HRERA GurugramTemp Project Id : RERA-GRG-PROJ-379-2019
Submission Date : 24-12-2019 05:27:49 AM
Applicant Type : Company
Project Type: ONGOING




ATS REALWORTH PVT LTD
ATS TOWER, PLOT NO- 16, SECTOR 135, NOIDA-201305
0120711150
9643007884 (Number Shared by Promoter in Public)
Compliances@atsgreens.com
http://www.atsgreens.com
XXXX065F
U70109DL2012PTC243081
 
 


 
 


 
 


 
 







ATS GRANDSTAND PHASE -1
SECTOR 99A, VILLAGE- GOPALPUR, TEHSIL & DISTRICT GURUGRAM, STATE-HARYANA
GURGAON
GURUGRAM
01207111500
9910490800 (Number Shared by Promoter in Public)
compliances@atsgreens.com
MR ARUN THAKUR
01207111500
9910490800 (Number Shared by Promoter in Public)
arunthakur@atsgreens.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
123717814-07-20171826863KOTAK MAHINDRA BANKHRERA Gurugram







2.62 (Acre)
175
61.34
11.5875 (Acre)
37 of 2013 (02-06-2024)
No
Address     296, FOREST LANE. SAINK FARMS, NEB SARAI, NEW DELHI-110068
Annexure-B- IN VIEW OF THE DEVELOPMENT AGREEMENT ENTERED BETWEEN/AMONG THE PARTIED THE DEVELOPER, WE HAVE A RIGHT TO DEVELOPED THE PROJECT LAND, AS PER THE TERMS OF THE DEVELOPMENT AGREEMENT. IN THAT CAPACITY THE DEVELOPER HAS A RIGHT TO REGISTER THE PROJECT, AS PER RERA. THE DEVELOPER ALSO HAVE THE GPA IN ITS FAVOUR AUTHORISING THE DEVELOPER TO ACT ON BEHALF OF LAND OWNERS.
NO
Yes
ATTACHED
No
Yes
Yes







16485.41 Lakhs
3942.18 Lakhs
6133.94 Lakhs
5329.80 Lakhs
1079.49 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.292
3CONSTRUCTION OF ROADS0.387
4PAVEMENTS0.180
5PARKS AND PLAYGROUNDS0.049
6GREEN BELTS1.182
7VEHICLE PARKINGS0.517
8ELECTRICITY SUB-STATION0.012
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total2.619




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDANo
WATER SUPPLYHUDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDANo
STORM WATER DRAINAGEHUDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS59SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM100SUBMITTED TO HUDA
3STORM WATER DRAINAGE65SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM391SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL39SUBMITTED TO HUDA
6STREET LIGHTING90SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING64SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS76SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE88SUBMITTED TO HUDA
10SHOPPING AREA0SUBMITTED TO HUDA
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO HUDA
12SCHOOL0SUBMITTED TO HUDA
13HOSPITAL/DISPENSARY0SUBMITTED TO HUDA
14ANY OTHER162SUBMITTED TO HUDA


26-05-2014 (date)
26-05-2014 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 1* (TYPE-C, GROUND FLOOR) TOWER-2 & 3128.674222
2APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 2* ( TYPE-D) TOWER-2 & 389.5611634822
3APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 3* (TYPE-C) TOWER-2 & 399.0311683332






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENT TYPE 1* (TYPE-C, GROUND FLOOR) TOWER-2 & 32ATTACHED
APARTMENT TYPE 2* ( TYPE-D) TOWER-2 & 334ATTACHED
APARTMENT TYPE 3* (TYPE-C) TOWER-2 & 383ATTACHED


01-01-2018
28-05-2022
30-05-2026
01-04-2024
2
30-05-2026
ATTACHED
ATTACHED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-04-2024
0
30-05-2026


266
0
0
88
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments75.38
Shops0
Plots0
IDC or EDC605.60
Land Cost3864.88

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments39
Shops0
Plots0
IDC EDC3.65
Land Cost0.60

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments113113114114
Shops0000
Plots0000
IDC EDC10.7510.7210.8410.84
Land Cost1.751.751.771.77

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments112113114114
Shops0000
Plots0000
IDC EDC10.6310.7210.8410.84
Land Cost1.731.751.771.77

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments112113114114
Shops0000
Plots0000
IDC EDC10.6010.7210.8410.84
Land Cost1.731.751.771.77

