WARDROBES
5 . TOILET
5 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
5 . 2 WALLSWALLS WITH BLEND OF HIGH QUALITY GRANITE / TILES / ITALIAN MARBLE AND TEXTURE PAINT UP TO CEILING
5 . 3 CEILINGPOP CEILING WITH LIGHT FIXTURES
5 . 4 COUNTERSCOUNTERS IN GRANITE / IMPORTED MARBLE
5 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER C.P. FITTING HANS GROHE/JAGUAR OR EQUIVALENT
5 . 6 FIXTURESCHINAWARE & WASHBASIN OF DURAVIT / VB / JAGUAR OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
6 . 2 WALLSPAINTING WITH PLASTIC EMULSION
6 . 3 CEILINGPOP CEILING WITH LIGHT FIXTURES
6 . 4 COUNTERSCOUNTERS IN GRANITE
6 . 5 FIXTURESCOMPLETE MODULAR KITCHEN
6 . 6 KITCHEN APPLIANCESCHIMNEY, HOB, FRIDGE, MICROWAVE, R.O.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
7 . 2 WALLS & CEILINGPAINTING WITH PLASTIC EMULSION, POP CEILING WITH LIGHT FIXTURES
7 . 3 TOILETFITTING & FIXTURES OF INDIAN MAKES
7 . 4 BALCONYEXTERNAL WALLS IN TEXTURE PAINT, IMPORTED / INDIAN MARBLE / GRANITE
8 . SIT-OUTS
8 . 1 FLOORFLOORING DONE WITH IMPORTED MARBLE
8 . 2 WALLS & CEILINGEXTERNAL WALLS IN TEXTURE PAINT, IMPORTED / INDIAN MARBLE / GRANITE
8 . 3 RAILINGSEXTERNAL SS/MS RAILING
8 . 4 FIXTURESLIGHTS PROVIDED












Sr. No.Document DescriptionDate of Document UploadView Document
1DEMARCATION PLAN19-01-2020 View Document
2CASH FLOW STATEMENT OF THE PROPOSED PROJECT19-01-2020 View Document
3A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS19-01-2020 View Document
4DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.19-01-2020 View Document
5COPY OF LICENSE ALONG WITH SCHEDULE OF LAND19-01-2020 View Document
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT19-01-2020 View Document
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT19-01-2020 View Document
8DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD19-01-2020 View Document
9SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN19-01-2020 View Document
10IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN19-01-2020 View Document
11ZONING PLAN19-01-2020 View Document
12IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN19-01-2020 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 EXTENSION NO. 02 OF 2023 DATED 23.02.2023 15-06-2023 View Document