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments112188206206
Shops0000
Plots0000
IDC EDC10.6017.7919.5619.56
Land Cost1.732.903.193.19

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments204204206371
Shops0000
Plots0000
EDC IDC19.3519.5635.15
land Cost3.16
Land Cost3.163.19
LAND COST5.73
IDC EDC19.35

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments423329332332
Shops0000
Plots0000
EDC IDC40.1331.1531.5031.44
Land Cost6.555.085.145.14

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments325160
Shops00
Plots00
EDC IDC30.8115.13
Land Cost5.032.47




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other75
Finance and marketing3997.97

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other3
Finance and marketing8.65

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other9999
Finance and marketing25.3925.3825.6725.66

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other9999
Finance and marketing25.1125.3825.6725.66

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other9999
Finance and marketing25.1125.3925.6625.67

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other9999
Finance and marketing25.1140.8544.7744.77

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System12151515
Sewerage treatment & garbage disposal0078
Electricity Supply System0000
Storm Water Drainage891010
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other9999
Finance and marketing48.4949.2551.2285.60

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11131313
Water Supply System1415150
Sewerage treatment & garbage disposal8880
Electricity Supply System72818282
Storm Water Drainage99100
Parks and Playgrounds0151818
Clubhouse/community centres0202222
Shopping area0000
Other9999
Finance and marketing113.43103.45105.6398.92

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements100
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System750
Storm Water Drainage00
Parks and Playgrounds186
Clubhouse/community centres222
Shopping area00
Other96
Finance and marketing95.0636.13












Particulars Remarks, if any
i. No. of Flats/Apartments constructed2
ii. No. of Flats/ Apartments booked119
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter2430.87 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter1998.35 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter432.52 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter432.52 Lakhs
vii. Amount invested in the project upto the date of application8618.60 Lakhs
Land cost (If any)3864.88 Lakhs
Apartments75.38 Lakhs
Infrastructure4072.74 LakhsOther Cost as per CA Certificate (Sep19)
EDC/ Taxes Etc.605.60 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession7866.81 Lakhs
(a) In respect of existing allottees4065.19 Lakhs
(b) In respect of rest of the project3801.62 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
25000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 8188.02 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS590
II. WATER SUPPLY SYSTEM1000
III. STORM WATER DRAINAGE650
IV. ELECTRICITY SUPPLY SYSTEM3910
V. SEWAGE TREATMENT & GARBAGE DISPOSAL390
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE880
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.760
XIII. COVERED PARKING110
XIV. OPEN PARKING120
XV. GARAGES00
XVI. SECURITY SYSTEM100
XVII. OTHER FACILITIES AS PER PROJECT REPORT28475









Yes
Yes
YES BANK LTD. SECTOR 18 NOIDA
001480200001177
YESB0000014
110532021
000085
Pritam Kumar Jha, ATS Tower Plot No - 16 Sector -135, Noida, 201305
Attached











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
No
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. AAIALREADY BEEN OBTAINED18-09-2013
II. HARYANA STATE POLLUTION BOARDALREADY BEEN OBTAINED29-10-2016
III. FOREST (NOC)ALREADY BEEN OBTAINED27-12-2013
IV. BUILDING PLAN APPROVALALREADY BEEN OBTAINED26-05-2014
V. ENVIRONMENT CLEARANCE ALREADY BEEN OBTAINED29-05-2014
VI. FIRE SCHEME APPROVAL REPORTALREADY BEEN OBTAINED27-11-2014
VII. FRESH WATER ALREADY BEEN OBTAINED29-11-2013
VIII. NBWL CLEARANCE ALREADY BEEN OBTAINED11-03-2014
IX. POWER LOAD ALREADY BEEN OBTAINED27-11-2013
X. RELEASE OF SEWAGE TREATED WATER FOR CONSTRUCTION ALREADY BEEN OBTAINED09-09-2013
XI. REQUEST LETTER FOR HASTA FOR ADDITIONAL LICENSEALREADY BEEN OBTAINED08-07-2016
XII. STP UNDERTAKING ALREADY BEEN OBTAINED09-09-2013
XIII. UNDERTAKING FOR DHBVN POWER LOADALREADY BEEN OBTAINED27-11-2013








Yes


Yes


GIST Attached













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES FLOORING IN LIVING, DINING & LOBBY WOODEN/ VITRIFIED TILES FLOORING IN BEDROOMS VITRIFIED TILES IN KITCHEN, UTILITY & SERVANT ROOM AND CERAMIC TILES IN TOILETS. BALCONIES WILL BE IN ANTI-SKID CERAMIC FLOORING
2WALL FINISHING DETAILSGLAZED TILES OF REQUIRED HEIGHT IN TOILETS & 600MM HEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATE COLOUR & PAINT
3KITCHEN DETAILSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE, ELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, WASHING MACHINE & FRIDGE TO BE PROVIDED. KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
4BATHROOM FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN ENTRANCE DOORS – PLYWOOD FRAMES WITH POLISHED VENEER ON TOP. ALL INTERNAL DOORS-LAMINATED PLYWOOD FRAMES . WINDOW FRAMES AND WINDOW PANELS OF ALUMINIUM/ UPVC SECTIONS.
7GLASS WORKNA
8ELECTRIC FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
9CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSLIFTS TO BE PROVIDED FOR ACCESS TO ALL FLOORS FROM COMMON LOBBY
13EXTERNAL GLAZINGSREFER SR NO 13.1
13.1WINDOWS/GLAZINGSWINDOW PANELS OF SEASONED HARDWOOD/ALUMINIUM/ UPVC SECTIONS. ALL HARDWARE IN POWDER COATED ALUMINIUM. SIZE AND SECTION AS PER DESIGN OF THE ARCHITECT
14DOORSREFER SR NO 14.1 AND 14.2
14.1MAIN DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED; STAINLESS STEEL/ BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKES
14.2INTERNAL DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION OF FTTH NETWORK
19EXTERNAL FINISHING/COLOUR SCHEMEAPPROPRIATE FINISH OF TEXTURE PAINT OF EXTERIOR GRADE WATER PROOF PAINT
20INTERNAL FINISHINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS & CEILINGS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER WITH OBD
1 . 3 CEILINGPLASTER WITH OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FLOORING/VITRIFIED TILES
2 . 2 WALLSPLASTER WITH OBD
2 . 3 CEILINGPLASTER WITH OBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES
3 . 2 WALLSGLAZED TILES
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
3 . 6 FITTING/FIXTURESPREMIUM CHROME PLATED FITTINGS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSPLASTER WITH OBD
4 . 3 CEILINGPLASTER WITH OBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSGLAZED TILES
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5 . 6 FIXTURESPREMIUM CHROME PLATED FITTINGS
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSGLAZED TILES 600MM HEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATE COLOUR & PAINT
6 . 3 CEILINGPLASTER WITH OBD
6 . 4 COUNTERSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
6 . 5 FIXTURESELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES IN UTILITY & SERVANT ROOM
7 . 2 WALLS & CEILINGPLASTER WITH OBD
7 . 3 TOILETGLAZED TILES OF REQUIRED HEIGHT IN TOILETS & CERAMIC TILES IN TOILETS FOR FLOORING
7 . 4 BALCONYBALCONIES WILL BE IN ANTI SKID CERAMIC FLOORING
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD12-12-2019 View Document
2SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN12-12-2019 View Document
3CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT24-12-2019 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT24-12-2019 View Document
5ZONING PLAN12-12-2019 View Document
6GIST OF THE IMPORTANT PROVISIONS OF THE AGREEMENT28-01-2021 ------
7COPY OF LICENSE ALONG WITH SCHEDULE OF LAND12-12-2019 View Document
8IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN12-12-2019 View Document
9DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.12-12-2019 View Document
10IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN16-12-2019 View Document
11A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS12-12-2019 View Document
12CASH FLOW STATEMENT OF THE PROPOSED PROJECT16-12-2019 View Document
13BOARD RESOLUTION07-02-2020 ------
14ENCUMBRANCE DETAILS07-02-2020 ------
15SERVICE ESTIMATES07-02-2020 ------
16FIRE SCHEME APPROVAL REPORT07-02-2020 ------
17DEMARCATION PLAN07-02-2020 View Document
18LC-IV07-02-2020 ------
19BUILDING PLAN APPROVAL LETTER (BR-III)07-02-2020 ------
20APPROVED SITE PLAN PHASE-107-02-2020 ------
21ENVIRONMENT CLEARANCE APPROVAL07-02-2020 ------
22AIRPORT HEIGHT CLEARANCE07-02-2020 ------
23LOI07-02-2020 ------
24SERVICE PLAN APPROVAL LETTER07-02-2020 ------
25RENEWAL LICENSE 379-201917-02-2020 ------